DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
|
|
- Leonard Sanders
- 6 years ago
- Views:
Transcription
1 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order C, Airport Improvement Program (AIP) Handbook: The preparation of this document may have been supported, in part, through the Airport Improvement Program financial assistance from the Federal Aviation Administration as provided under Title 49 U.S.C., Section The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of this report by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted therein nor does it indicate that the proposed development is environmentally acceptable or would have justification in accordance with appropriate public laws. 900 S. BROADWAY SUITE 350 DENVER, COLORADO PHONE: FAX:
2 Contents 1.0 Introduction Study Goals Local Information Airport Management and Ownership Structure Airport History and Activity Inventory Airport Reference Code & Aircraft Groupings Airport Reference Point (ARP) Runway Bearing and Magnetic Declination Meteorological Data Weather Observation Equipment Wind Coverage Temperature Precipitation Historical Aviation Activity Operations and Based Aircraft Fuel Sales Financial Information FAA AIP Grant History & Capital Improvement plan (CIP) Capital Improvement Plan Regional Setting and Land Use Community Planning Initiatives Airport Airspace Usage & NextGen Mountain Airspace Airspace Classification Airspace Congestion Programs and Procedures to Relieve Airspace Congestion Further Improvement & NextGen Technology Instrument Approach Equipment and Procedures Precision Instrument Landing System Non-precision Approach Systems Noise Abatement Procedures Obstructions to Air Navigation Airfield Runways Taxiways Aprons Pavement Condition Lighting, Marking, and Signage of Runway and Taxiways Visual and Navigational Airport Aids General Aviation Facilities Fixed Base Operator i
3 Airport Hangars Development Areas Surface Transportation Airport Access Road Network Access Roads Parking Areas Support Facilities Airport Administration ARFF/SRE/Maintenance Building Aircraft Fuel Storage Airport Equipment Aircraft Rescue and Fire Fighting Equipment (ARFF) Snow Removal Equipment (SRE) Utilities Aviation Activity Forecasts Data Sources FAA Terminal Area Forecast (TAF) FAA Advisory Circular 150/ FAA Form Airport Cooperative Research Program Report: Counting Aircraft Operations at Non- Towered Airports ACRP Report: Airport Aviation Activity Forecasting Forecasting Aviation Activity by Airport FAA Aerospace Forecasts, Fiscal Years FAA Advisory Circular 150/5070-7B, Airport Master Plans Woods & Poole Economics Forecasting General Aviation Activity Measures and Metrics Aircraft Operations Based Aircraft Demographic and Economic Factors National Aviation OutLook FAA Aerospace Forecast General Aviation Manufacturers Association (GAMA) Historical Aviation Activity FAA Terminal Area Forecasts (TAFs) Atlantic Aviation Records Review of Existing Forecasts Previous Master Plan Forecast CDOT System Plan Forecast FAA TAF Forecasting Methodologies Times Series Analysis Regression Analysis Market Share Analysis Aircraft Operations Forecast Air Taxi/Commuter Operations General Aviation Operations Local/Itinerant Operations ii
4 3.7.4 Military Operations Preferred Aircraft Operations Forecast Summary Design Hour Operations Annual Instrument Operations Based Aicraft Forecast Selected Based Aircraft Forecast Critical Aircraft Comparison to Existing FAA TAF Aircraft Operations Forecast Based Aircraft Forecast Factors that May Create Changes in the Forecast Summary of Preferred Forecasts Facility Requirements and Demand/Capacity Analysis Regional Airport System Role Airside Requirements FAA Design Standards Runways Airfield Capacity Analysis Runway Orientation Runway Length Runway Width Runway Line of Sight Runway Strength Runway Surface Runway Shoulders and Blast Pads Taxiways Navigational Aids Airspace Requirements Obstructions General Aviation Transient Aircraft Parking Apron Based Aircraft Parking Aprons Apron Pavement Aircraft Storage Requirements Fixed Base Operator (FBO) Facility Needs Airport Support Facilities Airport Administration/ARFF/SRE/Maintenance Building Aircraft Rescue and Fire Fighting (ARFF) Snow Removal Equipment (SRE) Airport Perimeter Fence and Access Control Fuel Storage Requirements 100LL, Jet-A, and Self-Fueling Deicing Facilities Utilities Landside Requirements Regional Transportation Network On-Airport Circulation Roadways Auto Parking iii
5 4.11 Facility Requirements Summary Alternatives Analysis Development Goals Identified Airside & Landside Alternatives Evaluation Criteria Extension of Runway 8/ Overview Assumptions Runway Extension Considerations Preliminary Runway Extension Alternatives Airside Alternative 1 Extend Runway 500 Feet East Recommendation Transient & GA Apron Expansion Transient Apron Expansion GA Apron Expansion Preferred Alternative Chosen Southeast Hangar Development Southeast Hangar Development Alternative Southeast Hangar Development Alternative Southeast Hangar Development Alternative Recommendation for the Southeast Hangar Development Preferred Alternative for the Southeast Hangar Development Auto Parking and circulation Alternative Alternative Alternative Recommendation Preferred Alternative Summary Environmental Overview Air Quality Compatible Land Use Department of Transportation Act: Section 4(f) Farmlands Fish, Wildlife, and Plants Floodplains Hazardous Materials, Pollution Prevention, and Solid Waste Historical, Architectural, Archeological, and Cultural Resources Light Emissions and Visual Impacts Natural Resources and Energy Supply Noise Socioeconomic Impacts, Environmental Justice, and Children s Environmental Health and Safety Risks Water Quality Wetlands Wild and Scenic Rivers iv
6 7.0 Airport Plans Airport Layout Plan Runway System Taxiway System Airspace Plan Inner Portion of the Approach Surface Drawings Departure Surface Drawings Terminal Area Plan Land Use Drawing Exhibit A Airport Property Map Financial Implementation Plan RIL Financial Information Revenues Expenditures Contributed Capital/ Funding Sources FAA Airport Improvement Program (AIP) CDOT Division of Aeronautics Discretionary Aviation Grant Program Colorado State Infrastructure Bank Loan Program Private Investment Grant History Capital Improvement Plan (CIP) Phase I 5 Year CIP ( ) Phase II 5 to 10 Year CIP ( ) Phase III 11 to 20 Year CIP ( ) Tables Table 1-1 Surrounding Communities Table 2-1 Aircraft Approach Category Table 2-2 Airplane Design Group (ADG) Table 2-3 Allowable Crosswind Component Per Runway Design Code (RDC) Table 2-4 Rifle Garfield County Airport Temperature Summary Table 2-5 Rifle Garfield County Airport Precipitation Summary Table 2-6 Based Aircraft Table 2-7 RIL FBO Fuel Sales Table 2-8 FAA Grant History Table 2-9 RIL Instrument Approaches and Minimums Table 2-10 Airport Fuel Storage Table 2-11 Airport Snow REmoval Equipment Table 2-12 Airport Utility Services Table Based Aircraft Table 3-2 General Aviation Operations (in Thousands) at Towered Airports Table 3-3 TAF: Historical Based Aicraft Table 3-4 Adjusted Historical Operations Counts v
7 Table Airport Master Plan Forecast Table Colorado Aviation System Plan Forecast for RIL Table 3-7 FAA TAF Forecast for RIL Table 3-8 Air Taxi/Commuter Operations Socioeconomic Variables' Correlation Coefficients Table 3-9 Air Taxi/Commuter Operations Forecast Table 3-10 GA Operations Socioeconmic Variables Correlation Coefficeints Table 3-11 GA Operations Forecast Table 3-12 GA Operations Forecast Distribution Summary Table 3-13 Aircraft Operations Forecast Summary Table 3-14 Design Hour Operations Forecast Table 3-15 Instrument Operations Forecast Table 3-16 Based Aircraft Socioeconmic Variables Correlation Coefficeints Table 3-17 Based Aircraft Forecast Table 3-18 Based Aircraft Forecast Distribution Summary Table 3-19 Aircraft Operationg by RDC Type in Table 3-20 RDC Aircraft Forecast Table 3-21 FAA Template for Comparing Airport Planning and TAF Forecasts Table 4-1 FAA Design Standards Table 4-2 Recommended Runway Lengths FOR RIL Table 4-3 Runway Design Standards Table 4-4 Runway Weight Capacity Table 4-5 Taxiway Design Standards Table 4-6 Transient Aircraft Apron Requirements Table 4-7 Based Aircraft Apron Requirements Table 4-8 Based Hangared Aircraft Requirements Table 4-9 Jet-A Fuel Storage Capacity Table 4-10 AvGas Fuel Storage Capacity Table 4-11 Facility Requirements Summary Table 5-1 GA Apron Development Alternatives Comparison Matrix Table 5-2 Southeast Hangar Development Matrix Table 5-3 Auto Parking & Improved Circulation Alternatives Matrix Table 5-4 RIL Recommended Facility Improvements Table 6-1 DOT Section 4(f) Properties Table 6-2 Candidate, Threatened, & Endangered Species Table 6-3 National Register of Historic Places - Rifle Table 8-1 RIL Financial Summary Table 8-2 RIL Grant History Table 8-3 RIL 20-Year Development Plan Estimated Project Cost Summary Table 8-4 Phase I Estimated Project Cost Summary Table 8-5 phase II Estimated Project Cost Summary Table 8-6 Phase III Estimated Project Cost Summary Figures Figure 2-1 Aircraft Groupings Figure 2-2 All Weather Wind Rose vi
8 Figure 2-3 IFR Wind Rose Figure 2-4 IFR Flight Plans Filed To/From RIL Figure 2-5 Airspace Classifications Figure 2-6 RIL & Surrounding Mountain Airspace Figure 2-7 Colorado WAM Sensor Locations Figure 2-8 Runway 8/ Figure 2-9 Taxiway System Figure 2-10 Apron Areas Figure Pavement Condition Index Figure 2-12 FBO Facilities Figure 2-13 Airport Hangars Figure 2-14 Future Small Aircraft Hangar & Apron Development Figure 2-15 Future Large Aircraft Hangar & Apron Development Figure 2-16 Airport Access Roads Figure 2-17 Airport Parking Figure 2-18 Airport Support Buildings Figure 2-19 Aircraft Fuel Storage Figure 3-1 GA Airplane Deliveries Figure 3-2 RIL TAF Historical Operations Figure 3-3 Air Taxi/Commuter Operations Linear Analysis Figure 3-4 Air Taxi/Commuter Operations Forecast Figure 3-5 GA Operations Forecast Figure 3-6 Based Aircraft Forecast Figure 4-1 Impacts to Runway Length Figure 4-2 Business Jet Runway Length Requirements (100% Useful Load) Figure 4-3 Part 77 Surfaces Figure 4-4 Transient Aircraft Parking Apron Figure 4-5 Regional Access Figure 4-6 Existing Airport Parking Figure 5-1 Business Jet Runway Length Requirements Figure 5-2 Airside Alternative 1 - Extend Runway 500 Feet East Figure 5-3 Transient Apron Alternative Figure 5-4 GA Development Apron Alternative Figure 5-5 GA Development Alternative Figure 5-6 Southeast Hangar Development Alternative Figure 5-7 Southeast Hangar Development Alternative Figure 5-8 Southeast Hangar Development Alternative Figure 5-9 Auto Parking & Circulation Improvement Alternative Figure 5-10 Auto Parking & Circulation Improvement Alternative Figure 5-11 Auto Parking & Circulation Improvement Alternative Figure 6-1 Existing Farmlands Figure 7-1 Airport Layout Plan (To Be Included) Figure 7-2 Airport Layout Plan Data Sheet (To Be Included) Figure 7-3 Airport Airspace Drawing (To Be Included) Figure 7-4 Airport Airspace Obstruction Table (To Be Included) Figure 7-5 Airport Airspace profile (To Be Included) Figure 7-6 Runway 8 Inner Approach Plan & Profile (To Be Included) vii
9 Figure 7-7 Runway 26 Inner Approach Plan & Profile (To Be Included) Figure 7-8 Runway 8 Departure Plan & Profile (To Be Included) Figure 7-9 Runway 26 Departure Plan & Profile (To Be Included) Figure 7-10 Terminal Area Plan (To Be Included) Figure 7-11 Land Use Drawing (To Be Included) Figure 7-12 Exhibit A Airport Property Map (To Be Included) Figure 8-1 Airport Development Plan Appendices Appendix A Aviation Glossary of Terms Appendix B City of Rifle and Garfield County Zoning and Land Use Exhibits Appendix C RIL Instrument Approach Analysis (To Be Included) viii
1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationAirport Master Plan Update
Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationAustin-Bergstrom International Airport Master Plan Update
FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future
More informationCity of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport
City of Monett, Missouri Airport Master Plan Update for the Monett Municipal Airport Pride and Progress Airport Inventory Monett Municipal Airport (HFJ) Master Plan Update MoDOT Project Number: 08-098B-1
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationPublic Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California
Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationMASTER PLAN UPDATE GRANT NUMBER
T MASTER PLAN UPDATE D R AF GRANT NUMBER 3-48-0062-42 MAY 2015 1. Introduction... 1-1 1.1 History of Dallas Love Field... 1-1 1.2 Airport Setting... 1-2 1.2.1 DALLAS-FORT WORTH-ARLINGTON METROPOLITAN STATISTICAL
More informationEXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #
EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to
More informationWelcome to the Boise Airport Master Plan Update Open House
Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationChapter 2 FINDINGS & CONCLUSIONS
Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationChapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update
Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside
More informationTECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan
TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationMASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.
in association with AirProjects Inc. Conway Consulting Gunda Corporation Quadrant Consultants RdlR Architects Sunland Group DRAFT TECHNICAL REPORT MASTER PLAN Prepared for Houston Airport System Houston,
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More information6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)
6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationChapter 1 Introduction and Project Overview
Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier
More informationTechnical Advisory Committee Meeting February 29, 2016
Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationCatExes vs. EAs When and How to Prepare
CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationand Forecast Review and Approval Process
LONG BEACH, CALIFORNIA FAA Terminal Area Forecast (TAF) Overview and Forecast Review and Approval Process Paul Devoti Airport Planner Federal Aviation Administration paul.devoti@faa.gov 1 TAF Overview
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationChapter 1 Introduction and Project Overview
EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationWhat is an Airport Master Plan?
What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationAirport Master Plan 1
1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationInput Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot
Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationAviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011
Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationPUBLIC SCOPING MEETING APRIL 2018
Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More information8.0 AIRPORT LAYOUT PLANS
8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationOffice of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN
Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationPassenger Facility Charge Application #1
Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationOffice of Commercial Space Transportation: Notice of Availability, Notice of Public
This document is scheduled to be published in the Federal Register on 04/20/2018 and available online at https://federalregister.gov/d/2018-08345, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationAlternatives Development and Evaluation Report
Airport Master Plan Alternatives Development and Evaluation Report Prepared by: AECOM Prepared for: Illinois Department of Transportation December 16, 2011 Table of Contents Topic Page Number Cover Sheet...
More informationChapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES
Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationARP Forecast Review Critical Aircraft Data Sources
ARP Forecast Review Critical Aircraft Data Sources Kent Duffy FAA Office of Airports National Planning & Environmental Division, APP-400 December 14, 2015 Aviation Forecasts Airport sponsors
More information