1 Ministry of Transport Republic of Tajikistan Investment Project RECONSTRUCTION OF KURGAN-TUBE AIRPORT Dushanbe 2011

2 INTRODUCTION According to Minutes decision of the meeting in Government of the Republic of Tajikistan No. 17/3-19 from , Minutes decision of the meeting in Ministry of Transport of the Republic of Tajikistan No. 26 from , as well as recommendations of experts of State Road Design and Research Institute of Civil Aviation (SRD and RI CA) Aeroproject (Moscow) the technical proposals were developed to reconstruction of Kurgan-Tube Airport. The technical proposals (TP) developed by SURDE Loikhakash with the participation of State Unitary Aviation Enterprise (SUAE) Tajik Air, TRDI Tajikgiprovodhoz and experts of Kurgan-Tube Airport. Initial data for Investment Project Development were: 1. Minutes decision of commission work from ; 2. Proposals of TRDI Tajikgiprovodhoz in bank protection works in Vahsh river of Airport region; 3. Memorandum of SRD and RI CA Aeroproject from ; 4. Information of Kurgan-Tube Airdrome; 5. Recommendations for lighting arrangement on Kurgan-Tube Airdrome; 6. Location map of radio aids on Kurgan-Tube Airdrome. CONCEPT DESCRIPTION OF EXISTING KURGAN-TUBE AIRPORT Existing airport is located in 12 km easter of Kurgan-Tube. Runway of length 2285 m and of width 42 m is in satisfactory condition and was exploited on passenger transportations by aircrafts АN- 24, YAK-40, AN-2. Air terminal building and buildings of service area have been exploited throughout the years. The approach road to airport of the length 2,4 km is in satisfactory condition with hard surface. Axis direction of runway is North-South. From the South side the runway edge closely abuts against main channel of the length over 30 m. Water level of the channel in summer is practically on runway level. In the distance of 0,9 km from the south runway threshold Kurgan-Tube Railway Station is located. There is a slight site development between channel and roads. In the distance of 1,3 km from the south runway threshold in south-easterly direction located Vahsh Nitrogen Fertilizer Plant. The north runway edge closely abuts against the left bank of Vahsh river, the terrace height is over 7 m. In the distance of 2,5 km from the north runway threshold in north-easterly direction located railroad metal bridge through Vahsh river. Formerly there was industrial production of gravel material for construction works in flood plain of Vahsh river below the bridge down-stream. Vahsh river has a meandering (wandering) nature of watercourse on bordering site to airport area. At the present time watercourse of Vahsh river is pressed to the left bank, and allows performing construction works straight in flood plain. From the west side airport area is bounded by branch of main channel. From the east side over 1,4 km from runway located the vineyards. To altitude relief boundaries pertains aiguilles which located in the north-east in the distance of 5 km from the north runway threshold.

3 TECHNICAL PROPOSALS Reconstructed airport in prospect is designed for passenger-and-freight transportations therefore extension of artificial runway approximately will come up to at least 800 m. In recommendations of SRD and RI CA Aeroproject are proposed three versions of runway extension: the first and main is to Vahsh river, the second is extension to both sides: to river side and channel with flyover construction and the third version is transferal of airport elsewhere. According to version No.1 Runway extension in north direction, to Vahsh river is associated with: - Construction of regulation and bank protection works in Vahsh river on both banks, from railroad bridge down the stream with general length 11 km on both banks. - Embankment fill in flood plain for runway and airstrip of the width at least 300 m and of the length 800 m and average height 7 m. According to version No.2 Runway extension in south direction is connected with crossing of main channel. Considering maximum water level in channel, which is practically equal to artificial runway level, the construction of trestle bridge is excluded. Similarly, according to regulations towards flight safety, existence of railway and highway, located perpendicularly to runway heading and in direct proximity from extended runway, is unallowable. According to version No.3 Transferal of airport to new area require considerable expenses. In this respect and taking into account recommendations of SUAE Tajik Air, SRD and RI CA Aeroproject extension of runway was considered in north direction, to flood plain of Vahsh river. Generally, reconstruction of airport includes the following: 1. Reconstruction of runway, taxiway, apron, parking area; 2. Drainage system at runway and airfield; 3. Airport equipment with new lighting; 4. Airport equipment with radio aids and communication; 5. Construction of VIP building; 6. Reconstruction of Flight Control Tower; 7. Terminal for local and international passengers service; 8. Transformer substation with two transformers 35\10\0,4-400 kilovolt-ampere; 9. Freight airplane station; 10. Freight airplane apron; 11. Freight terminal; 12. Emergency Rescue Station (ERS) and Fire Emergency; 13. Air Traffic Control Radar (ATC Radar) Building; 14. Overhaul of existing buildings, structures and airport objectives; 15. Patrol road on airdrome area; 16. Enclosure of airport area; 17. Reconstruction of approach road to the airport.

4 BASIC TECHNICAL-AND-ECONOMIC INDEXES No. Unit of Name of indexes measurement Indexes 1 Airport status International 2 Airdrome class «В» 3 Artificial runway length m Artificial runway width m 45 5 Aircraft type В Surface of artificial runway, taxiway, parking area Asphalt concrete 7 Volume of earthworks thous.m Cost of airport reconstruction mln US$ Including bank protection works on Vahsh river mln US$ Including reconstruction of approach road to the airport mln US$ 240 Kurgan-Tube airport is designed for passenger-and-freight transportations emphasizing freight transportations to CIS and other foreign countries. It is necessary to execute design and survey works on airport area, on runway extension section, bank protection works on Vahsh river, lighting arrangement section and radio aids for flight operations, approach road to the airport.

5 PROJECT COST ESTIMATE No. Name Cost in thous. US$ 1 VIP building Reconstruction of Flight Control Tower Passenger terminal Transformer substation with two transformers 35\10\0,4-400 kilovoltampere 5 Artificial runway extension Reconstruction of artificial runway, taxiway, parking area Freight airplane station and apron Freight terminal ERS and Fire Emergency ATC Radar Building Lighting Radio aids and communication Enclosure of airport area Patrol road on airdrome area Object of total overhaul Reconstruction of approach road to the airport Bank protection works on Vahsh river TOTAL:

6 North threshold of articial runway Existing service technical territory

7 Asphalt plant and Transformer substation Storehouse of combustive-lubricating materials

8 Airport bus-station building

9 Radio set «Chanara» South threshold of artificial runway and «Sarband» channel

10 Airport building and apron

Rebuilding Plan For Mosul International Airport

Rebuilding Plan For Mosul International Airport Rebuilding Plan For Mosul International Airport Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction

More information

CHISINAU AIRPORT ID CARD

CHISINAU AIRPORT ID CARD CHISINAU AIRPORT ID CARD Chisinau Airport is the biggest and main airport of Moldova (lata : KIV, ICAO : LUKK), Eastern Europe; Location -14 km south of Chisinau; Area -480 ha; Terminal -built in 1970

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

CAREC Corridor Implementation Progress, Planned Actions, and Support Needs TAJIKISTAN

CAREC Corridor Implementation Progress, Planned Actions, and Support Needs TAJIKISTAN CAREC Corridor Implementation Progress, Planned Actions, and Support Needs TAJIKISTAN 1 2 2 3 2 4 DEVELOPMENT PARTNERS ASIAN DEVELOPMENT BANK (499,1 mln.usd) EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017

MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference. November 2017 MEXICO CITY S NEW INTERNATIONAL AIRPORT 2017 ACI-LAC Conference November 2017 Millions of Passengers The need for a new airport» New Airport opening in 2020 Passenger Projections Growth: 140 120 100 80

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

FAA Office of Airport Safety and Standards

FAA Office of Airport Safety and Standards FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering

More information

Inaugurated on 18 th March 2013

Inaugurated on 18 th March 2013 W Inaugurated on 18 th March 2013 Location of Mattala Mattala Rajapaksa International Airport is an international airport serving the city of Hambantota in southeast Sri Lanka. Tourist attractions, such

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Rodrigues Regional Assembly Chief Commissioner s Office

Rodrigues Regional Assembly Chief Commissioner s Office Ref: CCO/CAV/1/2013 Rodrigues Regional Assembly Invitation for Expressions of Interest Consultancy Services for the Design of Runway Extension & Ancillary Works at Sir Gaetan Duval Airport Plaine Corail,Rodrigues

More information

Katowice Airport localization. Poland

Katowice Airport localization. Poland June 2017 Katowice Airport localization Poland 2 Katowice Airport localization on Polish territory Area: 312 679 km² Russia Latvia Population: 38 500 000 Germany Belarus Katowice Airport services the most

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

FSUE ROSMORPORT CONSTRUCTION OF THE INTERNATIONAL MARINE TERMINAL WITH YACHT MARINA IN THE CITY OF PIONERSKY, KALININGRAD REGION

FSUE ROSMORPORT CONSTRUCTION OF THE INTERNATIONAL MARINE TERMINAL WITH YACHT MARINA IN THE CITY OF PIONERSKY, KALININGRAD REGION FSUE ROSMORPORT CONSTRUCTION OF THE INTERNATIONAL MARINE TERMINAL WITH YACHT MARINA IN THE CITY OF PIONERSKY, KALININGRAD REGION Situated in the Northern part of the Kaliningrad peninsula, in the middle

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003.

The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003. The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003. The Report of the Minister of Transport of Ukraine the General Director

More information

Construction of Pyongyang International Airport IP6

Construction of Pyongyang International Airport IP6 Construction of Pyongyang International Airport IP6 (Presented by GACA, DPR Korea) Summary The purpose of this paper is to update members regarding airport construction by outlining the successes and experiences

More information

Chapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe

Chapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe Chapter 10 The aerospace subject is very large and diverse. As seen in previous chapters, there are many subject areas. So far you have learned about history, weather, space and aerodynamics. Now you will

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Dear participants of the conference!

Dear participants of the conference! Dear participants of the conference! Let me assure you of my sincere respect and greet you on behalf of Turkmenkhowayollary State Civil Aviation Department. First of all, I thank you for your attention

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

The Future of Aviation for Central New Mexico

The Future of Aviation for Central New Mexico The Future of Aviation for Central New Mexico MISSION STATEMENT THE WHOLE AIRPORT EXPERIENCE HISTORY SPECIFICATIONS FACILITIES SERVICES RECENT IMPROVEMENTS FUTURE DEVELOPMENT & USE USER PROFILE The mission

More information

ROJUNAI AERODROME FLIGHT INSTRUCTIONS

ROJUNAI AERODROME FLIGHT INSTRUCTIONS ROJUNAI AERODROME FLIGHT INSTRUCTIONS Vilnius 2015 COORDINATED: The Civil Aviation Administration Director Joris Gintilas 2015 APPROVED: The owner of Rojunai aerodrome Aurimas Bezaras 2015. ROJUNAI AERODROME

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

KBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack

KBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: p. 1 of 5 Diagram #2: p. 2 of 5 OVERVIEW Bellingham International Airport (BLI) is a full service commercial airport located in Whatcom County, approximately 3 miles N.W. of the city limits

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Aviation Sector Services. Transportation / Aviation

Aviation Sector Services. Transportation / Aviation Aviation Sector Services Transportation / Aviation 01 04 Cover / Ottawa Macdonald Cartier International Airport, Ottawa ON; Above / San Diego International Airport, San Diego, CA Delivering World-class

More information

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

Company Profile Division of special systems

Company Profile Division of special systems Company Profile Division of special systems Content (3) Something from our history (4) Division of special systems (5) Airports (6) Heliports (7) Ground aircraft arresting systems (8) Laboratories, centres

More information

Ministry of transport and communications of the Kyrgyz Republic. Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia

Ministry of transport and communications of the Kyrgyz Republic. Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia Ministry of transport and communications of the Kyrgyz Republic Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia Project Purpose: Modernization and re-equipment of air traffic system

More information

Investigation Report. Identification. Factual information. German Federal Bureau of Aircraft Accidents Investigation. TX002-0/07 September 2008

Investigation Report. Identification. Factual information. German Federal Bureau of Aircraft Accidents Investigation. TX002-0/07 September 2008 German Federal Bureau of Aircraft Accidents Investigation Investigation Report TX002-0/07 September 2008 Identification Type of incident: Incident Date: 12 January 2007 Place: Aircraft: Manufacturer /

More information

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CANBERRA AIRPORT IS THE ONLY 24 HOUR BOEING 747, B777-300 AND A340 CAPABLE AIRPORT...BETWEEN BRISBANE AND MELBOURNE. 9 Runway and airfield developments Airports

More information

Innovation based development of Klaipeda Port technologies

Innovation based development of Klaipeda Port technologies Discover a proven way! Innovation based development of Klaipeda Port technologies Mr. Artūras Drungilas Marketing and Corporate Affairs Director Klaipeda State Seaport Authority PortofKlaipeda.lt 1 Management

More information

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE 1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION SA17 SMALL AIRPORT WINTER MAINTENANCE To ensure the Anahim Lake airport is kept open and safe for small airport users. 2. GENERAL PERFORMANCE SPECIFICATIONS

More information

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Ref. AIM Para AOPA Air Safety Foundation   Supported by the FAA   Ref. AIM Para Supported by the FAA ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with

More information

Catchment area - 30 min drive time inhabitants - 1 hour drive time inhabitants - 2 hours drive time

Catchment area - 30 min drive time inhabitants - 1 hour drive time inhabitants - 2 hours drive time Administrative Department for the Communal System and Urbanisation CLASS: NUMBER: Varaždin, 1 October 2014 Introduction Position of the Airport with regard to the Varaždin County and the Wider Region;

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

FINAL REPORT. Investigation into the incident of aircraft SAAB-SAFIR 91D, registration OE-KSS, at LKTB on 11 September Prague October 2005

FINAL REPORT. Investigation into the incident of aircraft SAAB-SAFIR 91D, registration OE-KSS, at LKTB on 11 September Prague October 2005 Ref. No 439/05/ZZ Copy No: 3 FINAL REPORT Investigation into the incident of aircraft SAAB-SAFIR 91D, registration OE-KSS, at LKTB on 11 September 2005 Prague October 2005 A) Introduction Operator: Aircraft

More information

National Transportation Safety Board Washington, D.C

National Transportation Safety Board Washington, D.C E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Safety Recommendation Date: June 25, 2004 In reply refer to: A-04-48 through -50

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Dallas Love Field Capital Program. September 16, 2015

Dallas Love Field Capital Program. September 16, 2015 Dallas Love Field Capital Program September 16, 2015 1 The Dallas Airport System Dallas Love Field, Dallas Executive Airport, Downtown Vertiport A $86 million City of Dallas enterprise Operated by the

More information

SFAR 93 and Minimum Altitudes

SFAR 93 and Minimum Altitudes SFAR 93 and Minimum Altitudes Stuart W. Goering FAA Aviation Safety Counselor 1/14/2003 22:12 Copyright 2003 Stuart W. Goering 1 You Make the Call Too Low or Just Fine? 1/14/2003 22:12 Copyright 2003 Stuart

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

Appendix 4 St. Charles Basin

Appendix 4 St. Charles Basin Appendix 4 St. Charles Basin The St. Charles hurricane protection system (HPS), shown in Figure 1, was designed as part of the Lake Pontchartrain, LA, and Vicinity Hurricane Protection Project. The St.

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

SOCIAL-ECONOMIC DEVELOPMENT OF THE REPUBLIC OF DAGESTAN

SOCIAL-ECONOMIC DEVELOPMENT OF THE REPUBLIC OF DAGESTAN УДК 338.001.36 Akilov Saigid А. An employee of the Ministry of economics and territorial development of the Republic of Dagestan (state employee), Department of macroeconomic analysis and forecasting Master

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

a. Aeronautical charts DID THIS IN LESSON 2

a. Aeronautical charts DID THIS IN LESSON 2 AIRMAN CERTIFICATION STANDARDS: REMOTE PILOT SMALL: You will know and be able to explain in writing or oral form the below tasks regarding AIRPORT OPERATIONS Task References Objective Task B. Airport Operations

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES The County of Montrose, Colorado is accepting Statements of Qualifications from qualified firms

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

USAF Aero Club Local Procedures Exam Updated February 2017

USAF Aero Club Local Procedures Exam Updated February 2017 USAF Aero Club Local Procedures Exam Updated February 2017 Instructions This exam is part of the Annual Standardization Test. Continue with the following exam using a separate answer sheet and check (

More information

visits4u Case Studies: Amsterdam Schiphol Airport Amsterdam, Netherlands

visits4u Case Studies: Amsterdam Schiphol Airport Amsterdam, Netherlands visits4u Case Studies: Amsterdam Schiphol Airport Amsterdam, Netherlands Amsterdam Airport Schiphol Amsterdam, Netherlands Title: Limitless Travelling Description Amsterdam Airport Schiphol, is the main

More information

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States Diagram #1: Van Nuys Abatement and Curfew Regulation Page 1 Aircraft Categories: A, B & C / All Runways p. 1 of 20 Diagram #2: Van Nuys Abatement and Curfew Regulation Page 2 p. 2 of 20 Diagram #3: Van

More information

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo 8 Aviation Support 8.1 Aerodrome Rescue and Fire Fighting Services CASA mandates that a permanent Aerodrome Rescue and Fire Fighting Service (ARFFS) is established for domestic aerodromes when more than

More information

Whitsunday Airport. The pilot s gateway in the heart of the Whitsundays. Visiting Pilot s Guide

Whitsunday Airport. The pilot s gateway in the heart of the Whitsundays. Visiting Pilot s Guide Whitsunday Airport The pilot s gateway in the heart of the Whitsundays Visiting Pilot s Guide Airport Statistics & Services ERSA Reference: Situation: Elevation: Shute Harbour/Whitsunday. Lat 20 o 16 S

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Flight Inspection Services

Flight Inspection Services Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

CE 563 Airport Design

CE 563 Airport Design CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals This document is scheduled to be published in the Federal Register on 12/04/2014 and available online at http://federalregister.gov/a/2014-28535, and on FDsys.gov 1 DEPARTMENT OF TRANSPORTATION Federal

More information

Jax Navy Flying Club Course Rules

Jax Navy Flying Club Course Rules Jax Navy Flying Club Course Rules Responsibilities. The Jax Navy Flying Club maintains responsibility for ensuring that all pilots operating out of Naval Air Station Jacksonville are familiar with local

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

US Airspace A History

US Airspace A History US Airspace A History The Federal airway system began in 1927, when the Department of Commerce acquired the transcontinental airway from the U.S. Postal Service. All airspace was uncontrolled, there were

More information

Morbi Airport Gujarat

Morbi Airport Gujarat Morbi Airport Gujarat Airports Authority of India INDEX Page No 1. About The City.1-2 2. Technical Details..3-7 3. Earmarked Airstrip Land Map.8 4. Certificate Issued By GUJSAIL...9 5. Google Earth Pictures...10

More information

Statistics of inbound tourism

Statistics of inbound tourism Statistics of inbound tourism Agency of the Republic of Kazakhstan on Statistics Vienna, July 2009 www.stat.kz Information streams according to inbound tourism in Republic Kazakhstan: The statistical inspections

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

SUGHD REGION, TAJIKISTAN

SUGHD REGION, TAJIKISTAN SUGHD REGION, TAJIKISTAN GEOGRAPHY The region s territory is mostly mountainous The Kuramin Range (elevation up to 3768 m) and Mevagul mountain (elevation up to 1624 m) are in the north. The Turkestan

More information

LANCASTER AIRPORT DRIVER TRAINING PROGRAM

LANCASTER AIRPORT DRIVER TRAINING PROGRAM LANCASTER AIRPORT DRIVER TRAINING PROGRAM INTRODUCTION 1. Airfield Driving Basics 2. Movement / Non-Movement Area 3. Airfield Signs, Markings & Lighting 4. Airfield Communications 5. Aviation Phonetics

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Connect Oregon IV Final Review Committee Final Recommendation

Connect Oregon IV Final Review Committee Final Recommendation ODOT 1A0217 Port of Portland 3R0192 Central Oregon & Pacific Railroad Project Selection, Administration, and Debt Service $ 500,000 $500,000 Air Trans Center Taxilane-Ph 3 $ 3,500,000 $ 14,800,000 $ 18,300,000

More information

Planning Proposal for Refurbishment and Up-gradation of Airport in Surat, Gujarat, India

Planning Proposal for Refurbishment and Up-gradation of Airport in Surat, Gujarat, India Planning Proposal for Refurbishment and Up-gradation of Airport in Surat, Gujarat, India Palak Agrawal, Jay Dalal, and Dr. Krupesh Chauhan Abstract With globalization, the role of airports in the trade

More information

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607 AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal

More information

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD) Published by in accordance with ICAO Annexes 4 and 15 of the Convention on International Civil Aviation 2018

More information

Driving Training Class. Presented by: Lancaster Airport Authority

Driving Training Class. Presented by: Lancaster Airport Authority Driving Training Class Presented by: Lancaster Airport Authority Driving is a Privilege Driving on the airport, airport apron and ramps is a privilege and can be revoked at anytime for any reason. Violations

More information