1 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, of 14 Sponsor: City of Naples Airport Authority NPIAS No.: Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A Airport Project ID: 1 FY8 CIP -AIP 26 Realign TW B South Phase II EXTEND T/W ^B^ 25 FT. 45 TAXIWAYS: Extend Taxiway (Standards) TA8 extension of Taxiway B South Phase II - construction We will benefit from this improvement by adding transient aircraft parking spaces, reducing opportunity for runway incursions and greatly improving airfield safety. 4/2/1 Rehab of GA Apron should be identified as a separate project. 28 FAA $2,369, State $62,36 28 Local $62,361 Year Total $2,494,42 Project Total-State $62,36 $62,361 $2,369, % 2.5 % 95. % $2,494,42

2 of Airport Project ID: FY12 CIP Rehabilitate R/W and Entry/Exit Taxiways REHAB R/W RUNWAYS: Rehabilitate Runway RU8 This project consists of the complete rehabilitation of RW 14/32 in its entirety along with grade transitions and rehab of intersecting taxiways to a point outside the runway safety area. Some areas may require complete pavement removal and replacement and if an overlay is required, consideration should be given to a stress relief layer to prevent /retard reflective cracking. This runway is in very poor condition. Due to age and weather, severe alligator cracking has resulted in partial subbase deteriorization at the approach end of runway 14. This area has a load bearing capacity of 55, lbs. However, it is currently utilized by aircraft weighing up to 75, lbs. on a daily basis. In recent pavement evaluations, this runway was found to have many weak spots. In addition, in 21, runway 14/32 thresholds were displaced to comply with the Airport's FAA approved masterplan and new entry/exit taxiways are needed to align with the new runway thresholds. 28 FAA $65, 28 Local $433, State $216,667 Year Total $1,3, 29 FAA $1,, 29 Local $1,333, FAA $1,, 29 State $666,667 Year Total $4,, Project Total-State $883,334 $1,766,666 $2,65, % % 5. % $5,3,

3 of Airport Project ID: Taxiway E, Ramp and Realign North Quad Access Road (Enterprise Ave.) CONSTRUCT TAXIWAY ^E^ PHASES 1 AND 2 49 TAXIWAYS: Construct Taxiway (Standards) TA7 Construct taxilane E in north quadrant, additional aircraft parking ramp, realign north quadrant access road (Enterprise Ave.) including drainage, utilities and lighting and construct an airside access road. A taxilane is planned to be constructed to provide access to additional development of hangars and apron in the North Quadrant. Additional apron/ramp area is severely needed to address the limited tie-down and parking areas especially during high seasonal activity periods. The existing north quadrant access roadway is composed of the original WWII taxiway pavement and is in very poor condition. The realignment and rehabilitation of this access road is needed to accomodate the existing and future aviation development in this quadrant. This project was not considered for FAA funding. 27 State $25, 27 Local $25, Year Total $5, 211 Local $6, 211 State $6, Year Total $1,2, Project Total-State $85, $85, $ 5. % 5. %. % $1,7,

4 APF12 4 of 14 APF12 Airport Project ID: 3 Rehabilitate Runway RUNWAYS: Rehabilitate Runway RU8 Rehabilitate Runway 5-23 by reconstruction of isolated areas, milling and overlay of entire runway. A stress relief layer may be required to prevent reflective cracking. Runway 5/23 is the airports' primary runway and is utilized by commercial and general aviation aircraft up to 75, lbs. daily. This runway has severe cracking resulting in water intrusion and subbase deteriorization. In addition, the new overlay will improve transverse runway cracks to promote drainage. 28 FAA $2, 28 Local $133, State $66,667 Year Total $4, 29 Local $666, State $333, FAA $1,, Year Total $2,, 21 FAA $5, 21 Local $1,, 21 FAA $1,, 21 State $5, Year Total $3,, Project Total-State $9, $1,8, $2,7, % % 5. % $5,4,

5 APF52 5 of 14 APF52 Airport Project ID: FY7 CIP-AIP 25 Safety/Emergency Access Road, TW B Phase I design only, G Design and Construct T-Hangars South Quadrant 51 TAXIWAYS: Extend Taxiway (Capacity) TA6 Non-Licensed vehicle / ARFF access road around Runway 23 end, extension of Taxiway B South Phase I & apron expansion- design only, phase I of South Quad T-hangar Development consisting of 3 of total 6 units with access taxiways. We will benefit from these improvements by adding additional based aircraft hangars, additional transient aircraft parking spaces, reducing opportunity for runway incursions and greatly improve airfield/aircraft safety. Currently, fuel trucks and ARFF vehicles must cross the primary runway to service aircraft on the north and south quads of the airfield. A. Phase I of South Quad Hangar Development consisting of 3 of total 6 units with access taxiways B. Non-licensed vehicle / ARFF Access Road around Runway 23 end C. Extension of Taxiway B South - Phase I (design only). Some items are not eligible for FAA funding. 27 State $72, 27 Local $72, 27 FAA $2,727, Local PFC $92, Year Total $2,963,993 Project Total-State $72, $164, $2,727, % 5.53 % 92.4 % $2,963,993

6 PFL of 14 PFL2655 Airport Project ID: Airfield Security Gate Card Access Control System Security Gate Card Access System 1 OTHER - Security: Security Enhancements (EDS) OT19 The existing airfield security gate card access control system has reached its useful life, replacement parts are no longer manufactured and it is a stand alone system resulting in poor control. This high priority security project will include, but not be limited to, installation of a new airfield security gate card access control system including control and communications panels, proximity readers, pedestals and bollards, hydraulic gate operators, supply web-hosted control and management contract, and proximity cards. The existing airfield security gate card access control system has reached its useful life, replacement parts are no longer manufacturered and it is a stand alone system resulting in poor control. This high priority security project will include, but not be limited to, installation of a new airfield security gate card access control system including control and communications panels, proximity readers, pedestals and bollards, hydraulic gate operators, supply web-hosted control and management contract, and proximity cards. This project was not considered for FAA funding. 27 Local $189, 27 State $12, Year Total $39, Project Total-State $12, $189, $ % %. % $39,

7 PFL of 14 PFL3243 Airport Project ID: 4 FY9 CIP Localizer/DME for RW 23 Approach 46 RUNWAYS: Install Instrument Approach Aid RU18 In advance of the relocation/decommissioning of Cypress TVOR located in the west quadrant, we are installing a Localizer/DME for approach to RW 23. In advance of the relocation/decommissioning of Cypress TVOR located in west quadrant, we are installing a Localizer/DME for approach to RW 23. This project not considered for FAA funding. Needs TSA verification and approval. 21 State $8, 21 Local $8, Year Total $1,6, Project Total-State $8, $8, $ 5. % 5. %. % $1,6,

8 PFL584 8 of 14 PFL584 Airport Project ID: 1 FY7- AIP 24 Hurricane Damage Repairs 45 EQUIPMENT: Install Emergency Generator EQ16 Commercial Terminal Roof repair, purchase emergency generator, perimeter fence repair and replacement, signage repair and replacement, replace navaids, beacon and beacon tower, all damaged during 25 Hurricane Wilma Commercial Terminal Roof repair, purchase emergency generator, perimeter fence repair and replacement, signage repair and replacement, replace navaids, beacon and beacon tower, all damaged during 25 Hurricane Wilma Some items not eligible for FAA funding. 27 FAA $1,444,23 27 Local $111, State $111,826 Year Total $1,667,882 Project Total-State $111,826 $111,826 $1,444, % 6.7 % % $1,667,882

9 PFL of 14 PFL6511 Airport Project ID: 3 TW A Rehabilitation 66 TAXIWAYS: Rehabilitate Taxiway TA3 Taxiway A is in poor repair and needs extensive rehabilitaion work. In a recent pavement management study of the entire airport, Taxiway A shows immediate need of reconstruction. 29 Local $2, 29 State $1, 29 FAA $3, Year Total $6, 21 Local $57, 21 State $285, 21 FAA $855, Year Total $1,71, Project Total-State $385, $77, $1,155, % % 5. % $2,31,

10 PFL of 14 PFL6512 Airport Project ID: 3 TW B North Rehabilitation 66 TAXIWAYS: Rehabilitate Taxiway TA3 Taxiway B North is in very poor condition. In a recent pavement management study of the entire airport, Taxiway B North shows immediate need of reconstruction. 21 Local $11, 21 State $55, 21 FAA $165, Year Total $33, 211 Local $333, State $166, FAA $5, Year Total $1,, Project Total-State $221,667 $443,333 $665, % % 5. % $1,33,

11 PFL of 14 PFL6513 Airport Project ID: 3 TW C Rehabilitation 66 TAXIWAYS: Rehabilitate Taxiway TA3 This Taxiway is in poor condition In a recent pavement management study of the entire airport, Taxiway C shows immediate need of reconstruction. 211 Local $66, FAA $1, 211 State $33,334 Year Total $2, 212 FAA $45, 212 Local $3, 212 State $15, Year Total $9, Project Total-State $183,334 $366,666 $55, % % 5. % $1,1,

12 PFL of 14 PFL6514 Airport Project ID: 4 GA Apron Rehabilitation 6 APRON: Rehabilitate Apron AP2 The GA apron is in very poor condition. In a recent pavement management study of the entire airport, the General Aviation Terminal Apron shows immediate need of reconstruction. 212 Local $266, State $133, FAA $4, Year Total $8, 213 FAA $75, 213 Local $1,166, FAA $1,, 213 State $583,333 Year Total $3,5, Project Total-State $716,666 $1,433,334 $2,15, % % 5. % $4,3,

13 PFL of 14 PFL6515 Airport Project ID: 4 CAT Apron Rehabilitation 6 APRON: Rehabilitate Apron AP2 The commercial terminal apron is in very poor condition In a recent pavement management study of the entire airport, the Commercial Terminal Apron shows immediate need of reconstruction. 213 Local $266, FAA $4, 213 State $133,333 Year Total $8, 214 FAA $1,5, 214 Local $1,666, State $833, FAA $1,, Year Total $5,, Project Total-State $966,666 $1,933,334 $2,9, % % 5. % $5,8,

14 PFL of 14 PFL6539 Airport Project ID: 1 South Quad T-Hangars Phase II BUILDINGS: Construct/Expand/Improve/Modify/Relocate T-Hangars BU4 Construction Phase II South Quad Hangar Project - 3 more of total 6 hangars with access taxiways. We will benefit from these improvements by adding more hangar space for based aircraft. This project not considered for FAA funding. 28 Local $2,83,61 28 State $2,83,61 Year Total $5,66,122 Project Total-State $2,83,61 $2,83,61 $ 5. % 5. %. % $5,66,122

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

MOST aircraft need a runway for landing and takeout.

MOST aircraft need a runway for landing and takeout. 38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Beginning balance available for Priority I Projects: $1,737,029

Beginning balance available for Priority I Projects: $1,737,029 2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

LRTP Ref. Type of Work. Detailed Project Description. Improve MIA's Fuel Farm 5-5 $1,106 $0

LRTP Ref. Type of Work. Detailed Project Description. Improve MIA's Fuel Farm 5-5 $1,106 $0 (All s are at Miami International Airport - MIA and General Aviation Airports) TPO Facility/ Name Detailed Description AP10441 Closure of Perimeter Road Along MIA's Fuel Farm Improve MIA's Fuel Farm 5-5

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT Date of Public Notice: 8/15/2016 In accordance with the requirements of Section 158.24 of Federal Aviation

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

DALLAS LOVE FIELD MAY 2015 DRAFT

DALLAS LOVE FIELD MAY 2015 DRAFT 8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

General Dick Stout Field: 2010 General Aviation Airport Runway 18/36 3,410 x Hangars 65 Based Aircraft St. George 177 Based A/C Cedar d City 65

General Dick Stout Field: 2010 General Aviation Airport Runway 18/36 3,410 x Hangars 65 Based Aircraft St. George 177 Based A/C Cedar d City 65 the Future of GENERAL DICK STOUT FIELD Hurricane, Utah December 16, 2010 General Dick Stout Field: 2010 General Aviation Airport Runway 18/36 3,410 x 40 43 Hangars 65 Based Aircraft St. George 177 Based

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

CatExes vs. EAs When and How to Prepare

CatExes vs. EAs When and How to Prepare CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have

More information

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN OCTOBER 2018 T A B L E O F C O N T E N T S Table of Contents Chapter 8 Financial Plan 8.1 Introduction... 8-1 8.2 Enplanement

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

JWN Runway Safety Area Project Summer 2015 Closure

JWN Runway Safety Area Project Summer 2015 Closure JWN Runway Safety Area Project Summer 2015 Closure March 2015 Welcome and Overview Doug Kreulen, Chief Operating Officer Robert Ramsey, P. E., A.A.E. Chief Engineer Overview Purpose of Closure Concurrent

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

From concept through completion, CGA is your AVIATION engineering firm!

From concept through completion, CGA is your AVIATION engineering firm! The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

COMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport:

COMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport: Existing Facilities Pensacola Regional Airport is served by a number of airside and landside facilities. Two intersecting, grooved asphalt runways serve the airport. These runways are runway 17/35 (7,004

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

SECTION 7. THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation)

SECTION 7. THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation) SECTION 7 THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation) The Dayton International Airport spans over 4,500 acres in both Montgomery and Miami Counties. The airport encompasses

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Funding Package TOTAL $15,172,000

Funding Package TOTAL $15,172,000 Funding Package ACT 13 $3,000,000 Transportation Capital Budget $5,000,000 Redevelopment Capital Program(RACP) $3,000,000 Passenger Facility Charge (PFC) $1,500,000 Multimodal Transportation (DCED) $1,500,000

More information

Ground Vehicle Operations Training READING REGIONAL AIRPORT

Ground Vehicle Operations Training READING REGIONAL AIRPORT Ground Vehicle Operations Training READING REGIONAL AIRPORT October 22, 2014 Airport Operations Area (AOA) Movement Areas Non-Movement Areas Non-Movement Area Markings Never cross solid line with out ATC

More information

Financial Plan/Capital Improvements - DRAFT 6-1

Financial Plan/Capital Improvements - DRAFT 6-1 The analyses completed in previous chapters evaluated development needs at McKinney National Airport (TKI or Airport) over the next 20 years, based on forecast activity, facility requirements, safety standards,

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

RECOMMENDED 2013 BUDGET

RECOMMENDED 2013 BUDGET RECOMMENDED 2013 BUDGET December 12, 2012 Budget Highlights Draft October 17, 2012 Aviation Operation & Maintenance (O&M) Expenses 1.5 percent overall O&M increase (including debt service) 2013 Salary

More information

Development Program and Implementation Plan

Development Program and Implementation Plan CHAPTER 8 Development Program and Implementation Plan 8.1 INTRODUCTION The FAA identifies airports that are significant to national air transportation through the development of the National Plan of Integrated

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

GDOT AND FAA ADO UPDATES

GDOT AND FAA ADO UPDATES GDOT AND FAA ADO UPDATES Building on the Past Soaring Into the Future Aviation Program Update 2015 GDOT PowerPoint October 27, 2016 Title Page Georgia Airports Association Presented By Steven V. Brian,

More information

FAA Office of Airport Safety and Standards

FAA Office of Airport Safety and Standards FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

Planned Procurement Opportunities Report. June 2017

Planned Procurement Opportunities Report. June 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

TXDOT AVIATION DIVISION

TXDOT AVIATION DIVISION TXDOT AVIATION DIVISION Airport Project Development & Selection Process Today s Topics Project Development Process Working with TxDOT Aviation Division Funding Sources National Plan of Integrated Airports

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Trick or Treat Process M

Trick or Treat Process M AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall

More information

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 TRACK: TRACK C (AIRSIDE/ENGINEERING) Title: Upcoming Airfield Programs WORKSHOP: Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 Image: O

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information