1 38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1

2 Airport Improvement Program AIP Eligibility The federal AIP grants reimburse most airport sponsors Airport must be open to the public. Airport must be included in the NPIAS for up to 90% of eligible costs. Authorization The FAA Modernization and Reform Act of 2012 was signed February 14, 2012 and expired September 30, The program is operating under a short term extension until September 30, Appropriation FY2017 funding is planned at the same level as last year. The program is funded through April 28, (National Plan of Integrated Airport Systems). General aviation airports must be classified. Airport sponsor must agree to FAA Federal Grant Assurances. Project requested must be eligible and justified as determined by the FAA Federal Grants Nebraska airports received 24 grants Grant funds of just over $26M Three engineering services grants for FY17 construction projects Construction projects include: Alliance: seal coat asphalt Lincoln: electrical improvments Nebraska City Municipal: pave and light runway Central City: T-hangar and taxilanes Eppley Airfield, Omaha: rehabilitate terminal ramp Federal Funding Breakdown $80,000,000 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0 Stimulus NonPrimary Discretionary State Apportionment Primary & Cargo 2

3 AIP Grants Issued for GA Airports State Grant Program The program includes state grants and matching grants for federal projects. All licensed public-use airports are eligible to receive state grants. 80 eligible airports, 9 of the public-use airports are not eligible for federal funds and have used this program to construct and maintain their pavement. Airside infrastructure projects are eligible. Funded from aviation fuel taxes. State Grant Program Funds Allocated to the State Grant Program Grant Funds Fuel Tax Revenue 3

4 Current Unfunded Needs Ainsworth: parallel taxiway to runway 13/31 Ainsworth: replace VASI with PAPI Alliance: parallel taxiway to runway 12/30 Alliance: access road and parking improvements Alliance: terminal enhancements (as gateway to community) Alma: parallel taxiway (pave: $915,000; light: $128,000) Alma: T-hangar Alma: construct spray apron Arapahoe: runway rehabilitation (reconstruction: $1,091,100) Arapahoe: install runway lights, beacon ($113,460) Arapahoe: runway extension to meet FAA minimum length standards Auburn: taxilanes ($280,000) Auburn: hangar rehabilitation, replace doors Auburn: snow removal equipment Aurora: Taxiway & apron reconstruction ($00,000 may not have local match) Beatrice: rehabilitate taxilanes to hangars A, B, C ($407,500) Beatrice: PAPI runway 18, NSP Blair: taxilanes, apron expansion ($200,000) Blair: extend runway and taxiway to 5,500 ($2,640,000) Blair: T-hangar addition Blair: Executive hangar Bloomfield: runway rehabilitation (reconstruction: $981,990; overlay: $672,300) Bloomfield: install runway lights, beacon ($102,120) Bloomfield: taxiway and taxilane reconstruction Bloomfield: T-hangar rehabilitation/replacement Broken Bow: apron expansion ($284,250) Cambridge: hangar rehabilitation Central City: hangar rehabilitation Central City: pave access road and parking lot Chadron: parallel taxiway to runway 02/20, NSP ($1,210,000; project could be broken into phases) Chadron: apron expansion Chadron: terminal building renovations/update Chadron: extend runway 11/29 700, NSP Chappell: runway rehabilitation (reconstruction: $1,600,000) Chappell: apron expansion ($125,000) Columbus: terminal building Columbus: taxilanes and apron for hangar development Columbus: pave crosswind runway, NSP Cozad: Taxilane reconstruction & apron expansion ($160,000) Crete: Hangar taxilanes replacement and drainage improvements ($1,100,000) Crete: Parking lot and road rehabilitation ($385,000) Crete: hangar replacement Grand Island: utility upgrades (sewer)($1,500,000) Grant: AWOS III P/T Grant: parallel taxiway Hartington: light parallel taxiway ($275,000) Harvard: taxiway rehabilitation (reconstruct: $502,000; overlay: $343,620) Hastings: relocate ASOS Hastings: install MALSR, NSP (not AIP eligible) Holdrege: install water main Hyannis: pavement rehabilitation (reconstruction: $1,445,700) Imperial: site development Kearney: extend runway 13/31 200, NSP Lexington: parallel taxiway Lexington: rehab road and parking lot ($366,000) McCook: SRE and SRE building McCook: hangar and/or hangar rehabilitation McCook: extend runway 4/22, NSP Nebraska City: parallel taxiway to runway 33 ($1,268,955; includes federal ineligible section) Nebraska Department of Aeronautics: PCI software update to include PCN values ($80,000) Nebraska Department of Aeronautics: Economic Impact Study Neligh: AWOS III P/T North Platte: relocate utilities ($1,000,000) North Omaha: correct licensing violations North Omaha: pavement rehabilitation O Neill: runway 4/22 lights ($290,000) O Neill: pave access road and parking ($600,000) O Neill: complete parallel taxiway to runway 13 Ogallala: parallel taxiway ($1,720,000; project could be broken into phases) Ord: complete parallel taxiway to runway 13 Oshkosh: terminal building to meet ADA requirements Plattsmouth: construct crosswind runway, NSP Plattsmouth: install MALSR, NSP Red Cloud: AWOS III P/T Sargent: 200 runway extension and survey for approach eligibility (pavement: $87,000 survey: $120,00) Scottsbluff: pave west access road to airport ($1,951,260) Scottsbluff: parallel taxiway to runway 23 (pave: $2,822,400; light: $454,860) Scribner: PAPI Seward: apron ($625,000) Sidney: pave runway 3/21, NSP Sidney: install MALSR, NSP South Sioux City: runway rehabilitation (reconstruction: $1,208,600) Tecumseh: Reconstruct T-hangar Thedford: PAPI Valentine: extend/widen runway 1432 to C-II, NSP Valentine: full parallel taxiway Valentine: install MALSR, NSP (not AIP eligible) Wahoo: construct taxilane ($275,000) Projects Constructed in 2016 Hangars and Fuel Systems are the most common capital improvement request. Farington Field, Auburn 4

5 Farington Field, Auburn Chadron Municipal Airport Reconstruction Runway 2/20 Nebraska City Municipal Airport Scribner State Airfield 5

6 Tekamah Municipal Airport Planned projects for 2017 funding include: Eppley Airfield Kearney Regional Airport Ainsworth: seal coat Kearney: runway rehabilitation Millard: taxiway lights Norfolk: storm sewer Plattsmouth: partial parallel taxiway Wayne: parallel taxiways York: joint seal & marking Several engineering services grants for FY2018 rehabilitation 6

7 Norfolk Regional Airport Rehabilitate Storm Sewer Wayne Municipal Airport Plattsmouth Municipal Airport Relocate Partial Parallel Taxiway Beyond

8 Future Opportunities and Challenges Thank You. 8

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

NESHAP Initial Notifications. Subpart CCCCCC Gasoline Dispensing Facilities

NESHAP Initial Notifications. Subpart CCCCCC Gasoline Dispensing Facilities NESHAP Initial Notifications Subpart CCCCCC Gasoline Dispensing Facilities IIS Source City 2328 Pump and Pantry #26 Ainsworth 1666 Albion Casey's Albion 60802 Pump and Pantry #25 Albion 1795 Git N Split

More information

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

Beginning balance available for Priority I Projects: $1,737,029

Beginning balance available for Priority I Projects: $1,737,029 2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

From concept through completion, CGA is your AVIATION engineering firm!

From concept through completion, CGA is your AVIATION engineering firm! The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

LIHTC Properties in Nebraska's 3rd District Through 2013

LIHTC Properties in Nebraska's 3rd District Through 2013 1 1040 S Wabash Ave 1040 S Wabash Ave Hastings NE 68901 1993 $ 244,476 1995 Not Indicated 66 65 Not Indicated 1106 W Nathan Dr 1106 W Nathan Dr Wayne NE 68787 No 1998 $ 39,157 1999 New Construction 16

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

2014 Nebraska Attraction Attendance Counts % of Total Attendance from Out of State Visitors

2014 Nebraska Attraction Attendance Counts % of Total Attendance from Out of State Visitors % of Total Attendance from Out of State Visitors Summer Attendance (Memorial Day- Labor Day) % of Summer Attendance from Out of State Visitors City Name of Attraction Total Attendance Omaha Omaha's Henry

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Rio Vista Municipal Airport Potential Alternatives for the Future Ownership, Operation and Maintenance of the Airport

Rio Vista Municipal Airport Potential Alternatives for the Future Ownership, Operation and Maintenance of the Airport Rio Vista Municipal Airport Potential Alternatives for the Future Ownership, Operation and Maintenance of the Airport Prepared for City of Rio Vista Prepared by Aries Consultants Ltd. March 2015 Rio Vista

More information

nicholas j pela SUMMARY OF PERSONAL AIRPORT PROJECT EXPERIENCE ARIZONA

nicholas j pela SUMMARY OF PERSONAL AIRPORT PROJECT EXPERIENCE ARIZONA ARIZONA Bisbee Municipal Airport Bisbee, Arizona / New Runway 17/35 and Apron Construction Phase 1 Bisbee Municipal Airport Bisbee, Arizona / Runway and Apron Pavement Overlay Phase 2 Bisbee Municipal

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Financial Plan/Capital Improvements - DRAFT 6-1

Financial Plan/Capital Improvements - DRAFT 6-1 The analyses completed in previous chapters evaluated development needs at McKinney National Airport (TKI or Airport) over the next 20 years, based on forecast activity, facility requirements, safety standards,

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN OCTOBER 2018 T A B L E O F C O N T E N T S Table of Contents Chapter 8 Financial Plan 8.1 Introduction... 8-1 8.2 Enplanement

More information

Trick or Treat Process M

Trick or Treat Process M AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Aviation Trust Fund. The Results of Senate Bill 526

Aviation Trust Fund. The Results of Senate Bill 526 Aviation Trust Fund The Results of Senate Bill 526 Nevada Aviation Trust Fund Page 2 Inside: Background Funding Opportunities and Issues Senate Bill 526 2005 Aviation Trust Fund Results Airport Projects

More information

Funding Package TOTAL $15,172,000

Funding Package TOTAL $15,172,000 Funding Package ACT 13 $3,000,000 Transportation Capital Budget $5,000,000 Redevelopment Capital Program(RACP) $3,000,000 Passenger Facility Charge (PFC) $1,500,000 Multimodal Transportation (DCED) $1,500,000

More information

OREGON AVIATION PLAN AIRPORT SUMMARY CRATER LAKE-KLAMATH REGIONAL AIRPORT

OREGON AVIATION PLAN AIRPORT SUMMARY CRATER LAKE-KLAMATH REGIONAL AIRPORT OREGON AVIATION PLAN AIRPORT SUMMARY CRATER LAKE-KLAMATH REGIONAL AIRPORT In 2018, the Oregon Department of Aviation (ODA) updated the Oregon Aviation Plan (OAP) for the state airport system which includes

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT

OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT In 2018, the Oregon Department of Aviation (ODA) updated the Oregon Aviation Plan (OAP) for the state airport system which includes 95 airports,

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

AirportInfo. Airport Improvement Program

AirportInfo. Airport Improvement Program AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for

More information

FAA Reauthorization Issues & Impacts on Airports

FAA Reauthorization Issues & Impacts on Airports Issues & Impacts on Airports Presentation to Mid America Association of State Transportation Officials July 21, 2011 Presented by Greta J. Hawvermale Sr. Director of Engineering & Environmental Matters

More information

2015 Nebraska Attraction Attendance Counts

2015 Nebraska Attraction Attendance Counts % of Total Attendance from Out of State Visitors Summer Attendance (Memorial Day- Labor Day) % of Summer Attendance from Out of State Visitors City Name of Attraction Total Attendance Omaha Omaha's Henry

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

JWN Runway Safety Area Project Summer 2015 Closure

JWN Runway Safety Area Project Summer 2015 Closure JWN Runway Safety Area Project Summer 2015 Closure March 2015 Welcome and Overview Doug Kreulen, Chief Operating Officer Robert Ramsey, P. E., A.A.E. Chief Engineer Overview Purpose of Closure Concurrent

More information

Development Program and Implementation Plan

Development Program and Implementation Plan CHAPTER 8 Development Program and Implementation Plan 8.1 INTRODUCTION The FAA identifies airports that are significant to national air transportation through the development of the National Plan of Integrated

More information

ARIZONA DEPARTMENT OF TRANSPORTATION Aeronautics Division FIVE-YEAR AIRPORT DEVELOPMENT PROGRAM FY

ARIZONA DEPARTMENT OF TRANSPORTATION Aeronautics Division FIVE-YEAR AIRPORT DEVELOPMENT PROGRAM FY ARIZONA DEPARTMENT OF TRANSPORTATION Aeronautics Division FIVE-YEAR AIRPORT DEVELOPMENT PROGRAM FY 2005 2009 Kearny Airport Airport of the Year-2003 Arizona Department of Transportation Aeronautics Division

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

Hollaway Consulting Engineers, LLC Statement of Qualifications

Hollaway Consulting Engineers, LLC Statement of Qualifications Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Section (a)(1). Description of Projects Impose and Use

Section (a)(1). Description of Projects Impose and Use November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear

More information

Application to Impose and Use Passenger Facility Charges - #16

Application to Impose and Use Passenger Facility Charges - #16 Application to Impose and Use Passenger Facility Charges - #16 Submitted to: The Federal Aviation Administration By: The Des Moines International Airport June 23, 2017 Ms. Sheila Bridges PFC Coordinator

More information

James Arthur Vineyards Retail and Restaurant Locations Updated - October 30th, 2012

James Arthur Vineyards Retail and Restaurant Locations Updated - October 30th, 2012 Round Table Bar & Grill 633 Main Street Adams 68301 Super Foods 641 Main Street Adams 68301 Jay's Kegger 635 East 4th Ainsworth 69210 Thrifty Way 334 W Main Street Albion 68620 Safeway 500 East 3rd Street

More information

PFC Application #2 Niagara Falls International Airport

PFC Application #2 Niagara Falls International Airport Public Notice Application #2 Falls International April 12, 2018 Agenda Program at the Falls International Notice to air carriers and consultation meeting Class of air carriers not required to collect Air

More information

Airport Finance 101 Session 3 - Capital Funding

Airport Finance 101 Session 3 - Capital Funding Airport Finance 101 Session 3 - Capital Funding Capital Development Funding Improvement Projects usually require substantial funding to be implemented In business world capital is associated with funds

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Airport Closure Evaluation Report Silver Bay Municipal Airport (BFW) Prepared by MnDOT Office of Aeronautics

Airport Closure Evaluation Report Silver Bay Municipal Airport (BFW) Prepared by MnDOT Office of Aeronautics Airport Closure Evaluation Report Silver Bay Municipal Airport (BFW) Prepared by MnDOT Office of Aeronautics 1/2/2019 Contents Summary...4 Conditions leading to Closure...4 Public investment in the airport...4

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet RESOLUTION 17-87 APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET By Board Member Mark Ouimet WHEREAS, the Wayne County Airport Authority (the Authority ), pursuant to the Aeronautics

More information

2013 Nebraska Attraction Attendance Counts

2013 Nebraska Attraction Attendance Counts City Name of Attraction Total Attendance % of Total Attendance from Out of State Visitors Summer Attendance (Memorial Day- Labor Day) % of Summer Attendance from Out of State Visitors Omaha Omaha's Henry

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals This document is scheduled to be published in the Federal Register on 12/04/2014 and available online at http://federalregister.gov/a/2014-28535, and on FDsys.gov 1 DEPARTMENT OF TRANSPORTATION Federal

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

Nebraska. Ainsworth. Adams. Ainsworth. Ainsworth L-1 TS. Alda. Albion. Albion. Alda. Alda. Alexandria. Allen. Allen. Allen. Alliance.

Nebraska. Ainsworth. Adams. Ainsworth. Ainsworth L-1 TS. Alda. Albion. Albion. Alda. Alda. Alexandria. Allen. Allen. Allen. Alliance. Adams Ainsworth Ainsworth 828 Ainsworth L-1 TS Albion 547 Albion 839 Alda 621 Alda Alda 840 Alexandria Allen 479 Allen 556 Allen 818 Alliance 492 Alliance Alliance Alliance Alliance L-2 HS Alliance L-3

More information

Omaha Omaha's Henry Doorly Zoo and Aquarium 2,046, % 937, %

Omaha Omaha's Henry Doorly Zoo and Aquarium 2,046, % 937, % City Name of Attraction Total from Omaha Omaha's Henry Doorly Zoo and Aquarium 2,046,171 38.4% 937,569 42.0% Ogallala Lake McConaughy State Recreation Area 1,366,863 1,268,620 Raymond Branched Oak State

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information