1 EUROCONTROL Local Single Sky ImPlementation (LSSIP) BULGARIA Year Level 1

2

3

4

5 DOCUMENT IDENTIFICATION SHEET LSSIP for Bulgaria Infocentre Reference: 15/01/12-07 Document Identifier Edition: Year 2014 LSSIP Year 2014 Bulgaria Edition Date: 14/04/2015 LSSIP Focal Point Ivan ILIEV Acting head of S&P department LSSIP Contact Person Ana Paula FRANGOLHO Status Intended for Unit DPS/PEPR Working Draft General Public Draft Agency Stakeholders Proposed Issue Restricted Audience Released Issue Accessible via: Path: Internet ( Y:\03 LSSIP\1. LSSIP States\Bulgaria (BG) - APF\Year 2014\Released\LSSIP Year 2014 BG Released.docx LINKS TO REFERENCE DOCUMENTS 1 LSSIP Guidance Material 2 ESSIP Plan Edition ESSIP Report STATFOR Forecasts 5 Acronyms and abbreviations 6 European ATM Master Plan 7 LSSIP Documents 8 National AIP 9 FAB Performance Plan LSSIP Year 2014 Bulgaria Released Issue

6

7 APPROVAL SHEET The following authorities have approved all parts of LSSIP Year 2014 document and their signature confirms the correctness of the reported information and reflects their commitment to implement the actions laid down in the European Single Sky ImPlementation (ESSIP) Plan Edition LSSIP Year 2014 Bulgaria Released Issue

8

9

10

11

12

13

14

15 TABLE OF CONTENTS Executive Summary... 1 Introduction... 4 Chapter 1 - National ATM Environment Geographical Scope International Membership Geographical description of the FIR(s) Airspace Classification and Organisation National Stakeholders Civil Regulator(s) BULATSA Airports Military Authorities Chapter 2 - Traffic and Capacity Evolution of traffic in Bulgaria SOFIA ACC Traffic and en-route ATFM delays Summer 2014 performance Planning Period Chapter 3 - ESSIP Report recommendations Chapter 4 - National Projects Chapter 5 - Regional Co-ordination FAB Co-ordination FAB Projects Regional cooperation Radar Data Sharing OLDI Links Voice communication MFC links Regional Route Network Developments Regional Communication Network Regional Projects Chapter 6 - ESSIP Objective Implementation ANNEXES LSSIP Year 2014 Bulgaria Released Issue

16

17 Executive Summary National ATM Context Pursuant to the Agreement on the establishment of DANUBE FAB, two cross borders sectors were introduced within the FAB airspace in December The free route (FRA) phase 1 on state level was implemented and performance data is being assessed towards the next phase implementation. The inter-fab cooperation with BLUE MED FAB was reinforced by signing a Letter on ANSP level cooperation in FAB matters developing relations of strategic importance to DANUBE FAB. The purpose is to establish regular cooperation in the areas of safety, operations, technical, training and performance to create benefits for the stakeholders. The DANUBE FAB activity financed by TEN-T (support to the implementation of the IDP within DANUBE FAB 2012-EU S TEN-T) regarding the prototyping and validating of CPDLC functionalities, procedures and related HMI was completed in The work under the same call related to free route operations on DANUBE FAB level continues as scheduled. Traffic and Capacity The 2014 was influenced by an unplanned substantial air traffic growth in result of the traffic flow distortion as a consequence from the situation in Ukraine (since March 2014) which was further accelerated in July. The peak of traffic growth was measured in August, resulting in increase of overflying traffic up to 27.6%. Traffic avoiding the Ukraine airspace continues to influence Sofia ACC. Republic Bulgaria made an outstanding effort to provide ANS without delay despite the traffic growth using its all operational and technical resources and all available tools for optimisation. ESSIP Objective Implementation In 2014 the following objectives were completed according their schedule: 1. COM09 Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP); 2. ITY-FMTP Apply a common flight message transfer protocol (FMTP). Good progress was achieved towards the completion of objectives AOP04.1 and AOP04.2. The A- SMGCS was installed and tested at Sofia Airport and the concerned personnel received the appropriate training. The completion of both objectives will be achieved simultaneously by the end of February Close to completion is the objective FCM05 (Implementation of interactive rolling NOP). Currently LARA operates in numerous locations in trial mode, operational use on national level is planned in January Elements of the ATM System - SATCAS are pending upgrade. These upgrades are related to ITY-SPI (operation with enhanced surveillance capability Mode S, ADS-B and WAM) and ITY-AGDL (Initial ATC air ground data link services above FL285) objectives. With regard to objectives due for 2014, COM10 Migrate from AFTN to AMHS is late in implementing objective(s) 03 and 04 which are planned to be completed in 2015 due to a delay related to the elaboration of the enhanced AMHS capabilities (Extended ATSMHS). The introduction of a new Voice Communication System was a major project, which will be finalised by mid-2015 and contributed to the completion of objective COM09, and towards the progress of objectives COM10 and COM11. LSSIP Year 2014 Bulgaria 1 Released Issue

18 LSSIP Bulgaria * FOC Date Planned implementation date (see legend at the bottom of the table) State-related ESSIP Objectives AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling <= [IDP] [E] * AOM19 Implement Advanced Airspace Management [IDP] [E] * AOM21 Implementation of Free Route Airspace [IDP] [E] * AOP03 Improve runway safety by preventing runway incursions [IDP] * Implement ground based safety nets - Short Term Conflict ATC02.2 Alert (STCA) - level 2 [E] * Implement ground based safety nets - Area Proximity ATC02.5 Warning - level 2 [E] * Implement ground based safety nets - Minimum Safe ATC02.6 Altitude Warning - level 2 [E] * Implement ground based safety nets - Approach Path ATC02.7 Monitor - level 2 [E] * ATC07.1 Implement arrival management tools [E] Implement automated support for conflict detection and ATC12 [E] conformance monitoring * Implement, in En-Route operations, information exchange [IDP] ATC15 mechanisms, tools and procedures in support of Basic [E] * AMAN operations ATC16 Implement ACAS II compliant with TCAS II change 7.1 * Electronic Dialogue as Automated Assistance to Controller [IDP] ATC17 during Coordination and Transfer [E] * Migrate ground international or regional X.25 data networks COM09 [IDP] or services to the Internet Protocol (IP) * COM10 Migrate from AFTN to AMHS * Implementation of Voice over Internet Protocol (VoIP) in COM11 ATM * FCM01 Implement enhanced tactical flow management services [E] * [IDP] FCM03 Implement collaborative flight planning [E] * [IDP] FCM04 Implementation of Short Term ATFCM Measures - phase 1 [E] [IDP] FCM05 Implementation of interactive rolling NOP [E] * INF04 Implement integrated briefing * INF07 Electronic Terrain and Obstacle Data (TOD) * ITY-ACID Aircraft identification Ensure quality of aeronautical data and aeronautical ITY-ADQ [E] information * [IDP] ITY-AGDL Initial ATC air-ground data link services above FL-285 [E] * Implement air-ground voice channel spacing requirements ITY-AGVCS2 below FL195 * Implementation of ground-ground automated co-ordination ITY-COTR [E] processes * ITY-FMTP Apply a common flight message transfer protocol (FMTP) [IDP] * ITY-SPI Surveillance performance and interoperability * NAV03 Implementation of P-RNAV [E] * NAV10 Implement APV procedures [IDP] [E] * Implement measures to reduce the risk to aircraft operations SAF10 caused by airspace infringements * SAF11 Improve runway safety by preventing runway excursions * Implement the EUROCONTROL Safety Regulatory SRC-RLMK Requirements (ESARRs) SRC-SLRD Safety Levels and Resolution of Deficiencies LSSIP Year 2014 Bulgaria 2 Released Issue

19 Airport-related ESSIP Objectives <= LBSF-Sofia Implement Advanced Surface Movement Guidance and AOP04.1 [E] Control System (A-SMGCS) Level1 * Implement Advanced Surface Movement Guidance and AOP04.2 Control System (A-SMGCS) Level 2 * [IDP] AOP05 Implement Airport Collaborative Decision Making (CDM) [E] * Implement Continuous Descent Operations (CDO) ENV01 [IDP] techniques for environmental improvements * Implement Collaborative Environmental Management ENV02 (CEM) at Airports * Understanding the Table Objective Completed Objective Partly Completed Objective Planned No Plan Missing Data Not Applicable (Bulgaria/Sofia Airport does not participate in this obj.) Late E= Essential Master Plan Reference IDP = Interim Deployment Programme NOTE: The year where the coloured box is placed indicates the Implementation Completion Date as stated in the ESSIP for each objective. The colour-code indicates the Local progress with respect to this date. LSSIP Year 2014 Bulgaria 3 Released Issue

20

21 Introduction The Local Single Sky ImPlementation documents (LSSIPs), as an integral part of the ESSIP/LSSIP mechanism, constitute a short/medium term implementation plan containing ECAC States actions to achieve the Implementation Objectives as set out by the ESSIP and to improve the performance of their national ATM System. The LSSIP document Year 2014 describes the situation in the State at the end of December The LSSIP documents are structured into 6 chapters to better differentiate the Stakeholder(s) accountable for the information contained in each of them: Chapter 1 provides an overview of the ATM institutional arrangements within the State, the membership of the State in various international organizations, the organizational structure of the main ATM players - civil and military - and their responsibilities under the national legislation. In addition, an overview of the Airspace Organization and Classification, the ATC Units, the ATM systems operated by the main ANSP are also provided in this chapter. Chapter 2 provides a comprehensive picture of the situation of Air Traffic, Capacity and ATFM Delay per each ACC in the State. It shows the evolution of Air Traffic and Delay in the last five years and the forecast for the next five years. It gives also the achieved performance in terms of delay during the summer season period and the planned projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at the agreed performance level; Chapter 3 provides a set of recommendations extracted from the ESSIP Report which are relevant to the state/stakeholders concerned. The state reports how they have handled those recommendations and the actions taken during the year to address the concerns expressed by those recommendations; Chapter 4 provides a set of the main ATM national projects which contribute directly to the implementation of the ATM MP OIs and/or Enablers and ESSIP related Objectives. The description, timescale, progress made and expected contribution to the ATM Key Performance Areas are provided by the states per each project included in this chapter; Chapter 5 deals with the ATM Regional Coordination. It provides an overview of the FAB cooperation and Projects and also all other regional initiatives and Projects which are out of the FAB scope. The content of this chapter generally is developed and agreed in close cooperation between the states concerned; Chapter 6 contains high-level information on progress and plans of each ESSIP Objective. The information for each ESSIP Objective is presented in boxes giving a summary of the progress and plans of implementation for each Stakeholder. The conventions used are presented at the beginning of the section. Note: Chapter 6 is completed with a separate document called LSSIP Level 2. This document consists of a set of tables organised in line with the list of ESSIP Objectives. Each table contains all the actions planned by the four national stakeholders to achieve their respective Stakeholder Lines of Action (SLoAs) as established in the ESSIP. Note: The information contained in Chapter 6 is deemed sufficient to satisfy State reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring. LSSIP Year 2014 Bulgaria 4 Released Issue

22 Chapter 1 - National ATM Environment 1.1 Geographical Scope International Membership Bulgaria is a Member of the following international organisations in the field of ATM: Organisation Since ECAC 1991 EUROCONTROL 1997 European Union 2007 EASA 2007 ICAO 1967 NATO 1991 ECAA Geographical description of the FIR(s) The geographical scope of this document addresses the Sofia FIR. The Sofia ACC sector configuration is organised in the Sofia family sector group and the Varna family sector group. The Sofia family sectors encompass 4 elementary sector groups (Sofia-Alpha upper/lower, Sofia-Bravo upper/lower, Sofia-Charlie upper/lower, Sofia-Delta upper/lower). In 2014, these elementary sectors were grouped in 4 en-route sectors. During the 2014 summer season, the Sofia family sectors group most frequently accommodated the following sector configurations: Alpha+ Charlie Upper Bravo+Delta Upper Division flight level FL 355/365 Alpha+ Charlie Lower Bravo+Delta Lower The Varna family sectors encompass 2 elementary sector groups (Varna Alpha upper/lower, Varna Bravo upper/lower). During the 2014 summer season, the Varna family sectors group most frequently accommodated the following sector configurations: Alpha + Bravo Upper Division flight level FL 355/365 Bravo Alpha + Bravo Middle Division flight level FL 325 Alpha + Bravo Lower LSSIP Year 2014 Bulgaria 5 Released Issue

23 Following CNATCC implementation, the CNATCC sector configuration consists of 10 elementary sectors (6-Sofia family sectors and 4-Varna family sectors) and these elementary sectors are grouped in 6 enroute sectors. The Division Flight Level (DFL), between upper and lower airspace, is FL 245. The following map shows the geographical situation of the Bulgarian airspace above FL245 in The following map shows the geographical situation of the Bulgarian night free route airspace above FL245 since 11 December In effect from 11 December 2014, two cross border sectors (CBS) have been established on a permanent basis within the DANUBE FAB. A description of the airspace is depicted below: LSSIP Year 2014 Bulgaria 6 Released Issue

24 Sector DF1: Horizontal limits N E N E N E N E N E National border with Romania N E Vertical limits Upper limit - FL 660 Lower limit - FL 245 Airspace classification (ICAO) C Sector DF2: Horizontal limits Vertical limits N E N E Upper limit N E FL 660 National border with Romania Airspace classification (ICAO) C N E Lower limit - FL 245 LSSIP Year 2014 Bulgaria 7 Released Issue

25 1.1.3 Airspace Classification and Organisation With effect from 27 November 2003, the airspace classification has been changed. Airspace ICAO class A from FL 245 till FL 660 was replaced by ICAO Class C. No modifications have been stipulated for airspace classification below FL 125. With effect from 20 December 2007 the airspace classification ICAO class E from minimum FL defined for each sector up to FL 125 has been changed. 1. Airspace class C is applied: Within the lateral and vertical limits of all CTRs; Within the lateral limits of Bulgarian TMAs, from 600m height up to the upper limits of the terminal control areas; To ATS routes within Sofia FIR (from minimum FL defined for each ATS route up to FL 660); Within Sofia FIR airspace outside CTRs, TMAs and ATS routes from FL 95 to FL Airspace class E was replaced by ICAO Class C and Class G. 3. Airspace class G is applied: Within the lateral limits of Sofia FIR with the exemption of CTRs/TMAs/ATS routes and CTAs from GND/sea level up to FL 95; Within TMAs lateral limits, except CTRs from ground/sea level up to 600 m height. FL 660 AIRSPACE CLASSIFICATION IN BULGARIA ACC s CLASS C RNAV Route CLASS C TMA s CLASS C ATS Route CLASS C FL 95 FL 95 CLASS G 6 00 m AGL TWR s CLASS C 600 m AGL GROUND/SEA LEVEL When the military zones/areas (CTRs/TMAs of military bases and TSAs) are activated, the airspace within those zones and areas is not classified. In accordance with Regulation No.5 of the Bulgarian Ministry of Transport, Information Technology and Communications, both metric and imperial systems are implemented within the Bulgarian airspace with effect from 27 November LSSIP Year 2014 Bulgaria 8 Released Issue

26 1.2 National Stakeholders The main National Stakeholders involved in ATM in Bulgaria are the following: Directorate General Civil Aviation Administration (DGCAA); Bulgarian Air Traffic Services Authority (BULATSA); Military Authorities; Airport Operators. Their activities are detailed in the following subchapters and their relationships are shown in the diagram below. Ministry of Transport, IT and Communications Directorate General Civil Aviation Administration Airspace Management Board Ministry of Defence Air Force Command Airport Operators Air Traffic Services Authority Military Air Traffic Services Authority The Airspace management board is not a stakeholder itself but a strategic level body of the unified system for civil and military airspace management in Bulgaria. It includes stakeholders representatives from the Ministry of Transport, IT and Communications, Ministry of Defence, Directorate of the Civil Aviation Administration, Staff of the Bulgarian Army, Air Force HQ, Bulgarian Air Traffic Services Authority (BULATSA) and the Military ATM Section. It acts as executive interagency body of the Ministry of Transport and the Ministry of Defence. The main tasks of the Air Space Management Board are: Unification of civil and military operations relating to the airspace management; State policy management on the strategic planning and distribution of the airspace; Co-ordination between the civil and military authorities Civil Regulator(s) General information The Minister of Transport, IT and Communications is responsible for the management and supervision of civil aviation, civil aircraft and aeronautical facilities within the Republic of Bulgaria. The Minister exercises his/her functions through the Directorate General Civil Aviation Administration (DGCAA). Activity in ATM: Rule-making Organisation responsible Directorate General Civil Aviation Administration (DGCAA) Legal Basis The legal basis and power to undertake ATM safety regulation in Bulgaria are defined in the Civil Aviation Act. The rules and regulations, as a second level of the safety regulatory framework, are in place and effectively applied by the DGCAA. The Minister of Transport is entrusted with the promulgation of ATM safety LSSIP Year 2014 Bulgaria 9 Released Issue

27 Activity in ATM: Organisation responsible Legal Basis regulations/ordinances proposed by DGCAA. The third level of regulation is DGCAA instructions and decrees as dynamic/temporary measures. Safety Oversight DGCAA, ANS Dept. Civil Aviation Act and DGCAA Structural regulation Enforcement actions in case of non-compliance with safety regulatory requirements Airspace Economic DGCAA Ministry of Transport, Information Technology and Communications and Ministry of Defence Ministry of Transport, Information Technology and Communications / DGCAA Civil Aviation Act, DGCAA Structural regulation Civil Aviation Act Airspace management - National Regulation No.19, National Instruction 24 and National Instruction 25 Charges Regulation applicable for the usage of public airports and for the provision of air navigation services in the Republic of Bulgaria Environment DGCAA National Regulation No.16, National Regulation No.30 Security DGCAA Civil Aviation Act Accident investigation AAIU Civil Aviation Act (Article 16 and Article 142), National Regulation No DGCCA The Directorate General Civil Aviation Administration (DGCAA) is the Bulgarian Regulatory Authority and it is a legal entity within the Ministry of Transport, Information Technology and Communications (MTITC) responsible for the supervision of the safety of aviation in the national airspace, certification of civil aircraft and equipment, certification and licensing of aircraft operators, the relevant staff involved in civil aviation and the licensing of aviation training centres. DGCAA carries out the assigned functions in accordance with the European regulations in the field of Air Transport, the Civil Aviation Act, the related regulations and Ministerial decrees. The DGCAA Structural Regulation (Official Gazette 37/1999, last amended 29/2010) sets out the state administration responsibilities and functions. DGCAA is managed and represented by the Director General, who is authorized to promulgate the administrative acts and mandatory directives in accordance with the applicable legislation. Art.16 c of the Civil Aviation Act states that the Directorate General Civil Aviation Administration is a national supervisory authority with regard to the safe and effective operation of air navigation services providers. In performing its functions, the national authority is independent functionally, organisationally and institutionally from the air navigation services providers. Website: Civil Aviation Administration - The DG CAA organisation chart is given in annex B. Annual Report published: Y The Annual Report for 2014 is in preparation. For the older versions and more information see: LSSIP Year 2014 Bulgaria 10 Released Issue

28 1.2.2 BULATSA Name of the ANSP: BULgarian Air Traffic Services Authority (BULATSA) Governance: State Enterprise Ownership : 100% state-owned Services provided Y/N Comment ATC en-route Y Common National Air Traffic Control Centre in Sofia was operationally deployed in February ATC approach Y Sofia, Varna, Burgas. ATC Aerodrome(s) Y Sofia, Varna, Burgas, Plovdiv, Gorna Oryahovitsa. AIS Y 5 airports plus en-route services. CNS Y All CNS infrastructure is BULATSA s property. MET Y 5 airports plus en-route services. ATCO training Y BULATSA training centre. Others N Runway and Approach Lighting Systems together with the Power Supply Systems for airport management were submitted to the remaining 2 civil airports Plovdiv and Gorna Oryahovitsa according to the amended Civil Aviation Act. Additional information: Provision of services in other State(s): Y BULATSA provides air traffic services (ATS), communication service (COM) and surveillance service (SUR) within the cross-border sector (Sector DF 1) as an integral part of the adjacent sectors within SOFIA FIR, having the lateral and vertical limits as described in Section Geographical description of the FIR(s). The navigation service (NAV), meteorological service (MET) and aeronautical information service (AIS) below FL 245 is provided within the same volume of airspace (Sector DF 1), by the ANSP of the host State, using the available resources. Annual Report published: Y The annual reports covering the yearly activities of the ANSP are available at: Website: The BULATSA organisation chart is given in annex B. LSSIP Year 2014 Bulgaria 11 Released Issue

29 ATC system in use Specify the manufacturer of the ATC system currently in use: Upgrade 1 of the ATC system is performed or planned? Replacement of the ATC system by the new one is planned? SELEX ES Planned: Mode S CPDLC, MTCD v.2, VERA tool, HMI Planned: Procurement and deployment of a new automated ATC system to implement the Common projects and the SESAR deployment programme and replace the existing one, which lifecycle expires. The system will be required to ensure interoperability with the other neighbouring systems, enabling synergy at regional level and with the NM systems ATC units The ATC units in the Bulgarian airspace which are of concern to this LSSIP are the following: ATC Unit Number of sectors Associated FIR(s) Remarks En-route TMA Sofia ACC/APP 10 1 Sofia FIR Varna APP - 1 Sofia FIR Burgas APP - 1 Sofia FIR SATCAS V2 was implemented in February 2008, which facilitated the hand-over of Varna en-route sectors to the CNATCC. The en-route sectors of Varna ACC were transferred to Sofia ACC in February The provision of aerodrome services within the Bulgarian CTRs is performed by the following TWR units: Sofia TWR; Varna TWR; Burgas TWR; Plovdiv TWR; Gorna Oryahovitsa TWR Airports General information There are 5 international state-owed airports in Bulgaria. Sofia Plovdiv 1 Upgrade is defined as any modification that changes the operational characteristics of the system (SES Framework Regulation 549/2004, Article 2 (40)) LSSIP Year 2014 Bulgaria 12 Released Issue

30 Gorna Oryahovitsa Varna Burgas Sofia, Plovdiv and Gorna Oryahovitsa airports are state owned and operated. Varna and Burgas airports are operated by German-Bulgarian consortium Fraport Twin Star Airport Management ( since Airport(s) covered by the LSSIP APO SloAs are contained in the following objectives: ENV, AOP, FCM05, ITY-ADQ, ITY-AGVCS2, SAF11 and INF07. The airport covered in this LSSIP is Sofia International Airport. Varna, Burgas, Plovdiv and Gorna Oryahovitsa airports are also covered by the LSSIP but only within the scope of the APO part of the following objectives: ITY-ADQ; ITY-AGVCS2; SAF Military Authorities The Military Authorities involved in ATM in Bulgaria are composed of: Ministry of Defence (MoD); Staff of Defence (SoD); Air Force Headquarters (AFHQ); Military ATM Section; Air Operations Centre (AOC); Air Bases; The military authorities in Bulgaria have no responsibility for the provision of ATS to GAT traffic. They report to the Ministry of Defence. Their regulatory, service provision and user role in ATM are detailed below Regulatory role Regulatory framework and rule-making OAT OAT and provision of service for OAT governed by national legal provisions? Level of such legal provision: Ministerial Decrees and Instructions Authority signing such legal provision: Minister of Defence and Commander of the BGR Air Force These provisions cover: Rules of the Air for OAT Y Y GAT Provision of service for GAT by the Military governed by national legal provisions? Level of such legal provision: N/A Authority signing such legal provision: N/A These provisions cover: Organisation of military ATS for OAT Y Organisation of military ATS for GAT N/A OAT/GAT Co-ordination Y OAT/GAT Co-ordination N/A N LSSIP Year 2014 Bulgaria 13 Released Issue

31 Oversight ATCO Training Y ATCO Training N/A ATCO Licensing N ATCO Licensing N/A ANSP Certification N ANSP Certification N/A ANSP Supervision Y ANSP Supervision N/A Aircrew Training Y ESARR applicability N/A Aircrew Licensing Additional Information: ANSP for the military aircraft is the Air Force. The Chief of Air Force licenses the MATCO/aircrew personnel. Additional Information: The administrative supervision is exercised by the AFHQ. Specifically the operational one is done by the MATSA section within AFHQ Operations Division. Means used to inform airspace users (other than military) about these provisions: N Additional Information: N/A Additional Information: N/A Means used to inform airspace users (other than military) about these provisions: National AIP N/A National AIP N/A National Military AIP Y National Military AIP N/A EUROCONTROL eaip N/A EUROCONTROL eaip N/A Other: N/A Other: N/A OAT National oversight body for OAT: AFHQ GAT NSA (as per SES reg. 550/2004) for GAT services provided by the military: N/A separated from the civil NSA (In this case, please explain in Additional information whether it is separated from service provision, - a Joint Civil-military NSA; Additional information: N/A Additional information: N/A Service Provision role Services Provided: OAT Services Provided: En-Route Air Operation Centre En-Route N/A Approach/TMA Air Bases Approach/TMA N/A Airfield/TWR/GND Air Bases Airfield/TWR/GND N/A AIS Command, Control and Surveillance Base MET Separate unit within AOC MET N/A SAR A transport aircraft and/or helicopter are assigned 24/7 for SAR duty for the entire territory. Additionally, SAR Teams are assigned by the Air Bases Commanders for a designated area of LSSIP Year 2014 Bulgaria 14 Released Issue AIS SAR GAT N/A N/A

32 responsibility. TSA/TRA monitoring Airspace Use and Coordination Centre within AOC FIS Other: CNS services Other: N/A Additional Information: Additional Information: Military ANSP providing GAT services SES certified? N/A If YES, since: N/A Duration of the Certificate: Certificate issued by: N/A If NO, is this fact reported to the EC in accordance with SES regulations? Additional Information: User role N/A IFR inside controlled airspace, Military aircraft can fly? OAT only GAT only Both OAT and GAT Y If Military fly OAT-IFR inside controlled airspace, specify the available options: Free Routing N/A Within specific corridors only Y Within the regular (GAT) national route network Y Under radar control Y Within a special OAT route system N/A Under radar advisory service N/A If Military fly GAT-IFR inside controlled airspace, specify existing special arrangements: No special arrangements N/A Exemption from Route Charges Y Exemption from flow and capacity (ATFCM) measures N/A N Provision of ATC in UHF Y CNS exemptions: Y 8.33 Y Mode S N/A ACAS Y Others: N/A Flexible Use of Airspace (FUA) Military in Bulgaria apply FUA requirements as specified in the Regulation No 2150/2005: FUA Level 1 implemented: Y FUA Level 2 implemented: Y FUA Level 3 implemented: Y Y LSSIP Year 2014 Bulgaria 15 Released Issue

33 Chapter 2 - Traffic and Capacity 2.1 Evolution of traffic in Bulgaria Bulgaria - Annual IFR Movements IFR flights IFR movements - Actuals IFR movements - Baseline forecast IFR movements - High forecast IFR movements - Low forecast 2010 A 2011 A 2012 A 2013 A 2014 F 2015 F 2016 F 2017 F 2018 F 2019 F 2020 F A = Actual F = Forecast EUROCONTROL Seven-Year Forecast (September 2014) IFR flights yearly growth 2011 A 2012 A 2013 A 2014 F 2015 F 2016 F 2017 F 2018 F 2019 F 2020 F H 22.8% 6.6% 5.4% 5.5% 4.3% 5.9% 6.8% Bulgaria B 7.1% 0.2% 1.9% 22.5% 4.7% 4.1% 4.2% 2.8% 5.0% 5.8% L 22.1% 2.8% 2.2% 2.5% 2.6% 2.9% 2.7% ESRA08 B 3.1% -2.4% -1.1% 1.8% 2.4% 2.8% 2.3% 2.3% 2.8% 3.1% 2014 Traffic in Bulgaria increased by 25.3% during Summer 2014 (May to October), when compared to the same period during The EUROCONTROL Seven-Year Forecast predicts an average annual increase between 2.6% and 5.5%, with a baseline growth of 4.2% during the planning cycle. LSSIP Year 2014 Bulgaria 16 Released Issue

34 2.2 SOFIA ACC Traffic and en-route ATFM delays LBSRACC - Traffic and en-route ATFM delays IFR flights (Daily Average) Enroute Delay (minutes per flight) Peak Day Traffic Summer Traffic Yearly Traffic Summer Traffic Forecast High Traffic Forecast - Summer Low Traffic Forecast - Summer Summer enroute delay (all causes) Yearly enroute delay (all causes) * Summer 2014 performance En-route Delay (min/flight) - Summer Capacity Traffic Evolution 2014 Capacity Baseline Ref value Actual gap % 172 (+15%) No The en-route delay per flight remained at zero during Summer Planned capacity increase: sufficient capacity Achieved Comments ATS route network development and increase of maximum sector configurations available Yes Maximum configuration: 12 sectors Summer 2014 performance assessment Yes Maximum configuration: 10 sectors was sufficient The ACC capacity baseline was measured with ACCESS and was assessed to be at 172. During the period June/July, the average peak 1 hour demand was 163 flights and the average peak 3 hour demand was 150 flights Planning Period The planning focuses on the Summer season to reflect the most demanding period of the year from a capacity perspective. This approach ensures consistency with the previous planning cycles. LBSRCTA Annual Summer En-route ATFM delay breakdown - Reference Values LSSIP Year 2014 Bulgaria 17 Released Issue

35 ACC 2014 baseline LBSR 172 Capacity Profiles Profiles (hourly movements and % increase over previous year) H 173 1% 179 3% 188 5% 198 5% 210 6% Ref % 175 1% 181 3% 187 3% 197 5% L 172 0% 173 1% 173 0% 175 1% 179 2% Open 172 0% 172 0% 172 0% 172 0% 173 1% C/R 177 3% 183 3% 191 4% 198 4% 206 4% Free Route Airspace Airspace Management Advanced FUA Airport & TMA Network Integration Cooperative Traffic Management Airspace Procedures Staffing Technical Capacity Significant Events Capacity Plan Lower level limit of FRA with Danube Stepped implementation of full FRA FAB New sector boundaries for Varna and Sofia Airspace changes at interface with Turkey Cross border sectorisation within Danube FAB (Dec 14) Updated LoAs with Istanbul ACC Upgrade of SATCAS system Additional control working positions Improved ATFCM, including use of occupancy counts and STAM ATS route network development Airspace changes at the interface with Turkey resulting from the implementation of the Istanbul new airport Cross sector training Additional ATCOs Increase of maximum sector configurations available New airport in Istanbul Max sectors 12* 12* 12* 12* 12* Capacity increase p.a. 5% 3% 3% 3% 3% Reference profile 1% 1% 3% 3% 5% Additional information * According to the traffic demand, up to 12 sectors can be opened LSSIP Year 2014 Bulgaria 18 Released Issue

36 LBSRACC - Reference capacity profile and alternative scenarios Capacity profile (movements per hour) Reference Capacity Profile Capacity Profile Shortest Routes (Open) Capacity Profile Current Routes Capacity Profile High Capacity Profile Low Capacity Baseline Plan Planning Period Outlook No problems are foreseen for Sofia ACC during the planning cycle. LSSIP Year 2014 Bulgaria 19 Released Issue

37 Chapter 3 - ESSIP Report recommendations Recommendations issued from the ESSIP Report for 2013 applicable to Bulgaria for all items that require corrective actions and improvements. Reference Recommendation Ownership number Local Stakeholders that declared delays in REC (4) implementation of AOP04.1 to take corrective BG (LBSF) measures to reduce the implementation delays. State feedback: In 2014 BULATSA joined the applicability area of AOP04.1. The objective was initially planned outside the objective implementation timeframe according the local needs. Nevertheless the A-SMGCS was installed and tested at Sofia Airport and the concerned personnel received the appropriate training. The completion of both objectives (AOP04.1 and AOP04.2) will be achieved simultaneously by the end of February Local Stakeholders that declared delays in REC (5) implementation of SAF10 to take corrective BG measures to reduce the implementation delays. State feedback: The European Action Plan will be reviewed by DGCAA for adaptation in Bulgaria. BULATSA implemented most appropriate parts of the European Action Plan for Airspace Infringement Risk Reduction. Local Stakeholders that declared delays in REC (6) implementation of INF04 to take corrective BG measures to reduce the implementation delays. State feedback: MET self-briefing system is implemented at Sofia/Plovdiv/Burgas and Varna airports. Terminal integration of ARO/MET briefing application is planned to be completed in Local Stakeholders that declared delays in REC (7) implementation of NAV03 to take corrective BG measures to reduce the implementation delays. State feedback: BULATSA plans the PBN implementation for Varna and Burgas TMAs and Gorna Oriyahovitsa CTR by the end of Plans are in place for PBN implementation in Sofia TMA and Plovdiv CTR by the end of All plans are compliant to the local needs. REC Ensure better planning reliability at local level. All States State feedback: The recommendation is taken under consideration. To improve reliability the planning/monitoring processes of the objective implementation progress will also take into account project-related risks at all phases of the objective activities. The ANSPs should ensure synchronised system REC All ECAC ANSPs evolution between neighbouring States. State feedback: The recommendation is taken under consideration. In response to REC , in 2013 trilateral interoperability testing between Bucharest, Sofia and Belgrade ACCs was executed. The final pre-operational system configuration for AMHS, together with the pre-operational AMHS test between Bucharest and Sofia ACCs were undertaken in Additionally the technical parameters and testing procedure for FMTP connection between Bucharest and Sofia were established in 2013, including bilateral interoperability testing between the two ACCs. Towards compliance with the AMHS Community Specification (CS), the DANUBE FAB ANSPs are establishing new AMHS connections in a coordinated manner. In regard to the migration from AFTN to the AMHS, the DANUBE FAB ANSPs agreed to implement basic and enhanced AMHS capability, and to establish new AMHS connections in a harmonised and coordinated way. The enhanced AMHS has been implemented and migration from AFTN to AMHS is to be completed by March REC The ANSPs within a FAB should coordinate their FAB ANSPs LSSIP Year 2014 Bulgaria 20 Released Issue

38 Reference number Recommendation Ownership system renewal and capability evolution more closely in order to deliver larger scale performance improvements to customers. State feedback: Due to different system lifecycles, the ANSPs considered unfeasible a unitary system renewal within DANUBE FAB and jointly planned its activities, in order to implement essential parameters with a view on harmonisation for a better efficiency and fully interoperability between ROMATSA and BULATSA systems. The evolution of DANUBE FAB s technical infrastructure and system development is carried out in line with the DANUBE FAB Concept of Operations, European Regulations and with the Interim Deployment Programme, the European Single Sky Implementation (ESSIP) and the respective Local Single Sky Implementations (LSSIPs). The harmonisation of the objectives for the European ATM Network (EATMN) systems and services supporting the future DANUBE FAB environment is achieved through Transfer Activities and Required System Changes for Implementation within DANUBE FAB document which was created based on DANUBE FAB Refined Target Architecture The BULATSA System renewal is envisioned in The system specifications and functionalities will be in line with the Common projects and the SESAR deployment programme. The system will be required to ensure interoperability with the other neighbouring systems, enabling synergy at FAB, at regional level and with the NM systems. LSSIP Year 2014 Bulgaria 21 Released Issue

39 Chapter 4 - National Projects Project Name: A-SMGCS Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Replacing the old ground surveillance radar with the implementation of A-SMGCS Level 1 and elements of A- SMGCS Level 2 - the Control Function and Runway incursion monitoring. Schedule/Implementation planning Scheduled for completion: 2015 Status Implementation of the project is in near completion and is proceeding according to the established schedule. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: AOP04.1, AOP04.2 OI Steps: - Other References: ESSIP/LSSIP: * Bulgaria joined the applicability area of the objectives above at a later date. ATM Master Plan: OIs - AO-0102 AO-0201 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency Improves ground capacity during low visibility. Improving safety of operations in Sofia airport with surface conflict detection and alerting on runways and the whole manoeuvring area. The runway incursion probability is expected to decrease two fold. Less exhausted gases emissions and noise pollution due to optimized taxi and holding points time and weather delay. Two times greater economic benefits to costs due to less delays on ground and final approach, flight efficiency. The ASMGCS web-based application will prove a valuable tool for providing statistics regarding airport movements correlated to runway, taxiway, and apron pavement strength (gross weight vs PCN and its deterioration from usage). Project Name: Organisation(s) Communication infrastructure for A/G Data Link Services BULATSA (BG) Description/Scope/Objectives Project Code: Building communications infrastructure and contracting the communication providers to ensure the A/G Data Link Services as per Regulation (EC) 29/2009. Schedule/Implementation planning Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-AGDL OI Steps: AUO-0301 Other References: AGDL is prerequisite to AF 6 Initial Trajectory Information Sharing (i4d). Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Increased capacity through both reduction of voice congestion and increase in controller efficiency. LSSIP Year 2014 Bulgaria 22 Released Issue -

40 Safety Environment (including flight efficiency) Cost efficiency Through the delivery of standard and unambiguous messages (entailing significant error and fatigue reduction), the provision of a communications back up and the possibility of immediate message retrieval, data link communications are a major safety enhancement. - (1) Data link is a cost-effective capacity increase enabler through sector productivity increase and delay cost savings. Staff cost avoidance expected. (2) En-route cost savings and reduction of delays of the AUs. Project Name: Organisation(s) Modernisation of the A/G radio communication equipment BULATSA (BG) Description/Scope/Objectives Project Code: Modernisation of radio VHF air-ground radio equipment to allow 8,33 KHz channel spacing. Gradual replacement of FM radio "air-ground' with 8,33 khz channel spacing and installation of new frequencies in compliance with Regulation (EC) 1265/2007, Regulation (EU) 1079/2012. Schedule/Implementation planning Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-AGVCS2 OI Steps: Other References: En - CTE-C5 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency - Additional sectors availability for optimal sector configuration. Redundancy and avoidance of frequency interference. - - Project Name: New ATM system Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Procurement and deployment of a new automated ATC system to implement the Common projects and the SESAR deployment programme and replace the existing one, which lifecycle expires. The system will be required to ensure interoperability with the other neighbouring systems, enabling synergy at regional level and with the NM systems. Schedule/Implementation planning Status Pre-definition phase. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: AOM19, AOM21, ATC02.2, ATC02.5, ATC02.6, ATC12, ATC15, ATC17, FCM03, ITY-AGDL OI Steps: - Other References: PCP: AF1 - Arrival Management extended to en-route Airspace, AF3 - Flexible Airspace Management And Free Route, AF4 - Network Collaborative Management, AF6 Initial Trajectory Information Sharing LSSIP Year 2014 Bulgaria 23 Released Issue

41 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity According the SESAR Deployment program and Common projects functionalities. E-AMAN: Improved airport/tma capacity of Istanbul. Optimum capacity of Sofia ACC to support Istanbul operations. Safety Environment (including flight efficiency) Cost efficiency According the SESAR Deployment program and Common projects functionalities. According the SESAR Deployment programme and Common projects functionalities. E-AMAN - Reduced holding and low level vectoring has a positive environmental effect in terms of noise and fuel usage at Istanbul airport. According the SESAR Deployment program and Common projects functionalities. E-AMAN - Reduced costs through reduction in delays at Istanbul airport and the adjacent Sofia ACC. Project Name: Organisation(s) New PSRs and SSRs (en-route and TMA) BULATSA (BG) Description/Scope/Objectives Project Code: New en-route Varbitza and Cherni Vrah PSRs and SSRs and new TMA PSR and SSR at Sofia airport. Schedule/Implementation planning Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-SPI OI Steps: - Other References: En - CTE-S5 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency Providing the necessary radar coverage to provide reduced separation in the ACC /Sofia TMA. (1) Monitoring of independent non-cooperative targets and aircrafts with technical problems. (2) Reservation if frequency 1090 blocked (ADS-B, WAM, Mode-S). (3) Unambiguous radar identification. (4) Improved integrity of radar data, avoiding the deficiency of codes. Providing the necessary radar coverage to enable DCT, FRA and shorter routes. Lower maintenance costs, distant control and better serviceability. - Project Name: SATCAS upgrade Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Upgrade of the automated ATC system SATCAS to enable CPDLC in compliance with Regulation (EC) 29/2009. Schedule/Implementation planning As per provision of Regulation (EC) 29/2009. Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-AGDL OI Steps: - LSSIP Year 2014 Bulgaria 24 Released Issue

42 Other References: AGDL is prerequisite to AF 6 Initial Trajectory Information Sharing (i4d). Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency Increased capacity through both reduction of voice congestion and increase in controller efficiency. Through the delivery of standard and unambiguous messages (entailing significant error and fatigue reduction), the provision of a communications back up and the possibility of immediate message retrieval, data link communications are a major safety enhancement. - Data link is a cost-effective capacity increase enabler through sector productivity increase and delay cost savings. Staff cost avoidance expected. En-route cost savings and reduction of delays of the AUs. Project Name: VOR DME upgrade Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Modernisation of the VOR / DME navigation system aligned with the EUROCONTROL's Navigation Application & Navaid Infrastructure Strategy for the ECAC area up to 2020 and the 2015 Airspace Concept & Strategy for the ECAC Area & Key Enablers. Schedule/Implementation planning Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: NAV03 OI Steps: - Other References: - Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety Environment (including flight efficiency) Cost efficiency The new system will enable safe operations after expiry of the useful life of the old equipment. - Optimisation of the expenses due to unification of the VOR infrastructure. Project Name: WAM and ADS-B Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Procurement and deployment of Wide area multilateration (WAM) and automatic dependent surveillance (ADS-B). Schedule/Implementation planning Status The implementation is ongoing. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-SPI OI Steps: - Other References: En -CTE-S1b, En-CTE-S5 LSSIP Year 2014 Bulgaria 25 Released Issue

43 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency - Optimised capacity in the TMAs to ensure redundant coverage. Unambiguous radar identification. Improved integrity of the radar data using parameters from the aircraft. Improving the systems ensuring safety. - LSSIP Year 2014 Bulgaria 26 Released Issue

44 Chapter 5 - Regional Co-ordination 5.1 FAB Co-ordination The DANUBE FAB is currently under phase 4 FAB Implementation phase. The State Agreement on the establishment of the DANUBE FAB between the Republic of Bulgaria and Romania was signed in December 2011 and was ratified by both governments in The Agreement entered into force on 16 November 2012, thus ensuring the legal basis for the FAB ahead of the SES deadline. DANUBE FAB project phases The DANUBE FAB State Agreement provides the overarching legal framework for the governance of the FAB. The core bodies are: - Governing Council: provides oversight and approval of key FAB documentation (annual plans, safety policy, airspace policy, performance plans, etc). - NSA Board: provides a formal coordination and an interface between the NSAs involved in supervisory tasks at DANUBE FAB level. - ANSP Board: oversees implementation of the FAB at the ANSP level via the ANSP agreement. - Airspace Policy Body: responsible for enhancing the joint civil-military coordination process and for the flexible use of airspace application within the cross-border airspace. NSA Board DANUBE FAB Governing ANSP Board Airspace Policy Body Approved structure, enabled by State Agreement OSC SAPSC Administrative Cell SQSESC Enabled by ANSP Cooperation Agreement Figure 1: DANUBE FAB Governance Structure The ANSP Board is supported in the implementation of the FAB through its working arrangements, including specialised Standing Committees or other supporting bodies established in accordance with their respective Rules of Procedures. LSSIP Year 2014 Bulgaria 27 Released Issue

45 In turn the ANSP Board is supported by the Strategy and Planning Standing Committee (SAPSC) for all DANUBE FAB cooperation domains, and is composed of ANSP experts. It is supported by the Operations Standing Committee (OSC) which carries out work in the areas of operations, technical and training, and by the Safety, Quality, Environment and Security Standing Committee (SQSESC) which performs the necessary tasks in its domain areas. ANSP Board SAPSC Administrative Cell OSC SQSESC Figure 2: DANUBE FAB ANSP Working Structure The Administrative Cell supports the SAPSC and is guided in its work by a set of overarching documents including the Project Management Plan (including the Communications Plan and Quality Management Plan) as well as the DANUBE FAB State Agreement and ANSP Cooperation Agreement. Realising the importance of implementing a number of initiatives, and in the spirit of collaboration and cooperation and bearing in mind the positive experience gained through the TEN-T financing of the DANUBE FAB activities in the period , in 2013 the DANUBE FAB ANSPs also successfully applied for TEN-T funds to assist the execution of studies and simulations. Elements of FRA and Air- Ground Data Link (AGDL) implementation are financially supported by the European Commission, and the activities have been designed to determine the most cost efficient ways to implement these concepts, whilst optimising the benefits for all ATM stakeholders. The TEN-T Action is seen as an important enabler for next phases of the FRA initiative implementation. DANUBE FAB s application was one of the few successful proposals in the field of ATM, and the only successful FAB proposal approved for financial support from the TEN-T programme under the Multi- Annual Work Programme for grants in the period In order to meet its ambitions and goals, DANUBE FAB has developed a comprehensive Strategic Program, which provides a high level overview of how and when the strategic objectives are to be achieved. The Strategic Program identified a number of priority projects, representing the most urgent and important issues for DANBUE FAB. These priority projects reflect the elements specified in the EU legislation and activities subject to TEN-T funding, among other activities. The referred high priority initiatives are: - Implementation of the Free Routes Airspace: An intermediate expansion step will take place in 2015, with night-time FRA at DANUBE FAB level planned for introduction in Q Depending on the outcome of the TEN-T studies, phase 3 (extension to up to 24/7 operations) is planned for Inter-FAB cooperation: DANUBE FAB is committed to cooperating and coordinating with other FABs. The cooperation is mainly focused on neighbouring FABs and third countries with a view to exchanging information on plans and activities and maximizing the benefits of operational improvements. In support of these initiatives DANUBE FAB will host the next European level inter-fab coordination workshop in Technical rationalization and infrastructure: DANUBE FAB will continue to identify opportunities to coordinate, rationalise and share technical infrastructure to generate cost savings and to further evolve the FAB. DANUBE FAB firmly believes that common procurement is an area for cooperation that will further improve the capacity and efficiency of ANS provision. - Data Link Services: A harmonised FAB approach towards DLS implementation has been established through the TEN-T activities. The studies have developed efficient procedures and LSSIP Year 2014 Bulgaria 28 Released Issue

46 provide an early insight into how the DLS will affect ATCO workload and how this translates into available airspace capacity. The execution of a real time simulation and the preparation of a supporting safety case are currently in progress, and will be used during the implementation of air-ground data link in DANUBE FAB. The DANUBE FAB Annual Plan 2014 consists of the adopted Activities and Tasks for 2014 and is based upon an extraction of the appropriate tasks identified in the DANUBE FAB Strategic Program In accordance with the State Agreement, the Annual Plan details the features of the Strategic Program, including the identification of responsibilities and timescales, and describes any modifications to the Strategic Program. In addition, a number of priority projects have been identified, representing the most urgent issues for DANBUE FAB in These priority projects therefore reflect, inter alia, the elements specified in the EU Pilot and activities subject to TEN-T funding. The aim of identifying such projects is to ensure focus is placed on the significant and vital tasks within DANUBE FAB and to assist in the planning, execution and monitoring of the associated activities. The development of the Annual Plan 2015 is scheduled to be completed by the end of the year. In order to meet its ambitions and goals, DANUBE FAB has developed a comprehensive Strategic Program, which provides a high level overview of how and when the strategic objectives are to be achieved. The Strategic Program identified a number of priority projects, representing the most urgent and important issues for DANBUE FAB. These priority projects reflect the elements specified in the EU legislation and activities subject to TEN-T funding, among other activities. For more details, please visit the DANUBE FAB website: LSSIP Year 2014 Bulgaria 29 Released Issue

47 5.2 FAB Projects Project Name: Organisation(s) Description/Scope/Objectives Activities to support the implementation of the IDP within DANUBE FAB EU S TEN-T BULATSA (BG), ROMATSA (RO) Project Code: DANUBE FAB EU S TEN-T The project concerns the DANUBE FAB requirements to improve air traffic management performance and the deployment of SESAR. The project is mainly focused on completion of a number of studies with the aim at the completion of the Interim Deployment Programme (IDP) established by the SES in the deployment of the initial set of SESAR solutions at the DANUBE FAB level. The project consists of development of a number of studies for the introduction of Free Route Airspace (up to 24/7 operations) and Data Link Services using Air Ground Data Link (AGDL) at FAB level. These preparatory activities ensure the most cost efficient and beneficial implementation of the concepts. Schedule/Implementation planning / Status The status of the project can be indicated through the status of its milestones as reflected in the financing decision for the project, as follows: 1. Approval of DLS operational concept at FAB level [31/05/2013] - Status: Completed; 2. Completion of procurement procedure for contracting project management services [31/07/2013] - Status: Completed; 3. Completion of procurement procedures for the contracting of CPDLC Simulation [31/07/2014] - Status: Completed; 4. Completion of procurement procedures for the contracting of CPDLC safety case [31/07/2014] - Status: Completed; 5. Completion of procurement procedures for contracting of FRA RTS [31/12/2014] - Status: Completed; 6. Preparation and conducting of procurement procedure for contracting external support for FRA safety case [31/12/2014] - Status: On-going public procurement procedure; 7. Delivery of DLS RTS Project Management Plan, completion of data preparation and completion of DLS RTS [31/12/2014] - Status: Completed; 8. Completion of DLS safety case [31/12/2014] - Status: Completed; 9. Delivery of FRA RTS Project Management Plan, completion of data preparation and completion of FRA RTS [31/12/2015] - Status: On-going; 10. Completion of FRA safety case [31/12/2015] - Status: Pending (waiting the awarding of the contract point 6 above). Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: AOM21, ITY-AGDL OI Steps: - Other References: ATM Master Plan: OI AOM-0401 OI AOM-0402 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity DLS preparatory activities - The introduction of AGDL in Europe is estimated to have a 10% net benefit on en-route capacity and is therefore a key enabler of the EU wide capacity target of en-route ATFM delay of lower than 0.5 minutes per flight. Given the low level of delay in the DANUBE FAB, this investment is not necessary for the achievement of the local target, but the nature of AGDL is that the benefit will be accrued in the core- European airspace where delays are in excess of the national targets. FRA preparatory activities - The effect on capacity will be determined after the completion of the DANUBE FAB FRA real time simulation. LSSIP Year 2014 Bulgaria 30 Released Issue

48 Safety DLS preparatory activities - The implementation of DLS at FAB level hasis expected to contribute to safety by providing a second communication channel between controllers and pilots and by reducing the probability of misunderstandings. Environment (including flight efficiency) FRA preparatory activities - The effect on safety will be determined after the completion of the DANUBE FAB FRA real time simulation. FRA preparatory activities - The introduction of FRA will enable the DANUBE FAB to deliver direct routes for the en-route segment and hence contribute fully to the EU-wide target of enroute horizontal flight efficiency. Cost efficiency DLS preparatory activities - N/A DLS preparatory activities - Optimised operating costs associated with more efficient sectorisation -due to the enabled by the DLS sector capacity increase. Cooperation Activities FRA preparatory activities - FRA will contribute towards the achievement of EU-wide costefficiency target, through maintaining the workload levels and high throughput. This will make a further contribution towards the optimised use of airspace. On-going FRA RTS and procurement procedure for FRA Safety Case. Project Name: Organisation(s) Description/Scope/Objectives Identify, coordinate and develop new opportunities for the FAB BULATSA (BG), ROMATSA (RO) Project Code: DANUBE FAB Activity A12 The objective of the project is to cooperate at inter-fab level with neighbouring FABs and third States with a view to exchanging information on plans and activities and to maximize the benefits of operational improvements. Schedule/Implementation planning Status The DANUBE FAB ANSPs are signatories parties of the GateOne cooperation agreement on the creation of the regional ANSP platform of Central and Eastern Europe which was signed by 11 ANSPs from FAB CE, DANUBE FAB and Baltic FAB, with the aim to promote the efficiency of European ATM through an enhanced cooperation among the participating service providers and to ensure a more powerful and coordinated role of the countries of the region in the European decision-making processes. In October 2014 DANUBE FAB ANSPs agreed with BLUE MED FAB a Letter on ANSP level cooperation in FAB matters with the purpose to establish regular cooperation with a view to exchanging information on plans and activities carried out within the FAB framework, especially in the areas of operations, technical, training, performance and safety. It is envisaged that an agreement with FAB CE on the matter can be concluded in DANUBE FAB will has begun an operational trial with FAB CE on 6th October 2014 to implement control of transfer procedures to enable a reduced horizontal separation at the interface between the two FABs at all FLs. This is expected to enable increased capacity for both parties. DANUBE FAB will has also attended an inter-fab coordination workshop in Amsterdam on 18th and 19th November Several DANUBE FAB initiatives to cooperate with Serbia, Moldova and FYROM have been undertaken. It is a long-term strategy of DANUBE FAB to extend its geographical scope; for this purpose the DANUBE FAB has developed an Observers policy to enable other States and FABs to participate in order to ease the transition towards full partnership. DANUBE FAB would appreciate the Commission s support in achieving this. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references LSSIP Year 2014 Bulgaria 31 Released Issue

49 ESSIP: - OI Steps: - Other References: DANUBE FAB Strategic Program Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities In terms of the EU wide performance targets, cooperation at inter-fab level with neighbouring FABs and third States will enable full benefit and contribution to the EU-wide environment target, and will make a further contribution towards the optimised use of airspace. The ANSPs will cooperate on activities carried out within the FAB framework, especially in the areas of operations, technical, training, performance and safety. Project Name: Implementation of Data Link Services Project Code: DANUBE FAB Activity A42 Organisation(s) Description/Scope/Objectives BULATSA (BG), ROMATSA (RO) The DANUBE FAB partners are committed to implementing air-ground data link in a coordinated manner, and agreed to find a common operational concept for the services, including the conformity of communications, flight data and initial flight planning processing systems, and ensuring that ground communication systems comply with the air-ground communication requirements. Schedule/Implementation planning As per provision of Regulation (EC) 29/2009. This activity remains in progress. Status In 2014, the DANUBE FAB ANSPs negotiated a contract with communication service providers (SITA and/or ARINC) to ensure the ground communication systems, and their constituents apply air-ground communications for CM and CPDLC data exchanges in compliance with Article 9 of Regulation (EC) No 29/2009, allowing ATN/VDL2. This activity remains in progress. To support the DLS activity, the DANUBE FAB ANSPs successfully applied for TEN-T funds, with the aim of optimising the air-ground data link implementing to reduce costs and to maximise network benefits. Through this approach, the DANUBE FAB ANSPs will ensure that implementation will achieve maximum cost efficiency and value for money. Through the TEN-T activity, a harmonised FAB approach towards DLS implementation has been established. The studies will develop efficient procedures and provide an early understanding of how the DLS implementation will affect ATCO workload and how this would eventually translate into available airspace capacity. Under the co-financed activity the DANUBE FAB ANSPs have defined a common operational concept, including the development of a common operating and training procedures for DLS operations within the FAB. This was completed in May In November 2014, the DANUBE FAB ANSPs performed an RTS, with the clear objective to study the implementation of the DLS and associated procedures. Through this RTS the DANUBE FAB ANSPs validated the operational concept and aspects of CPDLC (such as functionalities, HMI and the related procedures). During the same period, a Safety Case study for DLS was conducted. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: ITY-AGDL OI Steps: - Other References: OI AUO 0301 LSSIP Year 2014 Bulgaria 32 Released Issue

50 DANUBE FAB Strategic Program Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency Cooperation Activities The introduction of AGDL in Europe is estimated to have a 10% net benefit on en-route capacity and is therefore a key enabler of the EU-wide capacity target of en route ATFM delay of lower than 0.5 minutes per flight. Given the low level of delay in DANUBE FAB, this investment is not necessary for the achievement of the local target, but the nature of AGDL is that the benefit will be accrued in the core-european airspace where delays are in excess of the national targets. The implementation of DLS at FAB level has to contribute to safety by providing a second communication channel between controllers and pilots and by reducing the probability of misunderstandings. - DLS will contribute towards the achievement of EU-wide cost-efficiency target, through maintaining the workload levels and high throughput. This will make a further contribution towards the optimised use of airspace. Cooperation activities for the development of the safety case in support of the implementation of the data link within the DANUBE FAB airspace. Project Name: Organisation(s) Description/Scope/Objectives Implementation of Voice Over Internet Protocol (VOIP) in ATM (airground) BULATSA (BG), ROMATSA (RO) Project Code: DANUBE FAB Activity A39 Procurement and deployment of a new common system for operational voice communications (VCS) for both ANSPs. Schedule/Implementation planning Status The new VCS system is installed by ROMATSA and it is currently undergoing installation in the premises of BULATSA (envisaged for Q3 2015). Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: COM11 OI Steps: - Other References: En - CTE-C8 DANUBE FAB Strategic Program Expected Performance Contribution (specific to the participating organisation(s)) * Capacity Safety Environment (including flight efficiency) Cost efficiency The VCS will allow is an enabler towards improved capacity as it a prerequisite for dynamic sectorisation through enhanced allocation of voice. The new VCS will provide enhanced communication channels allowing for improved capacity, flexibility and availability of the communication system. N/A Cooperation Activities Optimised cost-efficiency due to common procurement and large scale implementation at FAB level). Cooperation activities for the development of the safety assessment for the changes, common procurement and synchronised deployment of equipment to support VoIP in ATM, testing activities, etc. LSSIP Year 2014 Bulgaria 33 Released Issue

51 Project Name: Organisation(s) Description/Scope/Objectives Route Implementation and Improvement Free Routing BULATSA (BG), ROMATSA (RO) Project Code: DANUBE FAB Activity A42 FRA Operations Implementation in DANUBE FAB as a Project includes, inter alia, actions for the definition of a common operational concept, common operating and training procedures and development of a safety case for FRA Operations within DANUBE FAB, to give assurance that provision of ATS in DANUBE FAB, after implementation of FRA Operations, will remain at least as safe as today or will improve safety. This Project includes a large scale Real Time Simulation (RTS) to prove the most applicable extension of FRA operation hours during day and night. The aim of this activity is to focus on the extension of DANUBE FAB FRA Operations during night towards full (24 hour) free route operations implementation. Project s phases: - Phase I Implementation of night Free Route operations within national boundaries COMPLETED on 14th November 2013, six months ahead of schedule; - Phase II Implementation of night DANUBE FAB common FRA will be introduced in Q1 2016; - Phase III Extension of Free Route operations outside the night period (up to 24/7 operations) is planned to be achieved in Schedule/Implementation planning Status The DANUBE FAB stakeholders invested significant effort in order to successfully implement phase 1 of the DANUBE FAB FRA project (i.e. FRA at national level at night time) by 14th November 2013 six months ahead of schedule and earlier than the expectations of the NSP (planned for 2014). This marks the successful implementation of the first phase of FRA within DANUBE FAB, with two further phases to follow, unlocking increased benefits for airspace users. The inception of FRA project in DANUBE FAB has started to fully open the airspace, providing virtually unrestricted flight planning freedom without a pre-defined set of Direct Routing (DCT) options. Initial FRA project set-up, combined with other network improvements provides an unmatched performance in terms of flight trajectory efficiency. In December 2014, DANUBE FAB concluded an agreement with EUROCONTROL to provide a Real Time Simulation to determine the most applicable extension of Free Routes Airspace up to 24/7 operations within DANUBE FAB airspace. Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: AOM21, ITY-AGDL OI Steps: - Other References: ATM Master Plan: OI AOM-0401 OI AOM-0402 DANUBE FAB Strategic Program Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - LSSIP Year 2014 Bulgaria 34 Released Issue

52 Environment (including flight efficiency) In terms of the EU wide performance targets, FRA will enable full benefit and contribution to the EU-wide environment target, and will make a further contribution towards the optimised use of airspace. For the first six months of 2014 the average en-route extension (as measured by the Performance Scheme s actual horizontal flight efficiency Key Performance Indicator (KPI) (KEA KPI) for DANUBE FAB has been significantly reduced compared to the same period in 2013 (according to the data provided by the PRB). Cost efficiency Cooperation Activities Extension of Free Route operations outside the night period (daytime FRA) by 2019, will enable full benefit and contribution to the EU-wide environmental target. FRA will contribute towards the achievement of EU-wide cost-efficiency target, through maintaining the workload levels and high throughput. This will make a further contribution towards the optimised use of airspace. Ongoing activities for FRA Real Time Simulation (RTS) and FRA Safety Case. LSSIP Year 2014 Bulgaria 35 Released Issue

53 5.3 Regional cooperation In order to achieve some of the ESSIP objectives, the Bulgarian DGCAA and BULATSA have to coordinate some of their actions with a number of adjacent ATS units. The LSSIP document would also help to foster regional co-ordination with neighbouring states by identifying mutually dependent actions. Bulgaria constantly promotes and boosts the co-operation in the region through their active participation in several regional initiatives and agreements. In 2011 BULATSA and SMATSA (Serbia and Montenegro ANSP) concluded an Agreement on SMATSA/BULATSA Operational-Technical Cooperation. The Agreement establishes a framework for operational-technical cooperation between both ANSPs with the purpose of improving safety and efficiency of ANS provision in their areas of responsibility. This enables coordination in a number of areas of common interest, such as ATM, Communication Navigation and Surveillance (CNS), harmonization of ATCO staff, Civil-Military aspects, regional Contingency Plans, flights checks and calibration of NAVAIDs, safety and quality, and performance. A number of expert and managerial meetings have taken place so as to coordinate common actions. In 2012 BULATSA and DHMI (Turkish ANSP) signed a Memorandum of Cooperation on technical and operational issues. Collaboration between BULATSA and DHMI is focused on radar data exchange, harmonisation of flight rules, development of a regional emergency plan, as well as other operational and technical activities and procedures aimed at the provision of quality air navigation services in the region. In the reporting period a number of meetings were organised related to the air traffic situation in the region. The DANUBE FAB ANSPs are signatories of the GateOne cooperation agreement on the creation of the regional ANSP platform (GateOne) of Central and Eastern Europe which was signed on 6 th November 2013 by 10 ANSPs (an 11 th joined in January 2014) in Sofia. GateOne aims to promote the efficiency of European ATM through an enhanced cooperation among the participating service providers, to ensure a more powerful and coordinated role of the countries of the region in the European decision-making processes. The platform is intended to explore areas of mutual interest, common goals, objectives and synergies between the partners, as well as to initiate cooperation in different fields related to Single European Sky (SES). It is also envisaged to carry out lobbying activities for the benefit of GateOne partners. GateOne encompasses three FABs (FAB CE, DANUBE FAB and Baltic FAB) and serves as a framework for exchange of best practices and elaboration of consolidated positions on ATM related matters. In October 2014 DANUBE FAB ANSPs agreed with BLUE MED FAB a Letter on ANSP level cooperation in FAB matters with the purpose to establish regular cooperation with a view to exchanging information on plans and activities carried out within the FAB framework, especially in the areas of operations, technical, training, performance and safety. It is envisaged that an agreement with FAB CE on the matter can be concluded in DANUBE FAB has begun an operational trial with FAB CE on 6th October 2014 to implement control of transfer procedures to enable a reduced horizontal separation at the interface between the two FABs at all FLs. This is expected to enable increased capacity for both parties. The DANUBE FAB has also attended an inter-fab coordination workshop in Amsterdam on 18th and 19th November Several DANUBE FAB initiatives to cooperate with Serbia, Moldova and FYROM have been undertaken. It is a long-term strategy of DANUBE FAB to extend its geographical scope; for this purpose the DANUBE FAB has developed an Observers policy to enable other States and FABs to participate in order to ease the transition towards full partnership. DANUBE FAB would appreciate the Commission s support in achieving this Radar Data Sharing Bilateral agreements for sharing of radar data were signed with Macedonia and Romania. BULATSA sends to Skopje ACC the Vitosha MSSR data and receives Banjski Rid s MSSR data. BULATSA sends to Bucharest ACC the Vitosha and Varbica MSSR data and receives the Bucuresti and Constanca MSSR data. The radar data sharing with Greece has been implemented in BULATSA sends to HCAA the Vitosha/Varbica MSSR data and receives the Thesalloniki/Pillion MSSR data. In 2011 BULATSA signed a bilateral agreement with the Serbia and Montenegro Air Traffic Services Agency (SMATSA). According to that agreement BULATSA receives radar data from Murtenica and Koviona radars and sends radar data to ATC Belgrade from Vitosha and Sofia radars. LSSIP Year 2014 Bulgaria 36 Released Issue

54 5.3.2 OLDI Links BULATSA established the following OLDI links with the external/internal ATS units: SOFIA ACC - ATH/MAC ACCs; SOFIA ACC - SKOPJE ACC; SOFIA ACC - BEOGRADE ACC; SOFIA ACC - BUCHAREST ACC; SOFIA ACC - SIMFEROPOL ACC; SOFIA ACC - IST/ANK ACCs Voice communication MFC links MFC/R2 connections have been established with the following external/internal ATS units: SOFIA ACC - ATH/MAC ACC; SOFIA ACC - MAKEDONIA APP; SOFIA ACC - BEOGRAD ACC; SOFIA ACC - SKOPJE ACC; SOFIA ACC - BUCHAREST ACC; SOFIA ACC - VARNA APP; SOFIA ACC - BURGAS APP; VARNA APP - BURGAS APP; SOFIA ACC - ISTANBUL ACC; SOFIA ACC - ANKARA ACC Regional Route Network Developments Further improvements of the ATS network in South-East Europe have been addressed during the RNDSG meetings. The main objectives are to review the route network improvement proposals raised by States, IATA, IACA and EUROCONTROL. The proposals that affect Bulgaria are related to the interfaces with Serbia and Romania. In the night of 13/14 November 2013 BULATSA implemented the Free Route Airspace Concept into the airspace of the Republic of Bulgaria. This concept allows the airspace users to freely plan a route via published way points and radio navigation aids without complying with the existing system of air routes. Initially the concept will be applied at night (from 1:00 a.m. to 7:00 a.m. local time) for all aircraft performing flights above flight level 245 (7450 m). In the long-term the application of the concept will result in reduced emissions from aviation activities and will contribute to achieving a faster, more efficient and more affordable air transport at the same or higher levels of safety Regional Communication Network Until 2010 the regional network used to cover Sofia, Skopje, Athens, Bucharest, Simferopol, Istanbul and Ankara ACCs. The Beograd ACC joined the network in LSSIP Year 2014 Bulgaria 37 Released Issue

55 5.3.6 Regional Projects Project Name: OLDI links Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives BULATSA established the following OLDI links with the external/internal ATS units: - SOFIA ACC - ATH/MAC ACCs; - SOFIA ACC - SKOPJE ACC; - SOFIA ACC - BEOGRADE ACC; - SOFIA ACC - BUCHAREST ACC; - SOFIA ACC- SIMFEROPOL ACC; - SOFIA ACC IST/ANK ACCs. Schedule/Implementation planning - Status - Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: - OI Steps: - Other References: - Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities - - Project Name: Radar Data Sharing Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Bilateral agreements for sharing of radar data were signed with Macedonia and Romania. BULATSA sends to Skopje ACC the Vitosha MSSR data and receives Banjski Rid s MSSR data. BULATSA sends to Bucharest ACC the Vitosha and Varbica MSSR data and receives the Bucuresti and Constanca MSSR data. The radar data sharing with Greece has been implemented in BULATSA sends to HCAA the Vitosha/Varbica MSSR data and receives the Thesalloniki/Pillion MSSR data. In 2011 BULATSA signed a bilateral agreement with the Serbia and Montenegro Air Traffic Services Agency (SMATSA). According to that agreement BULATSA receives radar data from Murtenica and Koviona radars and sends radar data to ATC Belgrade from Vitosha and Sofia radars. Schedule/Implementation planning - Status - Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: - OI Steps: - Other References: - LSSIP Year 2014 Bulgaria 38 Released Issue

56 Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities - - Project Name: Regional Communication Network Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives Until 2010 the regional network used to cover Sofia, Skopje, Athens, Bucharest, Simferopol, Istanbul and Ankara ACCs. The Beograd ACC joined the network in Schedule/Implementation planning - Status - Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: - OI Steps: - Other References: - Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities - - Project Name: Organisation(s) Regional Route Network Developments BULATSA (BG) Description/Scope/Objectives Project Code: Further improvements of the ATS network in South-East Europe have been addressed during the RNDSG meetings. The main objectives are to review the route network improvement proposals raised by States, IATA, IACA and EUROCONTROL. The proposals that affect Bulgaria are related to the interfaces with Serbia and Romania. - In the night of 13/14 November 2013 BULATSA implemented the Free Route Airspace Concept into the airspace of the Republic of Bulgaria. This concept allows the airspace users to freely plan a route via published way points and radio navigation aids without complying with the existing system of air routes. Initially the concept will be applied at night (from 1:00 a.m. to 7:00 a.m. local time) for all aircraft performing flights above flight level 245 (7450 m). In the long-term the application of the concept will result in reduced emissions from aviation activities and will contribute to achieving a faster, more efficient and more affordable air transport at the same or higher levels of safety. Schedule/Implementation planning - LSSIP Year 2014 Bulgaria 39 Released Issue

57 Status - Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: - OI Steps: - Other References: - Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities - - Project Name: Voice communication MFC links Project Code: - Organisation(s) BULATSA (BG) Description/Scope/Objectives MFC/R2 connections have been established with the following external/internal ATS units: - SOFIA ACC - ATH/MAC ACC; - SOFIA ACC - MAKEDONIA APP; - SOFIA ACC - BEOGRAD ACC; - SOFIA ACC - SKOPJE ACC; - SOFIA ACC - BUCHAREST ACC; - SOFIA ACC - VARNA APP; - SOFIA ACC - BURGAS APP; - VARNA APP- BURGAS APP; - SOFIA ACC ISTANBUL ACC; - SOFIA ACC ANKARA ACC. Schedule/Implementation planning - Status - Link to ESSIP (ATM Master Plan Level 3) / OI Steps (ATM Master Plan Level 2) / Other references ESSIP: - OI Steps: - Other References: - Expected Performance Contribution (specific to the participating organisation(s)) * Capacity - Safety - Environment (including flight efficiency) Cost efficiency - Cooperation Activities - - LSSIP Year 2014 Bulgaria 40 Released Issue

58 Chapter 6 - ESSIP Objective Implementation Conventions Two colour codes are used for each ESSIP Objective box : o o one colour code is used to show the Objective Scope in the Objective ID cell, and another colour code is used to show the Objective Progress in the State and for each national stakeholder. Obj. ID (*) Obj. Title (By mm/yyyy of overall objective, inc non-state SloAs) Obj. Progress (**) State s high level progress statement REG (By:mm-yyyy) (By:mm-yyyy) MIL (By:mm-yyyy) APO (By:mm-yyyy) REG high level progress statement high level progress statement MIL high level progress statement APO high level progress statement State Impl. Date APO. Progress (**) APO Impl. Date. Progress (**) Impl. Date MIL. Progress (**) MIL Impl. Date APO. Progress (**) APO Impl. Date (*) Objective Scope Code: (**) Objective/Stakeholder Progress Code: ECAC Completed No Plan EU+ Partly Completed Not Applicable Multi-N Planned Missing Data APT Late LSSIP Year 2014 Bulgaria 41 Released Issue

59 AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling Timescales: Initial operational capability: 01/01/2012 Full operational capability: 31/12/2018 [IDP] BULATSA and the Bulgarian military authority plan to apply the same rules, principles and procedures concerning the OAT/GAT interface. The planned actions are in progress and will continue in Revision of the national legislation and recognition of the respective military authorities as military ANSP is in progress. The applicability of EUROAT is considered to be further analysed for implementation. The harmonised OAT flight planning is planned for REG (By:12/2018) (By:12/2018) MIL (By:12/2018) The national Regulation No.19 and Instruction No.24 has been amended. Instruction No.25 is in process of amendment. The national Regulation No.19 and Instruction No.24 has been amended. Instruction No.25 is in process of amendment. The Bulgarian military authority plans to apply the same rules, principles and procedures concerning the OAT/GAT interface. Revision of the national legislation and recognition of the respective military authorities as military ANSP is in progress. There are no plans for EAD migration. The harmonised OAT flight planning is planned for The applicability of EUROAT is considered to be further analised for implementation. Implement Advanced Airspace Management Timescales: [IDP] AOM19 Initial operational capability: 01/01/2011 Full operational capability: 31/12/2016 The improved ASM/ATFCM process has been implemented. The rolling ASM/ATFCM was implemented in BULATSA plans to exchange data with ADR by The implementation of LARA tool is planned for (By:12/2016) The improved ASM/ATFCM process has been implemented. The rolling ASM/ATFCM process was implemented in The data exchange with ADR is planned for The implementation of LARA tool is planned for BULATSA has obtained a certificate from the NSA for the use of LARA. For the military, the improved ASM/ATFCM process has been implemented. The rolling ASM/ATFCM process was completed in The military authority will take into consideration the deployment of LARA tool by New ATM system Planned 31/12/2015 Planned 31/12/2015 Planned 31/12/2015 Planned 31/12/2015 Partly Completed 31/12/2015 Partly Completed 31/12/2015 AOM21 Implementation of Free Route Airspace Timescales: [IDP] Initial operational capability: 01/09/2013 Completed Full operational capability: 31/12/2017 Night FRA was implemented in Bulgaria in /11/2013 (By:12/2017) Night FRA was implemented in Bulgaria in Activities to support the implementation of the IDP within DANUBE FAB 2012 EU S TEN T / New ATM system / Route Implementation and Improvement Free Routing Completed 30/11/2013 LSSIP Year 2014 Bulgaria 42 Released Issue

60 Improve runway safety by preventing runway incursions Timescales: [IDP] AOP03 Initial operational capability: 01/04/2003 Full operational capability: 31/12/2013 The Safety Runways Teams for all 5 international airports in Bulgaria were established in They have been tasked to assess the existing aerodrome practices and procedures and identify the area of improvements. The EAPPRI recommendations which were deemed appropriate have been included in the relevant regulations, instructions and operator manuals. The preparation of the Airport operator Safety Management System (SMS) was completed in REG (By:12/2013) (By:12/2013) APO (By:12/2013) The Safety Runways Teams for all 5 international airports in Bulgaria were established in They have been tasked to assess the existing aerodrome practices and procedures and identify areas of improvements. The EAPPRI recommendations which deemed appropriate have been included in relevant regulations, instructions and operator manuals. The preparation of the Airport operator Safety Management System (SMS) has been completed in At the jointly used civil/military airports (Sofia/Plovdiv), military authorities comply with civilian practices and procedures. They do not have a role of ATC, Airport operator or regulator. The Local Safety runway teams at both airports involve military representatives in respect of the military operations. The EAPPRI recommendations which deemed appropriate have been included in relevant regulations, instructions and operator manuals. Implement Advanced Surface Movement Guidance and Control System (A SMGCS) Level1 AOP04.1 Timescales: Initial operational capability: 01/01/2007 Full operational capability: 31/12/2011 LBSF - Sofia The A SMGCS is planned outside the objective implementation timeframe according the local needs. The procurement of a new A SMGCS system comprising a Surface Movement radar, Multi lateration sensors, data fusion and situation awareness displays started in These technical upgrades, accompanied by ATCO training /licensing in ground movement control are the main pre requisites for the implementation of the Sofia Airport ground control operations. The A SMGCS is planned to be fully operational by the end of February REG (By:12/2010) (By:12/2011) APO (By:12/2010) The mandatory carriage of required equipment which would enable location/identification of the aircraft/vehicles on the manoeuvring area to be enacted for the Sofia Airport operation. National regulation in respect of the Sofia Airport A SMGSC implementation to be enacted by the end of February 2015 The A SMGCS is planned outside the objective implementation timeframe according the local needs. The procurement of a new A SMGCS system comprising a Surface Movement radar, Multi lateration sensors, data fusion and situation awareness displays started In These technical upgrades, accompanied by ATCO training /licensing in ground movement control are the main pre requisites for the implementation of the Sofia Airport ground control operations. The A SMGCS operations are planned to start beginning of Equipage of Sofia airport concerned ground vehicles with transponders is planned to be completed in the beginning of 2015.The necessary equipment is delivered but not installed in the service vehicles yet. A SMGCS Completed Completed Completed Completed Late 28/02/2015 Late 28/02/2015 Late 28/02/2015 Late 28/02/2015 LSSIP Year 2014 Bulgaria 43 Released Issue

61 Implement Advanced Surface Movement Guidance and Control System (A SMGCS) Level 2 AOP04.2 Timescales: Initial operational capability: 01/01/2007 Full operational capability: 31/12/2017 LBSF - Sofia The implementation of A SMGCS level 2 Elements of the Control Function and Runway incursion monitoring is completed and their deployment will coincide with the A SMGCS level 1 (AOP04.1) entry into operations. BULATSA does not intend to implement A SMGCS Routing and Guidance functions. (By:12/2017) APO (By:12/2017) Procured and installed were a new Surface Movement radar, Multilateration sensors, data fusion and situation awareness displays. The controllers are trained for the use of A SMGCS. The A SMGCS level 2 Elements full deployment will coincide with the A SMGCS level 1 entry into operations. The surface movement surveillance equipment would be property of BULATSA, therefore this action is not applicable for the Sofia Airport operator. A SMGCS Partly Completed 28/02/2015 Partly Completed 28/02/2015 Not Applicable AOP05 Implement Airport Collaborative Decision Making (CDM) Timescales: not applicable [IDP] Not Applicable LBSF - Sofia (Outside Applicability Area) Bulgaria is not within the objective applicability area. Not Applicable (By:01/2016) APO (By:01/2016) Not Applicable Implement ground based safety nets Short Term Conflict Alert (STCA) level 2 ATC02.2 Timescales: Initial operational capability: 01/01/2008 Full operational capability: 31/01/2013 BULATSA has implemented a state of the art STCA function within the CNATCC project (SATCAS system) for Sofia ACC/APP. Further adaptation of the STCA parameters and working methods was made in In the context of the 'Tight Tower Project', considered as an extension of SATCAS system, the STCA implementation at the Burgas APP unit was completed in STCA was implemented also at the Varna APP. (By:01/2013) BULATSA has implemented a state of the art STCA function within the CNATCC project (SATCAS system) for Sofia ACC/APP. Further adaptation of STCA parameters and working methods was made in In the context of the 'Tight Tower Project', considered as an extension of SATCAS system, the STCA implementation at the Burgas APP unit was completed in STCA was implemented also at the Varna APP. New ATM system Implement ground based safety nets Area Proximity Warning level 2 ATC02.5 Timescales: Initial operational capability: 01/01/2009 Full operational capability: 31/12/2016 This function was initially implemented at the Sofia ACC/APP units. The APW implementation at the Burgas/Varna APP units was completed in (By:12/2016) This function was initially implemented at the Sofia ACC/APP units. The APW implementation at the Burgas/Varna APP units was completed in New ATM system Completed 31/12/2009 Completed 31/12/2009 Completed 28/02/2009 Completed 28/02/2009 LSSIP Year 2014 Bulgaria 44 Released Issue

62 Implement ground based safety nets Minimum Safe Altitude Warning level 2 ATC02.6 Timescales: Initial operational capability: 01/01/2009 Full operational capability: 31/12/2016 This function was initially implemented at the Sofia ACC/APP units. The MSAW implementation at Burgas APP and Varna APP units was carried out in The adaptation of the MSAW parameters and working methods of the current MSAW implementation was performed in (By:12/2016) This function was initially implemented at the Sofia ACC/APP units. The MSAW implementation at Burgas APP and Varna APP units was carried out in The adaptation of the MSAW parameters and working methods of the current MSAW implementation was performed in New ATM system Completed 31/12/2010 Completed 31/12/2010 ATC02.7 Implement ground based safety nets Approach Path Monitor level 2 Timescales: Initial operational capability: 01/01/2009 Full operational capability: 31/12/2016 No Plan The implementation of APM is not planned. (By:12/2016) The implementation of APM is not planned. No Plan Implement arrival management tools (Outside Applicability Area) ATC07.1 Timescales: not applicable Bulgaria is outside the objective applicability area, therefore the overall objective progress is not applicable. Arrival sequencing and metering has been implemented by Sofia APP unit within the CNATCC. The implementation of Arrival sequencing was completed for Burgas and Varna APP units in No plans exist for the application of AMAN procedures and implementation of AMAN functions for any Bulgarian TMA. (By:12/2015) No plans exist for the application of AMAN procedures and implementation of AMAN functions for any Bulgarian TMA. Implement automated support for conflict detection and conformance monitoring ATC12 Timescales: Initial operational capability: 01/01/2008 Full operational capability: 31/12/2016 MTCD/MONA functions have been implemented within the first version of SATCAS. Further MTCD upgrades and new MONA functions (potential level bust, potential co ordination failure, SSR code assignment) have been implemented within SATCAS v.2. ATCO training for operational use of these advanced functions was conducted in the first quarter of (By:12/2016) MTCD/MONA functions have been implemented within the first version of SATCAS. Further MTCD upgrades and new MONA functions (potential level bust, potential co ordination failure, SSR code assignment) have been implemented within SATCAS v.2. New ATM system Implement, in En Route operations, information exchange mechanisms, tools and procedures in support of Basic AMAN operations [IDP] ATC15 Timescales: Initial operational capability: 01/01/2012 Full operational capability: 31/12/2017 Bulgaria intends AMAN implementation in en route operations to enable smooth operations with Turkey. The actual implementation and planning dates are further to be discussed and aligned with the deployment of the AMAN in Istanbul airport. (By:12/2017) Bulgaria intends AMAN implementation in en route operations to enable smooth operations with Turkey. The actual implementation and planning dates are further to be discussed and aligned with the deployment of the AMAN in Istanbul airport. The integration of en route AMAN for operational use into the current ATM infrastructure is to be considered. New ATM system Not Applicable Not Applicable Completed 30/09/2010 Completed No Plan No Plan LSSIP Year 2014 Bulgaria 45 Released Issue

63 Implement ACAS II compliant with TCAS II change 7.1 Timescales: ATC16 Initial operational capability: 01/03/2012 Full operational capability: 31/12/2015 NSA supervision tasks have been planned. The training plan and package has been developed by the ANSP, the ATCOs were trained in 2014 accordingly. A monitoring system of the performance of ACAS in the ATC environment has been established. REG (By:12/2015) (By:03/2012) MIL (By:12/2015) The supervision for compliance with regulatory provisions, airworthiness certification and operational approval are planned. The training plan and package has been developed by the ANSP. The concerned personnel were trained according to the training plan. A monitoring system of the performance of ACAS in the ATC environment has been established. Some of the transport type aircraft are equipped with ACAS II (TCAS II Version 7.0). Training plans for aircrews flying aircraft not equipped with ACAS II have not been developed. A monitoring system of the performance of ACAS in the military ATC systems has not been established. Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer [IDP] ATC17 Timescales: Initial operational capability: 01/01/2013 Full operational capability: 31/12/2018 Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer was implemented in 2008 with SATCAS v.2 system. Operational use is pending and depends on an agreement with the neighbouring ACCs and availability of the functions in their ATC systems. (By:12/2018) Electronic Dialogue as Automated Assistance to Controller during Coordination and Transfer was implemented in 2008 with SATCAS v.2 system. Operational use is pending and depends on an agreement with the neighbouring ACCs and availability of the functions in their ATC systems. New ATM system Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) [IDP] COM09 Timescales: Initial operational capability: 01/01/2006 Full operational capability: 31/12/2014 BULATSA data network is already IPv6 capable for international services. FMTP message exchange over IPv6 was completed at FAB level. Plans are in place with establishing IPv6 connections with the adjacent states depending on their IPv6 capabilities. (By:12/2014) BULATSA data network is IPv6 capable for international services. Migrate from AFTN to AMHS Timescales: COM10 Initial operational capability: 01/12/2011 Full operational capability: 31/12/2014 The new AFTN/AMHS system is operational from Enhanced AMHS capabilities will be further elaborated for implementation in (By:12/2014) The new AFTN/AMHS system is operational from In 2015 the AMHS will be operational on FAB level, coordinated implementation is pending. Planned 31/12/2015 Planned 31/01/2015 Completed 30/06/2014 Planned 31/01/2015 Partly Completed 31/12/2018 Partly Completed 31/12/2018 Completed 14/10/2014 Completed 14/10/2014 Late 31/12/2015 Late 02/08/2015 COM11 Implementation of Voice over Internet Protocol (VoIP) in ATM Timescales: Initial operational capability: 01/01/2013 Full operational capability: 31/12/2020 Planned Plans are in place for the implementation of lines of action in due time. 31/12/2020 (By:12/2020) Plans are in place for the implementation of lines of action in due time. Implementation of Voice Over Internet Protocol (VOIP) in ATM (air ground) Planned 31/12/2020 LSSIP Year 2014 Bulgaria 46 Released Issue

64 ENV01 Implement Continuous Descent Operations (CDO) techniques for environmental improvements Timescales: not applicable [IDP] Not Applicable LBSF - Sofia (Outside Applicability Area) Bulgaria is not within the objective applicability area. Not Applicable (By:12/2013) APO (By:12/2013) Not Applicable Implement Collaborative Environmental Management (CEM) at Airports ENV02 Timescales: not applicable LBSF - Sofia (Outside Applicability Area) Bulgaria is not within the applicability area of this objective. Nevertheless CEM was established formally in 2013 by adopting and signing two documents as per EUROCONTROL CEM guidelines: Shared Environmental Vision for Aircraft Operations, and Terms of Reference of CEM Council. The following stakeholders have signed the above documents for establishments of CEM: A. operational stakeholders: A.1 BULATSA A.2 APO Sofia Airport EAD, Fraport Twin Star Airport Management AD (Varna and Burgas airports), Plovdiv Airport EAD, Gorna Oryahovitsa Airport EAD A.3 USE Bulgaria Air, Air Via, Wizz Air B. other stakeholder: B.1 REG DG Civil Aviation Authority (By:12/2016) APO (By:12/2016) Bulgaria is not within the applicability area of this objective. Nevertheless, CEM was established formally in 2013 as per EUROCONTROL CEM Guidelines. Bulgaria is not within the applicability area of this objective. Nevertheless, CEM was established formally in 2013 as per EUROCONTROL CEM Guidelines. Implement enhanced tactical flow management services Timescales: FCM01 Initial operational capability: 01/08/2001 Full operational capability: 31/12/2006 The SATCAS system in operation at the CNATCC provides an output which contains standard correlated position reports in ASTERIX cat.62. The dissemination of CPRs to the CFMU by the CNATCC was introduced in August The FSA message in respect of all departures from Bulgarian airports, as well as its availability for overflight traffic is transmitted to the ETFMS. FSA implementation in case of re routing and holding was performed in 2010, with the SATCAS v.2 LINUX. (By:07/2014) See State comment. Implement collaborative flight planning Timescales: [IDP] FCM03 Initial operational capability: 01/01/2000 Full operational capability: 31/12/2015 The current FDPS (SATCAS v.2) is able to receive and transmit FPL data in ADEXP format. BULATSA still reviews the institutional arrangements with IFPS for flight data exchange in ADEXP format. The current system supports the manual mode of AFP transmission. Automatic mode of AFP transmission and other events triggering the AFP transmission were implemented through the SATCAS v.2 LINUX. (By:12/2015) See State comment. New ATM system Completed 31/07/2013 Completed 31/07/2013 Completed 31/07/2013 Completed 01/10/2011 Completed 01/10/2011 Completed 30/09/2010 Completed 30/09/2010 LSSIP Year 2014 Bulgaria 47 Released Issue

65 FCM04 Implementation of Short Term ATFCM Measures phase 1 (Outside Applicability Area) [IDP] Timescales: Not Applicable not applicable The objective is not applicable to Bulgaria. (By:12/2015) The objective is not applicable to Bulgaria. Not Applicable Implementation of interactive rolling NOP Timescales: [IDP] FCM05 Initial operational capability: 01/09/2013 Full operational capability: 31/12/2016 The Bulgarian AMC uses a CIAM terminal to send all AUP/UUP to NM. LARA operates in trial mode. LARA operational use is planned for January (By:12/2016) APO (By:12/2016) The Bulgarian AMC uses a CIAM terminal to send all AUP/UUP to NM. LARA operates in trial mode. Sofia Airport sends the airport slots information in SSIM format to EUACA on daily basis. Planned 31/01/2015 Planned 31/01/2015 Completed 31/01/2007 INF04 Implement integrated briefing Timescales: Initial operational capability: 01/07/2002 Full operational capability: 31/12/2012 Late ARO/MET integrated briefing (Level 5 according to the ICAO roadmap) will be completed in /12/2015 (By:12/2012) MET self briefing system is implemented at Sofia/Plovdiv/Burgas and Varna airports. Terminal integration of ARO/MET briefing application will be completed in Late 31/12/2015 Electronic Terrain and Obstacle Data (TOD) Timescales: INF07 Initial operational capability: 01/11/2014 Full operational capability: 31/05/2018 The national TOD policy and implementation programmes, setting up the necessary steps to enable the provision of electronic terrain and obstacle data will be established according to the objective. REG (By:05/2018) (By:05/2018) APO (By:05/2018) The national TOD policy and implementation programmes, setting up the necessary steps to enable the provision of electronic terrain and obstacle data will be established according to the objective. Objective will be completed after the establishment of the national TOD policy implementation programmes. Objective will be completed after the establishment of the national TOD policy implementation programmes. Aircraft identification Timescales: Entry into force of the Regulation: 13/12/2011 ITY ACID System capability: 02/01/2020 Possible deferred compliance, only for services provided by military units or under military supervision, subject to conditions:: 02/01/2025 Mode S surveillance contract is signed. In the next two years BULATSA will deploy three Mode S radar stations. Both ADS B and WAM systems will be deployed by the end of (By:01/2020) Mode S surveillance contract is signed. In the next two years BULATSA will deploy three Mode S radar stations. Both ADS B and WAM systems will be deployed by the end of Planned 31/05/2018 Planned 31/05/2018 Planned 31/05/2018 Planned 31/05/2018 Planned 31/12/2016 Planned 31/12/2016 LSSIP Year 2014 Bulgaria 48 Released Issue

66 ITY ADQ Ensure quality of aeronautical data and aeronautical information Timescales: Entry into force of the regulation: 16/02/2010 Article 5(4)(a), Article 5(4)(b) and Article 6 to 13 to be implemented by: 30/06/2013 Article 4, Article5(1) and Article 5(2), Article 5(3) and Article 5(4)(c) to be implemented by: 30/06/2014 All data requirements implemented by: 30/06/2017 Planned The ITY ADQ implementation is in progress. 30/06/2017 REG (By:06/2017) (By:06/2017) APO (By:06/2017) ITY ADQ implementation is in progress. ITY ADQ implementation is in progress. APO's implementation of ITY ADQ is in progress. Planned 30/06/2017 Planned 30/06/2017 Planned 30/06/2017 Initial ATC air ground data link services above FL 285 Timescales: Entry into force of regulation: 06/02/2009 [IDP] ITY AGDL New aircraft capability: 31/12/2010 Planned ATS unit operational capability Regulation (EC) 29/2009, Annex I, Part B (except Croatia): 04/02/2015 Retrofit aircraft capability: 04/02/2015 The execution of the AGDL implementation plan is in progress. 04/02/2015 REG (By:02/2016) (By:02/2016) MIL (By:01/2014) National regulation No.141 will be used for the certification of communication infrastructure and ATM system data link capabilities. The execution of the AGDL implementation plan is in progress. The existing military transport aircraft are not capable of flying above FL 285. Activities to support the implementation of the IDP within DANUBE FAB 2012 EU S TEN T / Communication infrastructure for A/G Data Link Services / Implementation of Data Link Services / New ATM system / Route Implementation and Improvement Free Routing / SATCAS upgrade Planned 04/02/2015 Planned 31/01/2015 Not Applicable LSSIP Year 2014 Bulgaria 49 Released Issue

67 ITY AGVCS2 Implement air ground voice channel spacing requirements below FL195 Timescales: Entry into force: 07/12/2012 New and upgraded radio equipment: 17/11/2013 New or upgraded radios on State aircraft: 01/01/2014 Interim target for freq. conversions: 31/12/2014 All radio equipment: 31/12/2017 All frequencies converted: 31/12/2018 State aircraft equipped, except those notified to EC: 31/12/2018 State aircraft equipped, except those exempted [Art 9(11)]: 31/12/2020 Planned The necessary actions are planned as per the objective description according Regulation (EU) 1079/ /12/2018 REG (By:12/2018) (By:12/2018) MIL (By:12/2020) APO (By:12/2018) Local exemptions will be analysed and published accordingly. The 8,33 khz channel spacing capability of the radios evidences will be ensured by the end of The 8,33 khz channel spacing capability of the radios will be ensured by the end of The necessary actions will be planned as per the objective description according Regulation (EU) 1079/2012. The necessary actions will be planned as per the objective description according Regulation (EU) 1079/2012. Modernisation of the A/G radio communication equipment Planned 31/12/2018 Planned 31/12/2018 Planned 31/12/2018 No Plan Implementation of ground ground automated co ordination processes Timescales: Entry into force of regulation: 27/07/2006 For putting into service of EATMN systems in respect of notification and initial coordination processes: 27/07/2006 ITY COTR For putting into service of EATMN systems in respect of Revision of Coordination, Abrogation of Coordination, Basic Flight Data and Change to Basic Flight Data: 01/01/2009 To all EATMN systems in operation by 12/2012 : 31/12/2012 Systems serving ACCs providing services above FL 285 in the airspace in Annex I, Part B of Regulation (EC) 29/2009 (except Croatia): 04/02/2015 Objective is partially implemented. Full implementation is planned. The current ATM system at Sofia ACC is capable of sending and receiving a complete set of basic OLDI messages (ACT, LAM, PAC, REV, MAC ABI, INF). The system supports the transfer of communication messages (ROF/MAS/COF/TIM/HOP/SDM) and co ordination dialogue messages (RAP, RRV, SBY, ACP, RJC, CDN). The implementation of LOF and NAN messages is planned for (By:02/2016) MIL (By:12/2012) The current ATM system at Sofia ACC is capable of sending and receiving a complete set of basic OLDI messages (ACT, LAM, PAC, REV, MAC ABI, INF). The system supports the transfer of communication messages (ROF/MAS/COF/TIM/HOP/SDM) and co ordination dialogue messages (RAP, RRV, SBY, ACP, RJC, CDN). The implementation of LOF and NAN messages is planned for The military unit integrated in the Common National Air Traffic Control Center (CNATCC) shares the complete FP data with Civilian ATS units. BULATSA and the military units (not located in CNATCC) exchange the FP data using CPL message. SATCAS is equipped with the internal system capabilities for XIN/XRQ data exchange. All requests for crossing the reserved military airspace will be handled within the SATCAS in CNATCC. Partly Completed 04/02/2015 Partly Completed 04/02/2015 Not Applicable LSSIP Year 2014 Bulgaria 50 Released Issue

68 Apply a common flight message transfer protocol (FMTP) Timescales: Entry into force of regulation: 28/06/2007 All EATMN systems put into service after 01/01/09: 01/01/2009 [IDP] ITY FMTP All EATMN systems in operation by 20/04/11: 20/04/2011 Transitional arrangements: 31/12/2012 Transitional arrangements when bilaterally agreed between ANSPs: 31/12/2014 The current ATM system (SATCAS v.2) is capable of supporting information exchange via FMTP. FMTP exchange is implemented between Sofia, Constanta and Otopeni.The migration of the existing OLDI links to TCP/IP is dependent on the TCP/IP capabilities of the neighbouring States. Coordination with Belgrade is ongoing regarding FMTP testing and the operational implementation. (By:12/2014) MIL (By:12/2014) The current ATM system (SATCAS) is capable of supporting the OLDI data exchange via TCP/IP. The objective is not applicable for MIL. Surveillance performance and interoperability Timescales: Entry intro force of regulation: 13/12/2011 ATS unit operational capability: 12/12/2013 ITY SPI New aircraft capability: 08/06/2016 ELS in transport type State aircraft : 07/12/2017 EHS and ADS B Out in transport type State aircraft : 07/06/2020 Ensure training of MIL personnel: 07/06/2020 Retrofit aircraft capability: 07/06/2020 Interoperability of surveillance data is already ensured. Safety Assessment for the existing BULATSA surveillance infrastructure is planned by REG (By:02/2015) (By:02/2015) MIL (By:06/2020) Formal acceptance of the ANSPs safety assessment reports will be communicated to the ANSP after their submission for review. Interoperability of surveillance data is already ensured. Safety Assessment for the existing BULATSA surveillance infrastructure was completed. Some of the military transport and training aircrafts are equipped with Mode S Elementary and Enhanced Surveillance equipment. There are no plans to retrofit those with missing equipment. All new aircrafts will be properly equipped. New PSRs and SSRs (en route and TMA) / WAM and ADS B Implementation of P RNAV Timescales: NAV03 Initial operational capability: 01/01/2001 Full operational capability: 31/12/2012 BULATSA plans the PBN implementation for Varna and Burgas TMAs and Gorna Oriyahovitsa CTR by the end of Plans are in place for PBN implementation in Sofia TMA and Plovdiv CTR by the end of (By:12/2012) BULATSA plans the PBN implementation for Varna and Burgas TMAs and Gorna Oriyahovitsa CTR by the end of Plans are in place for PBN implementation in Sofia TMA and Plovdiv CTR by the end of VOR DME upgrade Implement APV procedures Timescales: [IDP] NAV10 Initial operational capability: 01/06/2011 Full operational capability: 31/12/2016 BULATSA plans the APV/Baro implementation for Varna and Burgas TMAs in April The APV/Baro implementation for Sofia TMA, Gorna Oryahovitza and Plovdiv CTRs is planned by the end of REG (By:04/2016) (By:12/2016) The national Regulation No.37 from , on the terms and procedures for the issuance and control of air operator certificates for commercial air transportation refers to JAR OPS. BULATSA plans the APV/Baro implementation for, Varna and Burgas TMAs in April The APV/Baro implementation for Sofia TMA, Gorna Oryahovitza and Plovdiv CTRs is planned by the end of Completed 14/10/2014 Completed 01/10/2008 Not Applicable Planned 31/01/2019 Completed 31/12/2013 Completed 31/12/2013 Planned 31/12/2019 Late 31/12/2016 Late 31/12/2016 Planned 31/12/2016 Completed 30/04/2011 Planned 31/12/2016 LSSIP Year 2014 Bulgaria 51 Released Issue

69 Implement measures to reduce the risk to aircraft operations caused by airspace infringements SAF10 Timescales: Initial operational capability: 01/06/2008 Full operational capability: 31/12/2011 The European Action Plan will be reviewed for adaptation in Bulgaria. BULATSA implemented most appropriate parts of the European Action Plan for Airspace Infringement Risk Reduction. REG (By:12/2011) (By:12/2011) MIL (By:12/2011) The European Action Plan will be reviewed for adaptation in Bulgaria. Many of the actions are already implemented. BULATSA implemented most parts of the European Action Plan for Airspace Infringement Risk Reduction considered appropriate. The objective is not applicable for MIL. Improve runway safety by preventing runway excursions Timescales: SAF11 Initial operational capability: 01/09/2013 Full operational capability: 31/01/2018 Most of the measures envisaged in the European Action Plan for the Prevention of Runway Excursions are implemented. The remaining measures are to be analised and implemented accordingly. REG (By:01/2018) (By:12/2014) APO (By:12/2014) Most of the measures are implemented. Some are to be analised in 2015 for implementation. Most of the measures are already implemented. The remaining measures regarding the ATCOs training are to be implemented in All appropriate measures are implemented by the Bulgarian airports serving international flights. Late 30/06/2015 Late 30/06/2015 Completed 01/12/2011 Not Applicable Planned 31/12/2015 Planned 31/12/2015 Late 31/12/2015 Completed SRC RLMK REG (By:12/2010) SRC SLRD REG (By:12/2010) Implement the EUROCONTROL Safety Regulatory Requirements (ESARRs) (Outside Applicability Area) Timescales: not applicable Safety Levels and Resolution of Deficiencies (Outside Applicability Area) Timescales: not applicable Not Applicable Not Applicable Not Applicable Not Applicable LSSIP Year 2014 Bulgaria 52 Released Issue

70

71 Annexes Annex A Specialists involved in the LSSIP Process LSSIP Co-ordination LSSIP Focal Point for Bulgaria BULATSA Ivan ILIEV LSSIP Focal Point for DGCAA DGCAA Kalin RAYCHEV LSSIP Focal Point for Military Authorities Military Authorities Col. Kosyo KOEV LSSIP Contact Person for Bulgaria EUROCONTROL Ana Paula FRANGOLHO ESSIP Objective Implementation ESSIP Objective EUROCONTROL Objective Owners AOM13.1 R. BUCUROIU, O. MROWICKI, C. LUCCIOLI (E. REUBER till 02/2015) EUROCONTROL PEPR Objective Coordinator A. DYBOWSKA B. Jelev AOM19 G. ACAMPORA, O. MROWICKI A. DYBOWSKA B. Jelev AOM21 R. BUCUROIU A. DYBOWSKA M. Tsenkov AOP03 T. LICU P. VRANJKOVIC V. Pejkov AOP04.1 P. ADAMSON P. VRANJKOVIC Y. Pavlov AOP04.2 P. ADAMSON P. VRANJKOVIC Y. Pavlov AOP05 P. ADAMSON P. VRANJKOVIC N/A ATC02.2 B. BAKKER, S. DROZDOWSKI I. FEIJT V. Vasilev ATC02.5 B. BAKKER, S. DROZDOWSKI I. FEIJT V. Vasilev ATC02.6 B. BAKKER, S. DROZDOWSKI I. FEIJT V. Vasilev ATC02.7 B. BAKKER, S. DROZDOWSKI I. FEIJT N/A ATC07.1 P. CONROY, P. TERZIOSKI L. DELL ORTO N/A ATC12 P. TERZIOSKI L. DELL ORTO V. Vasilev ATC15 P. CONROY, P. TERZIOSKI L. DELL ORTO V. Vasilev ATC16 S. DROZDOWSKI L. DELL ORTO I. Stefanov ATC17 S. MORTON L. DELL ORTO V. Vasilev COM09 L. POPESCU O. ALFARO D. Stoyanov COM10 Y. EYUBOGLU A. KOKONA D. Stoyanov COM11 L. POPESCU A. KOKONA D. Stoyanov ENV01 C. FABER B. HILL E. Lakova ENV02 S. MAHONY, A. WATT B. HILL E. Lakova FCM01 H. KOOLEN O. CIOARA R. Tashkov FCM03 S. SMIDT O. CIOARA V. Vasilev FCM04 M. RICHARD O. CIOARA N/A FCM05 P. MATERN O. CIOARA B. Jelev INF04 P. MATERN A-P. FRANGOLHO M. Stoyanova INF07 A. PETROVSKY A-P. FRANGOLHO D.Kirchev ITY-ACID A. DESMOND-KENNEDY O. CIOARA Y. Pavlov National Stakeholder Specialist(s) LSSIP Year 2014 Bulgaria 53 Released Issue

72 ESSIP Objective EUROCONTROL Objective Owners EUROCONTROL PEPR Objective Coordinator ITY-ADQ M. UNTERREINER A-P. FRANGOLHO D. Kirchev ITY-AGDL S. DISSING A. KOKONA V. Vasilev ITY-AGVCS2 J. POUZET O. ALFARO D. Stoyanov ITY-COTR S. MORTON L. DELL ORTO V. Vasilev ITY-FMTP L. POPESCU O. ALFARO D. Stoyanov ITY-SPI M. BORELY, R. STEWART O. CIOARA Y. Pavlov NAV03 F. PAVLICEVIC A. KOKONA I. Tzonev NAV10 R. FARNWORTH A. KOKONA I. Tzonev SAF10 T. LICU I. FEIJT V. Markov SAF11 S. LAWRENCE I. FEIJT V. Markov SRC-RLMK M. DEBOECK A. DYBOWSKA N/A SRC-SLRD M. DEBOECK A. DYBOWSKA N/A National Stakeholder Specialist(s) LSSIP Year 2014 Bulgaria 54 Released Issue

73 Annex B National Stakeholders Organisation Charts DGCAA organisational chart LSSIP Year 2014 Bulgaria 55 Released Issue

74 BULATSA organisational chart LSSIP Year 2014 Bulgaria 56 Released Issue

Local Single Sky ImPlementation LSSIP BULGARIA

Local Single Sky ImPlementation LSSIP BULGARIA EUROCONTROL Local Single Sky ImPlementation LSSIP 2017 - BULGARIA Level 1 - Implementation Overview Document Title LSSIP Year 2017 for Bulgaria Infocentre Reference 18/02/26/10 Date of Edition 24/05/2018

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

Local Single Sky ImPlementation (LSSIP) ROMANIA

Local Single Sky ImPlementation (LSSIP) ROMANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Romania Infocentre Reference: 15/01/12-33 Document Identifier Edition: Year 2014

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by

More information

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for The Former Yugoslav Republic of Macedonia Infocentre

More information

EUROCONTROL SPECIFICATIONS SYNOPSIS

EUROCONTROL SPECIFICATIONS SYNOPSIS EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification

More information

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FYROM Infocentre Reference: 16/01/29-68 Document

More information

Local Single Sky ImPlementation (LSSIP) MALTA

Local Single Sky ImPlementation (LSSIP) MALTA EUROCONTROL Local Single Sky ImPlementation (LSSIP) MALTA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Malta Infocentre Reference 17/01/30/126 Date of Edition 04/04/2017 LSSIP Focal Point

More information

Local Single Sky ImPlementation (LSSIP) ROMANIA

Local Single Sky ImPlementation (LSSIP) ROMANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Romania Infocentre Reference: 16/01/29-85 Document Identifier Edition: Year 2015

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FYROM Infocentre Reference: 14/01/07-16 Document

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Local Single Sky ImPlementation (LSSIP) IRELAND

Local Single Sky ImPlementation (LSSIP) IRELAND EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Ireland 15/01/12-21 Document Identifier Edition: Year 2014 LSSIP Year 2014 Ireland

More information

Local Single Sky ImPlementation (LSSIP) LITHUANIA

Local Single Sky ImPlementation (LSSIP) LITHUANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) LITHUANIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Lithuania Infocentre Reference: 16/01/29-76 Document Identifier Edition: Year

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

Local Single Sky ImPlementation (LSSIP) IRELAND

Local Single Sky ImPlementation (LSSIP) IRELAND EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Ireland Infocentre Reference: 16/01/29-73 Document Identifier Edition: Year 2015

More information

European ATM Master Plan Level 3. Implementation View

European ATM Master Plan Level 3. Implementation View European ATM Master Plan Level 3 Implementation View Plan 2016 Executive summary Setting the scene This Implementation Plan constitutes the Implementation view or Level 3 of the European ATM Master Plan

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

REG ASP MIL APO USE INT IND NM

REG ASP MIL APO USE INT IND NM ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,

More information

Local Single Sky ImPlementation (LSSIP) ROMANIA

Local Single Sky ImPlementation (LSSIP) ROMANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ROMANIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for ROMANIA Infocentre Reference: 14/01/07-33 Document Identifier Edition: Year 2013

More information

Local Single Sky ImPlementation (LSSIP) ALBANIA

Local Single Sky ImPlementation (LSSIP) ALBANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ALBANIA Year 2016 - Level 1 FOREWORD The Local Single Sky ImPlementation (LSSIP) documents are the yearly expression of commitment of civil and military

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA

Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA EUROCONTROL Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Bosnia Herzegovina Infocentre Reference: 16/01/29-58 Document Identifier

More information

REG ASP MIL APO USE INT IND NM

REG ASP MIL APO USE INT IND NM ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,

More information

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item

More information

ASBU-Bloc0 Moroccan achievements and planned activities

ASBU-Bloc0 Moroccan achievements and planned activities Moroccan Civil Aviation Authority ASBU-Bloc0 Moroccan achievements and planned activities KINGDOM OF MOROCCO Ministry of Equipment, Transport and Logistics Civil Aviation Authority Tunis, March 2017 1-48

More information

Local Single Sky ImPlementation (LSSIP) UKRAINE (Formally known as LCIP)

Local Single Sky ImPlementation (LSSIP) UKRAINE (Formally known as LCIP) EUROCONTROL Local Single Sky ImPlementation (LSSIP) UKRAINE (Formally known as LCIP) Years 2017-2021 Level 1 Document Title LSSIP Year 2016 for Ukraine Reference Documents LSSIP Documents LSSIP Guidance

More information

Local Single Sky ImPlementation (LSSIP) ARMENIA

Local Single Sky ImPlementation (LSSIP) ARMENIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ARMENIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Armenia Infocentre Reference: 14/01/07-02 Document Identifier Edition: Year 2013

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Local Single Sky ImPlementation (LSSIP) NORWAY

Local Single Sky ImPlementation (LSSIP) NORWAY EUROCONTROL Local Single Sky ImPlementation (LSSIP) NORWAY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Norway Infocentre Reference 17/01/30/130 Date of Edition 04/04/2017 LSSIP Focal Point

More information

Local Single Sky ImPlementation (LSSIP) IRELAND

Local Single Sky ImPlementation (LSSIP) IRELAND EUROCONTROL Local Single Sky ImPlementation (LSSIP) IRELAND Year 2016 - Level 1 Document Title LSSIP Year 2016 for Ireland Infocentre Reference 17/01/30/121 Date of Edition 29/05/2017 LSSIP Focal Point

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2012 Level 1 DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for FYROM Infocentre

More information

European ATM Master Plan Level 3. Implementation View

European ATM Master Plan Level 3. Implementation View European ATM Master Plan Level 3 Implementation View 2017 2017Plan European ATM Master Plan Level 3 Implementation View 2017 2017Plan EXECUTIVE SUMMARY What is the role of the European ATM Master Plan

More information

Local Single Sky ImPlementation (LSSIP) SERBIA

Local Single Sky ImPlementation (LSSIP) SERBIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) SERBIA Year 2012 Level 1 DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for SERBIA Infocentre Reference: 13/01/02-34 Document

More information

2.2 ANSP Certification, Designation & Cross-Border ANS Provision

2.2 ANSP Certification, Designation & Cross-Border ANS Provision 2.2 ASP Certification, Designation & Cross-Border AS Provision 2.2.1 Certification For the time being there is no schedule agreed for the certification. It will be defined after an action plan is developed

More information

Local Single Sky ImPlementation (LSSIP) ALBANIA

Local Single Sky ImPlementation (LSSIP) ALBANIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ALBANIA Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for ALBANIA Infocentre Reference: 14/01/07-01 Document Identifier Edition: Year 2013

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

Local Single Sky ImPlementation (LSSIP) SERBIA

Local Single Sky ImPlementation (LSSIP) SERBIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) SERBIA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Serbia Infocentre Reference 17/01/30/134 Date of Edition 28/03/2017 LSSIP Focal Point

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Local Single Sky ImPlementation (LSSIP) LATVIA

Local Single Sky ImPlementation (LSSIP) LATVIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) LATVIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Latvia Infocentre Reference: 15/01/12-23 Document Identifier Edition: Year 2014

More information

Local Single Sky ImPlementation (LSSIP) MOLDOVA

Local Single Sky ImPlementation (LSSIP) MOLDOVA EUROCONTROL Local Single Sky ImPlementation (LSSIP) MOLDOVA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Moldova Infocentre Reference: 15/01/12-28 Document Identifier Edition: Year 2014

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

European ATM Master Plan Level 3. Implementation View Plan 2018

European ATM Master Plan Level 3. Implementation View Plan 2018 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 7 EXECUTIVE SUMMARY What is the role of the European ATM Master Plan

More information

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA

Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA Year 2016 Level 1 FOREWORD The Local Single Sky ImPlementation (LSSIP) documents are the yearly expression

More information

Local Single Sky ImPlementation (LSSIP) LATVIA

Local Single Sky ImPlementation (LSSIP) LATVIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) LATVIA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Latvia Infocentre Reference: 16/01/29-75 Document Identifier Edition: Year 2015

More information

Local Single Sky ImPlementation (LSSIP) ARMENIA

Local Single Sky ImPlementation (LSSIP) ARMENIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) ARMENIA Year 2016 - Level 1 Document Title LSSIP Year 2016 for Armenia Infocentre Reference 17/01/30/102 Date of Edition 24/03/2017 LSSIP Focal Point

More information

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services Civil-Military Cooperation in Germany Roland Mallwitz German Air Navigation Services Head of Surveillance Services Agenda 50 Years of Development in ATM Evolution of Cooperation in Surveillance and Identification

More information

Local Single Sky ImPlementation (LSSIP) SLOVAKIA

Local Single Sky ImPlementation (LSSIP) SLOVAKIA EUROCONTROL Local Single Sky ImPlementation (LSSIP) SLOVAKIA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Slovakia Infocentre Reference: 15/01/12-35 Document Identifier Edition: Year

More information

Year 2011 Level 1 EUROCONTROL

Year 2011 Level 1 EUROCONTROL Local Single Sky ImPlementation (LSSIP) THE FORMER UGOSLAV REPUBLIC OF MACEDONIA ear 2011 Level 1 EUROCONTROL DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for FROM Infocentre

More information

Local Single Sky ImPlementation (LSSIP) HUNGARY

Local Single Sky ImPlementation (LSSIP) HUNGARY EUROCONTROL Local Single Sky ImPlementation (LSSIP) HUNGARY Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Hungary Infocentre Reference: 15/01/12-20 Document Identifier Edition: Year 2014

More information

NEFAB Project Feasibility Study Report Operational Concept

NEFAB Project Feasibility Study Report Operational Concept NEFAB Project Feasibility Study Report Operational Concept Page 1 of 16 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. AIRSPACE DESIGN... 6 2.1 ATS Routes and Free Routes 6 2.2 Sectorisation 6 2.3 Airspace

More information

LSSIP Year 2015 <STATE>

LSSIP Year 2015 <STATE> LSSIP Year 2015 State can choose a personalised picture for the cover FP should send the State-personalised picture to the CP before 15 December 2015. Requirements for the picture to be as follows:

More information

Local Single Sky ImPlementation (LSSIP) MALTA

Local Single Sky ImPlementation (LSSIP) MALTA EUROCONTROL Local Single Sky ImPlementation (LSSIP) MALTA Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP Year 2015 for Malta Infocentre Reference: 16/01/29-78 Document Identifier Edition: Year

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS TO ALL INTERESTED PERSONS IN THE PROCEDURE FOR GRANTING A CONCESSION FOR SERVICE FOR THE OBJECT CIVIL AIRPORT FOR PUBLIC

More information

Local Single Sky ImPlementation (LSSIP) TURKEY

Local Single Sky ImPlementation (LSSIP) TURKEY EUROCONTROL Local Single Sky ImPlementation (LSSIP) TURKEY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Turkey Infocentre Reference 17/01/30/140 Date of Edition Released Issue LSSIP Focal

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

Local Single Sky ImPlementation (LSSIP) HUNGARY

Local Single Sky ImPlementation (LSSIP) HUNGARY EUROCONTROL Local Single Sky ImPlementation (LSSIP) HUNGARY Year 2016 - Level 1 Document Title LSSIP Year 2016 for Hungary Infocentre Reference 17/01/30/120 Date of Edition 31/03/17 LSSIP Focal Point

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Local Single Sky ImPlementation (LSSIP) FINLAND

Local Single Sky ImPlementation (LSSIP) FINLAND EUROCONTROL Local Single Sky ImPlementation (LSSIP) FINLAND Year 2015 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Finland Infocentre Reference: 16/01/29-66 Document Identifier Edition: Year 2015

More information

Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA

Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA EUROCONTROL Local Single Sky ImPlementation (LSSIP) BOSNIA AND HERZEGOVINA Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Bosnia - Herzegovina Infocentre Reference: 15/01/12-06 Document

More information

Local Single Sky ImPlementation (LSSIP) DENMARK

Local Single Sky ImPlementation (LSSIP) DENMARK EUROCONTROL Local Single Sky ImPlementation (LSSIP) DENMARK Year 2016 - Level 1 Document Title LSSIP Year 2016 for Denmark Infocentre Reference 17/01/30/111 Date of Edition 03/05/2017 LSSIP Focal Point

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine Civil/Military Cooperation ICAO Workshop Civil/Military Cooperation in Ukraine October 2013 Ukraine Gained independence in 1991 Population: 47 million Total area: 603,700 sq.km Land boundaries: 4,558 km

More information

Local Single Sky ImPlementation (LSSIP) FINLAND

Local Single Sky ImPlementation (LSSIP) FINLAND EUROCONTROL Local Single Sky ImPlementation (LSSIP) FINLAND Year 2013 Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for FINLAND Infocentre Reference: 14/01/07-14 Document Identifier Edition: Year 2013

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Local Single Sky ImPlementation (LSSIP) CYPRUS

Local Single Sky ImPlementation (LSSIP) CYPRUS EUROCONTROL Local Single Sky ImPlementation (LSSIP) CYPRUS Year 2016 Level 1 FOREWORD The Local Single Sky ImPlementation (LSSIP) documents are the yearly expression of commitment of civil and military

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL DOCUMENT CHARACTERISTICS LE EUROCONTROL Guidance for Military Aeronautical Information

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Local Single Sky ImPlementation (LSSIP) CZECH REPUBLIC

Local Single Sky ImPlementation (LSSIP) CZECH REPUBLIC EUROCONTROL Local Single Sky ImPlementation (LSSIP) CZECH REPUBLIC Year 2016 - Level 1 Document Title LSSIP Year 2016 for Czech Republic Infocentre Reference 17/01/30/110 Date of Edition 08/06/17 LSSIP

More information

Local Single Sky ImPlementation (LSSIP) SWEDEN

Local Single Sky ImPlementation (LSSIP) SWEDEN EUROCONTROL Local Single Sky ImPlementation (LSSIP) SWEDEN Year 2016 Level 1 Document Title LSSIP Year 2016 for Sweden Infocentre Reference 17/01/30/138 Date of Edition 07/04/17 LSSIP Focal Point Bengt

More information

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services EUROCONTROL Dynamic Management of the European Airspace Network ADR Data Catalogue Annex A: Supported Services Prepared by Guido Van Laethem and Maria Scott CFMU Date 10 th June 2011 Version 0.4 EUROCONTROL

More information

Local Single Sky ImPlementation (LSSIP) PORTUGAL

Local Single Sky ImPlementation (LSSIP) PORTUGAL EUROCONTROL Local Single Sky ImPlementation (LSSIP) PORTUGAL Year 2016 - Level 1 Document Title LSSIP Year 2016 for Portugal Reference Documents LSSIP Documents LSSIP Guidance Material Master Plan Level

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

ICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017

ICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017 ICAO ASBU Implementation Monitoring Questionnaire Reference period 2017 V.5 20/10/2017 Please fill in the information highlighted in yellow. For those objectives that are reported Ongoing (Partially Completed)

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010 The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic

More information

LSSIP Year Level 1 Implementation Overview. < what needs to be filled in>

LSSIP Year Level 1 Implementation Overview. < what needs to be filled in> LSSIP Year 2018 Level 1 Implementation Overview < what needs to be filled in> In yellow text guidance to help fill in the document to be deleted afterwards by FP In red text elements to be updated by CP

More information

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet NNF Work-shop on Navigation, Safety and Technology Dato: 2. February 2016 Gunn Marit Hernes Luftfartstilsynet Scope Present an overview of the main regulatory activities currently undertaken by EASA in

More information

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,

More information

Local Single Sky ImPlementation LSSIP GEORGIA

Local Single Sky ImPlementation LSSIP GEORGIA EUROCONTROL Local Single Sky ImPlementation LSSIP 2017 - GEORGIA Level 1 - Implementation Overview Document Title LSSIP Year 2017 for Georgia Infocentre Reference 18/02/26/20 Date of Edition 06/04/2018

More information

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times

More information

Local Single Sky ImPlementation (LSSIP) EURO-MAASTRICHT

Local Single Sky ImPlementation (LSSIP) EURO-MAASTRICHT EUROCONTROL Local Single Sky ImPlementation (LSSIP) EURO-MAASTRICHT Year 2014 - Level 1 DOCUMENT IDENTIFICATION SHEET LSSIP for Maastricht Infocentre Reference: 15/01/12-13 Document Identifier Edition:

More information

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Euromed Civil Aviation II project

Euromed Civil Aviation II project Euromed Civil Aviation II project Final event on GNSS for aviation Gilles Fartek, Euromed Civil Aviation II (INTEGRA A/S) Euromed Aviation II is financed by EC DEVCO Air Traffic management EUROMED AVIATION

More information