TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
|
|
- Emil Stokes
- 5 years ago
- Views:
Transcription
1 TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General Study Objectives Public Involvement Issues to Be Resolved CHAPTER TWO EXISTING CONDITIONS Introduction Airport Setting Location Classification Historical Background Community Profile Size Population Climate Economy Air Traffic Activities Air Traffic Local Air Service Passenger Enplanements Cargo Activities Based Aircraft Airspace and Air Traffic Control Ground-Based Navigational Aids and Instrument Approach Procedures Flight Service Station Aviation Facilities Runways Waterlane Taxiways Aircraft Parking Apron Terminal Area Facilities Airport Access Vehicle Parking Table of Contents, Tables, Figures, Exhibits, and Appendices - i
2 Description Page Number Airport Support Facilities Airport Rescue and Fire Fighting (ARFF) Facility Airport Maintenance Equipment Facilities Airport Security Fuel Facilities and Aircraft Services Air Cargo Operations Fixed Base Operators (FBO) Hangar Facilities Airport Utilities Airport Environs and Land Use Comprehensive Plan Land Use Plan Parks and Recreation Conclusion CHAPTER THREE PROJECTIONS OF AVIATION DEMAND Introduction Industry Trends and Airport Role Projections of Passenger Enplanements Linear Trend Methodology Market Share Methodology Seasonal Analysis Methodology Enplanement Projection Comparison Projection of Airline Operations and Fleet Mix Air Carrier Operations Air Taxi Operations Commercial Fleet Mix Projection Critical Aircraft Projection of Air Cargo Activity Projection of General Aviation Activity Based Aircraft Projections Preferred Based Aircraft Projection General Aviation Aircraft Operations Projection Based Aircraft Fleet Mix Projection of Military Operations Projection of Instrument Operations Activity Peaking Characteristics Projections Summary Table of Contents, Tables, Figures, Exhibits, and Appendices - ii
3 Description Page Number CHAPTER FOUR DEMAND/CAPACITY ANALYSIS AND DETERMINATION OF FACILITY REQUIREMENTS Airfield Demand/Capacity Analysis Airfield Layout Weather Conditions Aircraft Fleet Mix Touch-and-Go Operations Peak Hour Airfield Capacity Annual Service Volume Range of Delay Demand/Capacity Summary Airfield Facility Requirements Runway Length Runway Width Runway Pavement Strength Runway Depth (Floatplane Basin) Taxiway and Taxi Channel System Airfield Safety Areas FAR Part 77 Surfaces Navigational Aids (NAVAIDs) Passenger Terminal Facility Requirements Airline Support Public Space Concessions Other Airport Space Conclusion Aircraft Gate and Apron Requirements Aircraft Gates General Aviation Facility Requirements Aircraft Storage Buildings and Apron Transient/Based Aircraft Tie-Downs Floatplane Basin Slips/Facilities Helicopter Facilities General Aviation Auto Parking Fixed Base Operators Support Facility Requirements Airport Rescue and Firefighting Aircraft Maintenance/Snow Removal Equipment Building Fuel Storage Air Cargo Airport Access/Circulation and Automobile Parking Requirements Airport Access and Circulation Auto Parking Basic Infrastructure Requirements Table of Contents, Tables, Figures, Exhibits, and Appendices - iii
4 Description Page Number CHAPTER FIVE ALTERNATIVE PLAN CONCEPTS Development Considerations Evaluation Criteria and Methodology Airfield Alternatives New Runway Alternative 1 - No Action New Runway Alternative 2A - Parallel GA Runway (Close-In) New Runway Alternative 2B - Parallel GA Runway (South of Basin) New Runway Alternative 3A - GA Runway on West Douglas Island New Runway Alternative 3B - GA Runway on West Douglas Island Recommended New Runway Alternative Runway Safety Area Alternatives RSA Alternative 1 - Construct RSA to Full Standards RSA Alternative 2 - Construct RSA to Full Standards, Shift Runway to East RSA Alternative 3 - Declared Distances/Displaced Threshold RSA Alternative 4 - Construct RSA on Airport Property RSA Alternative 5 - No Action Recommended RSA Alternative Passenger Terminal Alternatives Terminal Development Alternative 1 - Existing Concourse Configuration Terminal Development Alternative 2 - West Air Carrier Concourse Terminal Development Alternative 3 - Realign East Air Carrier Concourse Recommended Terminal Alternative General Aviation Considerations West GA Development Area Central GA Development Area East GA Development Area Air Cargo Facility Considerations Airport Maintenance/Support Facility Alternatives Facility Requirements Alternative Development Sites Evaluation of Alternative Development Sites Selection of the Recommended Alternative Vehicular Access and Parking Alternatives Terminal Curb Parking Facility Alternatives Recommended Parking Alternative Access and Circulation Alternatives Recommended Access and Circulation Alternative Utilities/Infrastructure Requirements Duck Creek and Jordan Creek Issues Table of Contents, Tables, Figures, Exhibits, and Appendices - iv
5 Description Page Number Recommended Development Plan Runways and Taxiways Passenger Terminal Facility Air Cargo General Aviation Aircraft Parking Helicopter Facilities Snow Removal Equipment Building Floatplane Basin Development Passenger Terminal Vehicle Parking Lot Surface Transportation Access CHAPTER SIX FINANCIAL PLAN Introduction Development Schedule and Costs Operating Revenues and Expenses Source and Use of Funds End of Table of Contents Table of Contents, Tables, Figures, Exhibits, and Appendices - v
6 TABLES Table Number Description Page Number CHAPTER TWO EXISTING CONDITIONS Table 2-A Air Traffic Activity, Table 2-B Passenger Enplanements, Table 2-C Existing Runway Data Table 2-D Existing Terminal Dimensions CHAPTER THREE PROJECTIONS OF AVIATION DEMAND Table 3-A Air Carrier Enplanement Projections Linear Trend Methodology Table 3-B Air Taxi Enplanement Projections Linear Trend Methodology Table 3-C Air Carrier Enplanement Projections Market Share Methodology Table 3-D Enplanement Projections Seasonal Analysis Methodology Table 3-E Enplanement Projection Comparison Table 3-F Air Carrier Operations Projections Table 3-G Air Taxi Operations Projections Table 3-H Air Carrier Fleet Mix Projections Table 3-I Air Taxi (Fixed Wing) Fleet Mix Projections Table 3-J Air Cargo Projections Table 3-K Based Aircraft Projections Market Share Methodology Table 3-L Based Aircraft Projections Socioeconomic Methodology Table 3-M General Aviation Operations Projections Table 3-N Based Aircraft Fleet Mix Projections Table 3-O Military Activity Projection Table 3-P Instrument Operations and Approach Projections Table 3-Q Peak Demand Characteristics Table 3-R Projections Summary CHAPTER FOUR DEMAND/CAPACITY ANALYSIS AND DETERMINATION OF FACILITY REQUIREMENTS Table 4-A Runway 8/26 Exit Taxiway Types and Locations Table 4-B Aircraft Fleet Mix by Classification Table 4-C Projected Peak Hour Aircraft Operations Table 4-D Projected Total Aircraft Operations Table 4-E FAA Estimated Delay Ranges Table of Contents, Tables, Figures, Exhibits, and Appendices - vi
7 Table Number Description Page Number Table 4-F Runway 8/26 Projected Delay Table 4-G Floatplane Basin Projected Delay Table 4-H FAA Aircraft Classifications Table 4-I FAA Design Criteria Table 4-J Runway Length Requirements Table 4-K Pavement Strength Requirements Table 4-L Minimums by Aircraft Category Table 4-M Approach Minimums by Aircraft Category Table 4-N Terminal Space Requirements Table 4-O Future Terminal Apron Requirements for Air Carrier and Air Taxi Aircraft Table 4-P General Aviation Aircraft Storage Requirements Table 4-Q Future Inventory of Airport Snow Removal Equipment Table 4-R Space Requirements for Snow Removal Equipment Building Table 4-S Fuel Sales Table 4-T Automobile Parking Requirements CHAPTER FIVE ALTERNATIVE PLAN CONCEPTS Table 5-A Airfield Alternatives Analysis Matrix Table 5-B Delay Costs Table 5-C Airfield Alternatives Cost Comparison Table 5-D Environmental Factors - GA Runway Alternatives Table 5-E RSA Alternatives Analysis Matrix Table 5-F RSA Alternatives Cost Comparison Table 5-G Environmental Factors - RSA Alternatives Table 5-H Terminal Alternatives Analysis Matrix Table 5-I Terminal Alternatives Facility Comparison Table 5-J Terminal Alternatives Cost Comparison Table 5-K Future Inventory of Airport SRE Table 5-L Space Requirements for SRE Building Table 5-M Environmental Factors - SRE Building Table 5-N SRE Building Alternative Evaluation Matrix Table 5-O Parking Alternatives Analysis Matrix Table 5-P Parking Alternatives Cost Comparison Table 5-Q Access and Circulation Alternatives Analysis Matrix Table 5-R Access and Circulation Alternatives Cost Comparison CHAPTER SIX FINANCIAL PLAN Table 6-A Airport Development Schedule and Costs Table 6-B Deferment Scenario Airport Development Schedule and Costs Table 6-C Terminal Space Requirements for Limited Building Expansion Table 6-D Operating Revenues and Expenses Table 6-E Source and Use of Funds End of Tables Table of Contents, Tables, Figures, Exhibits, and Appendices - vii
8 FIGURES Figure Number Description Page Number CHAPTER TWO EXISTING CONDITIONS Figure 2-1 Location Map Figure 2-2 Historical Population Growth Figure 2-3 Per Capita Income CHAPTER THREE PROJECTS OF AVIATION DEMAND Figure 3-1 Enplanement Projection Comparison CHAPTER FOUR DEMAND/CAPACITY ANALYSIS AND DETERMINATION OF FACILITY REQUIREMENTS Figure 4-1 Variations of Single Runway Use Configuration Figure 4-2 Projected Annual Demand vs. Capacity - Runway 8/ Figure 4-3 Projected Annual Demand vs. Capacity - Floatplane Basin Figure 4-4 Typical Operating Aircraft Figure 4-5 Runway Protection Zone (Requirements) Figure 4-6 FAR Part 77 Surfaces Figure 4-7 NAVAID Requirements End of Figures Table of Contents, Tables, Figures, Exhibits, and Appendices - viii
9 EXHIBITS Exhibit Number Description Following Page Number CHAPTER TWO EXISTING CONDITIONS Exhibit 2-1 Existing Airport Layout CHAPTER FIVE ALTERNATIVE PLAN CONCEPTS Exhibit 5-1 New Runway Alternative 2A Parallel GA Runway Exhibit 5-2 New Runway Alternative 2B Parallel GA Runway Exhibit 5-3 New Runway Alternatives 3A/3B GA Runway W. Douglas Island Exhibit 5-4 Terminal Alternative 1 Existing Concourse Configuration Exhibit 5-5 Terminal Alternative 2 West Air Carrier Concourse Exhibit 5-6 Terminal Alternative 3 Realign East Air Carrier Concourse Exhibit 5-7 West General Aviation Development Area Exhibit 5-8 Central General Aviation Development Area Exhibit 5-9 East General Aviation Development Area Layout Exhibit 5-10 Alternative SRE Building Sites Exhibit 5-11 Parking Alternative 2 Surface Parking Exhibit 5-12 Parking Alternative 2 Parking Garage Exhibit 5-13 Access Alternative 1 Convert Yandunkin Drive to Two-Way Traffic Exhibit 5-14 Access Alternative 2 Close Shell Simmons Drive to Through Traffic End of Exhibits Table of Contents, Tables, Figures, Exhibits, and Appendices - ix
10 APPENDICES Appendix Description Page Number A ALP Set... A-1 B PAC Members... B-1 C Importance of Alternate Funding Sources... C-1 End of Appendices Table of Contents, Tables, Figures, Exhibits, and Appendices - x
1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationAirport Master Plan Update
Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationCity of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport
City of Monett, Missouri Airport Master Plan Update for the Monett Municipal Airport Pride and Progress Airport Inventory Monett Municipal Airport (HFJ) Master Plan Update MoDOT Project Number: 08-098B-1
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationMASTER PLAN UPDATE GRANT NUMBER
T MASTER PLAN UPDATE D R AF GRANT NUMBER 3-48-0062-42 MAY 2015 1. Introduction... 1-1 1.1 History of Dallas Love Field... 1-1 1.2 Airport Setting... 1-2 1.2.1 DALLAS-FORT WORTH-ARLINGTON METROPOLITAN STATISTICAL
More informationPublic Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California
Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationMASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.
in association with AirProjects Inc. Conway Consulting Gunda Corporation Quadrant Consultants RdlR Architects Sunland Group DRAFT TECHNICAL REPORT MASTER PLAN Prepared for Houston Airport System Houston,
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More information1 PURPOSE AND NEED 1.1 INTRODUCTION
1.1 INTRODUCTION 1 PURPOSE AND NEED This Environmental Assessment (EA) addresses projects at Juneau International Airport (JIA) that are the direct outcome of a Master Plan prepared for the airport and
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationAustin-Bergstrom International Airport Master Plan Update
FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationAIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA
AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationAlternatives Analysis EXECUTIVE SUMMARY
Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationThe CLE Master Plan Includes:
The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing
More information8.0 AIRPORT LAYOUT PLANS
8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented
More informationRecommended Performance Measures
Recommended Performance Measures January 2009 1 RECOMMENDED PERFORMANCE MEASURES Performance measures are utilized by the North Central Texas Council of Governments (NCTCOG) to monitor the performance
More informationChapter 2 FINDINGS & CONCLUSIONS
Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued
More informationMASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013
MASTER PLAN UPDATE WORKING PAPER NO. 3 Demand/Capacity Analysis and Facility Requirements March 18, 2013 Contents 4 Demand/Capacity Analysis and Facility Requirements... 4 1 4.1 Summary of Aviation Demand
More informationB GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:
2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More information3.9 AIRPORT SUPPORT FACILITIES
3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationHartford-Brainard Airport Potential Runway Closure White Paper
Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)
More informationThe forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.
Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting
More informationWelcome to the Boise Airport Master Plan Update Open House
Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update
More informationAlternatives. Introduction. Range of Alternatives
Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More information1. Background and Proposed Action
1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport
More informationChapter 4 AIRPORT DEVELOPMENT ALTERNATIVES
Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More information3.1 CRITICAL AIRCRAFT
The purpose of the demand capacity analysis is to determine an airport s capacity and its ability to support the forecasted aviation demand. Facility requirements identify development, replacement, and/or
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationEugene Airport Master Plan Update Executive Summary
- ~o Eugene Airport Master Plan Update Executive Summary Prepared for City of Eugene, Oregon Prepared by May 2010 The Federal Aviation Administration (FAA) developed the airport master planning process
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationCurrent Airport Roles
Chapter Four: Current Airport Roles Introduction Current airport roles are defined differently from national, state, and local perspectives. The Federal Aviation Administration (FAA) has established two
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationPULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project
PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February
More informationThe offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10
The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationCHAPTER 5: Landside Facility Requirements and Development Concepts
CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationTO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,
More informationWhat is an Airport Master Plan?
What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More information6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)
6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationChapter 5 Airport Development Alternatives
Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2
More informationAIRPORT FACILITY REQUIREMENTS
4.1 INTRODUCTION Chapter 4 AIRPORT FACILITY REQUIREMENTS The major elements of the Airport, which were described in Chapter 3, Existing Airport Facilities must be analyzed individually and balanced in
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationChapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES
Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.
More informationCOMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport:
Existing Facilities Pensacola Regional Airport is served by a number of airside and landside facilities. Two intersecting, grooved asphalt runways serve the airport. These runways are runway 17/35 (7,004
More information