1 NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road transport & Highways) Department of Road Transport & Highways Two lanning with paved shoulder of Khagaria Purnea Section of NH 31 from Km to Km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. MPR No. : 32 For the Month of August-14 Consultant: BLOOM COMPANIES, LLC Concessionaire: KHAGARIA PURNEA HIGHWAY PROJECT LTD EPC: PUNJ LLOYD LTD

2 Two laning with paved shoulder of Khagaria-Purnea section of NH- 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Contents LOCATION MAP... 2 EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 PROJECT BACKGROUND... 4 SALIENT FEATURES... 6 PROJECT DETAILS... 7 Pre construction Activities... 8 Status of Permission and Approvals as per schedule E... 9 Plant Establishment Scope of Work at a Glance Status of working Drawing Geotechnical and hydrological Report Financial Progress Mix Design Material Stocked at site Traffic Management Measures Maintenance on Existing Road S-Curve Organization Chart Concessionaire: Organization Chart EPC (PLL) Organization Chart Sub Contractor Quality Control Tests Weather Report List of Plant, Machinery and QC Equipments QC Equipments for Each Camp Photographs O & M Report Strip Chart Main Carriageway Monthly Progress Report for the Month of August-14 1

3 Two laning with paved shoulder of Khagaria-Purnea section of NH- 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. LOCATION MAP Km End Point Km Start Point CAMP II PIU, NHAI CAMPIII CAMP I Concessionaire Office QUARRY SITE LOCATION MAP KHAHARIA PURNEA HIGHWAY PROJECT Monthly Progress Report for the Month of August-14 2

4 Two laning with paved shoulder of Khagaria-Purnea section of NH- 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. EXECUTIVE SUMMARY The Government of India in the Ministry of Shipping, Road Transport and Highways had authorized National Highway Authority of India for two laning with paved shoulder of Khagaria Purnea Section of NH-31 from km km in the state of Bihar to be executed as BOT (annuity) on DBFOT pattern under NHDP Phase III Project and has by its letter no. NHAI/BOT/11012/26/2004/16963 dated awarded to M/S Punj Lloyd infrastructure Ltd for semiannual annuity of Rs crores with a project construction period of 910 days from and concession period of 17 Years. The entity has promoted and incorporated Khagaria Purnea Project Ltd as concessionaire (SPV). The concessionaire has entered into EPC Agreement with M/s Punj Lloyd Ltd. for carrying out works under the scope of the project on the Project Highway. The EPC contractor in turn has engaged M/s APCO Infratech for execution of the work as sub contractor. NHAI has engaged M/s BLOOM Companies, LLC, USA in association with Bloom Infrastructure and Logistic (I) Pvt. Ltd. to act as Independent Consultant for the said project. Hereunder is the Financial progress summary Details Elapsed contract period in % age Cumulative planned progress % age. Cumulative achieved progress % age Cumulative Slippage % age Target for September 2014 % age. KPHPL Monthly Progress Report for the Month of August-14 3

5 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. INTRODUCTION The Government of India had entrusted the development, Maintenance and management of Khagaria Purnea Section of National Highway No. 31 from KM to Km in the state of Bihar to be executed as BOT (annuity) on DBFOT pattern under NHDP Phase III. The road starts from Km just outside Khagaria town and ends at Km of NH- 31 at NH-57 junction. It moves Eastwards parallel to Ganga river through Khagaria, Bhagalpur, Katihar and Purnea district. National Highway No. 31 is one of the major connecting links of North India with North East and west Bengal. It connects Assam, West Bengal, Bihar and Jharkhand. The Khagaria Purnea project, Being the part of NH-31 it Shares very large volume of traffic. The hagaria Purnea road lies on the northern side of the Ganga River. The terrain condition is absolutely plain with intermittent populated villages. Since it lies in the Gangetic plains, the soil is alluvial. PROJECT BACKGROUND Two laning of Khagaria Purnea section of NH-31 lies in Gangetic plain, parallel to Ganga river and Railways track. The road passes through flat terrain on low land. The general ground profile slopes form north to south in this area water accumulates on north side of roads because of inadequate cross drainage. Some portion of project stretches are under submergence for long time in a year. The area is generally flooded with water spill from Koshi and Ganga river during monsoon and causes deterioration. One of the stretches called PASARAHA area suffers road failure due to subsidence and depression. Some where the railways track along the road causes water logging. The majority of abutting land use is under agricultural followed by residential. The alignment is sprayed with small habitants. There are number of important town like Mansi, Maheshkunth, Bihpur, Narayanpur, Naugachhia, Kursela, Harda and Purnea. The river in north Bihar play havoc in the monsoon, the habitation shifts to higher ground like roads and railway embankment. The project stretch has fairly straight alignment with very few curves and there is no drastic change in gradient. There are numbers of cross roads mostly NH and SH with large number of access road. The road has very poor road facilities and hazardous junctions. Monthly Progress Report for the Month of August -14 4

6 Scope of the Project Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Two laning of khagaria Purnea section of NH-31 from Km to Km with paved shoulder in the state of Bihar comprises: i) Widening and strengthening of road with 10 m carriageway including paved shoulder and 1 m of shoulder on either side of road. ii) iii) Operation and maintenance of the road. Construction of the road facilities like Toll Plaza, road side furniture, etc. Monthly Progress Report for the Month of August -14 5

7 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. SALIENT FEATURES Project Title Two laning with paved shoulder of Khagaria Purnea Section of NH-31 from Km to Km in the state of Bihar to be executed as BOT (annuity) on DBFOT pattern under NHDP Phase III project. Letter of Award No. Letter of Award Date Concession Agreement no. Date of Concession agreement NHAI/BOT/11012/26/2004/16963 Client / Employer/Authority NHAI, G-5 & 6, Sector 10, Dwarka, New Delhi Concessionaire Khagaria-Purnea Highway Project Ltd, Punj Lloyd House, 17-18, Nehru Place, New Delhi EPC Contractor Punj Lloyd Ltd. Sub Contractor Independent Engineer Estimated Project Cost APCO Infratech Ltd M/s BLOOM Companies, LLC, USA in association with Bloom Infrastructure and Logistic (I) Pvt. Ltd Crores Appointed Date (declared on 19 th Dec, 2011) Schedule Two Lanning Date (Project Completion Date) Concession period COD (910 days from Appointed Date) 17 years 4 th Nov 13 Completion Certificate 3 rd Feb, 2014 Monthly Progress Report for the Month of August -14 6

8 PROJECT DETAILS Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Details of Road Road Length Service Road Realignment of existing Road Major Intersections Minor Junction Pavement Type Km Km 4 Location 7 Nos. 11 Nos. Flexible Project Facilities Toll Plaza Truck Lay byes Bus byes / Shelter Traffic Aid post Bridge Details Major Bridges Repair Minor Bridge Rehabilitation / Repair / widening ROB (Repairs) Slab Culvert (New, retained and widened) 2 Nos. 3 Nos. (either side) 6 Nos. 2 Nos. 5 Nos. 5 Nos. 4 Nos. (Construction NIL) 30 Nos. ROW Location Proposed ROW Existing ROW as in contract Required ROW to m 60 m to m 45 m to m 60m to m 60m 20 m to m 60m Realignment Section Existing length: 400 m Existing chainage length: 520 m Existing length: 920 m Existing length: 360 m Total Realignment: 2.20 km Monthly Progress Report for the Month of August -14 7

9 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Pre construction Activities Land and utility Shifting Sl.No. Description of Work STATUS 1 Land Acquisition 2 Handing over of land 3 Utility Shifting 3A:- Completed for entire Section. 3D:- Completed 3G: Completed and submitted to NHAI. Toll Plaza Land and additional 10m ROW required from Km 309- Km 317. Additional 3A for Bhagalpur and Purnea completed, 3D completed for Purnea Chakrami Village- encumbrance problem Km to Km : 97 % of land (up to Toe) is handed over by NHAI, PIU- Begusarai on , the balance land is under process of land acquisition. BSEB Electrical Poles shifting. Khagaria District (km 270- km 309): electrical line has been shifted. Bhagalpur District (km 309-km 352): electrical line has been shifted. Katihar District (km 352 km 391): electrical line has been shifted. Purnea District (km 391-km 410): electrical line has been shifted. Design and Investigation Details Sl.No. Description of Work STATUS 1 Traffic Survey Completed 2 Inventory Completed 3 Topographic Survey Completed 4 Centre line marking 140 KM 5 OGL 140 KM Monthly Progress Report for the Month of August -14 8

10 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. UTILITY SHIFTING STATUS Sl.No Particulars Unit Total Work done up to previous Month Work done During the Month Cumulative Work done up to this Month 1 BSEB Khagaria All Completed Completed Bhagalpur All Complete Completed Katihar All Complete Completed Purnea All Complete Completed Month wise Land Availability Status Status of Permission and Approvals as per schedule E Sr. No. Description 1. Applicable permit as per schedule i) Permission of the state Government for extraction ii) iii) S. No Month of boulder from quarry Permission of Village Panchayat and Pollution control board for installation of crusher. License for use of explosives Land Available in the month iv) Permission from State government for drawing water from river/reservoir. v) License from Inspector of factories or competent authorities for setting up Batching Plant. vi) Clearance from Pollution control board for Setting up Batching Plant. Vii) Permission of Village Panchayat and Pollution control board for Asphalt Plant. viii) Permission of Village Panchayat and State Government for Borrow earth. ix) Permission of State Government for Cutting trees. x) Any other permits or clearances required under Applicable Laws 2 Environmental Clearance for project: NA Remarks NA as aggregate is purchased from suppliers. NA as aggregate is purchased from suppliers. NA as aggregate is purchased from suppliers. NOC for bore well is granted by village Panchayat. No need of permission for reservoir. Permission granted by PCB, Bihar Permission granted by PCB, Bihar NOC from Village Panchayat Obtained Permission granted by PCB, Bihar Obtained Cumulative Land Available 1 Nov % 97% 2 May % 3 June % 4 July % 5 August % Permission is granted and is under cost estimate of tree cutting. Concessionaire shall comply with the same as and when required Monthly Progress Report for the Month of August -14 9

11 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Plant Establishment S.N. Description of plant Status 1 Crusher Plant (200 TPH) Established at Sakrigali and is functioning Concessionaire / EPC 2 Camp Establishment / Site Offices Established at Chanakya Vihar, Bhagalpur Sub Contractor 1) Established at Rangra (km 348 RHS) 2) Established at Harda (km 391 ) 3) Established at Km RHS 3 Batching Plant 1). Established at Harda (km 391 ) 4 5 WMM Plant (200 TPH) 1) Established at Rangra (km 348 RHS) (200 TPH) 2) Established at Harda (km 391 ) Hot Mix Plant (200TPH) 1) Established at Rangra (km 348 RHS) 2) Established at Km RHS Scope of Work at a Glance Sr. No. Particulars Units Scope Highway (Main Carriage Way) 1 Clearing & Grubbing KM KM Sub grade KM GSB KM Kerb Casting KM DLC KM PQC KM Drainage & Protective Works KM Highway (Service Road) 9 Clearing & Grubbing KM KM Structure 11 Sub grade KM GSB KM WMM KM DBM KM SD KM ROB (repair) Nos Major Bridges (repair) Nos Minor Bridges (Repair) Nos Slab and Box Culverts (including Rehabilitation) Nos. 30 Monthly Progress Report for the Month of August

12 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Status of working Drawing Sl No. Description Location Plan & Profile Status of Submission Status of Approval 1 Plan and Profile Completed Completed STRUCTURE DRAWING 2 Minor Bridge Completed Completed 3 Minor Bridge Completed Completed 4 Minor Bridge Completed Completed 5 Minor Bridge Completed Completed 6 Minor Bridge Completed Completed 7 Major Bridge Completed Completed 8 Major Bridge Completed Completed 9 Major Bridge Completed Completed 10 Major Bridge Completed Completed 11 Major Bridge Completed Completed 12 ROB Completed Completed 13 ROB Completed Completed 14 ROB Completed Completed 15 Toll Plaza Completed Completed 16 Slab Culvert Completed Completed 17 Slab Culvert Completed Completed 18 Slab Culvert Completed Completed 19 Slab Culvert Completed Completed 20 Slab Culvert Completed Completed 21 Slab Culvert Completed Completed 22 Slab Culvert Completed Completed 23 Slab Culvert Completed Completed 24 Slab Culvert Completed Completed 25 Slab Culvert Completed Completed 26 Slab Culvert Completed Completed 27 Slab Culvert Completed Completed 28 Box Culvert Completed Completed 29 Box Culvert Completed Completed 30 Box Culvert Completed Completed 31 Box Culvert Completed Completed 32 Box Culvert Completed Completed 33 Box Culvert Completed Completed 34 Box Culvert Completed Completed 35 Box Culvert Completed Completed 36 Box Culvert Completed Completed 37 Box Culvert Completed Completed Monthly Progress Report for the Month of August

13 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. 38 Box Culvert Completed Completed 39 Box Culvert Completed Completed 40 Box Culvert Completed Completed 41 Box Culvert Completed Completed 42 Box Culvert Completed Completed 43 Box Culvert Completed Completed 44 Box Culvert Completed Completed 45 Box Culvert Completed Completed 46 Boundary Stone Completed Completed 47 Guard Post Completed Completed 48 Pedestrian Guard Rail Completed Completed 49 Kerb Completed Completed 50 Service Road () Completed Completed 51 Service Road (RHS) Completed Completed 52 Service Road () Completed Completed 53 Service Road (RHS) Completed Completed 54 Service Road (BHS) Completed Completed 55 Service Road () Completed Completed 56 Service Road (RHS) Completed Completed 57 Service Road () Completed Completed 58 Service Road (RHS) Completed Completed 59 Service Road (BHS) Completed Completed 60 Service Road () Completed Completed 61 Service Road (RHS) Completed Completed 62 Service Road (BHS) Completed Completed 63 Landscaping Plan, Bus shelter and Septic Tank Completed Completed 64 Restaurant & Toilet block for Truck lay bye Completed Completed 65 Highway Lighting Toll Plaza Completed Completed 66 Highway Lighting Truck Laybye Completed Completed 67 W Beam Guard Rail Completed Completed 68 Crash Barrier Completed Completed 69 Bus Bay Completed Completed 70 Truck Lay Byes Completed Completed 71 Minor Inter Section Completed Completed 72 Major Intersection Completed Completed 73 Return Wall of Minor Bridge Completed Completed 74 Wing Wall of Culverts Completed Completed Monthly Progress Report for the Month of August

14 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Geotechnical and hydrological Report Status of Soil/ Geotechnical Investigation Report Sl. No. Status of Investigation Minor Bridges Completed Completed Completed Completed Completed Pasaraha Area Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Monthly Progress Report for the Month of August

15 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. PROGRESS Financial Progress: Details Elapsed contract period in % age Cumulative planned progress Up to this month (Cr) Cumulative planned progress Up to this month % age. Cumulative achieved progress (Cr) Cumulative achieved progress % age Cumulati ve Slippage % age Target for September 2014 % age. KPHPL (-) Physical Progress: Road Works Current Month Cumulative a. Cleaning and grubbing = Lane Km Lane Km b. = Lane Km Lane Km c. Sub-grade. = Lane Km Lane Km d. GSB I = 0.40 Lane Km Lane Km e. GSB II = 0.40 Lane Km Lane Km f. WMM I = 0.40 Lane Km Lane Km g. WMM II = 0.40 Lane Km Lane Km h. = 0.10 Lane Km Lane Km i. I = 0.10 Lane Km Lane Km j. = 3.50 Lane Km Lane Km k. DLC = 2.00 locations l. PQC = 2.00 locations Physical Progress: Details Elapsed contract period in % age Cumulative planned physical progress Up to this month % Cumulative achieved physical progress up to this month. % KPHPL Structure Works: Sr. No. Type of Structure 1 ROB (repair) Major Bridges (repair) Minor Bridges (repair) Slab and Box Culverts Side Total No. of Structures No. of Structures Tackled No. of Structures Completed No. of Structures in Progress/Balance RHS RHS RHS RHS Monthly Progress Report for the Month of August

16 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Sr. No. Cumulative Physical progress Description Unit Total Qty Cumulative Qty Achieved till Last Month Qty Planned in This month Qty Achieved in this month Cumulative Qty Planned till This Month Cumulative Qty Achieved till this month % Work Planned till this month % Work Achieved till this month Main Carriageway 1 Clearing & Grubbing KM KM Sub grade KM GSB KM WMM KM DBM KM KM W-Beam crash Barrier KM DLC KM PQC KM Drainage & Protective KM Works Service Road 1 Clearing & Grubbing KM KM Sub grade KM GSB KM WMM KM DBM KM SD KM Note: Total qty, achieved and planned have been changed including the structure length. Remark Monthly Progress Report for the Month of August

17 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Financial Progress Financial Progress during the month is tabulated below: Project Up to Previous month (July, 2014) Planned. Achieved (Crores) ( Crores) This month (August, 2014) Planned. Achieved (Crores) ( Crores) Planned. (Crores) Cumulative (Up to August, 2014) Achieved Planned. ( Crores) % Achieved % KPHPL (0.00%) 1.85 (0.30%) Mix Design 1. Mix Design of GSB :Approved 2. Mix Design of WMM :Approved 3. DBM :Approved 4. Concrete Mix Design :Approved 5. :Approved 6. DLC :Approved 7. PQC :Approved Material Stocked at site Sr. No. Materials Unit Quantity Remark 1 GSB (Natural) MT Cement Bags Stone Aggregate MT Stone Dust MT 2 5 Bitumen MT 66 6 Steel MT 2 Traffic Management Measures One number of Safety officer from EPC and 2 no. of Safety personals along with support staffs are deployed at Site to take care of safety aspects and Traffic Management. In addition, Safety & traffic management systems are implemented at all required locations as per the Safety & Traffic Management plan. Utmost care is being taken for safety of the work force as well as road users while carrying out the various activities. Sufficient numbers of prefabricated steel sign boards written with safety slogans and warning cautions has been made ready and being placed at all the desired locations to improve the safety standards. Monthly Progress Report for the Month of August

18 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Maintenance on Road Regular Maintenance for entire carriageway and service roads are being carried out timely and ambulances are deployed at both toll plazas and cranes and 24 hr patrolling are operational at site. Mean time cleaning of bushes and plant at shoulder has been cleaned. Similarly, cleaning of drain has been done regularly and monsoon precautions have been taken care. Existing road maintenance has been done for the supplementary agreement portion from km 309 to km 315. Encroach between at service roads at Gedabari (km 384), Harda Bajar (km 396), Naugachia (338), Maheshkhunt (288) are being creating lot of problems to road users. Most of the service roads are encroached by local vendors and same was informed to authority and local administration timely. All the potholes and patches have been rectified properly. Rain cuts developed during recent rain has been rectified. Cutting of grass on the shoulder and cleaning of road is going on continuously. Monthly Progress Report for the Month of August

19 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. S-Curve Monthly Progress Report for the month of August

20 54000 KHAGARIA PURNEA HIGHWAY PROJECT LTD TWO LANNING WITH PAVED SAHOULDER OF KHAGARIA - PURNEA SECTION OF NH-31 FROM KM TO IN THE STATE OF BIHAR TO BE EXECUTED AS BOT( ANNUITY) ON DBFOT PATTERN UNDER NHDP PHASE III PROJECT. FINANCIAL PROGRAMME WITH S-CURVE Date: Month SL. NO. ITEM NO. BRIEF DESCRIPTION OF MAJNOR ITEMS UNIT Estimated QTY % of Work Component Target / Actual Qty Executed As on Year M.S. MS-1 10% MS-2 35% MS-3 70% Month Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Remarks AMT.T Target QTY.T (a) Roadway Excavation Cum 1.40% AMT.A Actual QTY.A AMT.T Target 2.02 & filling QTY.T Cum 6.35% 2.03 (BA + C&F) AMT.A Actual QTY.A AMT.T Target QTY.T Subgrade filling Cum 3.14% AMT.A Actual QTY.A AMT.T Target QTY.T Granular Sub Base Cum 11.62% AMT.A 1.97 Actual QTY.A AMT.T Target QTY.T WMM -1st Layer Cum 5.29% AMT.A 4.00 Actual QTY.A AMT.T Target QTY.T WMM -Top Layer Cum 5.29% AMT.A 7.00 Actual QTY.A AMT.T Target QTY.T Bituminous Macadam Cum 2.66% AMT.A Actual QTY.A AMT.T Target QTY.T Dense Bituminous Macadam Cum 28.92% AMT.A 8.00 Actual QTY.A AMT.T Target QTY.T (b) Bituminous Concrete Cum 10.32% AMT.A Actual QTY.A AMT.T Target QTY.T Semi Dense Bituminous Concrete Cum 0.41% AMT.A Actual QTY.A AMT.T , Target QTY.T Dry Lean Concrete Cum 0.26% AMT.A Actual QTY.A AMT.T Target QTY.T Pavement Quality Concrete Cum 0.88% AMT.A Actual QTY.A AMT.T Target QTY.T & 6 Structural Concrete Cum 5.41% AMT.A Actual QTY.A AMT.T Target Rs. In QTY.T Toll Plaza & Buildings 4.77% Lacs AMT.A Actual QTY.A AMT.T Target Bought-out items,finishes, Road Rs. In QTY.T 15 Miss 13.28% facilities Lacs AMT.A Actual QTY.A TOTAL -----> 100% AMT.T Total AMT.A Original Schedule Actual Progress FOR APCO INFRATECH LTD. Monthly Programme Target Progress % Cumm Monthly Target Amount lacs Cumm AUTHORISED SIGNATORY Monthly Achieved Progress % Cumm Physical Progress Monthly Achieved Amt Lacs Cumm

21 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Organization Chart Concessionaire: NHAI, PIU- Begusrai, Bihar EPC Khagaria Purnea Highway Project Ltd Arjunudu.Ch,PM KPHPL coordinator Punj Lloyd Ltd PLL A Administrative Support Staff Sr. Highway Engineer RK Babjee Sr. Materials Engineer Kapleshwar Yadav Lisioning Manager / PRO Santosh Kumar Sinha Monthly Progress Report for the month of August

22 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Organization Chart EPC (PLL) A ( EPC ) Sub Contractor Project Director, PLL B RCM Administrative Support Staff Highway Engineer - 1Nos Amod Kumar Jha Planning Engineer -1 Ashish Churiwala Structural Engineer -1 AK Chaurasiya Materials Engineer/ QC-1 Ambuj Kumar Survey engineer- 1Nos Nirmal Nayak Quantity Surveyor -1 Phool Kumar Singh Safety In charge Abhay Kumar Lisioning Manager Ratnesh Bhushan Monthly Progress Report for the month of August

23 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Organization Chart Sub Contractor Sub Contractor (B) Project Manager Arvind Kumar (acting) Deputy Project Manager-2 Administrative / Purchase Section Incharge - 2Nos Planning Engineer Structural Engineer Materials Engineer Survey engineer Quantity surveyor Safety In charge Plant Manager Site engineers/ Super visor Site engineer/ Super visor QC/Lab Technicians Surveyors Safety supervisor Plant Engineer/ Workshop / Forman Monthly Progress Report for the month of August

24 Remarks Remarks Quality Control Tests QUALITY CONTROL REPORT FOR AUGUST, 2014 S.No Name of Test Testing Method Frequency of Test Specification Requirement (Limit) Quantity of work Carried Out Unit Upto Previous Month This Month No.of Tests Required Cumulative upto Previous Month Passed Failed Total Number of Tests Conducted Test done in this month Total Passed Total failed Total Tests Done Upto Date Total Passed Failed Total I OGL, 1 MDD/OMC IS:2720 Part-8 1 Test /250 m Ll/PI IS: 2720 Part-5 1 Test /250 m LL-70% PI-45% Max GSA IS: 2720: Part-4 1 Test /250 m FSI IS: 2720 Part-40 1 Test /250 m II EXISTING SOULDER SAMPLE Not more than 50% MDD/OMC IS:2720 Part-8 1 Test /250 m Ll/PI IS: 2720 Part-5 1 Test /250 m LL-70% PI-45% Max GSA IS: 2720: Part-4 1 Test /250 m FSI IS: 2720 Part-40 1 Test /250 m 5 CBR IS: 2720 Part-16 As Required III Borrow Area approval for Emb. & Subgrade Not more than 50% min. 10% for Subgrade 1 MDD/OMC IS:2720 Part-8 1 test per 1500 m Ll/PI IS: 2720 Part-5 1 test per 1500 m3 LL-70% PI-45% Max. m GSA IS: 2720: Part-4 1 test per 1500 m FSI IS: 2720 Part-40 1 test per 1500 m3 Not more than 50% CBR IS: 2720 Part-16 1 test per 3000 m3 min. 10% m IV Control test for GSB 1 Grading IS: 2386 Part-1 1 tes per 200 m3 2 MDD/OMC IS:2720 Part-8 As required by engineer 3 Ll/PI IS: 2720 Part-5 1 tes per 200 m3 4 10% Fines Value BS:812 Part CBR IS: 2720 Part-16 As required by engineer As required by engineer S.No Name of Test Testing Method Frequency of Test Table grade 1 m As per Lab Test NA Not more than 25 %& 6% kN min NA Min 30% NA Specification Requirement (Limit) Unit Upto Previous Month Monthly Progress Report August This Month No.of Tests Required Cumulative upto Previous Month Passed Failed Total Number of Tests Conducted Test done in this month Total Passed Total failed Total Tests Done Upto Date Total Passed Failed Total

25 Remarks V Control test for WMM 1 Comb. Grading IS: 2386 Part-1 1 tes per 100 m3 Table most MDD/OMC IS:2720 Part-8 As required by engineer 3 Ll/PI IS: 2720 Part-5 1 tes per 100 m3 NA PI not more than- 6% m AIV IS: 2386 Part-4 1 test per200 m3 Max 30% FI & EI IS: 2386 Part-1 1 test per200 m3 Max 30% VI Coarse Aggregate for concrete 1 Grading IS: 2386 Part-1 1 Test per day of Concrete IS AIV IS: 2386 Part-4 1 Test Per Week Max % FI IS: 2386 Part-1 2 Test Per Week Max 35% VII Fine Aggregate for concrete 1 Grading IS: 2386 Part-1 VIII Cement 1 Consistency IS:4031 Part-4 1 Test per day of Concrete As per IS Setting Times IS:4031 Part-5 IST-30min(min), FST-600min(max) Soundness IS:4031 Part-3 10mm Max Fineness IS:4031 Part-1 Per lot 10% max Days Compressive Strength IS:516 7 Days Days S.No Name of Test Testing Method Frequency of Test Specification Requirement (Limit) Quantity of work Carried Out Unit Upto Previous Month This Month No.of Tests Required Cumulative upto Previous Month Passed Failed Total Number of Tests Conducted Test done in this month Total Passed Total failed Total Tests Done Upto Date Total Passed Failed Total IX Dence Bituminous Macadam 1 Individual & Combined Gradation IS: 2386 Part-1 2 test / day per plant As Table Most Extraction With Gradation ASTM-D Ton/Test or Min 2 test/day O+0.3,-0.3% m AIV IS: 2386 Part-4 1 Test/50 cum Max 27% FI &EI IS: 2386 Part-1 1 Test/50 cum Max 30% Monthly Progress Report August

26 5 Marshall Stability (set) ASTM-D-1559 For each 400 T of mix produced, a set of three marshall specimens to be prepared and tested for stability, subject to minimum of two sets being tested per plant per day Min 9 kn at 60 degree a) Core Cutting 1test/250sqm m Tack Coat (Emulsion) IS :1203 1test/500sqm 2.0to3.0kg /10sqm m Prime Coat (Emulsion) IS :1203 1test/500sqm 6.0to9.0kg /10sqm m ` Up. To Prev. (RS ) This Month:- RS1: M.T Up. To Prev. (SS ) This Month:- SS1:- 0.0 M.T X Bituminous Concrete 1 Individual & Combined Gradation IS: 2386 Part-1 2 test / day per plant As Table Most Extraction With Gradation ASTM-D Ton/Test or Min 2 test/day O+0.3,-0.3% AIV IS: 2386 Part-4 1 Test/50 cum Max 24% FI &EI IS: 2386 Part-1 1 Test/50 cum Max 30% m For each 400 T of mix produced, a set of three marshall 5 specimens to be Marshall Stability Min 12 kn at 60 ASTM-D-1559 prepared and tested (set) degree for stability, subject to minimum of two sets being tested per plant per day 6 a) Core Cutting 1test/250sqm m Tack Coat (Emulsion) IS :1203 1test/500sqm 2.0to3.0kg /10sqm m XI BITUMEN (VG-30) 1 Penetration Sofftening Point MT Ductlity Viscosity XII BITUMEN (CRMB-60) 1 Penetration Sofftening Point Elastic Recovery MT Test Separation Test XIII Sr. no. CONCRETE CUBE COMPRESSIVE STRENGTH Grade of concrete 1 M 15 IS: Sample for 1-5 Cum. 2 Sample for 6- Unit Age of Concrete 15 Cum, 3 Sample m 3 7 Days for Cum, 4 Sample for Days Cum, 4+1 / Additional Monthly Progress Report August

27 Remarks 2 M 20 3 M 25 4 M 30 7 Days 50Cum. Or part for > Cum Days Days Days Days Days M 35 6 M 40 7 DLC 8 PQC 7 Days Days Days Days Days Days Days Days S.No Name of Test Testing Method Frequency of Test Specification Requirement (Limit) Quantity of work Carried Out Unit Upto Previous Month This Month No.of Tests Required Cumulative upto Previous Month Passed Failed Total Number of Tests Conducted Test done in this month Total Passed Total failed Total Tests Done Upto Date Total Passed Failed Total XIV FDD 1 OGL IS: 2720 Part-28 1 test per 1000 m2 95% Min m IS: 2720 Part-28 1 test per 1000 m2 95% Min m Subgrade Top IS: 2720 Part-28 1 test per 500 m2 97% Min m Subgrade Top IS: 2720 Part-28 1 test per 500 m2 97% Min m GSB IS: 2720 Part-28 1 test per 500 m2 98% Min m WMM IS: 2720 Part-28 1 test per 500 m2 98% Min m Shoulder IS: 2720 Part-28 1 test per 500 m2 98% Min m DLC IS: 2720 Part-28 3 test per 2000 m2 97% Min m Monthly Progress Report August

28 Weather Report Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. TWO Laning with paved shoulder of Khagaria - Purnia Section ofnh-31 Km to Km in the state of bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III project. Date Temprature ( o C) METROLOGICAL DATA RANGRA LAB Humidity (%) Max Min Max Min AUG-14 Rain Fall (mm) Weather Remarks 01-Aug Cloudy & Rain 02-Aug Cloudy & Rain 03-Aug Nil Cloudy & Clear 04-Aug Nil Cloudy & Clear 05-Aug Nil Clear 06-Aug Nil Clear 07-Aug Nil Clear 08-Aug Cloudy & Rain 09-Aug Cloudy & Rain 10-Aug Clear 11-Aug Nil Clear 12-Aug Nil Clear 13-Aug Cloudy & Rain 14-Aug Cloudy & Rain 15-Aug Cloudy & Rain 16-Aug Nil Cloudy & Clear 17-Aug Nil Cloudy & Clear 18-Aug Nil Clear 19-Aug Nil Clear 20-Aug Nil Clear 21-Aug Cloudy & Rain 22-Aug Cloudy & Rain 23-Aug Nil Cloudy & Clear 24-Aug Nil Cloudy & Clear 25-Aug Nil Clear 26-Aug Nil Cloudy 27-Aug Nil Cloudy 28-Aug Nil Cloudy 29-Aug Nil Cloudy 30-Aug Nil Cloudy & Rain 31-Aug Nil Clear Monthly Progress Report for the Month of August

29 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. List of Plant, Machinery and QC Equipments Plant and Machinery Tractor with Water Motor Wheel Vibratory Tandem Description JCB Excavator Tipper Paver trolley Tanker Grader Loader Roller Roller PTR HMP Requirement Mobilized at Site Description WMM Plant Broom Bit. Sprayer Batching Plant Transit Mixer Compressor Diesel Tank Crane Bar Cutting / Bending Machine Requirement Mobilized at Site Emulsion DG Set 500 DG Set DG Set 62.5 DG Set 15 Bump Description 4 wheeler Crusher Core cutter Trailor Tank Kva 125Kva Kva Kva indicator Requirement Mobilized at Site Weigh Bridge Dozer Monthly Progress Report for the Month of August

30 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. QC Equipments for Each Camp 1. Electronics Balance. Capacity:- 20Kg, 500 g, 100Kg, 50kg, 30kg, 5 kg, 2. Sieve Size: 11.2, 0.075, 75, 63, 53, 50, 40, 37.5, 31.5, 26.5, 25, 22.5, 20, 19, 18, 14, 13.2, 12.5, 10, 9.5, 6.3, 4.75, 2.36, 2, 1.7, 1.18, 1, 0.6, 0.425, 0.30, 0.15, Tray: 15 Nos. 4. Wooden Hammer : 1 No. 5. Thermometer Maximum, Minimum : 1 No. 6. Liquid Limit Device Casagrande: 1 no. Cone Penetration: 1 No. 7. Proctor Rammer : 1 No. 8. Spatula : 1 No 9. Capillary Bottle: 2Nos. 10. Moisture Tin : 110 Nos. 11. CBR testing Machine: 1 No 12. CBR Spacer : 1 No. 13. Proving Ring : 25 KN: 1 No. 50 KN: 1 No 14. Measuring Jar 100 ml : 12 Nos. 15. Wire Basket: No. 16. Pycnometer : 1 No. 17. Vibrating Machine: 1 No. 18. Hot Air Oven: 2 Nos. 19. C.T.M KN: 1 No % fine value apparatus: 1 No. 21. Sand Pouring Cylinder : 100 mm dia : 2 nos. 150 mm dia : 2 Nos. 200 mm dia ; 1 No 22. Moisture meter : 3 Nos. 23. Slump Test apparatus; 3 Nos. 24. Concrete Mixture: 1 No 25. Cube Mould 150X150X150 mm : 18 Nos. 26. Cube Mould 70.6x70.6x70.6 mm : 12 Nos. 27. Vacate Needle :1 No 28. Hot Plate : 1 No. 29. FI, EI Gauge : 1 No 30. AIV Test apparatus : 1 No. 31. CBR Mould : 8 Set Monthly Progress Report for the Month of August

31 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Photographs Annexure Q Photographs Main Carriageway Main Carriageway Monthly Progress Report for the Month of August

32 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Main Carriageway Main carriageway after grass cutting Monthly Progress Report for the Month of August

33 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Removal of accidental vehicle Ambulance & Crane Monthly Progress Report for the Month of August

34 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. Rain Cuts Rectification Road Maintenance Monthly Progress Report for the Month of August

35 Two laning with paved shoulder of Khagaria-Purnea section of NH 31 from km to km in the state of Bihar to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III. O&M Report Monthly Progress Report for the Month of August

36 MONTHLY INSPECTION REPORT (CIVIL) MONTH: August'14 CHAINAGE: VISUAL INSPECTION Side Slope Severity Severity Severity Severity Severity Severity Poor Fair Good Poor Fair Good Poor Fair Good Poor Fair Good Poor Fair Good Poor Fair Good Remarks M1 Fair , , , Fair Good Good - Turfing Good Good Fair Good Good Good - Slope Protection Good Good Good Fair Fair Good CLOSE INSPECTION Pavement Description - Rutting Nil Nil Nil Nil Nil Nil Repair of Rain cut done on specified location - Potholes/Cracks , , , , , , , , , Nil , Repair of Cracks and pot hole done at specified location - Shoving Nil Nil Nil Nil Nil Nil - Bleeding/Reveling Nil Nil Nil Nil Nil Nil - Edge Deformation Nil Nil Nil Nil Nil Nil - Depression Nil Nil Nil Nil Nil Nil - Roughness Good Good Good Good Good Good Median - Damaged/Crack Nil Nil Nil Nil Nil Nil

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL) National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Article 13, clause no of the Concession Agreement states that:

Article 13, clause no of the Concession Agreement states that: BACKGROUND Article 13, clause no. 13.2 of the Concession Agreement states that: 13.2 Inspection During the Construction Period the Independent Engineer shall inspect the Project Highway at least once a

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka-Raiganj Section of NH -34 from Km 294.800 to Km 395.000 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

DETAIL OF THE PROJECT

DETAIL OF THE PROJECT Page 1 Page 2 DETAIL OF THE PROJECT A CONTRACT DETAILS Project State Operation & Maintenance Phase of 4 Lane dual carriageway from Km 50.000 to Km. 100.000 of NH 6 (Kondhali Talegaon Section ) in the State

More information

Development of Road Infrastructure in India

Development of Road Infrastructure in India Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways Road Network in India Total Road Length about

More information

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H Road Network in India, Public Private Partnership Financing & Case Study 20.04.2018 Narendra Sharma, SE(PPP), MoRT&H Functions of Ministry of Road Transport and Highways, Govt. of India Formulation of

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH-45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation) ANNEXURE Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation).. SCHEDULES FOR SLUM/SOCIO-ECONOMIC SURVEY IN CITIES & TOWNS Part A: Part B: Part C: Annexure-I:

More information

MINUTES OF PROJECT REVIEW MEETING HELD ON

MINUTES OF PROJECT REVIEW MEETING HELD ON MINUTES OF PROJECT REVIEW MEETING HELD ON 4 th July 2016 1 The project review meeting started at 2.30 pm on 4 th July 2016 at the H.O of with the Managing Director of Shri A P M Mohammed Hanish IAS in

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2 EIA for Development of New Civil Enclave at Air Force Base at Bamrauli, Allahabad, Uttar Pradesh Public Hearing Details Annexure 2 Details of Public Hearing for Development of New Civil Enclave at Air

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY Township 137 Range 26 (Fairfield Township) sections 2 & 3 Township 138 Range 26 (City of Emily) sections 27, 34, 35, & 36 Township

More information

Wellington International Airport Runway Overlay

Wellington International Airport Runway Overlay Wellington International Airport Runway Overlay 2009. Parties involved Fulton Hogan Wellington Contractor. BECA - Consultant. Wellington international airport Ltd - Client. Contract Scope The contract

More information

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India Page 1 of 1 S.No. Name of the Scheme Actual 2009-10 Expenditure in 2010-11 (Cumulative) (Rs. In Crores) Grand Total 2010-11 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1 CSI Airport Mumbai Target 570.00 982.00 1645.00

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from: PASS Recycle/RAP Applications Definition RAP = Recycled Asphalt Pavement also called millings or grindings from: bump grinding of hot mix pavements millings from mill and fill operations large chunks of

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

IRRIGATION IN AGRICULTURE AND CLIMATE CHANGE. Agrotech, 2017

IRRIGATION IN AGRICULTURE AND CLIMATE CHANGE. Agrotech, 2017 IRRIGATION IN AGRICULTURE AND CLIMATE CHANGE Agrotech, 217 Legislation Current situation Needs, possibilities, existing and potential problems Irrigation is regulated with the Water Law, and when it comes

More information

MONTHLY O & M INSPECTION REPORT

MONTHLY O & M INSPECTION REPORT NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

The National Path Demonstration Site

The National Path Demonstration Site The National Path Demonstration Site at Battleby an introductory guide Good paths are essential if people are to enjoy the outdoors. Thoughtful path design really opens up access but there s more to building

More information

RelevantWorkExperience Engineering Design Consulting Services for 4 laning of Nagpur-Betul Section of NH-69 (Total Kms 176) in the state of Madhya Pradesh and Maharashtra under NHDP Phase IV on DBFOT (Annuity)

More information

11 th Annual Conference Road Development in India Telangana State Initiatives

11 th Annual Conference Road Development in India Telangana State Initiatives 11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure

More information

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT An ISO 9001 : 2008 Port ISPS CODE Compliant MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT TENDER No:- CME/PD/X /2017. TENDER FOR VALUATION OF THE FLOATING DRY DOCK AND OTHER INFRASTRUCTURE SET

More information

OFFSHORE WIND ENERGY. Dr. Rajesh Katyal Director General Additional Charge Group Head Wind Resource Assessment & Offshore

OFFSHORE WIND ENERGY. Dr. Rajesh Katyal Director General Additional Charge Group Head Wind Resource Assessment & Offshore OFFSHORE WIND ENERGY Dr. Rajesh Katyal Director General Additional Charge Group Head Wind Resource Assessment & Offshore Higher generation Surfaces of seas are generally smooth. Low Roughness less turbulent

More information

MONTHLY O & M INSPECTION REPORT DECEMBER

MONTHLY O & M INSPECTION REPORT DECEMBER NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012 Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris

More information

PPP Days 2010 PPPs Lessons from the Last 18 Months

PPP Days 2010 PPPs Lessons from the Last 18 Months PPP Days 2010 PPPs Lessons from the Last 18 Months Rajiv B Lall March 22, 2010 1 Private Sector Participation (PSP) in India Works & Services Contracts Management Contracts Operation Concessions Build

More information

Planned Procurement Opportunities Report. January 2019

Planned Procurement Opportunities Report. January 2019 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

SUB:CSWIP3.1/3.2.2/PAINTING INSPECTION COURSES &EXAM DETAILS

SUB:CSWIP3.1/3.2.2/PAINTING INSPECTION COURSES &EXAM DETAILS 1 SUB:CSWIP3.1/3.2.2/PAINTING INSPECTION COURSES &EXAM DETAILS This refers to your enquiry by mail details of requirements of CSWIP 3.1/3.2.2, B.GAS Course and Examination details are given below, please

More information

production Our general laboratory equipment are complementary equipment that are used in conjunction with our major equipment.

production Our general laboratory equipment are complementary equipment that are used in conjunction with our major equipment. general equipment production Our general laboratory equipment are complementary equipment that are used in conjunction with our major equipment. We supply an extensive inventory of general laboratory product

More information

SUMMARY OF UNAPPROVED COMMON PROPERTY AND FOREST COMMITTEE MINUTES. August 4, 2014

SUMMARY OF UNAPPROVED COMMON PROPERTY AND FOREST COMMITTEE MINUTES. August 4, 2014 SUMMARY OF UNAPPROVED COMMON PROPERTY AND FOREST COMMITTEE MINUTES August 4, 2014 Board Liaison Comments Mike Medica New Business: 6-2 Barcelona Request to check beetle and dying trees Joe Burleigh completed

More information

2.1 Private Pilot Licence (Aeroplane/Microlight)

2.1 Private Pilot Licence (Aeroplane/Microlight) GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 7 FLIGHT CREW STANDARDS TRAINING AND LICENSING

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 1 st February 2011 File reference: Document: 690387 Portfolio holder: Councillor Harris Meeting date: 9 th February 2011

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

DEPARTMENT OF TRANSPORTATION. Federal Aviation Administration. 14 CFR Part 39. [Docket No NE-13-AD; Amendment ; AD ]

DEPARTMENT OF TRANSPORTATION. Federal Aviation Administration. 14 CFR Part 39. [Docket No NE-13-AD; Amendment ; AD ] [Federal Register: July 3, 2003 (Volume 68, Number 128)] [Rules and Regulations] [Page 39815-39831] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr03jy03-4] DEPARTMENT OF

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT SESW, SWSE Section 15, NWNE, NENW, SWNE, SENE Section 22, Township 138, Range 27 (City of Fifty Lakes) Crow Wing County Land Services Department

More information

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included: Corridor of growth Corridor Description and Rating Areas Included: NEW GURGAON Sectors 76, 77, 78, 79, 79A, 79B, 80, 81, 81A, 82, 82A, 83, 84, 85, 86, 88, 88A, 88B, 89, 89A, 90, 91, 92, 93, 95 and 95A

More information

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314) Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314) Earnings Update Audited Financial Results FY 2013-14 April 23, 2014 Safe Harbor Statement This document contains certain forward looking statements

More information

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017 HARTZELL PROPELLER INC. One Propeller Place Piqua, Ohio 45356-2634 U.S.A. Telephone: 937.778.4200 Fax: 937.778.4215 MANUAL REVISION TRANSMITTAL Manual (61-00-65) Illustrated Tool and Equipment Manual REVISION

More information

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL 13 Domestic LPG Stove PRODUCT CODE : 340504005 QUALITY AND STANDARDS : IS 4246 : 1984 for LPG Stove : IS 11480:1985 for LPG Grillers : IS 5116:1985 for General requirements for domestic and commercial

More information

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen).

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen). PRE-BID CLARIFICATIONS / AMENDMENTS IN RESPONSE TO THE QUERIES RAISED BY PROSPECTIVE BIDDERS IN THE PRE-BID MEETING HELD ON 01.07.2016 11.00 A.M. IN THE CONFERENCE HALL, OSMCL FOR THE TENDER OF MOBILE

More information

FASTRAK PROGRESS REPORT

FASTRAK PROGRESS REPORT FASTRAK PROGRESS REPORT OCTOBER DECEMBER 212 The FasTrak Progress Report is prepared on a quarterly basis and is regularly distributed with the FasTrak Project Management Team (PMT) agenda and notice.

More information

Enhanced Emergency Shelter Kit (EESK)

Enhanced Emergency Shelter Kit (EESK) Finalized on 9 th of August 2017 Enhanced Emergency Shelter Kit (EESK) Introduction The enhanced emergency shelter kit was designed to cover the surface area of 15 m 2 with volume of 37.5 m 3. The size

More information

INSTALLATION INSTRUCTIONS for folding arm awnings

INSTALLATION INSTRUCTIONS for folding arm awnings Custom made Awnings and Blinds Item No 0757 INSTALLATION INSTRUCTIONS for folding arm awnings IMPORTANT INFORMATION BEFORE INSTALLING YOUR Updated 08/09/15 AN AWNING INSTALLATION IS A HOME IMPROVEMENT

More information

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES: 30 95 15 20mm Radius x 100 white painted Timber post 900 700 125 dia Timber Post Ground Level 500 500 TYPE I TYPE ll NOTES: 1. Type I Bollards are generally to be installed in grass verge areas. 2. Type

More information

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

/ Tool and Equipment Safety Tether System (T.E.S.T.S) 20 INSTRUCTIONS FOR USE AND PRODUCT GUIDE 799953 / 799955 Tool and Equipment Safety Tether System (T.E.S.T.S) Part # T353012 Rev 2 Reliance Industries LLC 2802 East X Street Deer Park, Texas 77536 281-930-800

More information

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 25, 2001 Mr. Melvin Mayfield, P.Eng. Construction Services Coordinator Dear Mr. Mayfield: Central Region Landslide

More information

Wheat Reference Prices Port Terminal Services 2017/2018

Wheat Reference Prices Port Terminal Services 2017/2018 Reference Prices Terminal Services 2017/2018 1. INTRODUCTION This document sets out a summary of Viterra s Reference Prices that are payable in respect of the provision of Terminal Services for Bulk for

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

Accident Report. Crane Failure Global Wind. 16-November-2006 Class B

Accident Report. Crane Failure Global Wind. 16-November-2006 Class B Accident Report Crane Failure Global Wind 16-November-2006 Class B NARRATIVE On 15 November 2006 at 2209 hours NZDT (New Zealand Daylight Saving Time), Global Wind berthed port side to at No. 9 berth Mount

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services. BRIEFING NOTE FOR BUS OPERATORS Inverclyde statutory Quality Partnership Scheme - 2015 What is an sqps? A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure

More information

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548 Finding Aid for DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, 1922-1923 Finding Aid Published: June 2011 20900 Oakwood Boulevard Dearborn, MI 48124-5029 USA research.center@thehenryford.org

More information

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006 of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Road Network Assessment 20 February 2005

Road Network Assessment 20 February 2005 SRI LANKA Road Network Assessment 20 February 2005 Page 1 of 10 By: Road Network Assessment East Coast South Coast North Coast Date Surveyed: 21.01.05-15.02.05 Weather conditions during survey: Dry and

More information

CIVIL AVIATION PUBLICATION CAP 00 GENERAL

CIVIL AVIATION PUBLICATION CAP 00 GENERAL CAP 00 GENERAL FOREWORD REVISION STATUS & LEP This Page Intentionally Left Blank FOREWORD Civil Aviation Publications (CAPs) are issued under the authority granted to the Director General by Decree. The

More information

QCC ACTION PLANNING IN 2004

QCC ACTION PLANNING IN 2004 QCC DATA Facilitator Leader Members Age DECREASING THE DAMAGE OF PLATE SLATE CONVEYOR OF BAGGING MACHINE -LE UP TO % WITHIN MONTHS INCLINE QCC KUJANG FERTILIZER COMPANY CIKAMPEK KARAWANG WEST JAVA INDONESIA

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

Rural Rustic Road Program

Rural Rustic Road Program Virginia Department of Transportation s Rural Rustic Road Program Prepared by the Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Michael

More information

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Table I II 1 2 3 4 5 6 7 8 9, 10 11, 12 13, 14 15, 16 17 18 An average year in Crookston, MN. Seasonal extremes in Crookston,

More information

FASTRAK PROGRESS REPORT

FASTRAK PROGRESS REPORT FASTRAK PROGRESS REPORT JANUARY MARCH 213 The FasTrak Progress Report is prepared on a quarterly basis and is regularly distributed with the FasTrak Project Management Team (PMT) agenda and notice. A copy

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

Public Service Department MONTHLY REPORT November 2017

Public Service Department MONTHLY REPORT November 2017 - Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects

More information

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway

Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway Wicking Geosynthetic Used for Frost Heave Prevention Pioneer Mountain Scenic Byway Mark Sikkema TenCate 365 South Holland Drive Pendergrass, GA 30567 (760)-693-1800 m.sikkema@tencate.com James B. Carpita,

More information

The Seychelles National Meteorological Services. Mahé Seychelles

The Seychelles National Meteorological Services. Mahé Seychelles Report for the fishermen Finding the best days to process sea-cucumber in the Seychelles during the months of March, April and May. The Seychelles National Meteorological Services Mahé Seychelles By: Hyacinth

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

TECHNICAL PAPER

TECHNICAL PAPER TECHNICAL PAPER 2002-01 TITLE: Reconstruction of Runway 9R-27L at Hartsfield Atlanta International Airport. The 33-Day Wonder a Case History AUTHOR(S): Anu Saxena, D.S. Saxena, Subash Reddy Kuchikulla,

More information

DOMESTIC LPG STOVE. Profile No.: 46 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

DOMESTIC LPG STOVE. Profile No.: 46 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION: Profile No.: 46 NIC Code: 27504 DOMESTIC LPG STOVE 1. INTRODUCTION: Liquefied Petroleum Gas and Natural Gas have become accepted fuels for domestic and commercial cooking mode of cooking as they offer

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

AGNI FIBER BOARDS PVT. LTD.

AGNI FIBER BOARDS PVT. LTD. AGNI FIBER BOARDS PVT. LTD. AN ISO 9001-2008 ORGANIZATION 991/1/A, G.I.D.C., MAKARPURA. VADODARA. GUJARAT. INDIA-390010 PHONE: +91-265-2631713 / 2646121. TELEFAX:+91-265-2634531. export@agnifiberboards.com

More information

History of Local Government Concrete Roads. John Nichols

History of Local Government Concrete Roads. John Nichols History of Local Government Concrete Roads John Nichols 1920 Parramatta Rd, Auburn, 1 km East of Duck River Parramatta Road 1918 Gravel, lasted three years 1923 reconstructed, failed winter of 1925 1925

More information

Environmentally Sensitive Maintenance for Dirt & Gravel trails TRAIL MIX. TRAIL MIX: aggregate for trails

Environmentally Sensitive Maintenance for Dirt & Gravel trails TRAIL MIX. TRAIL MIX: aggregate for trails TRAIL MIX: aggregate for trails Environmentally Sensitive Maintenance for Dirt & Gravel trails Penn State University: Center for Dirt and Gravel Road Studies Dave Shearer drs32@psu.edu www.dirtandgravelroad.org

More information

Union Station Rail Corridor East

Union Station Rail Corridor East Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES Page 1 of 10 This checklist broadly covers all areas of aerodrome operation, services & facilities. Efforts shall be made to cover areas depending on the time allocated for the inspection and deficiencies

More information

ENGINEERING STATISTICS REPORT ( FOR THE MONTH OF )

ENGINEERING STATISTICS REPORT ( FOR THE MONTH OF ) AAC 5 of 2001 3 rd July, 2001 APPENDIX -I COVER PAGE NAME OF ORGANISATION WITH LOGO ENGINEERING STATISTICS REPORT ( FOR THE MONTH OF ------------------- ) ISSUED BY : DISTRIBUTION LIST EXTERNAL 1. Director

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

6. Textile Products. Cargo Restraint Nets. Please feel free to contact us for your projects!

6. Textile Products. Cargo Restraint Nets. Please feel free to contact us for your projects! 6. Textile Products Cargo Restraint Nets and Straps 37 6. Textile Products Cargo Restraint Nets allsafe JUNGFALK manufactures for various customers cargo restraint nets designed to their specific requirements.

More information

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT May 2016 Page 1 of 8 CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT 1. Introduction 1.1. The mass and centre of gravity of aircraft should be determined prior to the initial issuance of the Certificate of Airworthiness.

More information