1 CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1

2 So you have a project Do I have to comply with NEPA? What type of NEPA documentation is required? Can this project be categorically excluded? Are extraordinary circumstances involved? Does this project normally require an EA (or EIS)? Who can prepare the required documentation? 2

3 Do I have to comply with NEPA? Is there a Federal action? Examples: Approving Federal funding for airport development Approving new public use airport Unconditionally approving Airport Layout Plan Authorizing imposition of passenger facility charge Approving use or transfer of federally-owned land for airport purposes Authorizing release of land for non-aeronautical purposes 3

4 What type of NEPA documentation is required? Three types of NEPA documentation: Categorical Exclusion (CatEx) Environmental Assessment (EA) Environmental Impact Statement (EIS) The Council on Environmental Quality (CEQ) allows Federal agencies to identify actions that, based on past experience with similar actions, do not individually or cumulatively have significant effects on the human environment 4

5 Can the project be categorically excluded? FAA Order E, paragraphs , identifies those actions that FAA has identified as normally not requiring an EA or EIS. For airport sponsors, most projects are covered under paragraphs 307 (administrative/general actions), 309 (equipment and instrumentation) and 310 (facility siting, construction, and maintenance). If all components of the proposed project are identified in these paragraphs, the project is eligible for processing as a Categorical Exclusion But only if no extraordinary circumstances are involved. 5

6 CatEx Process or * See FAA Order E, paragraphs

7 Are extraordinary circumstances involved? Exist when the proposed action may have a significant effect and involve impacts to any one of the following (FAA Order E, paragraph 304): Air quality Coastal resources DOT Act Section 4(f) properties Natural resources and energy supply Farmlands Fish, wildlife and plants Floodplains Hazardous materials Historic, architectural, archeological and cultural resources Noise Secondary impacts Water quality Wetlands Wild and scenic rivers Likely to be highly controversial Not consistent with local, state or federal plans and policies Directly, indirectly or cumulatively create a significant impact on the human environment. 7

8 Does the project normally require an EA? FAA Orders E (paragraph 401) and B (paragraph 702) identifies those actions that FAA has identified as normally requiring an EA. Examples: Acquisition of more then 3 acres Establishment of FAA housing, sanitation systems, fuel storage and distribution systems, and power source and distribution systems New or relocated facilities such as air route traffic control centers (ARTCC), airport traffic control towers (ATCT) and off airport radar systems New or relocated instrument landing systems Federal financial participation or unconditional ALP approval: Airport location New runway Major runway extension Runway strengthening that could result in significant offairport noise increases New or revised ATC procedures which routinely route air traffic over noise sensitive areas 8

9 Does the project normally require an EIS? FAA Orders E (paragraph 501) and B (paragrah 903) identifies those actions that FAA has identified as requiring an EIS. Examples: An EA that identifies a significant impact that can t be mitigated below the significance threshold New commercial airport in a Metropolitan Statistical Area (MSA) New runway in an MSA If Action Is Not Categorically Excluded: No Significant Impacts Anticipated Unsure Whether Significant Impacts Exist Significant Impacts Expected/Major Project EA EA or EIS EIS 9

10 What to provide FAA? Documentation that supports the appropriate NEPA-level of analysis Categorical Exclusion Most regions have a CatEx checklist or Extraordinary Circumstances Evaluation form Define Proposed Action Identify which CatEx (FAA Order E) is applicable Document no extraordinary circumstances exist Environmental Assessment 10

11 Who does what? Categorical Exclusion Airport Sponsor: Documentation FAA: Determination that project is categorically excluded Environmental Assessment Airport Sponsor: Documentation FAA: Finding of No Significant Impact Environmental Impact Statement Airport Sponsor: Supporting information FAA: Documentation and Record of Decision Agency Coordination Depends on the agency 11

12 Examples 1. Consolidated Rental Car 2. RNP Approach 3. Hydrant Fueling 4. Concourse Expansion 5. Runway Extension 6. Snow Storage Shed 7. New ATCT Tower 8. Runway Rehabilitation 12

13 Example 1 - CONRAC Airport has 2 acres of land adjacent to the airport perimeter, that when combined with 10 acres of vacant off-airport land available for sale is to be developed as a consolidated rental car facility (CONRAC) Access to what would become the CONRAC is an existing road that connects to the Airport s main entrance roadway Stormwater detention would be required for the CONRAC, but would be tied in with the existing stormwater system No endangered species, wetlands, and no historic sites would be affected The Airport area is non-attainment/maintenance for three pollutants No AIP funding, but PFCs would be used 13

14 Example 2 - RNP The FAA is seeking to implement a Required Navigation Performance (RNP) approach to two runways The approaches are overlays of existing tracks No change to the airport s noise abatement procedures (no change in tracks or runway use) A significant noise impact change will not occur within 65 DNL An increase in population and housing would occur at lower noise levels (<65DNL) RNP would result in a fuel burn savings from track mile savings There is an active watchdog citizen group because of past and ongoing noise concerns 14

15 Example 3 Hydrant Fueling Airport wishes to add Hydrant fueling to its existing gates on the main concourse Currently, fueling is done through tanker trucks Hydrant lines will meet state-of-the-art standard and will connect to the existing storage tanks on the Airport s perimeter. Area is non-attainment for ozone and project would reduce NOx emissions No AIP funding, and airport is not clear if PFCs would be used. 15

16 Example 4 Concourse Exp. The Airport wishes to extend one of its concourses to add 4 gates, boarding area, and concession space. The Airport currently has 47 gates, spread across three concourses Expansion would occur over existing apron area, and the apron would be expanded to serve gates 0.4 acre of wetland would be filled for the expanded apron Area is non-attainment for ozone and carbon monoxide No AIP funding, and unclear if PFCs will be used 16

17 Example 5 - Rwy Extension General aviation airport located in a rural (non-smsa) seeks to extend the their 4,000 ft single runway by 1,000 feet Airport owns land for runway, but would have to acquire 10 acres for approach protection Runway extension would allow more aircraft and larger aircraft to operate at the Airport Runway extension would fill 10 acres of low quality wetland Project would require relocating a major arterial or tunneling the road Area is attainment for all pollutants AIP funding will be used. 17

18 Example 6 Snow Shed Airport acquired 100 acres of nearby residential land due to noise about 10 years ago All residences were demolished, but 2 commercial buildings were retained and used by Airport Airport wishes to demolish one of the commercial buildings and build a snow equipment storage shed The commercial building has been deemed eligible for the national register of historic sites. No AIP, and no PFCs. 18

19 Example 7 New Tower The FAA wishes to build a new air traffic control tower The tower will replace the existing tower that does not allow sufficient space for controllers The new tower site will require displacement of a cargo building A site for the cargo facility has not been identified AIP funding will be pursued 19

20 Example 8 Rwy Rehab The Airport expects to rehab its primary runway over a 12 month period (7 months in 1 year, and 5 months in the following year) During rehab, the runway will be brought up to standards (lights and shoulders) This is one of a three runway airfield Noise during the construction period would produce an average annualized DNL increase of 1.5 to noise sensitive uses in the 65 DNL. AIP and PFC funding would be used. 20

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

PUBLIC SCOPING MEETING APRIL 2018

PUBLIC SCOPING MEETING APRIL 2018 Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the

More information

I-3 DFW Extension Public Hearing. June 2, 2011

I-3 DFW Extension Public Hearing. June 2, 2011 1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT FAA RECORD OF DECISION Appendix D FINAL EIS ADDENDUM DOCUMENTS This appendix contains information that has been identified as having been inadvertently omitted

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

OEPI OF TRANSPORTATION DOCKETS

OEPI OF TRANSPORTATION DOCKETS OEPI OF TRANSPORTATION DOCKETS DEPARTMENT OF TRANSPORTATION? "!? pi lb A v U FEDERAL AVIATION ADMINISTRATION DOCUMENTED CATEGORICAL EXCLUSION Supplemental Notice of Proposed Rulemaking for Congestion Management

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

Office of Commercial Space Transportation: Notice of Availability, Notice of Public This document is scheduled to be published in the Federal Register on 04/20/2018 and available online at https://federalregister.gov/d/2018-08345, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION 30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY 19 April 2016 Dave Full, RS&H Katie van Heuven, Kaplan Kirsch & Rockwell TODAY S PRESENTATION ACRP Update Overview

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Airport 101 O Hare Noise Compatibility Commission July 19, 2018

Airport 101 O Hare Noise Compatibility Commission July 19, 2018 Airport 101 O Hare Noise Compatibility Commission July 19, 2018 24 HOUR VIEW OF AIR TRAFFIC WHAT IS AN AIRPORT? Rural airstrip Private airport Military airport Community airport Regional airport Major

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in

More information

INITIAL ENVIRONMENTAL REVIEW. Boston-Logan Runway 4 Left Area Navigation (RNAV) Visual Flight Procedure Test

INITIAL ENVIRONMENTAL REVIEW. Boston-Logan Runway 4 Left Area Navigation (RNAV) Visual Flight Procedure Test INITIAL ENVIRONMENTAL REVIEW Boston-Logan Runway 4 Left Area Navigation (RNAV) Visual Flight Procedure Test FAA Order 7400.2 Appendix 5 (Modified) ======================================================================

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

Austin-Bergstrom International Airport Master Plan Update

Austin-Bergstrom International Airport Master Plan Update FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

1 PURPOSE AND NEED 1.1 INTRODUCTION

1 PURPOSE AND NEED 1.1 INTRODUCTION 1.1 INTRODUCTION 1 PURPOSE AND NEED This Environmental Assessment (EA) addresses projects at Juneau International Airport (JIA) that are the direct outcome of a Master Plan prepared for the airport and

More information

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update AIRPORTS DIVISION DEPARTMENT OF TRANSPORTATION March 13, 2012 AGENDA Introduction Purpose and Meeting Objectives Kahului

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

From concept through completion, CGA is your AVIATION engineering firm!

From concept through completion, CGA is your AVIATION engineering firm! The State of Iowa has 120 general aviation airports. Our staff specializes in serving these airports with their engineering needs. Aviation lighting and navigational aids Environmental and financial feasibility

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion

More information

AIRCRAFT NOISE ABATEMENT TASK FORCE MEETING ST. PETE CLEARWATER INTERNATIONAL AIRPORT. July 19, 2017

AIRCRAFT NOISE ABATEMENT TASK FORCE MEETING ST. PETE CLEARWATER INTERNATIONAL AIRPORT. July 19, 2017 AIRCRAFT NOISE ABATEMENT TASK FORCE MEETING ST. PETE CLEARWATER INTERNATIONAL AIRPORT July 19, 2017 St. Pete Clearwater International Airport (PIE), Aircraft Noise Abatement Task Force (NATF) Committee,

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

Update on FAA Standard Operating Procedures (SOP)

Update on FAA Standard Operating Procedures (SOP) Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Element 640 State of Rhode Island Airport System Plan - Overview

Element 640 State of Rhode Island Airport System Plan - Overview Element 640 State of Rhode Island Airport System Plan - Overview This document represents the Rhode Island Airport Corporation s (RIAC) plan for the state airport system (ASP). The plan establishes state

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015 Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Financial Plan/Capital Improvements - DRAFT 6-1

Financial Plan/Capital Improvements - DRAFT 6-1 The analyses completed in previous chapters evaluated development needs at McKinney National Airport (TKI or Airport) over the next 20 years, based on forecast activity, facility requirements, safety standards,

More information

Chapter 10 FAA Compliance Review

Chapter 10 FAA Compliance Review Chapter 10 FAA Compliance Review Introduction This chapter discusses the elements associated with the operation and management of Albany Municipal Airport, as a federally-obligated airport. The Federal

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

CHAPTER TWO THE PROPOSAL

CHAPTER TWO THE PROPOSAL CHAPTER TWO THE PROPOSAL 2.0 AIRPORT SPONSOR S PROPOSED PROJECT The Airport Sponsor s Proposed Project includes the following elements, which are depicted in Exhibit 2-1, Sponsor s Proposed Project: Expand

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

The Law of Noise Regulation Daniel S. Reimer

The Law of Noise Regulation Daniel S. Reimer The Law of Noise Regulation Daniel S. Reimer Today s Presentation Division of responsibility 2 Federal responsibility Noise source control Local responsibility Land use compatibility Aircraft restrictions

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

S p NA, illil MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION #

S p NA, illil MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION # NA, S p illil r, MINNEAPOLIS- ST. PAUL INTERNATIONAL AIRPORT ( MSP) NOISE OVERSIGHT COMMITTEE ( NOC) RESOLUTION # 01-2014 REGARDING FUTURE FAA PERFORMANCE- BASED NAVIGATION ( PBN)/ AREA NAVIGATION ( RNAV)

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

5.4 SECONDARY (INDUCED) IMPACTS

5.4 SECONDARY (INDUCED) IMPACTS 5.4 SECONDARY (INDUCED) IMPACTS Major development proposals often involve the potential for induced or secondary impacts on surrounding communities. Examples of these impacts include: shifts in patterns

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

Alternatives Development and Evaluation Report

Alternatives Development and Evaluation Report Airport Master Plan Alternatives Development and Evaluation Report Prepared by: AECOM Prepared for: Illinois Department of Transportation December 16, 2011 Table of Contents Topic Page Number Cover Sheet...

More information