1 NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis MONTHLY O & M INSPECTION REPORT (Completed stretch from Km: to Km ) BY INDEPENDENT CONSULTANT for the month of DECEMBER Concessionaire Ircon Soma Tollways Pvt.Ltd Independent Consultant K & J Projects Pvt. Ltd. PIU NHAI NASHIK

2 DHULE-PTMPALGAON (NH-3) BOT PROJECT K&J/DPNH filt2015t o zz+ 3 Date: 5th January 2015 To, The Project Director, National Highways Authority of India, PlU, Nashik, "Subodh House",S. N o ,Plot No.4, Off MumbaiAgra Highway Nashik Sub: lmprovement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km of NH-3 (Dhule-Pimpalgaon) in the state of Maharashtra on Build Operate and transfer (BOT) basis - O & M Inspection Report (COD stretch New Km to Km ) for the month of December Reg. Ref: Clause 19.2, Volume I of Concession Agreement. Dear Sir, As per Glause 19.2, Volume I of Concession Agreement, please find O & M Inspection Reporl of lc for the month of December This is for your kind ihformation please. With Best Regards, bnwchn/ A. Team Leader Dhule Pimpalgaon Section of NH-3. Encl: As above. GG: 1) The COO, ISTPL, Laling Toll Plaza, Laling, Tal-Dist Dhule for inf &n/a. 2) Mr. J. N. Dabe, Executive Director, M/s. K&J Projects Pvt. Ltd Nagpur for perusal. 3) Office Files. K & J Projects Pvt. Ltd. Plot No. 11, Shrirang Colony, Near A-one Petrol Pump, Old Agra Road, Deopur, Dhule , Maharashtra, India. Tel: ,Fax'. +9I , tl_pd@knjprojects.com,

3 Monthly O & M Inspection Report - November 2014 Improvement,Operation and Maintenance,Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4/6 Lane of Dhule to Pimpalgaon(Km Km 380) Section of NH-3 on BOT basis. MONTHLY O & M INSPECTION REPORT (December 2014) TABLE OF CONTENTS Sl.No. Description of work Page No. 1 Shoulder, slopes, earthworks 1 2 Road Maintenance 2 to 12 3 Structure 13 to 16 4 Road Furniture 17 to 33 5 Drainage 34 to 35 6 Misc. Maintenance Activities 36 to 37 7 Horticulture 38 to 39 8 Annexures Annexure -A : Encroachments Enchroachmnet Encroachment Median Encroachment 8.2 Annexure -B : Highway Lighting 8.3 Annexure -C : Avenue plants 8.4 Annexure - D : Recovery of Damages Details of imposition of Recoveries Status Recovery of Damages to to to K & J Projects Pvt. Ltd.

4 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 1 - Shoulder, slopes, earthworks Sl.No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks 1 Blading/grading shoulder and slope 2 Reconstruction & regravelling of slopes/shoulders Km Km to Km Km to Km Km to Km Km Km scouring of soft shoulders,hence stagnation of water during rainy season and to be repaired by exacavation,filling and compaction scouring of soil below the standpost of MBCB needs to be refilled with soil Defects to be rectified immediately complying with MORT&H specification Section 3000 requirement 3 Furnishing & laying turf Km to 550 median Grouted pitching damaged 4 Stone pitching Quadrant pitching on Nashik side is damaged and the bed of slab culvert Km at Km is filled with disposed litter and all rubbish, debris etc obstructing the flow of water To be rectified immediately as per Clause (III) of Vol-II of CA K & J Projects Pvt. Ltd Page 1

5 Monthy O and M Inspection Report - December 2014 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 2 - Road Maintenance Sl.No. 1 Description of Maintenance work to be Cleaning ROW done Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km (on soft Vegetation upto ROW to be shoulder) cleared Km to Km Km to Km Service Road Km to Km Rank Vegetation (S/R) Km to Km Rank Vegetation (S/R) Km to Km Rank Vegetation (S/R) Km to Km Km to Km Km to km Km to Km Km to Km Km to Km Km to Km Defects to be rectified immediately. Km to Km Vegetation upto ROW to be cleared Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 2

6 Monthy O and M Inspection Report - December Road Maintenance Sl.No. 1 Description of Maintenance work to be Cleaning ROW done 2 Clearance of Embankment Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km BHS Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km Km Service Road (S/R) footpath cleaning Footpath Cleaning (S/R) Cow dung heap lying along shoulder Garbage lying in ROW Garbage In front of Janta one factory Km Garbage lying in ROW 3 Cleaning Carriage ways Km to Km (Girna Garbage lying along the bridge) kerbs Km to Km Km SR Km SR Km Km SR Km to Km Km to Vegetation upto ROW to be cleared Vegetation on embankment to be cleared Garbage lying in ROW Garbage on the footpath Garbage on the separator Cow dung lying in ROW Garbage on the separator Garbage lying in ROW Garbage lying in ROW Defects to be rectified immediately. Defects to be rectified immediately. To be rectified pertaining to Clause of Volume-II of Concession Agreement. K & J Projects Pvt. Ltd. Page 3

7 Monthy O and M Inspection Report - December Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Sealing Cracks a) covered with 6-7mm stone chipping@ 4 0.1cum/10sgm b) covered with dry coarse sand surface dressing Km to Km Km to Km Second coat of surface dressing Km to Km Defects shall be rectified immediately by providing two Km to Km Porous and hungry surface coat surface dressing with 10mm aggregates Km to Km Km to Km Km to Km To be rectified immediately by full depth patching as Km to Km Clause Schedule L of Volume-II of Concession Km to Km Agreement. Km to Km Repair to Rutted portion and edge Km to Km m length cfompleted in lieu of 200m Rutting on BC surface breaking Km to Km Km to Km To be rectified immediately by full depth patching as Clause Schedule L of Volume-II of Concession Agreement. Km to Km Km to Km m length cfompleted in lieu of 800m 7 Sealing to closely spreaded cracks at scatterd locations Treatment of Bleeding 8 a) Providing treatment and repair to b) Deep potholes depth< 75mm 9 Dense Bituminous Macadam 10 Bituminous Macadam (Profile corrective course) K & J Projects Pvt. Ltd. Page 4

8 Monthy O and M Inspection Report - December Road Maintenance Sl.No. 11 Description of Maintenance work to be done Laying Bituminous concrete Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km m length completedin lieu of 100m Km to Km m length completed in lieu of 1150m Km to Km Km to Km m length completed in lieu of 600m Km to Km m length completed in lieu of 400m Km to Km m length completed in lieu of 150m Km to Km m length completed in lieu of 400m Km to Km m length completed in lieu of 450m Km to Km Cracks of moderate severity Km to Km of width 3-6mm on 13.6m length completed in lieu of 100m Km to Km microsurfacing done BC Km to Km surface with surface Km to Km deformation.to be rectified Km to Km immediately by milling and Km to Km filling the millled surface Km to Km with BC material Km to Km m length completed in lieu of 570m Km to Km m length completed in lieu of 450m Km to Km m length completed in lieu of 100m Km to Km Km to Km m length completed in lieu of 420m Km to Km m length completed in lieu of 3050m Km to Km m length completed in lieu of 300m Km to Km Km to Km K & J Projects Pvt. Ltd. Page 5

9 Monthy O and M Inspection Report - December Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Km to Km m length completed in lieu of 500m Km to Km m length completed in lieu of 100m Km to Km Km to Km Km to Km Cracks of moderate severity 4.7m length completed in lieu of 100m Km to Km of width 3-6mm on Km to Km microsurfacing done BC 10m length completed in lieu of 200m 11 Laying Bituminous concrete Km to Km surface with surface 58m length completed in lieu of 550m Km to Km deformation.to be rectified Km to Km immediately by milling and Km to Km filling the millled surface Km to Km with BC material Km to Km Km to Km Km to Km m length completed in lieu of 530m Km to Km m length completed in lieu of 100m Km to Km m length completed in lieu of 400m Km to Km m length completed in lieu of 200m Km to Km Km to Km Cracks of high severity i.e 424m length completed in lieu of 1230m Km to Km Alligator cracks on BC 127m length completed in lieu of 200m 11 Laying Bituminous concrete Km to Km surface. Defects shall be 235m length completed in lieu of 700m Km to Km rectified immediately by doing full depth patching Km to Km m length completed in lieu of 1700m Km to Km m length completed in lieu of 100m Km to Km Single course semi-dense bituminious concrete Using paving bitumen as per IS:73 13 Patching of built up spray grout in layers K & J Projects Pvt. Ltd. Page 6

10 Monthy O and M Inspection Report - December Road Maintenance Sl.No. 14 Description of Maintenance work to be Slurry seal done Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Logitudinal cracks on BC Km to Km surface.defects shall be Km to Km rectified immediately Km to Km complying to Clause m length completed in lieu of 100m Km to Km /Clause 516 of MORTH specification. Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 7

11 Monthy O and M Inspection Report - December Road Maintenance Sl.No Description of Maintenance work to be done Sealing the cracks using fog seal Tack coat a) With Bituminous emulsion /cut back of specified grade Premix patching with stone chipping mixed with binder. a) Using straight run bitumen (3.5 to 4%) compacted thickness upto 25mm. b) Patch work using cationic bitumen emulsion RS Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km (Slow Km to Km (Slow Km to Km Km to Km (Slow Km to Km Km to Km Km to Km (Slow Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Alligator /hair line crack of Defects shall be rectified immediately by spraying Low less severity i.e width less viscosity (SS-1) emulsion complying to MORT&H than 3mm formed on BC specification. surface K & J Projects Pvt. Ltd. Page 8

12 Monthy O and M Inspection Report - December Road Maintenance Sl.No. Description of Maintenance work to be done 18 Scarifying existing damaged BC surface Location in Km Type of Damages Notice Action taken by IC Remarks 19 Scarifying existing stone metal layers. 20 Missing of distressed road pavement in depth. a) in variable depth up to 50mm in single pass b) for depth mm in single pass c) for depth mm in single pass 21 Carriageway sweeping Watch and ward on highway MBCB and hand railing Km to Km Km to Km Km to Km Km to Km Km to Km a) Cleaning MBCB and hand railing Km to Km Km to Km Km to Km Km to Km Km to Km Km to km Km to Km MBCB Rank Vegetation To be rectified immediately K & J Projects Pvt. Ltd. Page 9

13 Monthy O and M Inspection Report - December Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km a) Cleaning MBCB and hand railing MBCB Rank Vegetation To be rectified immediately Km to Km Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 10

14 Monthy O and M Inspection Report - December Road Maintenance Sl.No. 22 Description of Maintenance work to be done b) Metal beam crash barrier b) Metal beam crash barrier c) Anti glare median railling Location in Km Type of Damages Notice Action taken by IC Remarks Curve portion affecting Km to Km visibility due to vegtation on Km to Km MBCB upto soft To be rectified immediately Km to Km shoulder.this requires to be cleared off. Km to Km Km to Km MBCB damaged To be rectified immediately Km to Km m length completed in lieu of 280m Km to Km m length completed in lieu of 1000m Km to Km Km to Km Km to Km Km to Km Road Roughness Km to Km Km to Km Km to Km Roughness value exceeds the specification limit m length completed in lieu of 1000m Km to Km Km to Km m length completed in lieu of 1000m Km to Km m length completed in lieu of 1000m Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 11

15 Monthy O and M Inspection Report - December Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km Km to Km Road Roughness Km to Km Km to Km Roughness value exceeds the specification limit. Km to Km m length completed in lieu of 1000m Km to Km K & J Projects Pvt. Ltd. Page 12

16 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 3 - Structure Sl. No Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. 1 Cleaning the upstream/downstream sides of C.D.works. a) Minor Bridge Km cleaning of embkt vegetation b) Major Bridge Km Box culvert cleaning of vegetation Km Slab culvert cleaning of vegetation Km Slab culvert cleaning of vegetation Km Pipe culvert cleaning of vegetation c) Culvert Km Pipe culvert cleaning of vegetation Km Pipe culvert cleaning of vegetation Km Pipe culvert cleaning of vegetation Km Pipe culvert cleaning of vegetation Km Box culvert cleaning of vegetation Km Box culvert cleaning of vegetation Km Cleaning of underpass required Km Cleaning of underpass required To be rectified immediately as per Clause (III) of Vol-II of CA Km Vegetation cleaning on stone pitching Km Cleaning of underpass required d) Underpasses Km Cleaning of VUP required Km Cleaning of underpass required Km Cleaning of VUP required Km silt,sand cleaning under NVUP Km vegetation, silt,sand cleaning under NVUP To be rectified immediately as per Clause (III) of Vol-II of CA K & J Projects Pvt. Ltd. Page 13

17 3 - Structure Sl. No 2 Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. Km RCC parapet damaged Replacing damaged/broken railing To be rectified immediately Km Median wall on Nashik side damged Km BHS (ROB) Km to Km BHS Km BHS Debris dumped in between ROB Abutment and RE wall is cleared off partially (on Pimpalgaon side).to be cleared off fully. Chute drain at Embankment to be cleared 3 Cleaning gutters, vent holes, weep holes, drainage spouts, railling Km BHS Km to Km Km to Km Km to Chute drain at Embankment to be cleared Chute drain at Embankment to be cleared To be rectified immediately Km to Km (MCW Slow Lane) missing spouts to be replaced immediately. 4 Repair stone/brick masonry 5 pointing to existing pointing works 6 Cement plaster & repair Painting exposed concrete/mansonry portion of bridge /CD works 7 a) Dry distemper of approved brand or lime b) Enamel paint of approved brand Km (Manmad F/O) 3 weep holesdamaged and all drainage spouts to be cleaned 8 Sealing of cracks by injection through nipples a) Cement Grout K & J Projects Pvt. Ltd. Page 14

18 3 - Structure Sl. No Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. b) Epoxy Resign Grout i) 25mm 8 ii) 40mm iii) 50mm 9 Repair to foundation 10 Applying epoxy mortar treatment over leached combed and pilled concrete 11 Periodic maintenance of expansion joint Km Metal strip broken, cracking of Km concrete To be rectified immediately Km Metal strip broken Metal strip broken, cracking of Km concrete, knocking sound, loss of sealing compound Km Metal strip broken Metal strip broken, cracking of Km concrete, knocking sound, loss of sealing compound Km Metal strip broken, loss of sealing compound 11 Periodic maintenance of expansion joint Km Metal strip broken,cracking of concrete,knocking sound,loss of sealing compound To be rectified immediately Km Km Km Metal strip broken Km Km Km Metal strip broken,loss of sealing compound K & J Projects Pvt. Ltd. Page 15

19 3 - Structure Sl. No 12 Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. Dismantling/breaking of damaged cement concrete floor 13 Maintenance to all type of bearings 14 Providing and fixing weep holes 75 mm dia in walls 15 Providing and laying required dia RCC hume pipe 16 Survey for Monitoring the Settlement K & J Projects Pvt. Ltd. Page 16

20 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Maintenance of road signs Avdhan village Laling village Arvi village Mungse village Malsane village 1 Devarpada village Sangvi village Village name boards missing.to be replaced a) Road sign board mounted on single post Devgaon village Vadalibhoi village Khadakjamb village BHS Dhule city Chinchve village Chandwad Missing Two Way Hazard Marker at Bus Bay Locations Km Laling Bus bay island separator Km Arvee Bus bay island separator Km Purmepada Bus bay island separator Km Mungse Bus bay island separator Km Chinchve Bus bay island separator Km Bus bay island separator To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement K & J Projects Pvt. Ltd. Page 17

21 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks 1 Km Shirwade Vani Bus bay island separator Km Arvee Bus bay island separator Km Purmepada Bus bay island separator Missing Two Way Hazard Marker at start of Service Road Km On Separator of service road Km On Separator of service road Km On Separator of service road Km On Separator of service road Km On Separator of service road a) Road sign board mounted on single post Km On Separator of service road Missing Object Marker in Median Opening Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Missing Hazard Marker Km Km To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement K & J Projects Pvt. Ltd. Page 18

22 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Km Km Km Km Km Km Km Km Km Km Km a) Road sign board mounted on single post Km Km Km Km Km Km Km Km Km Km Km Km Km Km To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement K & J Projects Pvt. Ltd. Page 19

23 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Km Km Km Km Median a) Road sign board mounted on single post Km Km Before Median wall of minor Bridge Hazard Marker erected after MBCB 1 Km Hazard markers placed in wrong position i.e. not it is 1 Km m inside MBCB Chevron board in MEDIAN Km to Km Chevron board Km to Km Chevron board Km to Km Chevron board b) Road sign board mounted on double post Km (median) Km (median) Km (median) Km (median) Kerb mount Guard rail damaged c) Road stud 2 Replacing/Installing Delineators Km to Km Km to Km Km to Km Km to Km Km to Km Delineators provided on Dhule & Nashik side at these median opening locations are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Defects to be rectified immediately Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II K & J Projects Pvt. Ltd. Page 20

24 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to km Km to Km Replacing/Installing Delineators Km to Km Km to Km Km to Km Km to Km Km to Km Delineators provided on Dhule & Nashik side are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 21

25 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Replacing/Installing Delineators Km to Km Km to Km Km to Km Km to Km Delineators provided on Dhule & Nashik side are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to km Reflective stickers on MBCB crash barrier K & J Projects Pvt. Ltd. Page 22

26 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Fixing of distance measurement stone Km /400 Km (uprooted) Km /800 Km /400 Km (not painted)/400/600 Km Km /800 Km Km (in grass)/800 Km Km (not painted)/600 4 a) Hectometer stone Km (not painted) Km (cleaning required) Km (not designated) HM stone damaged/missing/cleaning required To be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA Km Km Km Km (not painted)/600 Km (not painted) Km (not painted) Km (not painted) Km (notdesignated)/800 (cleaning) Km /400/600 Km Km /800 Km /600 K & J Projects Pvt. Ltd. Page 23

27 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km not painted Km (not painted)/600 Km (damaged)/800 Km (not painted) Km Km (not painted) Km Km Km /800 Km a) Hectometer stone Km (not painted) Km Km (not painted) Km (not painted) Km (not painted) HM stone damaged/missing/cleaning required Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume- II of Concession Agreement Km Km Km /400/600 Km Km Km /600 (not painted) Km Km (not painted) Km (not painted) Km Km (not painted) Km K & J Projects Pvt. Ltd. Page 24

28 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km /400 Km /600 (damaged) Km /600 Km /800 (cleaning) Km Km Km /400(not painted) Km Km (grass) /400(grass)/600 Km (not painted) Km /400 4 a) Hectometer stone Km /600 (grass) Km (grass) Km (cleaning) Km HM stone damaged/missing/cleaning required Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume- II of Concession Agreement Km Km Km not painted/800 (grass) Km /800 Km /600 (cleaning)/800 (cleaning) Km Km Km (grass) /800(grass) Km Km Km (not painted)/600(grass) Km K & J Projects Pvt. Ltd. Page 25

29 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km /400(cleaning)/800(grass) Km (grass)/400 (cleaning)/ 800(not painted) Km (grass)/400(grass)/600 (grass)/800(not painted) Km (grass) /600 (cleaning) Km /600(grass) Km (not painted)/400 (grass)/800 (not designated) Km (grass) Km (grass)/600 (not 4 a) Hectometer stone designated) Km (cleaning)/800(cleaning) Km Km Km Km /600 HM stone damaged/missing/cleaning required Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume- II of Concession Agreement Km /800 Km Km Km (not painted) /600/800 not painted Km not painted Km /600 not painted Km /600 (not designated) Km (not painted)/800 Km /400(not painted) Km (not painted)/400 Km K & J Projects Pvt. Ltd. Page 26

30 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks 4 a) Hectometer stone Km Km Km (not painted) Km Km Km Km Km Km /800 Km /400 HM stone Km damaged/missing/cleaning required Km /800 Km /400 Km /800 Km Km (not painted) Km (not designated) Km (not painted)/600(not painted) Km (not painted) Km Km Km stone not designated Km Vegetation growth; not visible 4 b) Kilometer stone Km Vegetation growth; not visible Km Vegetation growth; not visible Km Km stone to be raised Km Km stone missing Km Km stone to be repainted Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume- II of Concession Agreement Defects shall be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA K & J Projects Pvt. Ltd. Page 27

31 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Vegetation growth; not visible Km Vegetation growth; not visible Km KM stone damaged/missing Km KM stone damaged/missing Km Vegetation growth; not visible and to be raised Km Km stone missing Km Km stone in vegetatation Km Km stone in vegetatation Km Km stone to be raised Km Km stone in vegetatation b) Kilometer stone Km Km stone to be raised 4 Km Km stone in vegetatation Km Km stone in vegetatation Km Km stone in vegetatation Km Km stone missing Km Km stone in vegetatation Km Km stone in vegetatation Km Km stone uprooted Km Km stone painting faded Km Km stone painting faded Km Km stone disturbed Km KM stone uprooted Km BHS missing on both sides c) 5th kilometer stone Km th Km stone to be raised Km th Km stone (Disturbed) 5 Boundary stone Defects shall be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA Defects shall be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA K & J Projects Pvt. Ltd. Page 28

32 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Painting two coat on old surface a) Hectometer stone 6 b) Kilometer stone c) 5th kilometer stone d) Boundary stone Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Painting faded surface of kerb Km to Km Median kerb faded/blackened - needs repainting. Defects shall be rectified immediately Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km K & J Projects Pvt. Ltd. Page 29

33 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km to Km Km to Km Km Km Km to Km Km Km Island damaged (Chalisgaon) Seperator Kerb damaged Seperator Kerb damaged Openings Bell Mouth damaged Median opening Bell Mouth damaged Shoulder site kerb damaged Median Kerb damaged Separator Bell Mouth damaged 8 Km Median opening Bell Mouth damaged a) Damages of kerb stone Km Island stone pitching damaged Km Separator Bell Mouth damaged Km Median Opening Bell Mouth damaged Km to Km Median Kerb damaged Km Median openings Bell Mouth damaged Km Separator Bell Mouth damaged Km Median opening Bell Mouth dmaged Defects shall be rectified immediately Km to Median Kerb damaged Km to Median Kerb damaged Service Road b) Unauthorized Median break Km to Km Km to Km Unauthorised median breaks to be closed Defects shall be rectified immediately Km to Km K & J Projects Pvt. Ltd. Page 30

34 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Service Road Km to Km Km to Km b) Unauthorized Median break MCW Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Unauthorised median breaks to be closed centre line to be repainted Km to Km centre line to be repainted Km to Km Shoulder Edge line marking faded Km to Km Inner Line Faded Km to Km Center Line Faded 9 Raised pavement marker Km to Km Center Line Faded Km to Km Center + Inner line Faded Km to Km Center + Shoulder Edge line Faded Km to Km Shoulder Edge line Faded Km to Km Shoulder Edge line Faded Km to Km Center line Faded 10 Removal of encroachment of ROW As per annexure A (enclosed) Encraochment to be removed 11 Removal of unauthorized approaches 12 Rumbler Strip Km Km Km Speed breakers painted with alternate black and white bands to give additional visual warning are faded;needs to be repainted Defects shall be rectified immediately Defects to be rectified as per Clause (vi) Schedule L of CA,Vol-II To be rectified as per the order of the Bombay High Court for direction with Speed Breakers K & J Projects Pvt. Ltd. Page 31

35 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Rumbler Strip Km Km Km Km Km Speed breakers painted with alternate black and white bands to give additional visual warning are faded;needs to be repainted To be rectified as per the order of the Bombay High Court for direction with Speed Breakers Km Km Rumbler Strip Km Km Km Km Warning sign board not provided Needs to be provided for warning of the presence of the speed breakers to the drivers To be rectified as per the order of the Bombay High Court for direction with Speed Breakers Km Km Km Km Km Km Km Rumbler Strip Km Km Km cat-eyes not provided.needs to be provided to enhance night visibility. To be rectified as per the order of the Bombay High Court for direction with Speed Breakers Km Km Km Km K & J Projects Pvt. Ltd. Page 32

36 4 - Road Furniture Sl. No. Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Rumbler Strip Km Km Km cat-eyes not provided.needs to be provided to enhance night visibility. To be rectified as per the order of the Bombay High Court for direction with Speed Breakers Km Km Km the Rumble strip provided at Devarpada village is of more height Rumbler Strip Km than the IRC specification causing heavy jerks while passing over the strips. This is dangerous from safety point of view and needs to be To be rectified as per the order of the Bombay High Court for direction with Speed Breakers rectified as per the IRC specification by reducing the height. K & J Projects Pvt. Ltd. Page 33

37 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km: Sl.No. 1 Description of Maintenance work to be done Cleaning road side unlined drains to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 5 - Drainage Location in Km Type of Damage noticed Action taken by IC Remarks. Km to Km Km to Km Km to Km Km to Km side drain choked up,filled with soil & vegetation Cleaning of chute drain onembankment portion required side drain choked up,filled with soil To be rectified immediately 2 Cleaning road side lined drains Km to Km Drain Cleaning (S/R) To be rectified immediately Km (ROB) Drain Cleaning (S/R) Km to Km (Median) Km to Km (Median) Damaged drain to be repaired 3 Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Lined Drain Km to Km Median cross drain cleaning To be rectified immediately Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km to Km Median cross drain cleaning Km Drain Cover Damage (S/R) K & J Projects Pvt. Ltd. Page 34

38 Sl.No. 3 Description of Maintenance work to be Lined Drain done 5 - Drainage Km Km Km Location in Km Type of Damage noticed Action taken by IC Remarks. Km service road 01Nos Km service road 01Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Drain Cover Damage & Cleaning (S/R) Drain Cover Damage(S/R) Drain Cover Damage & Cleaning (S/R) Drain Cover Damage(S/R) Drain Cover Damage(S/R) RCC Drain Cover Missing to be provided To be rectified immediately To be rectified immediately K & J Projects Pvt. Ltd. Page 35

39 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km: to Km ) of NH-3 (Dhule-Pimpalgaon) in the state of Maharashtra on Build Operate and transfer (BOT) basis Misc. Maintenance Activities Sl. No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Km to Km Km to Km Footpath paver blocks damaged Busshelter damaged Footpath paver blocks damaged Busbay Footpath cleaning Footpath paver blocks damaged 1 Bus shelter Km to Km (Tehare) Vegetation and human excreta on the Busbay footpath to be cleaned Notice Issued Defect to be rectified immediately Km Roof sheet missing Km Roof sheet damaged Km to Km Vegetationon the Busbay footpath to be cleaned 2 3 Street light Guard stone Separate sheet enclosed Annx- B Km Km to Km Km to Km Guard stone missing/damaged Notice Issued Defect to be rectified immediately 4 Busbays Km Gents toilet -no water,no clean up,urinal not in proper function,wc in very dirty condition. Ladies toilet - locked from so many days, after opening of the toilet Notice Issued Defect to be rectified immediately block it was found no cleaning,no water and wash basin not in proper function. Km at the start of MBCB These locations are replaced with Object Marker 5 Erection of non standard signages Km at the start of MBCB Notice Issued in lieu of Hazard Marker; previously it was Hazard Km at the start of MBCB marker. To be rectified immediately as per IRC-79 Km at the start of MBCB K & J Projects Pvt. Ltd. Page 36

40 Misc. Maintenance Activities Sl. No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB 5 Erection of non standard signages Km at the start of MBCB Notice Issued Km at the start of MBCB Km at the start of MBCB Median Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge These locations are replaced with Object Marker in lieu of Hazard Marker; previously it was Hazard marker. To be rectified immediately as per IRC-79 K & J Projects Pvt. Ltd. Page 37

41 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis 7 - Horticulture Sl. No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks 1 Avenue Plantation Separate sheet enclosed Annx C Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Median Plantation Km to Km Km to Km Missing median plants to be replanted To be rectified immediately as per IRC :SP:21 2 Km to Km Km to Km Median Plantation Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Separator Km to Km Km to Km Km to Km Weeding required To be rectified immediately as per IRC :SP:21 K & J Projects Pvt. Ltd. Page 38

42 Sl. No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks Median Plantation Km to Km Km to Km Weeding required To be rectified immediately as per IRC :SP:21 Km to Km Median Plantation Km to Km Km to Km Km to Km Prunnuing required To be rectified immediately as per IRC :SP:21 Km to Km Km to Km K & J Projects Pvt. Ltd. Page 39

43 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (DECEMBER 2014) 8. Annexures K&J Projects Pvt. Ltd. Page 40

44 Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (DECEMBER 2014) 8.1. Annexure - A Encroachments K&J Projects Pvt. Ltd. Page 41

45 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Details of Encroachment () Nature of Hoardings and other Sl. No Chainge (Km) Description of Encroachment Encroachment Unauthorised Boards Length x Width Temporary Permanent Remarks 1 Km of service road Navkar Ford has created an encroachment inside ROW by 100mm thick concreting upto the existing RCC drain as a parking place for vehicles 30m length Permanent 2 Km Sai car dhaba - double post mounted board Permanent 3 Km Compound wall 7m length Permanent 4 Km UP - Bihar dhaba - double post mounted board Permanent 5 Km Indian Oil petrol pump - double post mounted board Permanent Not acceptable pertaining to Clause 5.0 of Schedule L, Volume-II of Concession Agreement 6 Km UP dhaba - double post mounted board Permanent 7 Km Hotel Moonlight -double post mounted board Permanent K & J Projects Pvt. Ltd. Page 42

46 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and Transfer (BOT) basis Details of Encroachment () Sl. No Chainge (Km) Description of Encroachment Encroachment Length x Width Nature of Hoardings and other Unauthorised Boards Temporary Permanent 1 Km Hotel city point -Double post mounted board 900mm x 600mm Permanent 2 Km Hotel city point -Single post truss mounted board 1.25m x 1.25m Permanent Remarks 1 Km to Km m length Permanent To be rectified 2 Km to Km Unauthorized erection of cement concrete post for fencing inside ROW 50m length Permanent pertaining to Clause 5.0 (a), Schedule -L of Volume -II of 3 Km to Km m length Permanent Concession agreement K & J Projects Pvt. Ltd. Page 43

MONTHLY O & M INSPECTION REPORT

MONTHLY O & M INSPECTION REPORT NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

6rKL+tv. Ref: As per Schedule-P, Volume-ll of Concession Agreement.

6rKL+tv. Ref: As per Schedule-P, Volume-ll of Concession Agreement. K&J/DPNH rrlt2}lsl Q \2,5 DITULE- PTMPALGAON (NH_) BOT PROJECT o he Project Director, National Highways Authority of India, PlU. Nashik "Subodh House",S. N o.g 2,plot No.4, Off MumbaiAgra Highway Nashik

More information

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL) National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44

More information

DETAIL OF THE PROJECT

DETAIL OF THE PROJECT Page 1 Page 2 DETAIL OF THE PROJECT A CONTRACT DETAILS Project State Operation & Maintenance Phase of 4 Lane dual carriageway from Km 50.000 to Km. 100.000 of NH 6 (Kondhali Talegaon Section ) in the State

More information

Article 13, clause no of the Concession Agreement states that:

Article 13, clause no of the Concession Agreement states that: BACKGROUND Article 13, clause no. 13.2 of the Concession Agreement states that: 13.2 Inspection During the Construction Period the Independent Engineer shall inspect the Project Highway at least once a

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH-45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

MINUTES OF PROJECT REVIEW MEETING HELD ON

MINUTES OF PROJECT REVIEW MEETING HELD ON MINUTES OF PROJECT REVIEW MEETING HELD ON 4 th July 2016 1 The project review meeting started at 2.30 pm on 4 th July 2016 at the H.O of with the Managing Director of Shri A P M Mohammed Hanish IAS in

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012 Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 1 st February 2011 File reference: Document: 690387 Portfolio holder: Councillor Harris Meeting date: 9 th February 2011

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

WEXEL BUILDING PRODUCTS. Roof Outlets. and. Floor Drains

WEXEL BUILDING PRODUCTS. Roof Outlets. and. Floor Drains WEXEL BUILDING PRODUCTS Roof Outlets and Floor Drains Unit 2, 34 Collinsvale St Rocklea Q4106 Ph: 07 3275 0800 ROOF OUTLETS A standard profile roof drain for conventional run-off collection. Suitable for

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

KP Lasnaya 1 River

KP Lasnaya 1 River KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno

More information

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES: 30 95 15 20mm Radius x 100 white painted Timber post 900 700 125 dia Timber Post Ground Level 500 500 TYPE I TYPE ll NOTES: 1. Type I Bollards are generally to be installed in grass verge areas. 2. Type

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase)

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Indian Maritime University (A Central University Govt. of India) East Coast Road, Uthandi, Chennai - 600 119. Tele:(044) 2453 0343/45, Fax: 2453 0342,

More information

BAXTER LAKE RECREATION AREA ASSOCIATION

BAXTER LAKE RECREATION AREA ASSOCIATION Baxter Lake Recreation Area Association SITE CONTROL COMMITTEE RULES TABLE OF CONTENTS Notes 2 Introduction 2 Campsites 2 Common Grounds 2 Green Areas 2 Cutting Trees 3 Application for Site Alteration

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

Permit Application Requirements For Temporary Tents, and Membrane Structures

Permit Application Requirements For Temporary Tents, and Membrane Structures CTY OF PAM DESERT Building & Safety Department Permit Application Requirements For Temporary Tents, and Membrane Structures F O R M A T O A B U E T Revised 1-30-14 73510 Fred Waring Drive Palm Desert,

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

Stainless Steel Catheter Storage Cabinets

Stainless Steel Catheter Storage Cabinets healthcare division CONTINENTAL METAL PRODUCTS Healthcare Equipment Meeting the Demands of the OR Proudly Made in the USA for over 70 years Catheter Storage CMP has been manufacturing Catheter Storage

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

Property access tracks

Property access tracks Property access tracks Planning, location, construction and maintenance The need for farm roads and tracks The efficient running of a property depends on, among other things, ready access to various locations

More information

THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended, 2 hereby orders as follows: -

THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended, 2 hereby orders as follows: - 1 Road Traffic (Jersey) Law, 1956. ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER, 1969. THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended,

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Enhanced Emergency Shelter Kit (EESK)

Enhanced Emergency Shelter Kit (EESK) Finalized on 9 th of August 2017 Enhanced Emergency Shelter Kit (EESK) Introduction The enhanced emergency shelter kit was designed to cover the surface area of 15 m 2 with volume of 37.5 m 3. The size

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS Monday, September 17, 2012 8:30 a.m. to 10:00 a.m. Lanark County Administration Building Drummond/North Elmsley Boardroom Page President,

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Rebuilding Plan For Mosul International Airport

Rebuilding Plan For Mosul International Airport Rebuilding Plan For Mosul International Airport Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction

More information

Cable Management System. Metal Raceway Product Range

Cable Management System. Metal Raceway Product Range Cable Management System Metal Raceway Product Range TRAY Ventilated Type Trays: (Standards, Load Capacity, Support Location and Electrical Grounding) KMC Australia manufactures Ventilated type cable trays

More information

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

DUPLEX STRAINERS BULLETIN NO KECKLEY COMPANY 3400 Cleveland Street P.O. Box 67 Skokie, Illinois 60076

DUPLEX STRAINERS BULLETIN NO KECKLEY COMPANY 3400 Cleveland Street P.O. Box 67 Skokie, Illinois 60076 Distributed By: M&M Control Service, Inc. www.mmcontrol.com/keckley.php 800-876-006 847-6-066 BULLETIN NO. 9400- DUPLEX STRAINERS Shown with Optional Differential Pressure Indicator KECKLEY COMPANY 400

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...

More information

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from: PASS Recycle/RAP Applications Definition RAP = Recycled Asphalt Pavement also called millings or grindings from: bump grinding of hot mix pavements millings from mill and fill operations large chunks of

More information

AMS MU800 Mullion Drained Curtain Walling

AMS MU800 Mullion Drained Curtain Walling SPECIFICATION AMS MU800 Mullion Drained Curtain Walling The AMS MU800 mullion drained curtain walling system offers unique architectural design features combined with market leading weather performance.

More information

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation) ANNEXURE Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation).. SCHEDULES FOR SLUM/SOCIO-ECONOMIC SURVEY IN CITIES & TOWNS Part A: Part B: Part C: Annexure-I:

More information

Welcome to the Pacific Spas family!

Welcome to the Pacific Spas family! Welcome to the Pacific Spas family! Your Pacific Spa has been engineered and built to the highest standards. Enjoy it regularly and experience the serenity and satisfaction that you ve wanted. The information

More information

Operation Manual SUPER BEAST Multi-tool SC-11M-10

Operation Manual SUPER BEAST Multi-tool SC-11M-10 Operation Manual SUPER BEAST Multi-tool SC-11M-10 Technical Specifications General Safety/Operating Instructions Attaching/Changing the Head Using the SUPER BEAST as a Cutter Using the SUPER BEAST as a

More information

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka-Raiganj Section of NH -34 from Km 294.800 to Km 395.000 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

SERENJE NAKONDE ROAD PROJECT PROJECT

SERENJE NAKONDE ROAD PROJECT PROJECT SERENJE NAKONDE ROAD PROJECT PROJECT 2 nd German Africa Infrastructure Forum Munich 3 rd -4 th December 2014 Eng. Amos Phiri Contracts Manager (PPIU COMESA-EAC-SADC TRIPARTITE) Serenje Nakonde Road Project

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

NEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections

NEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections NEIGHBOURHOOD INSPECTIONS A pictorial guide for neighbourhood inspections A PICTORIAL GUIDE FOR NEIGHBOURHOOD INSPECTIONS CONTENTS Introduction 4 EXTERNAL AREAS Descriptions of estate standards Car parks

More information

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR Installation & Maintenance LISTED Tested to *UL 103HT & ULC-S641 Instructions MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR

More information

Whakapirau and Kaipara District Council Working in Partnership

Whakapirau and Kaipara District Council Working in Partnership Whakapirau and Kaipara District Council Working in Partnership Plan Update 4 August 2015 2 Roading: Main road leading into Whakapirau. Rehabilitation work has been carried out on this road recently to

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

History of Local Government Concrete Roads. John Nichols

History of Local Government Concrete Roads. John Nichols History of Local Government Concrete Roads John Nichols 1920 Parramatta Rd, Auburn, 1 km East of Duck River Parramatta Road 1918 Gravel, lasted three years 1923 reconstructed, failed winter of 1925 1925

More information

SECTION TOILET ACCESSORIES

SECTION TOILET ACCESSORIES Specifier notes are shown in italics and should be deleted from the final document. Generally all of the manufacturer s products in this category are listed and the specifier must take care to delete those

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

ADVANCE PRODUCTS & SYSTEMS, INC. FOR FLANGES, VALVES & EXPANSION JOINTS SAFETY SPRAY SHIELDS CONTAINS AND DETECTS HAZARDOUS SPRAYOUTS

ADVANCE PRODUCTS & SYSTEMS, INC. FOR FLANGES, VALVES & EXPANSION JOINTS SAFETY SPRAY SHIELDS CONTAINS AND DETECTS HAZARDOUS SPRAYOUTS ADVANCE PRODUCTS & SYSTEMS, INC. FOR FLANGES, VALVES & EXPANSION JOINTS SAFETY SPRAY SHIELDS CONTAINS AND DETECTS HAZARDOUS SPRAYOUTS SAFETY SPRAY SHIELDS FOR FLANGES CLOTH Our plastic cloth safety shields

More information

Freestanding Litter Bins

Freestanding Litter Bins Freestanding Litter Bins We have a huge selection of bins for every location. If you are looking for bins for outdoor use in Ireland we would recommend the Heavy Duty 100L Litter Bin. This bin has been

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW CAREFREE RAFTER VI RV Accessory WITH AUTOMATIC AWNING SUPPORT Installation and Operation PRODUCT OVERVIEW The gives the awning user the ability to easily tighten the center fabric when the awning is extended.

More information

ISOM & ISSOM forbidden symbol comparison

ISOM & ISSOM forbidden symbol comparison & forbidden symbol comparison Forbidden symbols and their relatives Symbol 2000 (Long, Middle) 2007 (Sprint) 201 Impassable cliff An impassable cliff, quarry or earth bank (see 106) is shown with a 0.35

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Ditch flows slowly to the north

Ditch flows slowly to the north Ditch flows slowly to the north Photo 1. Wetland DE: Looking west across Wetland DE from upslope. Ponded water, mucky mineral soils, and patches of emergent vegetation observed. Wetland DE appears to be

More information

INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN

INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN READ THE INSTRUCTION BOOKLET AND THESE SUPPLEMENTARY INSTRUCTIONS CAREFULLY BEFORE INSTALLATION These instructions together with those in the instruction

More information

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings Page: 1 7 Scope: These standards shall apply to any temporary membrane structure, tent, or canopy, in accordance with the California Code Regulations (CCR) Title 19 and California Fire Code (CFC). Temporary

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road transport & Highways) Department of Road Transport & Highways Two lanning with paved shoulder of Khagaria Purnea Section of NH 31 from Km

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

The SALA series of. Vertical tank pumps

The SALA series of. Vertical tank pumps The SALA series of Vertical tank pumps Rubber lined & hard metal Vertical tank pumps The Metso VT, vertical tank, pumps are designed for abrasive slurry service and feature simple main -tenance and robust

More information

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen).

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen). PRE-BID CLARIFICATIONS / AMENDMENTS IN RESPONSE TO THE QUERIES RAISED BY PROSPECTIVE BIDDERS IN THE PRE-BID MEETING HELD ON 01.07.2016 11.00 A.M. IN THE CONFERENCE HALL, OSMCL FOR THE TENDER OF MOBILE

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

DUPLEX STRAINERS 800-KECKLEY ( ) BULLETIN NO / FAX: 847/ WEB SITE:

DUPLEX STRAINERS 800-KECKLEY ( ) BULLETIN NO / FAX: 847/ WEB SITE: BULLETIN NO. 9400- DUPLEX STRAINERS 800-KECKLEY (800-2-9) 847/674-8422 FAX: 847/674-206 E-MAIL: SALES@KECKLEY.COM WEB SITE: WWW.KECKLEY.COM NO QUESTION. WE HAVE THE ANSWERS. Shown with Optional Differential

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

The SALA series of. Vertical tank pumps

The SALA series of. Vertical tank pumps The SALA series of Vertical tank pumps Rubber lined & hard metal Vertical tank pumps The Metso VT, vertical tank, pumps are designed for abrasive slurry service and feature simple maintenance and robust