LSSIP Year 2014 <STATE>
|
|
- Eileen Lewis
- 5 years ago
- Views:
Transcription
1 LSSIP Year 2014 <STATE> State can choose a personalised picture for the cover FP should send the State-personalised picture to the CP before 15 December Requirements for the picture to be as follows: rectangular shape, high resolution (300 dpi/21 cm width). In black normal text common text <In yellow what needs to be filled in> In yellow text guidance to help fill-in the document to be deleted afterwards in the LSSIPs In green Instructions for CPs/FPs In red text pending to be further updated in template and LSSIP documents
2 TEMPLATE CHANGE TRACKING No Change Rationale 1 Excecutive Summary Title of section State Context renamed with National ATM Context Avoid Confusion 2 Note added to Introduction to refer that Chapter 6 data is used for ICAO ASBU monitoring. 3 In CAA Deletion of Institutionally. Request from EASA to limit the choice only to functional and organizational as per SES Regulation. 4 In ATC System in use New row for Major Changes inserted 5 Deletion of Accident/Incident Investigation Body 6 Chapter 4 & 5 The national/fab project are managed via the LSSIP DB. Data (Reports from DB) will be exportable to MSWord and directly usable for integration in LSSIP Documents Regional Cooperation 2 new sub-chapters added: Regional Cooperation Initiative and Regional Projects 8 Chapter 6 Progress of PCP Pre-requisite and Facilitators - Optional diagram Clarification Request from EASA Input from LSSIP EG This part was developed mainly for the SRC Objectives which have been already closed. Additionally same information is gathered by EASA in their Questionnaire Part 2.5, 7.81 and To avoid duplication of work between LSSIP document (Chapters 4 & 5) and DB (National Projects) - Single source for National/FAB projects for links to Master Plan and avoid inconsistencies Clarification LSSIP Year 2014 Template Released Issue
3 FOREWORD - To be updated before Dec 2014 LSSIP Year 2014 Template Released Issue
4 DOCUMENT IDENTIFICATION SHEET LSSIP for <STATE> Infocentre Reference: <XX> Document Identifier Edition: Year 2014 LSSIP Year 2014 <STATE> Edition Date: <Date> LSSIP Focal Point - <NAME> < > < Stakeholder and function> LSSIP Contact Person - <NAME> < > Unit DPS/PEPR Status Intended for Working Draft General Public Draft Agency Stakeholders Proposed Issue Restricted Audience Released Issue Accessible via: Path: Internet ( Y:\06 Methods and Quality\3. Templates\LSSIP Templates\LSSIP Template 2014\LSSIP Template Year 2014_FINAL16Sept.doc LINKS TO REFERENCE DOCUMENTS 1 LSSIP Guidance Material 2 ESSIP Plan Edition ESSIP Report STATFOR Forecasts 5 Acronyms and abbreviations 6 European ATM Master Plan 7 LSSIP Documents 8 <National AIP> 9 <FAB Performance Plan> LSSIP Year 2014 Template Released Issue
5 APPROVAL SHEET One signature page As last year, in order to make the signature process more flexible to different national environments, two options for signature are provided: 1) One of the national regulatory authorities signs on behalf of all the involved stakeholders leaving the arrangements between the signatory authority and the national stakeholders to be decided at State level. If this option is selected, the national arrangements must ensure that a person at the appropriate level of each of the involved stakeholders provides written confirmation (e.g. , letter, etc.) to the signatory authority of the correctness of the information provided. 2) The traditional way in which, as in the previous years, each involved stakeholder signs the approval sheet. The following authorities have approved all parts of LSSIP Year 2014 document and their signature confirms the correctness of the reported information and reflects their commitment to implement the actions laid down in the European Single Sky ImPlementation (ESSIP) Plan. Edition Stakeholder / Organisation Name Position Signature Date LSSIP Year 2014 Template Released Issue
6 TABLE OF CONTENTS Executive Summary... 1 Introduction... 4 Chapter 1 - National ATM Environment Geographical Scope International Membership Geographical description of the FIR(s) Airspace Classification and Organisation National Stakeholders Civil Regulator(s) <ANSP(s)> Airports Military Authorities... 8 Chapter 2 - Traffic and Capacity Evolution of traffic in <State> ACC <XX> Traffic and en-route ATFM delays Performance summer Planning Period ACC <XY> Traffic and en-route ATFM delays Performance summer Planning Period Chapter 3 - ESSIP Report recommendations Chapter 4 - National Projects Chapter 5 - Regional Co-ordination FAB Co-ordination FAB Projects Regional cooperation Regional Cooperation Initiative Regional Projects Chapter 6 - ESSIP Objective Implementation ANNEXES LSSIP Year 2014 Template Released Issue
7 Executive Summary 1 National ATM Context <Highlight here any important change having occurred during the past year or foreseen for the planning period>. Traffic and Capacity <Executive summary relating to Traffic and Capacity including en-route and airports (major, selected or all airports) figures> ESSIP Objective Implementation <Summarise overall situation in the implementation of ESSIP Objectives in the State. Special focus should be put on: 1) Any problem in completing objectives due for ) Plans for completing objectives due for 2015 and 2016> Example: With regard to objectives due for the period , XXXX is late in implementing objective(s) XXXX which is/are planned to be completed by March 2015 due to a delay of XXXXX. The introduction of a new Voice Communication System was a major project, which was finalised by end of 2014 and contributed to the completion of objectives COM09, COM10 and COM11. The objectives ATC02.5, ATC02.5, ATC02.6 and ATC02.7 will be fully completed with the new ATM system upgrade which is foreseen in 2015: The objective SAF11 is currently in the planning stage and is envisaged to be completed by 2018: LSSIP State * FOC Date Planned implementation date (see legend at the bottom of the table) State-related ESSIP Objectives <= AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling [IDP] AOM19 Implement Advanced Airspace Management [IDP] AOM20 Implement ATS Route Network (ARN) - Version 7 AOM21 Implementation of Free Route Airspace [IDP] AOP03 Improve runway safety by preventing runway incursions [IDP] * ATC02.2 ATC02.5 ATC02.6 ATC02.7 Implement ground based safety nets - Short Term Conflict Alert (STCA) - level 2 Implement ground based safety nets - Area Proximity Warning - level 2 Implement ground based safety nets - Minimum Safe Altitude Warning - level 2 Implement ground based safety nets - Approach Path Monitor - level 2 ATC07.1 Implement arrival management tools ATC12 Implement automated support for conflict detection and conformance monitoring LSSIP Year 2014 Template 1 Released Issue
8 LSSIP State * FOC Date Planned implementation date (see legend at the bottom of the table) ATC15 Implement, in En-Route operations, information exchange mechanisms, tools and procedures in support of Basic AMAN operations [IDP] ATC16 Implement ACAS II compliant with TCAS II change 7.1 * ATC17 COM09 Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) [IDP] [IDP] * COM10 Migrate from AFTN to AMHS * COM11 Implementation of Voice over Internet Protocol (VoIP) in ATM * FCM01 Implement enhanced tactical flow management services FCM03 Implement collaborative flight planning [IDP] FCM04 Implementation of Short Term ATFCM Measures - phase 1 [IDP] FCM05 Implementation of interactive rolling NOP [IDP] INF04 Implement integrated briefing * INF07 ITY-ACID Electronic Terrain and Obstacle Data (TOD) Aircraft identification ITY-ADQ Ensure quality of aeronautical data and aeronautical information ITY-AGDL Initial ATC air-ground data link services above FL-285 [IDP] ITY-AGVCS2 ITY-COTR Implement air-ground voice channel spacing requirements below FL195 * Implementation of ground-ground automated co-ordination processes ITY-FMTP Apply a common flight message transfer protocol (FMTP) [IDP] * ITY-SPI Surveillance performance and interoperability * NAV03 Implementation of P-RNAV NAV10 Implement APV procedures [IDP] SAF10 Implement measures to reduce the risk to aircraft operations caused by airspace infringements * SAF11 Improve runway safety by preventing runway excursions * SRC-CHNG Implementation of Safety Oversight of Changes to ATM by National Supervisory Authorities (NSA) * SRC-RLMK Implement the EUROCONTROL Safety Regulatory Requirements (ESARRs) * SRC-SLRD Safety Levels and Resolution of Deficiencies * Airport-related ESSIP Objectives <= AOP01.2 AOP04.1 AOP04.2 Implement airside capacity enhancement method and best practices based on Eurocontrol capacity and efficiency implementation manual Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level1 Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level 2 * AOP05 Implement Airport Collaborative Decision Making (CDM) [IDP] * LSSIP Year 2014 Template 2 Released Issue
9 ENV01 Implement Continuous Descent Operations (CDO) techniques for environmental improvements [IDP] * ENV02 Implement Collaborative Environmental Management (CEM) at Airports * Understanding the Table Objective Completed Objective Partly Completed Objective Planned No Plan Missing Data Not Applicable (<State/Airport> does not participate in this obj.) Late NOTE: The year where the coloured box is placed indicates the Implementation Completion Date as stated in the ESSIP for each objective. The colour-code indicates the Local progress with respect to this date. LSSIP Year 2014 Template 3 Released Issue
10 Introduction The Local Single Sky ImPlementation documents (LSSIPs), as an integral part of the ESSIP/LSSIP mechanism, constitute a short/medium term implementation plan containing ECAC States actions to achieve the Implementation Objectives as set out by the ESSIP and to improve the performance of their national ATM System. The LSSIP document Year 2014 describes the situation in the State at the end of December The LSSIP documents are structured into 6 chapters to better differentiate the Stakeholder(s) accountable for the information contained in each of them: Chapter 1 provides an overview of the ATM institutional arrangements within the State, the membership of the State in various international organizations, the organizational structure of the main ATM players - civil and military - and their responsibilities under the national legislation. In addition, an overview of the Airspace Organization and Classification, the ATC Units, the ATM systems operated by the main ANSP are also provided in this chapter. Chapter 2 provides a comprehensive picture of the situation of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolution of Air Traffic and Delay in the last five years and the forecast for the next five years. It gives also the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level; Chapter 3 provides a set of recommendations extracted from the ESSIP Report which are relevant to the state/stakeholders concerned. The state reports how they have handled those recommendations and the actions taken during the year to address the concerns expressed by those recommendations; Chapter 4 provides a set of the main ATM national projects which contribute directly to the implementation of the ATM MP OIs and/or Enablers and ESSIP related Objectives. The description, timescale, progress made and expected contribution to the ATM Key Performance Areas are provided by the states per each project included in this chapter; Chapter 5 deals with the ATM Regional Coordination. It provides an overview of the FAB cooperation and Projects and also all other regional initiatives and Projects which are out of the FAB scope. The content of this chapter generally is developed and agreed in close cooperation between the states concerned; Chapter 6 contains high-level information on progress and plans of each ESSIP Objective. The information for each ESSIP Objective is presented in boxes giving a summary of the progress and plans of implementation for each Stakeholder. The conventions used are presented at the beginning of the section. Note: Chapter 6 is completed with a separate document called LSSIP Level 2. This document consists of a set of tables organised in line with the list of ESSIP Objectives. Each table contains all the actions planned by the four national stakeholders to achieve their respective Stakeholder Lines of Action (SLoAs) as established in the ESSIP. 2 Note: The information contained in Chapter 6 is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring. LSSIP Year 2014 Template 4 Released Issue
11 Chapter 1 - National ATM Environment <CP : Copy appropriate content of Chapter 1 of LSSIP Year Attention: Tables and have been updated.> <FP : Update here the content of Chapter 1 of LSSIP Year 2013> 1.1 Geographical Scope International Membership <State> is a Member of the following international organisations in the field of ATM: <CP: Updates: Deletion of European Common Aviation Area and JAA. Addition of ITU > Organisation Since ECAC <yyyy> EUROCONTROL <yyyy> European Union <yyyy> EASA <yyyy> ICAO <yyyy> NATO <yyyy> ITU Geographical description of the FIR(s) The geographical scope of this document addresses the <State> FIR(s): <Name of FIRS>. <State> FIRs is surrounded by FIRs of <Nr> States, namely <names of States and FIRs>. (non-ecac bordering states) Airspace Classification and Organisation Describe the current classification of the airspace, if possible also add chart (example below). 1.2 National Stakeholders The main National Stakeholders involved in ATM in <xxxx> are the following: - <xxxx>; - <xxxx>; - <xxxx>; - <xxxx>. LSSIP Year 2014 Template 5 Released Issue
12 Their activities are detailed in the following subchapters and their relationships are shown in the diagram below. <Diagram to be inserted here as per the example below. It should be the State diagram.> Civil Regulator(s) General information Civil Aviation in <XXX> is the responsibility of the <Ministry of Transport>. The different national entities having regulatory responsibilities in ATM are summarised in the table below. The <CAA> is further detailed in the following sections. <CP: Updates: Establishment of Tolerable Safety Levels and Safety Performance Monitoring deleted. Accident investigation added> Activity in ATM: Rule-making Safety Oversight Enforcement actions in case of non-compliance with safety regulatory requirements Airspace Economic Environment Security Organisation responsible Legal Basis Accident investigation If for any of the activities above there is more than one organisation responsible, please explain here who-does-what (is responsible for) <CAA/DGAC> Explain what type of organisation structure is in place for ATM regulation (Aviation Ministry, Ministry department, State s aviation office, Autonomous agency, Civil Aviation department, Civil Aviation authority, other). 3 Explain how it is separated from the ANSP (functionally, organisationally). Explain the relationship with the Ministry of Transport (or equivalent). Annual Report published: Y/N <If Y, add URL or provide full name/reference to the document.> NOTE 1: The Annual Report referred to in this table is not to be confused with the State SES Annual Report submitted to the European Commission, it refers to the Report produced to capture its annual activities. NOTE2: If the Annual Report covering 2013 activities is still under preparation, provide above information for the 2012 Report. <Give address of CAA/DGCA website> LSSIP Year 2014 Template 6 Released Issue
13 <Reference to organisation chart at annex> <ANSP(s)> <Fill-in table below for the main ANSP in the State> Name of the ANSP: Governance: <e.g. Joint Stock Company, State enterprise...> Services provided Y/N Comment Ownership: ATC en-route Y <if no, specify who provides the service(s)> ATC approach Y <if no, specify who provides the service(s)> ATC Aerodrome(s) Y <if no, specify who provides the service(s)> AIS Y <if no, specify who provides the service(s)> CNS Y <if no, specify who provides the service(s)> MET Y <if no, specify who provides the service(s)> ATCO training Y <if no, specify who provides the service(s)> Others Additional information: Provision of services in other State(s): Y Please specify (ex. Airport management) <if yes, specify which service(s), in which State> <e.g. 100% Ministry of Economy> Annual Report published: Y/N <If Y, add URL or provide full name/reference to the document.> This is the annual report covering yearly activities of the ANSP. <Give address of ANSP website> <Reference to organisation chart at annex> ATC system in use 4 Specify the manufacturer of the ATC system currently in use: Upgrade 1 of the ATC system is performed or planned? Replacement of the ATC system by the new one is planned? Year Year When you answer this question please refer to the systems and procedures for air traffic services, in particular flight data processing systems, surveillance data processing systems and human-machine interface systems. 1 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40)) LSSIP Year 2014 Template 7 Released Issue
14 ATC units Description of the ATC units providing the services and their areas of responsibility; Size of the ATC unit (maximum number of sectors); Service provided (en-route or TMA no more ref to TWR); The ATC units in the <States> airspace, which are of concern to this LSSIP are the following: ATC Unit Number of sectors Associated FIR(s) Remarks En-route TMA Airports General information Describe, in a few words, the general situation (ownership, number of airports in the State) of the airports Airport(s) covered by the LSSIP APO SloAs are contained in the following objectives: ENV, AOP, INF07, ITY-ADQ and SAF11. In addition to the Annex B of the ESSIP Plan edition 2014, it is up to the individual State to decide which additional airports will be reported through LSSIP for those objectives. <So the following airports are covered in this LSSIP:> <Voluntarily, any information for selected or all airports which considered as important for the traffic or capacity related issues within the state/fir(/fab?/region?) could be provided> Military Authorities The Military Authorities involved in ATM in <State> are composed of: - <xxxx>; - <xxxx>; They report to <the Ministry of Defence>. Their regulatory, service provision and user role in ATM are detailed below. <Reference to organisation chart at annex> Regulatory role Regulatory framework and rule-making OAT OAT and provision of service for OAT governed Y/N by national legal provisions? Level of such legal provision: <State Law, Ministerial Decree, Air Force Regulation, Other> Authority signing such legal provision: <Prime Minister, Minister of Defence, Chief of Air Force, Other> These provisions cover: Rules of the Air for OAT Organisation of military ATS for OAT OAT/GAT Co-ordination ATCO Training GAT Provision of service for GAT by the Military governed by national legal provisions? Y/N /NA Level of such legal provision: <State Law, Ministerial Decree, Air Force Regulation, Other> Authority signing such legal provision: <Prime Minister, Minister of Defence, Chief of Air Force, Other> These provisions cover: Organisation of military ATS for GAT OAT/GAT Co-ordination ATCO Training LSSIP Year 2014 Template 8 Released Issue
15 ATCO Licensing ANSP Certification ANSP Supervision Aircrew Training Aircrew Licensing Additional Information: <Add any clarification you feel necessary on the topics above> Means used to inform airspace users (other than military) about these provisions: National AIP National Military AIP EUROCONTROL eaip Other: <Specify> ATCO Licensing ANSP Certification ANSP Supervision ESARR applicability Additional Information:<Add any clarification you feel necessary on the topics above> Means used to inform airspace users (other than military) about these provisions: National AIP National Military AIP EUROCONTROL eaip Other: <Specify> Oversight OAT National oversight body for OAT: <name, > Additional information: < > GAT NSA (as per SES reg. 550/2004) for GAT services provided by the military: <name, specify if it is: - a military NSA, separated from the civil NSA (In this case, please explain in Additional information whether it is separated from service provision, - a Joint Civil-military NSA; - a Civil NSA> Additional information: < > Service Provision role Services Provided: En-Route OAT If not provided by MIL specify who does provide this service Services Provided: GAT En-Route Approach/TMA Approach/TMA Airfield/TWR/GND Airfield/TWR/GND AIS AIS MET MET SAR TSA/TRA monitoring FIS Other: <Specify> Additional Information: Additional Information: SAR Other: <Specify> Military ANSP providing GAT services SES certified? <Y/N > If YES, since: <Dd/mm/yy> Duration of the Certificate: Certificate issued by: <name of NSA> If NO, is this fact reported to the EC in accordance with SES regulations? Additional Information: User role xx years IFR inside controlled airspace, Military aircraft can fly? OAT only GAT only Both OAT and GAT If Military fly OAT-IFR inside controlled airspace, specify the available options: LSSIP Year 2014 Template 9 Released Issue
16 Free Routing Within the regular (GAT) national route network Within a special OAT route system Within specific corridors only Under radar control Under radar advisory service If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements: No special arrangements Exemption from Route Charges Exemption from flow and capacity (ATFCM) measures Provision of ATC in UHF CNS exemptions: RVSM 8.33 Mode S ACAS Others: <Specify> Flexible Use of Airspace (FUA) Military in <State> applies FUA requirements as specified in the Regulation No 2150/2005: FUA Level 1 implemented: Y/N FUA Level 2 implemented: Y/N FUA Level 3 implemented: Y/N Y/N LSSIP Year 2014 Template 10 Released Issue
17 Chapter 2 - Traffic and Capacity This section was coordinated and will be prepared by EUROCONTROL DNM/OPL (Operations Planning), agreed with the Specialists concerned in the State and provided to the CP. Estimated timings: - For capacity-constrained States information will be available after the visit (due to take place between November 2014 and January 2015). The schedule of the visits will be provided to the CPs (some States may have their meetings scheduled in January 2015 due to budgetary reasons.) - For the non capacity-constrained States information will be available by mid-december. A reference will be inserted at the beginning of the chapter pointing to information related to the methodology used for breaking down targets will be available. The same reference includes also clarifications and important definitions of terms used in the text. It will be articulated into the following sub-chapters: Evolution of traffic in <State> ACC <XX> Traffic and en-route ATFM delays Performance summer 2014 Planning Period ACC <XY> Traffic and en-route ATFM delays Performance summer 2014 Planning Period LSSIP Year 2014 Template 11 Released Issue
18 Chapter 3 - ESSIP Report recommendations <CP : To customise recommandations for the State> Recommendations issued from the ESSIP Report for 2013 applicable to XX (State) for all items that require corrective actions and improvements. Reference number Recommendation Ownership REC (1) Local Stakeholders that declared delays in implementation of FCM01 to take corrective measures to reduce the implementation delays. DK, EE, MAS, BE, LV, MK, CZ, CY, NO, AM, PT, BA, UA, TR, UK REC (2) Local Stakeholders that declared delays in implementation of SRC-RLMK to take corrective measures to reduce the implementation delays. UA, AZ, GE REC (3) Local Stakeholders that declared delays in implementation of SRC-SLRD to take corrective measures to reduce the implementation delays. UA, AZ, GE REC (4) Local Stakeholders that declared delays in implementation of AOP04.1 to take corrective measures to reduce the implementation delays. FR (LFMN), DE (EDDM), FR (LFLL), FR (LFML), GR (LGTS), BG (LBSF), GR (LGAV), IT (LIMC), IT (LIML), IT (LIPZ), IT (LIRF), FR (LFBO), BE (EBBR), DE (EDDL), UK (EGLL), PT (LPPT), ES (LEPA), RO (LROP), ES (LEBL), PL (EPWA), UA (UKBB) REC (5) Local Stakeholders that declared delays in implementation of SAF10 to take corrective measures to reduce the implementation delays. BE, BG, CZ, IE, ES, AZ, BA, LV, EE, MD, ME, MK, UA, GR, HR, HU, PT, TR, RS, SE, SI, AL REC (6) Local Stakeholders that declared delays in implementation of INF04 to take corrective measures to reduce the implementation delays. LU, BG, HR, BA, GR, DE, ES, PL, GE, RO, RS, FI, ME, HU, IT REC (7) Local Stakeholders that declared delays in implementation of NAV03 to take corrective ES, DE, BE, CY, BG, GE, LV, AZ, LSSIP Year 2014 Template 12 Released Issue
19 Reference number Recommendation Ownership measures to reduce the implementation delays. MD, ME, MK, MT, HR, IT, RS, UK REC (8) Local Stakeholders that declared delays in implementation of AOP03 to take corrective measures to reduce the implementation delays. CZ, AL, BA, GR, ME, HR, BE, HU, ES, MD, PT, RO, RS, RO, RS, LU, SI, UA REC (9) Local Stakeholders that declared delays in implementation of ATC02.2 to take corrective measures to reduce the implementation delays. IT, AL, BA, NL, MT, PL, ES, CZ, GE, TR REC (10) Local Stakeholders that declared delays in implementation of ENV01 to take corrective measures to reduce the implementation delays. BA (LQSA), EE (EETN), HR (LDZA), BE (EBBR), CZ (LKPR), BE (EBAW), BE (EBOS), BE (EBLG), IT (LIPZ), TR (LTBA), TR (LTAI), LU (ELLX), IT (LIRF), UK (EGPF), IT (LIMC), IT (LIML), NO (ENGM), RO (LROP) REC (11) Local Stakeholders that declared delays in implementation of ITY-AGDL to take corrective measures to reduce the implementation delays. AT, IT, PT, SK, SI, SE, NO, RS, ES, ME, FR, MT REC (12) Local Stakeholders that declared delays in implementation of ITY-ADQ to take corrective measures to reduce the implementation delays. IE, AL, AT, LT, CZ, SI, PT, NO, NL, FR, DE, ES, UK, HU REC (13) Local Stakeholders that declared delays in implementation of COM10 to take corrective measures to reduce the implementation delays. NO, HU, FR, AM, GR, EE, UA REC (14) Local Stakeholders that declared delays in implementation of FCM03 to take corrective measures to reduce the implementation delays. NO, UK, FR REC (15) Local Stakeholders that declared delays in implementation of ITY-COTR to take corrective measures to reduce the implementation delays. AT, BE, DE, DK, BA, ES, IT, FR, GE, MT, HR, HU, IE, NO, SK, LSSIP Year 2014 Template 13 Released Issue
20 Reference number Recommendation Ownership UK, PT, SI REC Ensure better planning reliability at local level. All States REC The ANSPs should ensure synchronised system evolution between neighbouring States. All ECAC ANSPs REC The ANSPs within a FAB should coordinate their system renewal and capability evolution more closely in order to deliver larger scale performance improvements to customers. FAB ANSPs LSSIP Year 2014 Template 14 Released Issue
21 Chapter 4 - National Projects 6 <The national/fab projects are managed via the LSSIP DB. Data (Reports from DB) will be exportable to MSWord and directly usable for integration in LSSIP Documents. CPs and FPs to review information in the DB for projects> Introduce the table with a sentence of your choice: e.g. The main projects currently ongoing in <State> are depicted in the table below. Organisations Name Code Description Implementation Planning <Name of the Organisation> Example ORO NAVIGACIJA <Name of the Project> Air-ground data link implement ation <Project Code, where applicable> L-CNS- 01/1-I/V-C <Short description / scope / objectives of the project> <Indicate whether the project is supported by EUROCONTROL> Entities providing communication services shall ensure that the ground communication systems and their constituents apply airground communications for CM and CPDLC data exchanges in compliance with Article 9 of Regulation (EC) No. 29/2009, allowing either ATN/VDL-2 or an alternative communication <Initiation / Implementation dates > EATM Links Status Performance Contribution 2 <List the ESSIP objectives or OI Steps/enablers which the project contributes to> EC Regulation: 29/2009; IDP WP 4 ATM Master plan: AUO 0301, OI IS- 040; ESSIP/LSSIP ITY-AGDL <Explain in briefly the progress made so far > New project, initiated. <Explain briefly the expected contribution of the project to the different KPAs (capacity, safety, cost-efficiency and environment)> Safety: Enhancement through the delivery of standard and unambiguous messages, the provision of a communications back up and the possibility of immediate message retrieval. Capacity: Increased capacity Cooperation Activities <Where applicable, include common activities (e.g. common procurement, sharing of resources, etc.) as part of the agreement among the participating organisations> 2 Capacity, safety, cost-efficiency and environment as defined in Recital 2 of Regulation (EU) No 691/2010. LSSIP Year 2014 Template 15 Released Issue
22 technology. ICAO ASBU: SPC03.01 OFA through both reduction of voice congestion and increase in controller efficiency. Cost effectiveness: Data link is a costeffective capacity increase enabler through sector productivity increase and delay cost savings. Security: not a significant issue, as Data-link is a complimentary initiative in support to voice. LSSIP Year 2014 Template 16 Released Issue
23 Chapter 5 - Regional Co-ordination 6 <The national/fab projects are managed via the LSSIP DB. Data (Reports from DB) will be exportable to MSWord and directly usable for integration in LSSIP Documents. CPs and FPs to review information in the DB for projects> 5.1 FAB Co-ordination Elaborate if the State is part of the FAB project. If yes, please elaborate in few sentences the status of FAB project that State participates. Include all other participating States. 5.2 FAB Projects Include all projects with FAB partners only. Organisations Name Code Description Implementation Planning <Name of the Organisation> <Name of the Project> <Project Code, where applicable> <Short description / scope / objectives of the project> <Indicate whether the project is supported by EUROCONTROL> <Initiation / Implementation dates > EATM Links Status Performance Contribution 3 <List the ESSIP objectives or OI Steps/enablers which the project contributes to> <Explain in briefly the progress made so far > <Explain briefly the expected contribution of the project to the different KPAs (capacity, safety, cost-efficiency and environment)> Cooperation Activities <Where applicable, include common activities (e.g. common procurement, sharing of resources, etc.) as part of the agreement among the participating organisations> 3 Capacity, safety, cost-efficiency and environment as defined in Recital 2 of Regulation (EU) No 691/2010. LSSIP Year 2014 Template 17 Released Issue
24 5.3 Regional cooperation In 5.3.1, specify any other regional cooperation initiative with one or more States other than those within your FAB, if applicable. In 5.3.2, Indicate if your State is involved in other regional or multi-state projects, beyond those belonging to the FAB project of your State Regional Cooperation Initiatives Regional Projects Organisations Name Code Description Implementation Planning <Name of the Organisation> <Name of the Project> <Project Code, where applicable> <Short description / scope / objectives of the project> <Indicate whether the project is supported by EUROCONTROL> <Initiation / Implementation dates > EATM Links Status Performance Contribution 4 <List the ESSIP objectives or OI Steps/enablers which the project contributes to> <Explain in briefly the progress made so far > <Explain briefly the expected contribution of the project to the different KPAs (capacity, safety, cost-efficiency and environment)> Cooperation Activities <Where applicable, include common activities (e.g. common procurement, sharing of resources, etc.) as part of the agreement among the participating organisations> 4 Capacity, safety, cost-efficiency and environment as defined in Recital 2 of Regulation (EU) No 691/2010. LSSIP Year 2014 Template 18 Released Issue
25 Chapter 6 - ESSIP Objective Implementation <CP to produce RTP008> Conventions Two colour codes are used for each ESSIP Objective box : o o one colour code is used to show the Objective Scope in the Objective ID cell, and another colour code is used to show the Objective Progress in the State and for each national stakeholder. Obj. ID (*) Obj. Title (By mm/yyyy of overall objective, inc non-state SloAs) Obj. Progress (**) State s high level progress statement REG (By:mm-yyyy) ASP (By:mm-yyyy) MIL (By:mm-yyyy) APO (By:mm-yyyy) REG high level progress statement ASP high level progress statement MIL high level progress statement APO high level progress statement State Impl. Date APO. Progress (**) APO Impl. Date ASP. Progress (**) ASP Impl. Date MIL. Progress (**) MIL Impl. Date APO. Progress (**) APO Impl. Date (*) Objective Scope Code: (**) Objective/Stakeholder Progress Code: ECAC Completed No Plan EU+ Partly Completed Not Applicable Multi-N Planned Missing Data APT Late LSSIP Year 2014 Template 19 Released Issue
26 AOM13.1 Xxx REG (By:12/2018) ASP (By:12/2018) MIL (By:12/2018) Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling (By:12/2018 ) Xxx Xxx Xxx Partly Completed mm/yyyy Partly Completed mm/yyyy Partly Completed mm/yyyy Partly Completed mm/yyyy LSSIP Year 2014 Template 20 Released Issue
27 <Progress of PCP Pre-requisite and Facilitators - Optional diagram> LSSIP Year 2014 Template 21 Released Issue
28 PCP pre-requisites, essential pre-requisites and facilitators ATC07.1 Arrival Management Tools ATC15 In En Route operations, information exchange mechanisms, tools and procedures in support of Basic AMAN operations NAV10 Approach Procedures with Vertical Guidance AOP04.1 A-SMGCS Level 1 AOP04.2 A-SMGCS Level 2 AOP05 Airport CDM AOM19 Advanced Airspace Management AOM21 Free Route Airspace ATC12 Automated support for conflict detection and conformance monitoring FCM05 Interactive rolling NOP ATC17 Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer FCM04 Short Term ATFCM Measures Phase 1 FCM03 Collaborative Flight Planning COM09 Migrate from X.25 to Internet Protocol FMTP Flight Message Transfer Protocol ADQ Aeronautical Data Quality AGDL - Air-Ground Data Link LSSIP Year 2014 Template 22 Released Issue
29 Annexes Annex A Specialists involved in the LSSIP Process <To be updated with the FP> LSSIP Co-ordination LSSIP Focal Point for <State> <.> <.> LSSIP Focal Point for <Stakeholder> <.> <.> <.> <.> <.> LSSIP Contact Person for <State> EUROCONTROL <.> ESSIP Objective Implementation ESSIP Objective EUROCONTROL Objective Owners AOM13.1 R. BUCUROIU, O. MROWICKI, E. REUBER EUROCONTROL PEPR Objective Coordinator A. DYBOWSKA <.> AOM19 G. ACAMPORA, O. MROWICKI A. DYBOWSKA <.> AOM21 R. BUCUROIU A. DYBOWSKA <.> AOP03 T. LICU P. VRANJKOVIC <.> AOP04.1 P. ADAMSON P. VRANJKOVIC <.> AOP04.2 P. ADAMSON P. VRANJKOVIC <.> AOP05 P. ADAMSON P. VRANJKOVIC <.> ATC02.2 B. BAKKER, S. DROZDOWSKI I. FEIJT <.> ATC02.5 B. BAKKER, S. DROZDOWSKI I. FEIJT <.> ATC02.6 B. BAKKER, S. DROZDOWSKI I. FEIJT <.> ATC02.7 B. BAKKER, S. DROZDOWSKI I. FEIJT <.> ATC07.1 P. CONROY, P. TERZIOSKI L. DELL ORTO <.> ATC12 P. TERZIOSKI L. DELL ORTO <.> ATC15 P. CONROY, P. TERZIOSKI L. DELL ORTO <.> ATC16 S. DROZDOWSKI L. DELL ORTO <.> ATC17 S. MORTON L. DELL ORTO <.> COM09 L. POPESCU O. ALFARO <.> COM10 Y. EYUBOGLU A. KOKONA <.> COM11 L. POPESCU A. KOKONA <.> ENV01 C. FABER B. HILL <.> ENV02 S. MAHONY, A. WATT B. HILL <.> FCM01 H. KOOLEN O. CIOARA <.> FCM03 S. SMIDT O. CIOARA <.> FCM04 M. RICHARD O. CIOARA <.> FCM05 N. AGACDIKEN O. CIOARA <.> INF04 P. MATERN A-P. FRANGOLHO <.> INF07 A. PETROVSKY A-P. FRANGOLHO <.> National Stakeholder Specialist(s) LSSIP Year 2014 Template 23 Released Issue
30 ESSIP Objective EUROCONTROL Objective Owners EUROCONTROL PEPR Objective Coordinator ITY-ACID A. DESMOND-KENNEDY O. CIOARA <.> ITY-ADQ M. UNTERREINER A-P. FRANGOLHO <.> ITY-AGDL S. DISSING A. KOKONA <.> ITY-AGVCS2 (TBD) O. ALFARO <.> ITY-COTR S. MORTON L. DELL ORTO <.> ITY-FMTP L. POPESCU O. ALFARO <.> ITY-SPI M. BORELY, R. STEWART O. CIOARA <.> NAV03 F. PAVLICEVIC A. KOKONA <.> NAV10 R. FARNWORTH A. KOKONA <.> SAF10 T. LICU I. FEIJT <.> SAF11 S. LAWRENCE I. FEIJT <.> SRC-RLMK M. DEBOECK A. DYBOWSKA <.> SRC-SLRD M. DEBOECK A. DYBOWSKA <.> National Stakeholder Specialist(s) LSSIP Year 2014 Template 24 Released Issue
31 Annex B National Stakeholders Organisation Charts <CP : Copy organisation charts from LSSIP Year 2013> Insert the different organisation charts LSSIP Year 2014 Template 25 Released Issue
32 Annex C Glossary of Abbreviations <CP : Copy Abbreviations from LSSIP Year 2013> Specific abbreviations for this State. LSSIP Year 2014 Template 26 Released Issue
LSSIP Year 2015 <STATE>
LSSIP Year 2015 State can choose a personalised picture for the cover FP should send the State-personalised picture to the CP before 15 December 2015. Requirements for the picture to be as follows:
More informationLSSIP Year Level 1 Implementation Overview. < what needs to be filled in>
LSSIP Year 2017 Level 1 Implementation Overview < what needs to be filled in> In yellow text guidance to help fill in the document to be deleted afterwards by FP In red text elements to be updated by CP
More informationLocal Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Bosnia - Herzegovina Infocentre Reference: 15/01/12-06 Document
More informationLocal Single Sky ImPlementation (LSSIP) MOLDOVA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) MOLDOVA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Moldova Infocentre Reference: 15/01/12-28 Document Identifier Edition: Year 2014
More informationLocal Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FYROM Infocentre Reference: 14/01/07-16 Document
More informationLocal Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for The Former Yugoslav Republic of Macedonia Infocentre
More informationLocal Single Sky ImPlementation (LSSIP) ARMENIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ARMENIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Armenia Infocentre Reference: 14/01/07-02 Document Identifier Edition: Year 2013
More informationSESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM
SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well
More informationLocal Single Sky ImPlementation (LSSIP) LITHUANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) LITHUANIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Lithuania Infocentre Reference: 16/01/29-76 Document Identifier Edition: Year
More informationLocal Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Bosnia Herzegovina Infocentre Reference: 16/01/29-58 Document Identifier
More informationLSSIP Year Level 1 Implementation Overview. < what needs to be filled in>
LSSIP Year 2018 Level 1 Implementation Overview < what needs to be filled in> In yellow text guidance to help fill in the document to be deleted afterwards by FP In red text elements to be updated by CP
More informationEUROCONTROL SPECIFICATIONS SYNOPSIS
EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification
More informationEuropean Single Sky ImPlementation
European Commission European Single Sky ImPlementation EUROCONTROL January 2013 - European Organisation for the Safety of Air Navigation (EUROCONTROL) This document is published by EUROCONTROL for information
More informationLocal Single Sky ImPlementation (LSSIP) ALBANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ALBANIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for ALBANIA Infocentre Reference: 14/01/07-01 Document Identifier Edition: Year 2013
More informationLocal Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2012 Level 1 DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for FYROM Infocentre
More informationLocal Single Sky ImPlementation (LSSIP) ROMANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Romania Infocentre Reference: 15/01/12-33 Document Identifier Edition: Year 2014
More informationLocal Single Sky ImPlementation (LSSIP) BULGARIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) BULGARIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Bulgaria Infocentre Reference: 15/01/12-07 Document Identifier Edition: Year
More informationLocal Single Sky ImPlementation (LSSIP) SERBIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) SERBIA Year 2012 Level 1 DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for SERBIA Infocentre Reference: 13/01/02-34 Document
More informationLocal Single Sky ImPlementation (LSSIP) LATVIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) LATVIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Latvia Infocentre Reference: 15/01/12-23 Document Identifier Edition: Year 2014
More informationSESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM
SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that
More informationAPPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION
RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationLocal Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FYROM Infocentre Reference: 16/01/29-68 Document
More informationYear 2011 Level 1 EUROCONTROL
Local Single Sky ImPlementation (LSSIP) THE FORMER UGOSLAV REPUBLIC OF MACEDONIA ear 2011 Level 1 EUROCONTROL DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for FROM Infocentre
More informationLocal Single Sky ImPlementation (LSSIP) IRELAND
EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Ireland 15/01/12-21 Document Identifier Edition: Year 2014 LSSIP Year 2014 Ireland
More informationLocal Single Sky ImPlementation (LSSIP) FINLAND
EUROCONTROL Local Single Sky ImPlementation (LSSIP) FINLAND Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Finland Infocentre Reference: 16/01/29-66 Document Identifier Edition: Year 2015
More informationLocal Single Sky ImPlementation (LSSIP) FINLAND
EUROCONTROL Local Single Sky ImPlementation (LSSIP) FINLAND Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FINLAND Infocentre Reference: 14/01/07-14 Document Identifier Edition: Year 2013
More informationLocal Single Sky ImPlementation (LSSIP) MALTA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) MALTA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Malta Infocentre Reference 17/01/30/126 Date of Edition 04/04/2017 LSSIP Focal Point
More informationEUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR)
Traffic Forecast for 20 Years Resulting Challenges for Airports Potential Solutions AIRNETH, The Hague 12 th of April 2007 EUROCONTROL Eric MIART Manager - Airport Operations Programme (APR) www.eurocontrol.int/airports
More informationLocal Single Sky ImPlementation (LSSIP) MALTA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) MALTA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP Year 2015 for Malta Infocentre Reference: 16/01/29-78 Document Identifier Edition: Year
More informationLocal Single Sky ImPlementation (LSSIP) IRELAND
EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Ireland Infocentre Reference: 16/01/29-73 Document Identifier Edition: Year 2015
More informationLocal Single Sky ImPlementation (LSSIP) LATVIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) LATVIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Latvia Infocentre Reference: 16/01/29-75 Document Identifier Edition: Year 2015
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationDIRECTORATE CIVIL-MILITARY ATM COORDINATION. FLEXIBLE USE of AIRSPACE in EUROPE «Challenges»
DIRECTORATE CIVIL-MILITARY ATM COORDINATION FLEXIBLE USE of AIRSPACE in EUROPE «Challenges» Olivier Mrowicki CHISINAU 4th August 2009 1 Report of the PRC in 2007 Objective: Review of civil-military use
More informationLocal Single Sky ImPlementation (LSSIP) ROMANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for ROMANIA Infocentre Reference: 14/01/07-33 Document Identifier Edition: Year 2013
More informationLocal Single Sky ImPlementation (LSSIP) SLOVAKIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) SLOVAKIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Slovakia Infocentre Reference: 15/01/12-35 Document Identifier Edition: Year
More informationLocal Single Sky ImPlementation (LSSIP) HUNGARY
EUROCONTROL Local Single Sky ImPlementation (LSSIP) HUNGARY Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Hungary Infocentre Reference: 15/01/12-20 Document Identifier Edition: Year 2014
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationLocal Single Sky ImPlementation (LSSIP) ALBANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ALBANIA Year 2016 - Level 1 FOREWORD The Local Single Sky ImPlementation (LSSIP) documents are the yearly expression of commitment of civil and military
More informationLocal Single Sky ImPlementation (LSSIP) ROMANIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Romania Infocentre Reference: 16/01/29-85 Document Identifier Edition: Year 2015
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationLocal Single Sky ImPlementation (LSSIP) HUNGARY
EUROCONTROL Local Single Sky ImPlementation (LSSIP) HUNGARY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Hungary Infocentre Reference 17/01/30/120 Date of Edition 31/03/17 LSSIP Focal Point
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationLocal Single Sky ImPlementation (LSSIP) ARMENIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) ARMENIA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Armenia Infocentre Reference 17/01/30/102 Date of Edition 24/03/2017 LSSIP Focal Point
More information2.2 ANSP Certification, Designation & Cross-Border ANS Provision
2.2 ASP Certification, Designation & Cross-Border AS Provision 2.2.1 Certification For the time being there is no schedule agreed for the certification. It will be defined after an action plan is developed
More informationLocal Single Sky ImPlementation (LSSIP) NORWAY
EUROCONTROL Local Single Sky ImPlementation (LSSIP) NORWAY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Norway Infocentre Reference 17/01/30/130 Date of Edition 04/04/2017 LSSIP Focal Point
More informationEuropean ATM Master Plan Level 3. Implementation View
European ATM Master Plan Level 3 Implementation View Plan 2016 Executive summary Setting the scene This Implementation Plan constitutes the Implementation view or Level 3 of the European ATM Master Plan
More informationEASA European Aviation Safety Agency
EASA European Aviation Safety Agency First Regional Aviation Safety Group Pan American Meeting Costa Rica, 11-14 November 2008 Juan de Mata MORALES (EASA) EASA European Aviation Safety Agency European
More informationLocal Single Sky ImPlementation (LSSIP) TURKEY
EUROCONTROL Local Single Sky ImPlementation (LSSIP) TURKEY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Turkey Infocentre Reference 17/01/30/140 Date of Edition Released Issue LSSIP Focal
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationNNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet
NNF Work-shop on Navigation, Safety and Technology Dato: 2. February 2016 Gunn Marit Hernes Luftfartstilsynet Scope Present an overview of the main regulatory activities currently undertaken by EASA in
More informationICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017
ICAO ASBU Implementation Monitoring Questionnaire Reference period 2017 V.5 20/10/2017 Please fill in the information highlighted in yellow. For those objectives that are reported Ongoing (Partially Completed)
More informationLocal Single Sky ImPlementation (LSSIP) IRELAND
EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2016 - Level 1 Document Title LSSIP Year 2016 for Ireland Infocentre Reference 17/01/30/121 Date of Edition 29/05/2017 LSSIP Focal Point
More informationLocal Single Sky ImPlementation (LSSIP) AUSTRIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) AUSTRIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Austria Infocentre Reference: 15/01/12-03 Document Identifier Edition: Year 2014
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationOfficial Journal of the European Union L 186/27
7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose
More informationMAWA Chairman, Eng Jan PLEVKA PhD EDA Airworthiness Project Officer. 6 th EDA Military Airworthiness Conference 2014 in Rome
MAWA Chairman, Eng Jan PLEVKA PhD EDA Airworthiness Project Officer 6 th EDA Military Airworthiness Conference 2014 in Rome Topics Background to the MAWA Initiative MAWA approach Progress Achieved Next
More informationLocal Single Sky ImPlementation LSSIP ISRAEL
EUROCONTROL Local Single Sky ImPlementation LSSIP 2017 - ISRAEL Level 1 - Implementation Overview Document Title LSSIP Year 2017 for the State of Infocentre Reference 18/02/26/46 Date of Edition 11/06/18
More informationEUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL
EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL DOCUMENT CHARACTERISTICS LE EUROCONTROL Guidance for Military Aeronautical Information
More informationLocal Single Sky ImPlementation LSSIP GEORGIA
EUROCONTROL Local Single Sky ImPlementation LSSIP 2017 - GEORGIA Level 1 - Implementation Overview Document Title LSSIP Year 2017 for Georgia Infocentre Reference 18/02/26/20 Date of Edition 06/04/2018
More informationLocal Single Sky ImPlementation (LSSIP) UKRAINE (Formally known as LCIP)
EUROCONTROL Local Single Sky ImPlementation (LSSIP) UKRAINE (Formally known as LCIP) Years 2017-2021 Level 1 Document Title LSSIP Year 2016 for Ukraine Reference Documents LSSIP Documents LSSIP Guidance
More informationLocal Single Sky ImPlementation (LSSIP) PORTUGAL
EUROCONTROL Local Single Sky ImPlementation (LSSIP) PORTUGAL Year 2016 - Level 1 Document Title LSSIP Year 2016 for Portugal Reference Documents LSSIP Documents LSSIP Guidance Material Master Plan Level
More informationLocal Single Sky ImPlementation (LSSIP) DENMARK
EUROCONTROL Local Single Sky ImPlementation (LSSIP) DENMARK Year 2016 - Level 1 Document Title LSSIP Year 2016 for Denmark Infocentre Reference 17/01/30/111 Date of Edition 03/05/2017 LSSIP Focal Point
More information2 nd Stakeholders Consultation Workshop SES Interoperability Mandate on Air-Ground Voice Channel Spacing
2 nd Stakeholders Consultation Workshop SES Interoperability Mandate on Air-Ground Voice Channel Spacing 5 th September 2006 EUROCONTROL HQ - Brussels 1 WELCOME OBJECTIVES OF THE WORKSHOP Jean-Luc Garnier
More informationASBU-Bloc0 Moroccan achievements and planned activities
Moroccan Civil Aviation Authority ASBU-Bloc0 Moroccan achievements and planned activities KINGDOM OF MOROCCO Ministry of Equipment, Transport and Logistics Civil Aviation Authority Tunis, March 2017 1-48
More informationLocal Single Sky ImPlementation (LSSIP) SERBIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) SERBIA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Serbia Infocentre Reference 17/01/30/134 Date of Edition 28/03/2017 LSSIP Focal Point
More informationInternational Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN
International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item
More informationEuropean ATM Master Plan Level 3. Implementation View
European ATM Master Plan Level 3 Implementation View 2017 2017Plan European ATM Master Plan Level 3 Implementation View 2017 2017Plan EXECUTIVE SUMMARY What is the role of the European ATM Master Plan
More informationLocal Single Sky ImPlementation (LSSIP) CZECH REPUBLIC
EUROCONTROL Local Single Sky ImPlementation (LSSIP) CZECH REPUBLIC Year 2016 - Level 1 Document Title LSSIP Year 2016 for Czech Republic Infocentre Reference 17/01/30/110 Date of Edition 08/06/17 LSSIP
More informationOfficial Journal of the European Union L 146/7
8.6.2007 Official Journal of the European Union L 146/7 COMMISSION REGULATION (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationLSSIP Year 2011 Cyprus Part III - Chapter 15-1 Released Issue
LSSIP ear 2011 Cyprus Part III - Chapter 15-1 Released Issue Chapter 15 - Annual Report on the application of FUA 15.1 ational organisation and responsibilities at the 3 levels of FUA 15.1.1 At Strategic
More informationEN Official Journal of the European Union. (Acts whose publication is obligatory)
31.3.2004 EN Official Journal of the European Union L 96/1 I (Acts whose publication is obligatory) REGULATION (EC) No 549/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 laying down
More informationTerms of Reference for a rulemaking task
Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationEuromed Civil Aviation II project
Euromed Civil Aviation II project Final event on GNSS for aviation Gilles Fartek, Euromed Civil Aviation II (INTEGRA A/S) Euromed Aviation II is financed by EC DEVCO Air Traffic management EUROMED AVIATION
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationLSSIP LITHUANIA
25 YEARS of ATM Implementation Reporting in Europe LSSIP 2018 LITHUANIA EUROCONTROL Local Single Sky ImPlementation Level 1 Implementation Overview Document Title LSSIP Year 2018 for Lithuania Infocentre
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationCombined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013
IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationICAO EUR Region Performance Framework
ICAO EUR Region Performance Framework Regional Performance Framework Workshop Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office 9 April 2014 Page 1 OUTLINES Why a Regional Performance
More informationICAO GANP Requirements and Evolution
ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable
More informationPBN, ADQ, ADQ2 IR EUROCONTROL Activities Status
PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR
More informationRMT.0464 ATS Requirements The NPA
RMT.0464 ATS Requirements The NPA Fabio GRASSO EASA ATM/ANS Regulations Officer IFISA - FISO Seminar #7 08.09.2016 TE.GEN.00409-001 ATM/ANS CRs Regulation 2016/1377 Main objectives are to: implement Essential
More information1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)
SSC/14/54/5 Agenda Item 4.1 16 June 2014 54 th SINGLE SKY COMMITTEE 1/2 July 2014 Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability
More informationLocal Single Sky ImPlementation (LSSIP) LUXEMBOURG
EUROCONTROL Local Single Sky ImPlementation (LSSIP) LUXEMBOURG Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Luxembourg Infocentre Reference: 16/01/29-77 Document Identifier Edition: Year
More informationLocal Single Sky ImPlementation (LSSIP) CYPRUS
EUROCONTROL Local Single Sky ImPlementation (LSSIP) CYPRUS Year 2016 Level 1 FOREWORD The Local Single Sky ImPlementation (LSSIP) documents are the yearly expression of commitment of civil and military
More informationWorkshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont
Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community
More informationLocal Single Sky ImPlementation (LSSIP) AUSTRIA
EUROCONTROL Local Single Sky ImPlementation (LSSIP) AUSTRIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Austria Infocentre Reference: 16/01/29-55 Document Identifier Edition: Year 2015
More informationAIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place
AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)
More informationThe contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011
The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 Why SESAR needs SATCOM? Controllers need real time information... Past
More informationLocal Single Sky ImPlementation (LSSIP) EURO-MAASTRICHT
EUROCONTROL Local Single Sky ImPlementation (LSSIP) EURO-MAASTRICHT Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Maastricht Infocentre Reference: 15/01/12-13 Document Identifier Edition:
More informationCertification Procedure
Certification Procedure Frequentis AG Final Presentation, ESTEC, Dec. 06 th 2009 Thales Alenia Space Espana Thales Alenia Space France Thales Alenia Space Italia Topics 1 Overview 2 Key points 3 Conclusions
More informationRPAS/UAS Challenges in ATM. Peter Tannhäuser. Head of Legal Service 15 July 2015
Unmanned aerial vehicles (drones) Working Group on Legal Questions Related to Robotics and Artificial Intelligence European Parliament's Committee on Legal Affairs RPAS/UAS Challenges in ATM Peter Tannhäuser
More informationLocal Single Sky ImPlementation (LSSIP) PORTUGAL
EUROCONTROL Local Single Sky ImPlementation (LSSIP) PORTUGAL Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Portugal Infocentre Reference: 14/01/07-32 Document Identifier Edition: Year 2013
More informationLocal Single Sky ImPlementation (LSSIP) HUNGARY
EUROCONTROL Local Single Sky ImPlementation (LSSIP) HUNGARY Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Hungary Infocentre Reference: 16/01/29-72 Document Identifier Edition: Year 2015
More informationEuropean ATM Master Plan Level 3. Implementation View Plan 2018
2018 European ATM Master Plan Level 3 Implementation View Plan 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 7 EXECUTIVE SUMMARY What is the role of the European ATM Master Plan
More informationThe SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013
The SES Performance Scheme ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan 21-23 May 2013 1 EU s Single Aviation Market Before 1992: fragmented national markets based on restrictive bilateral
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More information