1 DRAFT Dorabelle Campground Rehabilitation September 2012

2 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section 25, Township T9S, Range R24E). The elevation of the campground ranges from approximately 5,375-5,500 feet above mean sea level (msl). The campground is located on property owned and managed by the USDA-FS- Sierra National Forest (SNF) and is accessed via Dorabelle Road, which is just off Highway 168. Figure 1 provides a map of the Project vicinity. According to the SNF Forest Land and Resource Management Plan the Project area is within Management Area 1 and Analysis Area 36, an area in which developed recreational opportunities such as public campgrounds are emphasized (USDA-FS 1991). Shaver Lake, a component of the Big Creek 2A, 8, and Eastwood Project (Federal Energy Regulatory Committee (FERC) Project No. 67), is a man-made, high-elevation reservoir that stores water from backcountry lakes and diversions. Water from these sources are discharged through Eastwood Power station into Shaver Lake. Stevenson Creek and North Fork Stevenson Creek are the primary tributaries to Shaver Lake. Other smaller tributaries include Swanson and Azalea creeks, as well as several unnamed ephemeral creeks. Dorabelle Campground has an approximately 38-acre footprint, with 67 campsites, two host sites, and 16 restrooms, as shown in Figure 2. The overall condition and accessibility of the Dorabelle Campground facilities were evaluated as part of the Recreation Resources Analysis and Facility Inventory Assessment and Compliance with the Americans with Disabilities Act (ADA) Assessment technical studies conducted for the Big Creek ALP (SCE 2007c). 1.2 PROPOSED ACTION This section describes specific construction activities associated with the removal, replacement, and/or rehabilitation of existing Dorabelle Campground facilities, including campsites, parking areas, restroom facilities, trash enclosures, trails, signage, and forest health treatments. See Figure 3 for a site plan of the Proposed Action and Appendix A for photographs and schematics of proposed new facilities. During the construction period, existing campsites or other previously disturbed grounds within Dorabelle Campground would serve as staging areas for construction equipment and materials. Ground-disturbing activities associated with the Proposed Action may include, but are not limited to, grading, leveling, trenching and widening, lengthening, and/or resurfacing of trails, roads, and parking spaces. Table 1 provides a list of construction equipment that would be used for the implementation of the Proposed Action.

3 1.2.1 Campsites The Proposed Action would require the rehabilitation and replacement of the existing Dorabelle Campground campsites and associated parking spurs to protect sensitive biological and cultural resources, update campground facilities, and meet current accessibility standards. Following completion of the Proposed Action, Dorabelle Campground would have a total of 62 campsites, 12 of which would be designed as universally accessible sites (i.e., consistent with Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG) and Architectural Barriers Act (ABA) Accessibility Standards (ABAAS). The 64 campsites would include: 60 single-capacity sites (10 universally accessible), including 2 host sites 4 double-capacity sites (2 universally accessible) Rehabilitation of the campsites would include the following specific actions: Retain 57 existing single-capacity sites Permanently remove 4 existing single-capacity sites Convert 4 single-capacity sites into 2 double-capacity sites Convert 2 single-capacity sites into 2 double-capacity sites Add 1 new single-capacity sites Campsite and parking spur removal would require the removal and disposal or off-site storage of existing tables, food storage containers, and fire rings. All material would be either disposed of at an approved refuse disposal site, or stored by USDA-FS in an existing storage facility. All campsites would be graded using earth-moving equipment (e.g., graders and excavators) to restore natural contours or to grade the site to meet accessibility standards and to better conform to existing topography. Rehabilitation of a single-capacity campsite would include development of a camp living area (approximately 25 feet wide and 18 feet long), tent pad area (approximately 16 feet wide and 16 feet long), and a parking spur (approximately 10 to 16 feet wide and 30 to 50 feet long). The new double-capacity campsites would include a camp living area (approximately 25 feet wide and 26 feet long), two tent pad areas (each approximately 16 feet wide and 16 feet long), and a parking spur (approximately 20 to 36 feet wide and 30 to 50 feet long). The rehabilitated campsite living areas would be composed of compacted aggregate and equipped with new universally accessible tables, bear-proof food storage containers, and fire rings. Tent areas would consist of compacted onsite soils. Parking spurs associated with each site would be paved with asphalt. Access routes to restrooms and parking facilities from the accessible campsites would comply with universally accessible slope and surface requirements. Additionally, the existing handrail along the edge of a granite outcropping near proposed campsite 38 would be removed and replaced with 130 linear feet of new steel railing.

4 1.2.2 Roads and Parking The Proposed Action would require reconstruction of the existing campground roads, entrance, and parking areas. The existing asphalt would be ground, graded and compacted to form the composite base for the new road. The new composite base would follow the existing road grade except for several areas that would require minimal re-grading to conform to current safety design criteria. The new asphalt roads will include a two-lane entrance road; six single-lane loop roads; and three pullouts. Under the Proposed Action the existing campground overflow parking area would be removed and a new paved overflow parking area with seven parking spaces would be developed in its location Restroom Facilities Under the Proposed Action, all of the existing 16 restroom facilities would be removed and replaced to meet current accessibility standards. Nine new vault toilet buildings would be constructed, each with two toilets, housing a total of 18 toilets. Prior to demolition and removal of the existing restroom facilities, each toilet vault would be pumped and waste materials removed from the site and disposed of by a permitted septage hauler. Each building would be demolished using an excavator. Materials would be loaded into a dump truck and disposed of at a USDA-FS approved location. Following demolition, the lid of the vault would be removed and disposed of at a facility qualified to accept hazardous waste. Exposed vault walls would then be collapsed. The hole left behind in the vault locations would be filled with on-site soils or imported fill, compacted in 12-inch lifts, and then re-vegetated with native plant species. After removal of the existing facilities, a total of nine new vault toilet buildings would be installed, each with two toilets. All of the new restroom facilities to be installed would be pre-fabricated concrete buildings. All buildings would meet current accessibility standards. Additionally, the existing holding tanks at both host sites would be removed and replaced. New holding tanks and sewer lines will be installed at both host sites Water Distribution System As a part of the Dorabelle Campground rehabilitation, the existing water distribution system and features within the campground would be abandoned in place, except where the contractor deems it necessary to remove old water lines for construction of new facilities. Under the Proposed Action approximately 6,000 linear feet of new two-inch piping would be installed for the water distribution system. New water pipe would be installed underneath the main campground road and loop roads except for a 222-foot-long section leading from the water tank to Loop A. Installation of the pipe would require digging trenches (e.g., using a trencher) approximately two and a half feet wide and

5 approximately two to three feet deep. After installation, any soil removed would be replaced and compacted. HDPE (3/4-inch) piping would be used for lateral connections from the main water lines to restroom facilities and water spigots. The water system would also include ball valves and drain valves throughout the system as necessary. New water spigots, consisting of stand-alone spigots and spigots adjacent to restroom facilities, would be installed throughout the facility. A gravel drain would be constructed at the base, and filled with soil and gravel. A pipe and water faucet would be attached to posts and to a concrete bowl that would channel the water and allow it to leach into the gravel drain Electrical System Under the Proposed Action, a new power pole and primary pole riser connecting to existing overhead electrical lines would be installed between proposed campsites 13 and 16 and would lead to a new main switchboard. From this point, the existing overhead electrical system would be removed and the new power line would be installed underground to the new vault toilet buildings, main entrance building, and campground host sites. Installation of the system would require digging trenches (e.g., using a trencher) approximately two and a half feet wide and approximately two to three feet deep. After installation, any soil removed would be replaced and compacted Trash Enclosures Under the Proposed Action, the seven existing trash enclosures would be removed. The wooden enclosures around the trash bins would be demolished, and the concrete slab would be broken up and removed. New trash enclosures would be constructed, each consisting of a 10-foot by 12-foot concrete slab with a 5-foot-high wooden enclosure along three sides Storm Water Drainage and Culverts Existing culverts and associated riprap would be removed during the campground road reconstruction process, and would be replaced with corrugated metal pipe culverts and/or concrete valley gutters. The new culverts would be similar in size to the existing culverts, ranging from 12 to 36 inches in diameter. Topsoil excavated during the culvert replacements would be stockpiled and covered with plastic to prevent contamination with noxious weeds. Following installation of the culvert, the topsoil would be replaced to restore the original slope and grade of the drainages and adjacent wetland areas. Rock energy dissipaters and rock-lined ditches would be installed, as necessary, on the upstream and downstream sides of culverts and concrete valley gutters to reduce erosion and to guide storm water away from roads and campsites Gates Under the Proposed Action, the existing entrance gate will be replaced with a new double-arm gate similar in style to the existing gate. The gate would be replaced in a

6 similar location and would provide a similar function of restricting vehicle access to the campground Trails Under the Proposed Action, several undeveloped trails leading from the parking area to the campground and Shaver Lake would be removed or upgraded to meet current FSORAG guidelines. The upgraded trails would be approximately 5 feet wide and consist of a hardened aggregate base. Any remaining undeveloped trails would be allowed to return to their native condition Signage New signage would be installed within the campground for the purpose of directing traffic around the campground road loops. In addition, new entrance signage, accessibility signs, and campsite signs would also be installed to replace or supplement the existing signage. Signs would be constructed from suitable materials (i.e., wood, metal, or recycled plastic) in accordance with all state and federal specifications Tree Removal and Forest Health Treatment The Proposed Action includes removal of trees to allow for the rehabilitation of roads and campsites that are realigned. In addition, forest health treatments are also included to address any impacts of construction-related activities on forest health and reduce the likelihood of tree stress, catastrophic forest fire, or insect invasion, while preserving or enhancing the campground s scenic character and the recreation setting. The treatments would strive for an open, park-like tree stand dominated by medium and large pine and fir trees Proposed Schedule The Proposed Action would be implemented May through November Forest health treatments would be implemented concurrently with the construction activities. The Proposed Action is expected to take approximately six to eight months to complete.

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety APPENDIX D Lot Specific Permit Compliance & Forest Plan (FP) Requirements Porter Fork Recreation Residence Tract (Items noted were documented in compliance letter, 8/12/2005, sent to all Rec. Residence

More information

PINECREST AREA CAMPGROUNDS IMPROVEMENTS

PINECREST AREA CAMPGROUNDS IMPROVEMENTS Prepared For: R United States Department of Agriculture Forest Service Stanislaus National Forest Summit Ranger District Pacific Gas and Electric Company PINECREST AREA CAMPGROUNDS IMPROVEMENTS Pinecrest,

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through recreation ecological restoration opportunities Collaboration

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

Temporary Campground Plan Review Application

Temporary Campground Plan Review Application Procedure to obtain a Temporary Campground Permit Step #1 At least fifteen (15) days prior to the opening of the temporary campground, operators should complete the plan review application (Page #2 to

More information

Silver Creek Plunge Campground Reconstruction

Silver Creek Plunge Campground Reconstruction Silver Creek Plunge Campground Reconstruction PROPOSED ACTION REPORT Emmett Ranger District Boise National Forest 1805 Highway 16, Room 5 Emmett, Idaho 83617 November 2009 Silver Creek Plunge Campground

More information

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

CEMVP-PD-C MEMORANDUM FOR FILE SUBJECT: Supplement No. 4,, Design Memorandum 10, Kaskaskia River, Illinois 1. References: a., Design Memorandum No. 10, approved 1997 (includes Supplements 1-3) b. ER 1130-2-550,

More information

Proposed Action Kaibab Campground Capital Improvement Project September 2008

Proposed Action Kaibab Campground Capital Improvement Project September 2008 Background Kaibab Campground Capital Improvement Project September 2008 The Williams Ranger District of the Kaibab National Forest is proposing to improve the Kaibab Lake Campground. Kaibab Lake Campground

More information

Building Permit Application

Building Permit Application Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium

More information

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID: Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located

More information

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho

More information

Lena Beach Recreation Area Renovation. Dear National Forest User:

Lena Beach Recreation Area Renovation. Dear National Forest User: United States Department of Agriculture Forest Service Alaska Region Tongass National Forest Juneau Ranger District 8510 Mendenhall Loop Juneau, AK 99801 Phone: (907) 586-8800 Fax: (907) 586-8808 File

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

esigning Camp and Picnic Units

esigning Camp and Picnic Units Chapter D esigning Camp and Picnic Units Camp units are designed for overnight use and may include a parking pad. Picnic units generally are for day use only. Equestrian camp and picnic units do not have

More information

Accessibility Guidelines for Outdoor Recreation and Trails

Accessibility Guidelines for Outdoor Recreation and Trails Accessibility Guidelines for Outdoor Recreation and Trails Association of Conservation Engineers September 17, 2007 Accessibility Guidelines for Outdoor Recreation and Trails Access Board is the independent

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT Montana Department of Public Health & Human Services Food & Consumer Safety Section (406) 444-2408 Campground or Trailer Court Establishment Plan Review When complete, send this document to the local sanitarian

More information

TRANSPORTATION SYSTEM MANAGEMENT PLAN

TRANSPORTATION SYSTEM MANAGEMENT PLAN Transportation System Management Plan FERC Project Nos. 2085, 2175, 67 and 120 TRANSPORTATION SYSTEM MANAGEMENT PLAN BIG CREEK HYDROELECTRIC SYSTEM MAMMOTH POOL BIG CREEK Nos. 1 AND 2 BIG CREEK Nos. 2A,

More information

FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018

FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018 FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018 The club facilities are the result of many years of labor and sacrifice on the part of many past and present members. The Camping Committee Chairperson(s),

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

Minimum Impact Suppression Tactics Implementation Guidelines

Minimum Impact Suppression Tactics Implementation Guidelines Minimum Impact Suppression Tactics Implementation Guidelines Establishing and Setting Up Camp Whenever possible, avoid establishing spike or coyote camps in Wilderness. If Wilderness camps are unavoidable,

More information

Note: This form applies to campgrounds and trailer courts only, not to work camps or youth camps as defined in , MCA.

Note: This form applies to campgrounds and trailer courts only, not to work camps or youth camps as defined in , MCA. Montana Department of Public Health & Human Services Food & Consumer Safety Section (406) 444-2408 Campground or Trailer Court Establishment Plan Review Note: This form applies to campgrounds and trailer

More information

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

COUNTY OF SAN MATEO Parks Department

COUNTY OF SAN MATEO Parks Department COUNTY OF SAN MATEO Parks Department DATE: September 23, 2014 COMMISSION MEETING DATE: October 2, 2014 TO: FROM: SUBJECT: Parks and Recreation Commission Scott Lombardi, Park Superintendent Superintendent

More information

Aquatic Invasive Species Sign Manual

Aquatic Invasive Species Sign Manual Aquatic Invasive Species Sign Manual July 2017 Minnesota Department of Natural Resources Ecological and Water Resources Division s Invasive Species Program in cooperation with the Parks and Trails Division

More information

CHESTER COUNTY HEALTH DEPARTMENT 402. CONTROL OF SANITATION IN ORGANIZED CAMPS AND CAMPGROUNDS.

CHESTER COUNTY HEALTH DEPARTMENT 402. CONTROL OF SANITATION IN ORGANIZED CAMPS AND CAMPGROUNDS. CHESTER COUNTY HEALTH DEPARTMENT 402. CONTROL OF SANITATION IN ORGANIZED CAMPS AND CAMPGROUNDS. 402.1. GENERAL PROVISIONS. 402.1.1 PURPOSE. The purpose of this Section is to provide for the protection

More information

Existing Resource Information

Existing Resource Information Botanical and Wildlife Vegetation alliances/wildlife habitats Grasslands annual/perennial Chaparral mixed/montane/chamise-redshank Riparian montane/valley foothill riparian Sierran mixed conifer Montane

More information

Permit Application Requirements For Temporary Tents, and Membrane Structures

Permit Application Requirements For Temporary Tents, and Membrane Structures CTY OF PAM DESERT Building & Safety Department Permit Application Requirements For Temporary Tents, and Membrane Structures F O R M A T O A B U E T Revised 1-30-14 73510 Fred Waring Drive Palm Desert,

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

Virginia Department of Transportation s Rural Rustic Road Program

Virginia Department of Transportation s Rural Rustic Road Program Virginia Department of Transportation s Rural Rustic Road Program Prepared by the Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Michael

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

Picnic Units A picnic unit is a part of a picnic area

Picnic Units A picnic unit is a part of a picnic area Grab Bars Grab bars are usually provided in buildings to provide stability and allow a person to use his or her arms to assist in movement over short distances. The most common location for grab bars is

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS PacifiCorp North Umpqua Hydroelectric Project FERC Project No. 1927 A VOLUME 1 EXHIBITS TMP and SA Implementation Summary B Settlement Agreement (Section 15) C D E F G H I J K L M N O P Q R S T U Rolling

More information

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13)

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13) Appendix A Tenderfoot Mountain Motorcycle Trail System Maintenance and Construction Plan (6/13/13) If the decision to implement the project as approved, grant funding would be pursued to fund construction

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Date: October 19, 2009 DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Introduction Background Whom Guidelines Apply To How to Submit Comments Contact for Further Information General Issues:

More information

National Recreation Trail Application for Designation

National Recreation Trail Application for Designation National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December

More information

Some Historical Aspects of Urban Water Systems

Some Historical Aspects of Urban Water Systems Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Name of Best Management Practice Best Management Practices for Hang Gliding and Paragliding in Jasper National

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

RIM TRAIL EXTENSION PROJECT

RIM TRAIL EXTENSION PROJECT DECISION MEMO For RAINBOW RIM TRAIL EXTENSION PROJECT Located on National Forest System Lands USDA Forest Service, Southwest Region Kaibab National Forest - North Kaibab Ranger District T.35 N, R.1 E,

More information

Definitions and Key Facility and Road Maintenance Costs

Definitions and Key Facility and Road Maintenance Costs Definitions and Key Facility and Road Maintenance Costs Cost Per Visitor: Total operational costs divided by total number of visitors. Cost Recovery: The percentage of expenses recovered through revenue.

More information

KP Lasnaya 1 River

KP Lasnaya 1 River KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG)

Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG) United States Department of Agriculture Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG) Pocket Version Forest Service National Technology & Development Program 1523 2811 MTDC Recreation

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Corabelle Park. Inventory. Future Development

Corabelle Park. Inventory. Future Development Corabelle Park Size: Approximately 4 acres Site Description: Corabelle Park is a relatively new park within the Murray County Park System. It is located on the south side of Corabelle Lake just off gravel

More information

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Wapiti and Greybull Ranger District Park County, Wyoming Background

More information

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning

Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning Gravel and Rock Extraction Highway Maintenance, Recapitalization and Twinning Backgrounder: Mountain National Parks A Need for Change Existing supplies of aggregate (sand and gravel) for highway maintenance,

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT US FOREST SERVICE TONGASS NATIONAL FOREST JUNEAU RANGER DISTRICT

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT US FOREST SERVICE TONGASS NATIONAL FOREST JUNEAU RANGER DISTRICT DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT US FOREST SERVICE TONGASS NATIONAL FOREST JUNEAU RANGER DISTRICT Trail of Time Adjacent Area Trails and Mendenhall Glacier Visitor Center Improvements Project

More information

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended Est. 1982 Est. 1982 Urban Planning Community Design Landscape Architecture 731 North Weber Street, Suite 10, Colorado Springs, CO 80903, 719 633-9700 http://www.gumanltd.com/ Members American society of

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction

More information

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report White Mountain National Forest United States Department of Agriculture Forest Service Rumney Rocks Project Supplemental Environmental Assessment Eastern Region Town of Rumney, Grafton County, NH 30-day

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement. [3411-15-P] DEPARTMENT OF AGRICULTURE Forest Service Angeles National Forest; Los Angeles County, CA Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS AGENCY: ACTION: Forest Service,

More information

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring Trail revitalising Western Australia Bibbulmun Track 973 km Cape to Cape Track 135 km Two of the world s great long distance walking tracks 1062 km Off-road cycle touring Trail revitalising 1. Framework

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

Northern Rail Extension, Phase One

Northern Rail Extension, Phase One General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail

More information

Backpacking and Hiking LEAVE NO TRACE

Backpacking and Hiking LEAVE NO TRACE Backpacking and Hiking LEAVE NO TRACE Activity Plan Hiking Series ACTpa014 Project Skills: Learn the seven principles of Leave No Trace (LNT) Develop a skit that demonstrates LNT principles Life Skills:

More information

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates Glebe Heights and Loch Haven Community Outreach Meeting South River High School May 17, 2016 Agenda Mayo

More information

B10. Agate Beach State Recreation Site

B10. Agate Beach State Recreation Site B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth

More information

Summary of Recreation Sites Development Name:

Summary of Recreation Sites Development Name: Development Name: Eau Pleine Site Number: 1 Owner: WVIC Eau Pleine Tailwater Boat Launch Lanes 1 Concrete plank landing, access to Eau Pleine tailwater & Lake DuBay. (45 planks long, 62.5') Picnic Tables

More information

General Implementation

General Implementation Features 1 General Implementation Allow vehicle travel for the purposes of dispersed camping within 300 feet of designated Forest roads and motorized trails except for the fen areas identified above, and

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area. 6450 RECREATIONAL VEHICLE PARK REGULATIONS 6450 TITLE AND PURPOSE. The provisions of Section 6450 through 6499, inclusive, shall be known as the Recreational Vehicle Park Regulations. The purpose of these

More information

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project

More information

Original Report F WIN , F WIN Prepared for Northland Power and Ministry of Tourism and Culture

Original Report F WIN , F WIN Prepared for Northland Power and Ministry of Tourism and Culture STAGE 2 ARCHAEOLOGICAL ASSESSMENT McLEAN S MOUNTAIN WIND FARM Part Lots 12-15, Concession 3 Geographic Township of Howland Part Lot 24, Concession 12 Geographic Township of Bidwell and Goat Island (formerly

More information

Santa Clara South Hills Recreation Park Project Development and Management Plan

Santa Clara South Hills Recreation Park Project Development and Management Plan Santa Clara South Hills Recreation Park Project Application for Land for Recreation or Public Purposes, City of Santa Clara, Utah Prepared for: Bureau of Land Management, St. George Field Office 345 East

More information

S Central Coast Heritage Protection Act APRIL 21, 2016

S Central Coast Heritage Protection Act APRIL 21, 2016 STATEMENT OF GLENN CASAMASSA ASSOCIATE DEPUTY CHIEF, NATIONAL FOREST SYSTEM U.S. FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE BEFORE THE UNITED STATES SENATE COMMITTEE ON ENERGY AND NATURAL RESOURCES

More information

Pipeline Support Services Theme Park Projects. Pipe rehabilitation using non-destructive techniques

Pipeline Support Services Theme Park Projects. Pipe rehabilitation using non-destructive techniques Pipeline Support Services Theme Park Projects. Pipe rehabilitation using non-destructive techniques Theme Park Pipeline Services Nu Flow has been used to rehabilitate failing and damaged pipe systems inside

More information

Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire

Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire United States Department of Agriculture Forest Service April 2011 Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire Scoping Report Prepared By Saco Ranger District,

More information