Rebuilding Plan For Mosul International Airport

Size: px
Start display at page:

Download "Rebuilding Plan For Mosul International Airport"

Transcription

1 Rebuilding Plan For Mosul International Airport

2 Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction Estimated Budget Part -3 Minimum (Basic) Airport Requirements Part -4 Estimated Budget

3 Part- 1.1 General Information About Mosul International Airport (MIAP) Before 2014 Mosul International Airport (IATA: OSM, ICAO: ORBM) is an airport located at Mosul (353Km from Baghdad), capital of Nineveh Governorate, Iraq. It became a civil airport in 1990 with the rebuild of the runway and construction of a new terminal. The Owner is Federal government of Iraq Ministry of Transport. The following table shows information about (MIA) taken from Aeronautical Information Publication (AIP), Edition Seventy-Two, Effective 06 Feb 2014

4 Airport Location and Runway Details 1 Aerodrome Reference Point coordinates and site N36º18'20.74" E043º08'50.63" The geographic center of the airfield 2 Direction and distance from city Bearing 142º at 2 NM 3 Elevation and Reference Temperature 709 ft (216.1 m) / 43.1º C 4 Taxiway width (average) 20m 5 RWY Dimensions 2650 m x 45 m 6 Runway codes 15,33 7 Threshold Coordinates and elevations N36º17'41.00" E043º09'10.88, 705 ft N36º19'00.48" E043º08'30.39", 709 ft

5 Part- 1.2 Images for Mosul International Airport (MIAP) Before 2014:

6 South Ramp and Terminal Building

7 Terminal Building

8 ATC Control Building

9 Part -2 Brief Description to Current Situation General During 2014 Nineveh Governorate was occupied by Islamic State of Iraq and Syria (IS) The airport was exposed to a complete devastation by IS. After taking control of the governorate, a site visit was done, and the following was reported: a. Runway: a series of relatively deep transversal cuts were excavated along the runway separated by about m. with multiple holes caused by detonation. As shown below in Figures 1,2,3,4 b. Taxiway: Photos are showing damages and cracks in the taxiway

10 Figure 1: Satellite view for Airport During IS

11 Figure 2: Transversal cuts

12 Figure 3: (Left)33 Runway Touch Down Zone, (Right) Detonation Holes in the Runway

13 Figure 4: Various debris and wreckage dumped on the runway surface to prevent any possible landing for aircrafts

14 C- Air Traffic Control Tower Complex: The tower and the technical building were detonated and completely destroyed. All communication and ATC control equipment were also detonated. As in the figure 5 below: Figure 5: ATCT and Technical Block Before (Left), After (Right)

15 d. Substations and firefighting station were detonated and completely destroyed e. Terminal building was detonated and completely destroyed f. Navaids, runway lighting system and radar system were detonated and completely destroyed g. Airport Infrastructure Completely destroyed

16 h- The Airport ground was cleaned after liberation war by local government as in showing images: Figure 6: Airport ground after cleaning

17 Part - 2 Reconstruction Estimated Budget Estimations were done based on the following: Estimation are for construction of a new airport as the first assessment shows full destruction of the airport facilities beyond repair. The budget is estimated for constructing a basic scalable airport with minimum support facilities as compared to the original runway which should include the following: A new CATII runway with length of 2650m and width 45m and shoulders of 7.5m A new taxi way A new APRON New service roads New Terminal building New Administration and utilities complex New Firefighting station A new ATCT and Technical block

18 Part - 2 Reconstruction Estimated Budget The following is included in the budget: Full scalable designs for the new airport Mobilization and initialization of the project The following was not considered by the budget since it will be provided by 3 rd party companies Ground Service equipment and vehicles, which will be provided by ground operator like Iraqi Airways or other providers

19 Part - 3 Minimum (Basic) Airport Requirements 1- Construction Works Runway: A new runway shall be constructed with width of 45 m which shall facilitate the landing and Takeoff for code D airplanes with shoulders 7.5m. Length is estimated between 2650 to 3000m depending on the budget and the construction designs. The designer is recommended to consider Asphalt concrete for the surface instead of cement concrete if the site is compatible for the following reasons: Low maintenance cost, Less time needed for maintenance which can guarantee continuous airport operation. Lower cost as compared with cement concrete runway. Taxiway: with width of 20m that can handle code F airplanes, after accurate site survey and testing it may be possible to rehabilitate the current damaged runway into a full taxiway to the new runway. With rapid exit

20 Part - 3 Minimum (Basic) Airport Requirements Apron: that can handle: Parking spot for 4C airplanes MARS Parking spot for 6C/3D Passenger Terminal Building: A new scalable building design shall be considered to provide a final capacity of 500,000 passenger per year. The terminal building shall be equipped with all the necessary operational infrastructure like Conveying and Baggage handling system, Fire alarm and fighting, check in desk, security and monitoring equipment, etc. Air Traffic Control Tower (ATCT) and Technical Block: A new site shall be located for the new ATCT and technical block, according to the location of the new runway. The elevation is to be designed according to the siting requirements of the new airfield. The ATCT and Technical block shall be equipped with all the necessary system to maintain 24/7/365 uninterruptable operation compatible with latest ICAO requirements. Fire station: Which shall be located and constructed according to the new airfield layout.

21 Part - 3 Requirements 2- Infrastructure Minimum (Basic) Airport Electrical systems: All airport electrical system shall be redesigned, to provide sustainable uninterrupted power supply for the new airport facilities. Water supply and sanitary: The existing network shall be evaluated and upgraded if possible to support the new airport facilities. Communication network: A design for a full network to support the runway equipment and provided communication for all airport facilities inside the airport. Also enabling communication with outside the airport. 3- Runway Systems Airfield Lighting Equipment (AGL) and NAVIDs: According to the new airfield design a new scalable AGL shall be designed and constructed to achieve CAT II operation in space Metrological systems: A CAT II meteorological system shall be installed to monitor and provide messages and warning to the Met office. 4- Air Traffic Control Tower systems ATCT Voice communication system: A new system shall be designed according to the new tower plan, considering the history of the airport traffic and the future expansion. Air Traffic Control Systems: Which shall furnish the ATCT cab with equipment for the ATCT controllers.

22 Part - 4 Estimated Budget: Overhead paging and BGM System Electronic Visual Information Display System Common Use Terminal System - CUTE Indoor Fiber Optic 5 Safety and Security Video Surveillance System Fire Alarm System D Air Traffic Control Tower (ATCT) and Technical Block Earth works Concrete works Masonry works Metal works Fire Alarm and Fighting (wet and dry sprinklers) Plumbing HVAC Electrical, Cable Tray Installation, cabling, Grounding, interior lighting, UPS, Exterior Lighting, Switches and Circuit Breakers Video Surveillance System Fire Alarm System structured cabling network E Fire Station 1 Building Earthworks, Concrete Works, Masonry Works, Metal Works, Plumbing Heating ventilating and Air Conditioning Electrical communication 2 Firefighting Vehicles and accessories Total Estimated Budget $200,000,000.00

sd/- DR. GURUPRASAD MOHAPATRA CHAIRMAN AIRPORTS AUTHORITY OF INDIA [EFFECTIVE DATE: 29 MARCH 2018] AERODROME DATA VADODARA AIRPORT (VABO)

sd/- DR. GURUPRASAD MOHAPATRA CHAIRMAN AIRPORTS AUTHORITY OF INDIA [EFFECTIVE DATE: 29 MARCH 2018] AERODROME DATA VADODARA AIRPORT (VABO) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero AIRAC AIP SUPPLEMENT File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

RUNWAY INCURSION PREVENTION MEASURES AT PARIS-CHARLES DE GAULLE AIRPORT

RUNWAY INCURSION PREVENTION MEASURES AT PARIS-CHARLES DE GAULLE AIRPORT RUNWAY INCURSION PREVENTION MEASURES ------------------------- COSCAP SEA/SA/NA: SEARAST/SARAST/NARAST meetings ( Bangkok, Thailand, 8-9/11-12/15-16 January 2007) ------------------------------------------

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

Runway Status Lights (RWSL) in Japan. July 2015

Runway Status Lights (RWSL) in Japan. July 2015 Ministry of Land, Infrastructure, Transport and Tourism CIVIL AVIATION BUREAU OF JAPAN Runway Status Lights (RWSL) in Japan July 2015 Table of contents Civil Aviation Bureau Japan What is RWSL Background

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

EGWN AD 2.1 LOCATION INDICATOR AND NAME EGWN - HALTON EGWN AD AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA. 3 5nm SE of Aylesbury

EGWN AD 2.1 LOCATION INDICATOR AND NAME EGWN - HALTON EGWN AD AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA. 3 5nm SE of Aylesbury UK MIL AIP AD 2 - EGWN - 1-1 04 AUG 05 EGWN AD 2.1 LOCATION INDICATOR AND NAME EGWN - EGWN AD 2.2 - AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP Co-ordinates and site at AD: 2 Direction and distance

More information

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA UNITED KINGDOM AIP AD 2.EGSL-1 26 May 2016 EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL ANDREWSFIELD EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

The leading airport systems integrator serving the civilian

The leading airport systems integrator serving the civilian Corporate Profile 2014 BAYANAT AIRPORTS Engineering & Supplies is the leading airport systems integrator in the region, specializing in ATM systems, Airside systems and Terminal systems, and is part of

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

Cabling solutions at the core of complex Airport projects

Cabling solutions at the core of complex Airport projects Cabling solutions at the core of complex Airport projects JetBlue Terminal installation at New York JFK Airport Opening in Sept 2008 of a new 640.000 sq foot terminal The terminal will double the number

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS) Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1

More information

AIP SUPPLEMENT 01/18 23 MAR18

AIP SUPPLEMENT 01/18 23 MAR18 PHONE : +94-11- 2264203 FAX : +94-11- 2259916 AFS E-mail : VCBIYHYX VCCCYAYX : aishq@airport.lk ddgasr@caa.lk DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA AERONAUTICAL INFORMATION SERVICES (AIS/HQ) AIRPORT

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

FAA Office of Airport Safety and Standards

FAA Office of Airport Safety and Standards FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering

More information

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction

More information

LRBC AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRBC BACĂU / Bacău LRBC AD 2.2 AERODROME GEOGRAPHICAL AND ADIMNISTRATIVE DATA

LRBC AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRBC BACĂU / Bacău LRBC AD 2.2 AERODROME GEOGRAPHICAL AND ADIMNISTRATIVE DATA AD 2.4-1 LRBC AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRBC BACĂU / Bacău LRBC AD 2.2 AERODROME GEOGRAPHICAL AND ADIMNISTRATIVE DATA 1 ARP coordinates and site at AD N 46 31 19 E 026 54 37 RWY center

More information

TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES)

TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES) AIP AD 2. AERODROMES AD 2.921 17 MAY 01 TVSC AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES) TVSC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE

More information

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN PILOT BRIEFING ROVANIEMI X-MAS FLY-IN GENERAL ICAO: EFRO IATA: RVN Runways: 03/21 AIP SUPPLEMENT An AIP Supplement will be in effect on the day of the event. This supplement details vital procedures for

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Annecy Airport IFR briefing For indication only

Annecy Airport IFR briefing For indication only 1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Work of the ACI World Safety and Technical Standing committee(wstsc) - PP Singh, Chair STSC & Head Safety, Compliance & Enforcement DIAL,IGI Airport

Work of the ACI World Safety and Technical Standing committee(wstsc) - PP Singh, Chair STSC & Head Safety, Compliance & Enforcement DIAL,IGI Airport Work of the ACI World Safety and Technical Standing committee(wstsc) - PP Singh, Chair STSC & Head Safety, Compliance & Enforcement DIAL,IGI Airport Delhi Outline ACI World Committees and WSTSC composition

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

ARP N W m. Rwy 21 Thr Elev N W. (GUND Elevation 172) 153 M. 853m x 27m.

ARP N W m. Rwy 21 Thr Elev N W. (GUND Elevation 172) 153 M. 853m x 27m. 09 27 UK AIP (28 Jul 11) AD 2-EGPT-2-1 AERODROME CHART - ICAO ARP 562628N 0032226W AD ELEV 397FT PERTH/SCONE EGPT GUND (Geoid Undulation) = The height of the Geoid (MSL) above the Reference Elipsoid (WGS

More information

MAST 16 th December 2009

MAST 16 th December 2009 MAST 16 th December 2009 Items for Discussion A380 meeting feedback Safety Performance Driver Van Run feedback AIP Review of AIP text re push-backs Review of AIP text re conditional line ups - unclear

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

Annecy Airport IFR briefing For indication only

Annecy Airport IFR briefing For indication only 1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

BAGHDAD FIR AERONAUTICAL INFORMATION SERVICE BAGHDAD INTERNATIONAL AIRPORT P.O.BOX 55103

BAGHDAD FIR AERONAUTICAL INFORMATION SERVICE BAGHDAD INTERNATIONAL AIRPORT P.O.BOX 55103 BAGHDAD FIR AERONAUTICAL INFORMATION SERVICE BAGHDAD INTERNATIONAL AIRPORT P.O.BOX 55103 Iraq AIP SUPPLEMENT No: A 05/2013 Date: 19 Sep 2013 Effective: 17 Oct 2013 AFTN: ORBIYNYX PHONE: +9641 813-2122

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

CEE 4674 Airport Planning and Design. Antonio A. Trani Julio Roa. Punta Cana Ecological Foundation Summer I, 2013

CEE 4674 Airport Planning and Design. Antonio A. Trani Julio Roa. Punta Cana Ecological Foundation Summer I, 2013 CEE 4674 Airport Planning and Design Antonio A. Trani Julio Roa Punta Cana Ecological Foundation Summer I, 2013 CEE 4674 - Course Information CEE This course is oriented to those engineering students who

More information

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

OJAI AD 2.3 JORDAN 01 AUG 2009

OJAI AD 2.3 JORDAN 01 AUG 2009 AIP AD 2.1 JORDAN 01 AUG 2009 OJAI AD 2.1 AERODROME LOCATION INDICATOR AND NAME OJAI - Queen Alia International OJAI AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at

More information

REALIGNMENT OF AIRCRAFT STANDS AT CARGO APRON & DETAILS OF TAXIWAY L2 INDIRA GANDHI INTERNATIONAL AIRPORT, NEW DELHI (VIDP)

REALIGNMENT OF AIRCRAFT STANDS AT CARGO APRON & DETAILS OF TAXIWAY L2 INDIRA GANDHI INTERNATIONAL AIRPORT, NEW DELHI (VIDP) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

Two s Too Many BY MARK LACAGNINA

Two s Too Many BY MARK LACAGNINA BY MARK LACAGNINA Two s Too Many Angled taxiways limiting the pilots view of the runway, clearances issued and read back hastily and incorrectly, and crossed radio transmissions 1 were among the common

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

PREDANNACK AD LOCATION INDICATOR AND NAME PREDANNACK PREDANNACK AD AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA. 2nm SE of Mullion.

PREDANNACK AD LOCATION INDICATOR AND NAME PREDANNACK PREDANNACK AD AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA. 2nm SE of Mullion. AD 2 - - 1-1 AD 2.1 - LOCATION INDICATOR AND NAME AD 2.2 - AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP Co-ordinates and site at AD: 2 Direction and distance from City: 3 Elevation/Reference Temperature:

More information

LOW VISIBILITY OPERATION

LOW VISIBILITY OPERATION 1. Introduction LOW VISIBILITY OPERATION Low visibility procedures exist to support low visibility operations at aerodromes. Low visibility procedures (LVP) means procedures applied at an aerodrome for

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30

Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30 Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster Helsinki, IST Event 2006 22/11/ 2006,16:00-17:30 Agenda 16:00 Welcome (Andrea Kurz, Airport Safety Cluster) 16:05 Setting

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development

More information

Air Accident Investigation Unit Ireland. FACTUAL REPORT INCIDENT TO BOMBARDIER DHC-8-402, G-JEDR Waterford Airport (EIWT), Ireland 05 June 2012

Air Accident Investigation Unit Ireland. FACTUAL REPORT INCIDENT TO BOMBARDIER DHC-8-402, G-JEDR Waterford Airport (EIWT), Ireland 05 June 2012 Air Accident Investigation Unit Ireland FACTUAL REPORT INCIDENT TO BOMBARDIER DHC-8-402, G-JEDR Waterford Airport (EIWT), Ireland 05 June 2012 Bombardier DHC-8-402, G-JEDR Waterford Airport (EIWT) 05 June

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

Construction of Pyongyang International Airport IP6

Construction of Pyongyang International Airport IP6 Construction of Pyongyang International Airport IP6 (Presented by GACA, DPR Korea) Summary The purpose of this paper is to update members regarding airport construction by outlining the successes and experiences

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

AD 2. AERODROMES VOAT AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VOAT AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - AGATTI / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

TVSU UNION ISLAND/Union Is. (ST. VINCENT AND THE GRENADINES)

TVSU UNION ISLAND/Union Is. (ST. VINCENT AND THE GRENADINES) AIP AD 2.951 AD 2. AERODROMES TVSU AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSU UNION ISLAND/Union Is. (ST. VINCENT AND THE GRENADINES) TVSU AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1

More information

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW!

Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! ! Front Line Managers (FLMs) and Airline Pilots Training for Operational Evaluation! of enhanced Final Approach Runway Occupancy Signal (efaros) at DFW! Maria Picardi Kuffner! September 2008, updated July

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

TVSB BEQUIA IS./J.F. Mitchell (ST. VINCENT AND THE GRENADINES)

TVSB BEQUIA IS./J.F. Mitchell (ST. VINCENT AND THE GRENADINES) AIP AD 2. AERODROMES AD 2.911 TVSB AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSB BEQUIA IS./J.F. Mitchell (ST. VINCENT AND THE GRENADINES) TVSB AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

AD 2. AERODROMES VIBR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VIBR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KULLU MANALI / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site

More information

FEILDING FEILDING VFR PREFERRED ARRIVAL/DEPARTURE RWY 10 VFR PREFERRED ARRIVAL/DEPARTURE RWY 10 ELEV 214 NZFI UNATTENDED: Effective: 17 NOV 11

FEILDING FEILDING VFR PREFERRED ARRIVAL/DEPARTURE RWY 10 VFR PREFERRED ARRIVAL/DEPARTURE RWY 10 ELEV 214 NZFI UNATTENDED: Effective: 17 NOV 11 TTTT TTTTTTTTTTTTTTTTTTT TTTTTTT TTTTTTTTTTTTTTTTTTTTTTT CTA/C 4500ft-9500ft CTA/C 9500ft 1800ft CFZ ELEV 214 NZFI AIP New Zealand NZFI AD 2-35.1 VFR PREFERRED ARRIVAL/DEPARTURE RWY 10 UNATTENDED: 124.1

More information

Ministry of Transport. Republic of Tajikistan. Investment Project

Ministry of Transport. Republic of Tajikistan. Investment Project Ministry of Transport Republic of Tajikistan Investment Project RECONSTRUCTION OF KURGAN-TUBE AIRPORT Dushanbe 2011 INTRODUCTION According to Minutes decision of the meeting in Government of the Republic

More information

Challenges to Airport Ramp & Runway Debris Control

Challenges to Airport Ramp & Runway Debris Control BASIC AIRPORT SAFETY & OPERATIONS SCHOOL FAA/AAAE Challenges to Airport Ramp & Runway Debris Control Airport Technology Boeing Commercial Airplanes October 2010 Airport Ramp & Runway Debris Control What

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Aerodrome Geographical and Administration Data

Aerodrome Geographical and Administration Data AIP New Zealand NZDN AD 2 - NZDN AD 2 NZDN AD 2. DUNEDIN NZDN DUNEDIN NZDN AD 2.2 Aerodrome Geographical and Administration Data 2 4 5 6 ARP coordinates and site at AD Direction and distance from (city)

More information

2015 Bond Proposal Model Airplane Parks (PR96) Alternative Model Airplane Park Location

2015 Bond Proposal Model Airplane Parks (PR96) Alternative Model Airplane Park Location Our club, Green Valley R/C Flyers, is presenting this proposal for consideration as an alternative location for a Model Airplane Park to be included in PR96 for the 2015 Bond Election. We are recommending

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak

More information

AIP AD SEYCHELLES 03 APR 14

AIP AD SEYCHELLES 03 APR 14 AIP AD 0.6-1 SEYCHELLES 03 APR 14 AD PART 3 AERODROMES (AD) AD 0.6 TABLE OF CONTENTS TO PART 3 AD 1. AERODROMES/HELCOPTER LANDING AREAS INTRODUCTION Pages AD 1.1 Aerodrome/helicopter landing areas availability

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) Published by in accordance with ICAO Annexes 4 and 15 of the Convention on International Civil Aviation 2018

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

ANNUAL GENERAL MEETING

ANNUAL GENERAL MEETING ANNUAL GENERAL MEETING April 19, 2012 April 19, 2012 AGENDA 1. CORPORATE INTRODUCTION 2. BUSINESS METRICS 3. AIRPORT DEVELOPMENT PROGRAM UPDATE 4. OTHER YYC ACTIVITY IN 2011 5. SPRINGBANK AIRPORT 6. LOOKING

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER

INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER 09-2020 By Chun-Hsing Ho, Dwight D. Eisenhower Fellow Department of Civil and Environmental

More information

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS S P I C E W O O D A I R P O R T 8 8 R H A N G A R F O R L E A S E 105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS Available for immediate lease 7,200 SF (90 x 80 ) Class A Aircraft Hangar W / Climate Controlled

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Office of Airport Safety and Standards

Office of Airport Safety and Standards Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information