Bits to Blocks Aviation System Block Upgrades (ASBU)

Size: px
Start display at page:

Download "Bits to Blocks Aviation System Block Upgrades (ASBU)"

Transcription

1 Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011

2 We are here... Bits Russia Canada Australia India China 2

3 We Can make Block Russia Canad a Australia India China 3

4 Reality of Our System Today Need for change

5 Need change The different regional /national ATM modernization programme the fundamental principles but can not explain all details in same way They are developed and governed and funded in the context of, and for, different audiences/ stakeholders/ culture They face different practical issues in terms of transition from legacy, specific business case etc This results in a large collection of disconnected and/or competing descriptions

6 A window to future Global framework is needed to ensure: Safety is maintained and enhanced. ATM improvement programmes are harmonized Barriers to future efficiency and environmental gains are removed, at reasonable cost 6

7 A window to future Investment certainty is required for: Operators Infrastructure providers Equipment manufacturers US$ 120 billion is to be spent on air transportation systems in the next ten years world-wide. 7

8 A window to future Regulatory approval process must be outlined Support States in introduction of significant changes 8

9 ICAO Aviation System Block Upgrades Global Air Navigation Industry Symposium 9

10 4 Blocks Upgrades 10

11 A Block is Made Up of Modules Global Air Navigation Industry Symposium 11

12 Modules are Grouped in 4 Performance Improvement Areas (PIA) Global Air Navigation Industry Symposium 12

13 PIA1: Greener Airports Global Air Navigation Industry Symposium 13

14 PIA2: Global Interoperable Systems & Data Global Air Navigation Industry Symposium 14

15 PIA3: Optimum Capacity & Flexible Flights Global Air Navigation Industry Symposium 15

16 PIA4: Efficient Flight Path Global Air Navigation Industry Symposium 16

17 4 Blocks Upgrades 17

18 Let s Focus on Block 1 Global Air Navigation Industry Symposium 18

19 Block 1 Modules for-pia 1: Greener Airports NAV Equip. Wake Vortex A- SMGCS A-CDM Remote Tower A/D MAN Global Air Navigation Industry Symposium 19

20 Block 1 Modules for-pia 2 Global Interoperable Systems & Data FF- ICE 1 Digital ATM Info SWI M Global Air Navigation Industry Symposium 20

21 Block 1 Modules for: PIA3 Optimum Capacity & Flexible Flights Dynami c ATS Routing CDM + FLT Plannin g In Trail ADS WX Info Interval Mgmt Global Air Navigation Industry Symposium 21

22 Block 1 Modules for-pia 4 Efficient Flight Path OPDs RPAs Synch/ 4D TRAD Global Air Navigation Industry Symposium 22

23 PIA 1:Greener Airports India ATM Initiatives Improved Airport Accessibility Indian SBAS System GAGAN PBN Improved Runway Safety ASMGCS in Six Airports Improved Airport Operations through A- CDM Airport CDM- OSCET OTP Improved Traffic Flow through Runway metering AMAN in Delhi Mumbai and Chennai GBAS

24 GAGAN- Indian SBAS

25 GAGAN- GPS Aided Geo Augmentation Navigation GAGAN has entered The Final Operations Phase The first milestone is to deliver an RNP 0.1 capability provided over the Indian FIR as specified in the ICAO specification. The second milestone is to deliver APV1 service as specified in the ICAO specification over 90% of the Indian land mass. The certified GAGAN system will be available by June 2013

26 Benefits of GAGAN GAGAN Foot Print Gains GAGAN is being developed to meet the ICAO GNSS SARPs and it will be interoperable with WAAS,EGNOS, and MSAS. GAGAN SBAS will be a significant addition to navigation capabilities in the entire South-East ASIA Will lead to greater Regional cooperation (interoperability, increased service areas)

27 Efficiency Initiatives PBN Implementation 2008 RNAV SID/STARS implemented at Mumbai, Delhi and Ahmadabad 2010 RNAV SID/STARS implemented at Chennai, Bangalore, Hyderabad and Kolkata 2011 RNP-1 ARR/DEP procedures for Calicut, Cochin in development RNAV 5 En-Route Project between Delhi-Mumbai planned 20 LNAV/VNAV procedures under development

28 A-CDM initiatives Operational Safety and Capacity Enhancement Team ( OSCET) An Airport CDM initiative by IATA, AAI and Airport operator at Mumbai and Delhi functional since 2010 resulting in- Significant improvements in Runway safety Reduction in Runway Occupancy Time (ROT) Improvements in On Time Performance (OTP) To facilitate CDM regular meetings of ANSPs, Airlines and Airport operators are held at all major airports.

29 Block 1 Modules for: PIA 2 Global Interoperable Systems Data FF- ICE 1 Digital ATM Info SWI M Global Air Navigation Industry Symposium 29

30 PIA 2 :Globally Interoperable systems and Data India ATM Initiatives Interoperability Through Groundground Systems Integration AIDC AMHS ATS DATA LINK AIDC Functionality tested between Mumbai-Chennai AIDC capable systems under implementation at all ACCs AIDC trials between Mumbai and Karachi ( Pakistan ) ATN Backbone Ground-Ground links between Mumbai and Singapore operational since in April 2011 Mumbai-Beijing AMHS link is under trial Mumbai-Karachi link under implementation ATS Data link for providing nation wide DATIS, VOLMET connectivity ATS AUTOMATION Integrated ATS Automation systems at Chennai, Delhi, Mumbai and Kolkata (planned) Interconnected ATS Automation systems at other 38 airports.

31 PIA 2 :Globally Interoperable systems and Data Service Improvement Through digital AIM Implemented AIS Automation system Smooth exchange of aeronautical data with other states Indian Aeronautical Information conforms to ISO9001:2008 QMS e-aip under final stage of publication Plans for publishing e-tod

32 Block 1 Modules for-pia3 Optimum Capacity & Flexible Flights Dynami c ATS Routing CDM + FLT Plannin g In Trail ADS WX Info Interval Mgmt Global Air Navigation Industry Symposium 32

33 PIA 3 :Optimum Capacity and Flexible flights India ATM Initiatives Improved Operations through Enhanced En route Trajectories Improved flow performance through planning PBN FUA AMAN INSPIRE Chennai Upper ACC implementation underway C-ATFM implementation Air traffic situational Awareness Nation wide Radar Surveillance ADS-B as supplement to Radar coverage Integration of sensor information

34 FUA-Civil Military Cooperation Proactive FUA program Three ATS routes ( L509, M875 and N877) made available for dynamic flight planning through military areas to facilitate smooth flow of air traffic to and from Afghanistan airspace Four entry/exit way points at common FIR boundary to support independent flows Conditional arrival/departure routes through Special Use Airspace at Delhi, Chennai and Cochin Resources Sharing Radar information sharing mechanism between AAI and IAF ( Delhi, Tambram, Bangalore and Kolkata ) Provision of Navigation Aids at defense airfields by AAI

35 PIA3: Capacity Initiatives Upper Airspace Harmonization-Chennai Project Chennai Upper ACC Chennai (VOMM) FIR airspace restructured based on four layer concept-upper ACC, lower ACC, Terminal APP and regional towers. Integrated Radar Coverage Provided with overlapping surveillance (9 radars & 14 ADS-B (planned) integrated) and communication facilities Facilitates smooth and efficient flow of enroute traffic at optimum levels Application of Uniform standards, procedures and separation minima for seamless ATM Similar restructuring of airspace is planned for Mumbai, Delhi and Kolkata FIR.

36 PIA3: Chennai Upper Airspace Sectors

37 Existing and Planned Radar coverage

38 PIA3: Central -ATFM Demand and Capacity balancing through CDM to enhance the traffic flow at six major airports 1 st phase of C-ATFM will be completed in 2012 Strategic, Pre-Tactical and Tactical ATFM and CDM capabilities at six major airports in phase 1. Subsequently ATFM will be extended to other airports In Phase 2 regional ATFM integration with the Indian C-ATFM envisaged

39 Block 1 Modules for PIA 4: Efficient Flight Path OPDs RPAs Synch/ 4D TRAD Global Air Navigation Industry Symposium 39

40 PIA 4 :Efficient Flight path India ATM Initiatives Improved Efficiency through descent profiles Continuous Descent Arrivals procedures established for Delhi Improved safety and efficiency through data link en route ADS-CPDLC operational since 2005 in entire oceanic airspace Reduced Horizontal Separation ( RHS ) of 50 NM introduced for aircraft with data link on 2 RNP routes Plan to extend RHS on all RNP routes in phases Subsequently plan to introduce NM separation on RNP routes

41

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

DISHA NOV CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure

DISHA NOV CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure DISHA -2013 NOV 25-26 2013 CNS- P Initiatives, Communication, Navigation and Surveillance Infrastructure Developing Tomorrows Aviation system Air Traffic growth expands two folds every fifteen years. Growth

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead

More information

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

MID Region Air Navigation Strategy

MID Region Air Navigation Strategy MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Yoshiki Imawaka Deputy Director - ICAO Asia and Pacific Office Global Ministerial Conference Riyadh, Saudi Arabia, 29 31 August

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,

More information

Block 0 to Block 1 Vaughn Maiolla

Block 0 to Block 1 Vaughn Maiolla Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.

More information

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014. The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Upper

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

(Presented by United States) EXECUTIVE SUMMARY

(Presented by United States) EXECUTIVE SUMMARY NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation

More information

You and ASBU. Javier Vanegas CANSO

You and ASBU. Javier Vanegas CANSO You and ASBU Javier Vanegas CANSO You and ASBU 4 th CANSO Latin American and Caribbean Conference Buenos Aires, 24-26 September 2012 Javier A. Vanegas Director Latin America and Caribbean Affairs TRANSFORMING

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3 Follow-up on the NAM/CAR Regional Performance-Based Air

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

ATFM/CDM ICAO s Perspective

ATFM/CDM ICAO s Perspective ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented PIA 1 Block - Module B0 - ACDM Date MAY, 2017 Module Description: To implement collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Asia/Pacific Air Traffic Management Perspectives

Asia/Pacific Air Traffic Management Perspectives Asia/Pacific Air Traffic Management Perspectives Len Wicks Regional Officer, Air Traffic Management, International Civil Aviation Organization (ICAO) MID ATMSG/4, Amman, April 2018 Contents Asia/Pacific

More information

Air Traffic Flow Management India V.Somasundaram Executive Director [ATM] Airports Authority of India

Air Traffic Flow Management India V.Somasundaram Executive Director [ATM] Airports Authority of India Air Traffic Flow Management India V.Somasundaram Executive Director [ATM] Airports Authority of India Main functions of AAI Air Traffic Management and the provision of Air Navigation Service in India and

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/18 IP/9 12/2/2012 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP EIGHTEENTH MEETING (APIRG/18) Kampala, Uganda (27 30 March 2012) Agenda Item 3.4: Communication

More information

ASBU-Bloc0 Moroccan achievements and planned activities

ASBU-Bloc0 Moroccan achievements and planned activities Moroccan Civil Aviation Authority ASBU-Bloc0 Moroccan achievements and planned activities KINGDOM OF MOROCCO Ministry of Equipment, Transport and Logistics Civil Aviation Authority Tunis, March 2017 1-48

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

The evolving air navigation system and the impact on avionics

The evolving air navigation system and the impact on avionics International Civil Aviation Organization The evolving air navigation system and the impact on avionics Vincent Galotti Deputy Director, Safety Standardization & Infrastructure, ICAO 18 August 2011 Introduction

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

SAMPLE TEMPLATE APPENDIX 3.5C-1

SAMPLE TEMPLATE APPENDIX 3.5C-1 APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE

More information

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6 8 December 2016 The United Arab Emirates Presented by Hamad Al Belushi Outline Brief on the UAE National ASBU

More information

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology An Overview Outline Today s Challenges Tomorrow s Needs Why ASBU methodology ASBU explanation Global Plan Next

More information

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July 2018 Saudi Arabia Outline High Level Plan Overall Progress in ASBU Implementation (Priority 1) Success Story(ies)/Initiatives

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR ASBU and Implementation Challenge Juliana Barros Gonçalves ATC Programme Manager, Atech ASBU IMPLEMENTATION Date 05/12/2017 ASBU industry consideration Juliana Barros Gonçalves

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY 8/9/ International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 7-9 October ) Agenda Item : Performance Framework for MID Region Air Navigation

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 2013 BOBASIO 3-WP/15 22-24//13 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/3) Hyderabad, India. 22 nd 24 th October 13 Agenda Item 4: BOBASIO Region Seamless

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B NSS 2018 AUCKLAND NZ Part 2 1 2 3 4 5 Sydney Lord Howe Is and Norfolk Island (Oceanic) General aviation bottom antenna only at 10,000 feet 6 Data Services Agreement Summary NAV CANADA

More information

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

ART Workshop Airport Capacity

ART Workshop Airport Capacity ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/19 WP16D INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP NINETEENTH MEETING (APIRG/19) (Dakar, Senegal (28 to 31 October 2013) Agenda Item 3 Performance Framework

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes ASBU IMPLEMENTATION ASBU industry consideration Date 16/08/2017 Edson Fagundes Gomes GOAL To present to the attendants of this workshop the industry considerations for ASBU modules. In this sense, we will

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Information Paper 2 SUMMARY

Information Paper 2 SUMMARY COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional

More information

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD اجلمهوریة اجلزائریة الدمیقراطیة الشعبیة RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE وزارة االشغال العمومیة و النقل MINISTÈRE DES TRAVAUX PUBLICS ET DES TRANSPORTS ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools PIA 1 Block Module B0 ACDM Date February 12, 2017 Module Description: Implements collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

ICAO ASBU Implementation/ Surveillance and ATS Automation

ICAO ASBU Implementation/ Surveillance and ATS Automation Session 1 ICAO SARPS, DOCUMENTATION AND GLOBAL AND REGIONAL PLANS REGARDING THE IMPLEMENTATION OF AERONAUTICAL SURVEILLANCE AND AUTOMATED SYSTEMS FOR ATS OPERATIONS ICAO ASBU Implementation/ Surveillance

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2 Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)

More information

Performance Based Navigation (PBN) Implementation Road Map

Performance Based Navigation (PBN) Implementation Road Map AIRPORTS AUTHORITY OF INDIA Performance Based Navigation (PBN) Implementation Road Map Version 1.0 September 2009 Directorate of Air Traffic Management Table of Contents 1. Introduction 2. PBN concepts

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017 CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA 1 ATFM Global Symposium-2017 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

What are we trying to achieve with this presentation:

What are we trying to achieve with this presentation: ATC Guild (India) What are we trying to achieve with this presentation: A high level breakdown of the Indian Aviation and ATM scenario An overview of global ATM initiatives Global ATC systems market Indian

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN VOLUME III 29 June 2018 ENDORSED BY NAT SPG/54 NAT ANP, Volume III June 2018 Page i TABLE OF CONTENTS PART 0 Introduction... 0-1 PART I - General Planning Aspects

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Many thanks to our host

Many thanks to our host Many thanks to our host Many thanks to our Lead Sponsor Opening Addresses Eng. Hussein Massoud Minister of Civil Aviation Egypt Opening Addresses Paul Riemens CANSO Chairman of the Executive Board & CEO,

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine Civil/Military Cooperation ICAO Workshop Civil/Military Cooperation in Ukraine October 2013 Ukraine Gained independence in 1991 Population: 47 million Total area: 603,700 sq.km Land boundaries: 4,558 km

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. BOBASIO 3-WP/09 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda Item 7: Green Initiatives

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY NACC/WG/5 WP/32 21/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3: Implementation on Air Navigation

More information

Safety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO

Safety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO International Civil Aviation Organization Safety and efficiency performance framework ASBU methodology H.Sudarshan Air Navigation Bureau, ICAO APANPIRG/22 Meeting, Bangkok, 5 9 September 2011 Presentation

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

Aviation System Block Upgrades

Aviation System Block Upgrades WORKING DOCUMENT FOR THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION ISSUED: 16 NOVEMBER 2011 SUCCESSOR TO THE WORKING DOCUMENT FOR GLOBAL AIR NAVIGATION INDUSTRY SYMPOSIUM (GANIS)

More information