1 CHAPTER TWO THE PROPOSAL 2.0 AIRPORT SPONSOR S PROPOSED PROJECT The Airport Sponsor s Proposed Project includes the following elements, which are depicted in Exhibit 2-1, Sponsor s Proposed Project: Expand and elevate Runway 9R/27L to an overall length of 8,000 feet and width of 150 feet. The reconstructed Runway 9R/27L would also be equipped with an Engineered Materials Arresting System (EMAS) 1 at both runway ends. [The Airport Sponsor s proposed runway development project was conceptually depicted on Broward County s Project Layout Drawing (PLD) dated 12/05 and submitted to the FAA Orlando Airport District Office (ADO). Although the PLD established an overall runway lengths of 8,197 feet, the FAA and Broward County agreed that the overall length of Runway 9R/27L would need to be shortened to 8,000 feet to achieve full compliance with the Runway Safety Area (RSA) design criteria; specifically to avoid having a portion of the RSA for Runway 27 in the Dania Cut-Off Canal.] Elevate Runway 9R end to an elevation of eight feet above Mean Sea Level (MSL); elevate Runway 27L end to an elevation of 45 feet MSL. Preliminary engineering analyses prepared by Broward County consultants have determined that the runway platform needs to provide a minimum of feet of vertical clearance over the Florida East Coast (FEC) Railway. This consists of 23.5 feet top of rail to inside top of tunnel, five feet top slab thickness, two feet minimum earth cover at edge of RSA over tunnel slab and 4.24 feet to allow for a minimum 1.5 percent transverse runway pavement slope. This results in a 0.6 percent grade from west to east. [Information from URS Corporation report dated 02/05, Proposed Reconstruction/Extension of Runway 9R/27L Evaluation of Runway Length and Grade.] Construct a new full-length parallel taxiway 75 feet wide on the north side of Runway 9R/27L with separation of 400 feet from 9R/27L. This proposed taxiway would accommodate Airplane Design Group (ADG) IV aircraft. [Conceptually depicted on Broward County s PLD dated 12/05 and submitted to the FAA Orlando ADO.] Construct an outer dual parallel taxiway that would be separated from the proposed north side parallel taxiway by 276 feet. 1 Engineered Material Arresting System (EMAS) is a "soft ground arresting system" consisting of a crushable cellular cement material installed on the runway overrun in a predetermined bed layout. EMAS provides a reliable and predictable capability to stop an aircraft by crushing under the weight of an aircraft providing deceleration and a safe stop. See FAA Order , Financial Feasibility and Equivalency of Runway Safety Area Improvements and Engineered Material Arresting Systems. June 2008 Page 2-1
2 Conceptually depicted on the Broward County PLD dated 12/05 and submitted to the FAA Orlando ADO. Since publication of the Draft EIS in March 2007 and based on a decision made by Broward County during a Commission Briefing on the airport master plan, a temporary runway is no longer being considered during the construction period for any of the alternatives. 2 [Conceptually depicted on URS exhibit, Proposed South Runway with Temporary Runway, dated September 23, 2005.] Construct connecting taxiways from the proposed full-length parallel taxiway to existing taxiways. [Conceptually depicted on Broward County s Airport Layout Plan (ALP) dated 4/05 and submitted to the FAA Orlando ADO by letter dated April 13, 2005.] Construct an Instrument Landing System (ILS) for landings on Runways 9R and 27L. Runway ends 9R and 27L would have a Category I ILS, which includes a Medium Intensity Approach Light System with runway alignment indicator lights (MALSR), localizer, and glideslope. [Noted in URS Corporation report dated 02/05, Proposed Reconstruction / Extension of Runway 9R/27L Evaluation of Runway Length and Grade.] Decommission Runway 13/31. This action is based on a letter to the FAA from Broward County (dated November 1, 2004) referencing the County s Airfield Development Program Object Statement which includes the statement decommission the use of Runway 13/31 (crosswind). 3 Terminal Gate Redevelopment. Broward County directed the FAA to use Option 2B of the Airport Master Plan Update Phase 2, to define the footprint for the redevelopment of the terminal gate area The construction and operation of a temporary runway was discussed by the Broward County Board of County Commissioners at the January 22, 2008 Commission Briefing on the Fort Lauderdale-Hollywood International Airport Master Plan Preferred Alternative Update. A copy of this letter, dated November 1, 2004, is provided in this EIS in Appendix C, FAA/Airport Sponsor s Correspondence. Letter to Dean Stringer, Manager, FAA Orlando Airports District Office; from Tom Jargiello, Director of Aviation, Broward County Department of Aviation Department, dated: November 1, Subject: Highlights of 2/1/06 FLL EIS Manager's Meeting. From: Bart.Vernace@faa.gov. Sent: Friday, February 03, :47 PM. To: Dean.Stringer@faa.gov; Jim.Castleberry@faa.gov; Mark Perryman; ralph.thompson@faa.gov; RBielek@broward.org; Rusty.Chapman@faa.gov; tjargiello@broward.org; Virginia.Lane@faa.gov Cc: benito.deleon@faa.gov; Jackie.Sweatt-Essick@faa.gov; tom.bennett@faa.gov; Miguel.Martinez@faa.gov; Suzie Kleymeyer; BPosadas@broward.org June 2008 Page 2-2
3 Per the analysis provided by Broward County, 5 the number of gates needed to accommodate the projected levels of passenger related activity through 2020 ranges between 78 to 84 gates. 6 [Source: Leigh Fisher Associates report dated January 2006, Master Plan Update Phase I, Draft Final Summary Report. Development Option 2B, Figure 6-24, Figure 6-25, and pp to 6-23.] 2.1 CONNECTED ACTIONS: 7 Close Airport Perimeter Road located within the approach to Runway 9R [Noted in URS Corporation report dated 02/05, Proposed Reconstruction/ Extension of Runway 9R/27L Evaluation of Runway Length and Grade.] Relocate ASR-9 [Source: FAA Southern Region Airport Surveillance Radar Site Survey Report, ASR-9 Relocation, Fort Lauderdale-Hollywood International Airport, 1/3/06] Acquire all, or a portion, of the Hilton Fort Lauderdale Airport Hotel (formerly the Wyndham Fort Lauderdale Airport Hotel) located at 1870 Griffin Road, Fort Lauderdale, Florida, to the extent, a portion of the existing structure would be located within the Proposed Runway Protection Zone (RPZ) for extended Runway 9R/27L. Acquire all, or a portion, of the Dania Boat Sales located at 1880 Griffin Road, Fort Lauderdale, Florida, to the extent, a portion of the existing structures would be located within the Proposed Runway Protection Zone (RPZ) for extended Runway 9R/27L. 2.2 REFINEMENT OF THE SPONSOR S PROPOSED PROJECT The Airport Sponsor s Proposed Project evolved over time through interaction between the FAA and Broward County (the Airport Sponsor). The FAA worked with Broward County to refine the Proposed Project, for the purposes of conducting the MEMORANDUM to Bolfi Posadas, Broward County Aviation Department. From Larry Coleman, LFA (Leigh Fisher Associates). Subject: Gate Requirement Analysis for Master Plan Update, Phase 1. Dated January 20, This memorandum provides a description of the factors that were considered and the methodology that was used by LFA to derive these estimates followed by a review of the findings and results. (Leigh Fisher Associates is now Jacobs Consultancy.) The proposed development of Concourse A at Terminal 1 is depicted on Exhibit 2-1, Sponsor s Proposed Project, as future development. FAA has determined that this project is independent and has separate utility from the proposed project and associated actions being analyzed in this EIS. Broward County prepared an environmental assessment for the proposed development of Concourse A, which includes the construction of five gates. These five gates are included in the total number of gates projected to be needed by The potential environmental impacts of the proposed development of Concourse A at Terminal 1 are disclosed in this EIS in Chapter Seven, Cumulative Impacts. Lane, Virginia. Federal Aviation Administration Memorandum. Subject FLL EIS - Clarification of the Airport Sponsor s Proposed Project and List of Projects to Include in EIS. To: David Bjorneboe, Broward County Aviation Department. June 8, June 2008 Page 2-3
4 appropriate NEPA analyses. The following is a listing of Broward County studies, discussions with the FAA, and Commission actions that were used by the FAA to define and refine the Airport Sponsor s Proposed Project and identify the connected actions for analysis in this Environmental Impact Statement. (1) Broward County planning studies conducted between November 2003 and May May 12, 2006: South Runway Concept Estimate, prepared by US Cost for Broward County Aviation Department. Transmitted by letter from Tom Jargiello, Director of Aviation to Dean Stringer, FAA Orlando Airports District Office. - March 20, 2006: Draft Technical Review of South Runway, prepared by URS Corporation for Broward County. - January 2006: Master Plan Update - Phase I Draft Final Summary Report Fort Lauderdale-Hollywood International Airport, prepared by Leigh Fisher Associates for Broward County. - January 20, 2006: Memorandum from Larry Coleman of Leigh Fisher Associates, to Bolfi Posadas, at Broward County, Subject: Gate Requirement Analysis for Master Plan-Update Phase I. - March 2005: Gate Utilization Study, prepared by URS Corporation for Broward County, appended to Aviation Department Gate Utilization Analysis Executive Summary Fort Lauderdale-Hollywood International Airport dated March 4, February 2005: Proposed Reconstruction/Extension of Runway 9R/27L Evaluation of Runway Length and Grade, prepared for Broward County by URS Corporation. - December 17, 2004: Concept Design Package New International Terminal at Fort Lauderdale-Hollywood International Airport, prepared by PGAL for Broward County. - May 25, 2004: Concourse E Expansion Study Fort Lauderdale- Hollywood International Airport, prepared by DMJM Aviation for Broward County. - March 2004: Proposed Reconstruction of Runway 9R/27L Preliminary Evaluation of Runway Lengths and Grades Fort Lauderdale-Hollywood International Airport, prepared by URS Corporation for Broward County. - November 2003: Assessment of Airfield Development Alternatives Final Report Fort Lauderdale-Hollywood International Airport, prepared by Leigh Fisher Associates for Broward County. (2) Revised Airport Layout Plan (ALP) conditionally approved by FAA in December (3) Conceptual ALP drawing approved by the Commission on October 26, 2004, which depicts the footprint of the proposed south runway expansion to a full length of 8,540 feet and within the confines of the Dania Cut-Off Canal on the west and NE 7th Avenue on the east. June 2008 Page 2-4
5 (4) County s Airfield Development Program Objective Statement adopted by the Commission on October 26, (5) December 23, 2005: Project Layout Drawing (PLD) prepared by URS Corporation for Broward County; shows the redevelopment and extension of Runway 9R/27L to a full length of 8,197 feet and the use of Engineered Material Arresting System (EMAS) on both runway ends. (6) January 17, 2006: The FAA presented a status briefing to the Commission on the analysis to date and the progress made on the development and evaluation of alternatives. The purpose of the briefing was to obtain the Commission s consensus on the purpose and need statements and the airfield alternatives to be considered for detailed evaluation in the Draft EIS. During that meeting, the Commission requested that the FAA review an iteration of the Airport Sponsor s Proposed Project that would consider the use of Engineered Material Arresting Systems (EMAS) at both ends of Runway 9R/27L. (The use of EMAS would allow the overall length of the proposed runway to be shorter (approximately 8,000 feet) thereby eliminating the need to use declared distance 8 to improve runway operational capability.) Pursuant to the Commission s request, an alternative was developed for the redevelopment and extension of Runway 9R/27L between the Dania Cut- Off Canal and NE 7th Avenue that is served with EMAS, rather than a standard RSA. (7) July 31, 2006: Meeting held with Broward County and the FAA EIS Team. Broward County determined that the Airport Sponsor s Proposed Project would include the runway as described by the Commission at the January 17, 2006 FAA briefing (the use of EMAS at both ends of Runway 9R/27L) 9 along with the implementation of the proposed runway use per the County s Interlocal Agreements Per FAA Advisory Circular 150/ Airport Design, Declared distance is defined as the distances the airport owner declares available for the airplane s takeoff run, takeoff distance, accelerate-stop distance, and landing distance requirements. The runway as proposed on the Project Layout Drawing (PLD) shows Runway 9R/27L at 8,197 feet. The EIS analysis of runway redevelopment alternatives justifies an overall length of 8,000 feet (see Chapter Four Alternatives, Alternative B1b and Alternative B1c Airport Sponsor s Proposed Project) predicated on the EMAS Design Requirements prescribed in FAA Advisory Circular (AC) 150/ A, Engineered Materials Arresting Systems for Aircraft Overruns. The installation of EMAS on a precision runway must provide a minimum of 600 feet of Standard Runway Safety Area (RSA) beyond the physical end of the runway. The design aircraft for Runway 9R/27L is a B which corresponds with Airport Reference Code D-IV, therefore, the overall width of the Standard RSA for runways configured with EMAS is 500 feet (per FAA Order , Financial Feasibility and Equivalency of Runway Safety Area Improvements and Engineered Material Arresting Systems). In accordance with this criterion, if Runway 9R/27L is configured at 8,197 feet the southwestern corner of the RSA would extend into the Dania Cut-Off Canal. Therefore, Runway 9R/27L has been reconfigured at to an overall length of 8,000 feet. Virginia Lane, FAA letter to Tom Jargiello, Director of Aviation Fort Broward County Aviation Department RE: Environmental Impact Statement Fort Lauderdale-Hollywood International Airport FAA EIS Noise Modeling Assumptions for the Airport Sponsor s Proposed Project, August 7, Tom Jargiello, Director of Aviation Broward County Aviation Department letter to Virginia Lane, FAA, August 22, Letters found in Appendix C, FAA/Airport Sponsor s Correspondence. June 2008 Page 2-5
6 The County s Interlocal Agreements are described in Chapter Five, Affected Environment, of this Draft EIS. (8) August 24, 2006: Revised Memorandum to FAA from Leigh Fisher Associates, Airport Sponsor s Proposed Project Operational Assumptions for (9) October 18, 2006: Teleconference between the FAA and Broward County regarding the Airport Sponsor s Proposed Project runway use assumptions for Broward County agreed with the FAA s 2020 runway use assumptions. The FAA evaluated the Sponsor s Proposed Project using the guidance provided in FAA Advisory Circulars/Orders that define standards for runway clearances, runway geometric criteria, and navigational aids. 12 The following list chronicles the events related to the National Environmental Policy Act (NEPA) environmental review of the Airport Sponsor s Proposed Project from January 2006 through October 2007: Memorandum from Leigh Fisher Associates to Virginia Lane (FAA Orlando District Office), dated August 24, 2006, describing the Airport Sponsor s Proposed Project runway use assumptions for 2012, which includes the proposed runway use per the County s Interlocal Agreements. The County s Interlocal Agreements are described in Chapter 5. The memorandum is located in Appendix H, Noise. The guidance provided in these FAA Advisory Circulars/Orders deal with the safety of aircraft operations at the airport. FAA Advisory Circular 150/ Airport Design; FAA Order C Siting Criteria for Instrument Landing Systems; and FAA Order A Visual Guidance Lighting Systems. June 2008 Page 2-6
7 January 17, 2006: The FAA briefs the Commission on study areas, preliminary purpose and need, and alternatives for EIS analysis. The Commission requests that the FAA review an iteration of the Airport Sponsor s Proposed Project that would consider the use of EMAS at both ends of Runway 9R/27L. January 18, 2006: The FAA coordinates and requests concurrence with local, state, and Federal agencies on study areas, preliminary purpose and need, and alternatives for EIS analysis in accordance with Vision 100 streamlining policies. January 18 and 19, 2006: The FAA conducts focus group meetings with neighborhood representatives regarding study areas, preliminary purpose and need, and alternatives for EIS analysis. February 2, 2006: The FAA conducts interim public workshop on study areas, preliminary purpose and need, and alternatives for EIS analysis. July 31, 2006: Meeting held with Broward County and the FAA EIS Team. Broward County determined that the Airport Sponsor s Proposed Project would include the runway as described by the Commission at the January 17, 2006 FAA briefing (the use of EMAS at both ends of Runway 9R/27L) along with the implementation of the proposed runway use per the County s Interlocal Agreements. 13 The County s Interlocal Agreements are described in Chapter Five, Affected Environment. January 2007: The FAA publishes the 2006 Terminal Area Forecast (TAF). The data originally used to prepare the Draft EIS was based on the 2004 FAA TAF published in January The 2006 FAA TAF projected a continued, but significantly lower, rate of growth in aviation demand at FLL than the 2004 FAA TAF. The 2006 FAA TAF projections also affected a significant change in the aircraft fleet and number of operations. Therefore, the FAA requested that the two future analysis years be revised to reflect the projected growth for 2012 and 2020 contained in the 2006 FAA TAF. March 30, 2007: A notice of the availability of the Draft EIS is published in the Federal Register, which began a 53-day comment period. May 1, 2007: A Workshop and Public hearing on the Draft EIS is held at the Broward County Convention Center in the City of Fort Lauderdale. April 18, 2007: The FAA conducts Agency Streamlining Coordination meeting to present the Draft EIS. April 17-19, 2007: The FAA conducts district wide briefings to present the Draft EIS. June 5, 2007: Broward County conducts public hearing and votes to confirm Alternative B1c as their Proposed Project. October 2007: The FAA conducts Airport tenant and airline coordination meetings. 2.3 LIST OF FEDERAL, STATE, AND LOCAL PERMITS AND APPROVALS The following actions are required by Federal agencies (other than the FAA) and state and local agencies for implementation of the Airport Sponsor s Proposed Project: 13 Virginia Lane, FAA letter to Tom Jargiello, Director of Aviation Fort Broward County Aviation Department RE: Environmental Impact Statement Fort Lauderdale-Hollywood International Airport FAA EIS Noise Modeling Assumptions for the Airport Sponsor s Proposed Project, August 7, Tom Jargiello, Director of Aviation Broward County Aviation Department letter to Virginia Lane, FAA, August 22, Letters found in Appendix C, FAA/Airport Sponsor s Correspondence. June 2008 Page 2-7
8 Issuance of a Clean Water Act Section 404 permit by the U.S. Army Corps of Engineers (USACE) related to potential impacts to jurisdictional streams and wetlands. Review and comment to the USACE of Section 404 Dredge and Fill Permit application by the U.S. Environmental Protection Agency (USEPA), U.S. Fish and Wildlife Service (USFWS), National Marine Fisheries Service (NMFS), and the Florida State Historic Preservation Office (SHPO). Section 401 Water Quality Certification from the South Florida Water Management District (SFWMD). Modification to the National Pollutant Discharge Elimination System (NPDES) permit (Section 402 of the Clean Water Act) for proposed construction activities; this would be coordinated through the SFWMD. Modification to the SFWMD Environmental Resource Permit (ERP) No S for impacts to jurisdictional wetlands. 2.4 PROPOSED FEDERAL ACTIONS The Federal actions, determinations, and approvals by the FAA, described in Section through Section of this chapter, would be required for completion of the Airport Sponsor s Proposed Project DETERMINATION OF PROJECT ELIGIBILITY FOR FEDERAL FUNDING APPROVAL The FAA would have to make an official determination of whether the following elements of the proposed action would be eligible for Federal funds: Site preparation Airfield construction of runway, taxiway, runway safety area, and other airfield facilities Development of terminal gates Environmental mitigation requirements (if any) Navigational aids Potential Federal funds for these project elements include Grant-in-Aid Funds through the Federal Airport Improvement Program (AIP) DETERMINATION OF PROJECT ELIGIBILITY TO IMPOSE AND USE PASSENGER FACILITY CHARGES (PFCs) The FAA would have to make an official determination of whether elements of the proposed action would be eligible for PFC funding. June 2008 Page 2-8
9 2.4.3 FAA APPROVAL AND FUNDING OF PROPOSED AIRPORT DEVELOPMENT The FAA s determination of the proposed action s eligibility for Federal funding would involve the approval of an ALP, 14 environmental approval in accordance with NEPA and FAA environmental requirements, 15 and determinations under other executive orders and statutes discussed in this EIS FAA INSTALLATION AND/OR RELOCATION OF NAVIGATIONAL AIDS ASSOCIATED WITH THE PROPOSED NEW RUNWAY The FAA would make a determination regarding the installation and/or relocation of navigational aids associated with the new runway FAA APPROVAL OF AIR TRAFFIC PROCEDURES FOR THE RUNWAY The FAA would amend the existing and/or develop new air traffic procedures for FLL to include an expanded runway and the closure of Runway 13/31. The FAA would have to approve the amended and/or new procedures, verify them through flight testing, and publish the procedures for general use DETERMINATION OF OBSTRUCTIONS TO NAVIGABLE AIRSPACE An aeronautical study to review and approve navigable airspace for the proposed runway under FAR 14 CFR Part 77, Objects Affecting Navigable Airspace FAA APPROVAL OF AIRSPACE FAA approval of the airspace associated with the proposed actions, based on an aeronautical study conducted under FAR 14 CFR Part 157, Notice of Construction, Alternation, Activation, and Deactivation of Airports, would be necessary before the proposed expanded runway could be opened for use and Runway 13/31 could be decommissioned (deactivated) FAA CERTIFICATION AND OTHER APPROVALS FAA modification or amendment of existing certificates or specifications would be required to meet the Commission s objective of providing an airport that will comply with FAA design standards and accommodate, in a safe and efficient manner, the passenger enplanements and aircraft activity forecasts U.S.C (a)(16) 49 U.S.C (c) 49 U.S.C U.S.C U.S.C (b) and June 2008 Page 2-9
10 Certification under FAR 14 CFR Part 139, Certification of Airports. Operating Specifications for scheduled air carriers intending to operate at the airport in the future under FAR 14 CFR Part 121, Certification and Operations: Domestic, Flag, and Supplemental Air Carriers and Commercial Operations of Large Aircraft APPLICABLE ENVIRONMENTAL LAWS, REGULATIONS, STATUTES, AND POLICIES This EIS addresses the airport development actions listed in Section through Section of this chapter for which the Airport Sponsor will seek Federal financial aid under the AIP. The information contained in this EIS will provide evidence to satisfy agency determinations and sponsor certifications under 49 USC and The approving FAA official will include the following determinations and sponsor certifications in the Record of Decision (ROD). FAA determination of conformity under the Clean Air Act, 42 U.S.C. 7506(c)(1). FAA determination that the Proposed Action is consistent with approved coastal zone management programs, Executive Order 13089, Coral Reef Protection; Coastal Barrier Resources Act, 16 U.S.C , and Coastal Zone Management Act, 16 U.S.C FAA determination of consistency with existing plans of public agencies for the development of the area surrounding the airport. Airport Development Grant Program, 49 U.S.C (a)(1). FAA determination that fair consideration has been given to the interests of communities in or near the project location. Airport Development Grant Program, 49 U.S.C (b)(2). FAA determinations under 49 U.S.C. 303(c) with respect to use of any publicly-owned land of a public park, recreation area, or wildlife and waterfowl refuge of national, state or local significance; or land from an historic site of national, State, or local significance. FAA findings regarding the potential impact to endangered or threatened species, marine mammals, essential fish habitat and migratory birds. Endangered Species Act, 16 U.S.C Marine Mammal Protection Act, 16 U.S.C h. Sustainable Fisheries Act, 16 U.S.C. 1855(b)(2). Migratory Bird Treaty Act, 16 U.S.C FAA floodplain determination and findings in accordance with Executive Order 11998, Floodplain Management. The environmental decision made by the FAA must also include floodplain findings in accordance with DOT Order , Floodplain Management and Protection. FAA determination in accordance with Section 106 of the National Historic Preservation Act of The FAA is required to make a determination related to the possible effect of the proposed actions on properties either June 2008 Page 2-10
11 listed or eligible to be listed on the National Register of Historic Places that are in the vicinity of the development of the proposed actions. National Historic Preservation Act, 16 U.S.C. 470(f). FAA determination regarding coordination and consultation with Native American representatives in accordance with DOT Order , Department of Transportation Programs, Policies, and Procedures Affecting American Indians, Alaska Natives, and Tribes; and FAA Order , American Indian and Alaskan Native Tribal Consultation Policy and Procedures. FAA determination regarding environmental justice in accordance with Executive Order and DOT Order , Environmental Justice. FAA determination that appropriate water quality requirements will be satisfied in accordance with the Clean Water Act. Clean Water Act, 33 U.S.C. 1251, et seq. Determination by the FAA in accordance with Executive Order 11990, Protection of Wetlands. Any impact to wetlands would necessitate a wetlands determination by the FAA in accordance with the above-mentioned Executive Order and Department of Transportation (DOT) Order A, Preservation of the Nation s Wetlands, and Section 404 of the Clean Water Act. 33 U.S.C June 2008 Page 2-11
12 THIS PAGE INTENTIONALLY LEFT BLANK June 2008 Page 2-12
13
U.S. DEPARTMENT OF TRANSPORTATION. Federal Aviation Administration Southern Region Atlanta, Georgia RECORD OF DECISION
U.S. DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Southern Region Atlanta, Georgia RECORD OF DECISION THE DEVELOPMENT AND EXPANSION OF RUNWAY 9R/27L AND OTHER ASSOCIATED AIRPORT PROJECTS
More informationFAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS
FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT FAA RECORD OF DECISION Appendix D FINAL EIS ADDENDUM DOCUMENTS This appendix contains information that has been identified as having been inadvertently omitted
More information1.0 AIRPORT HISTORY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
CHAPTER ONE HISTORY, BACKGROUND, AND PUBLIC INVOLVEMENT 1.0 AIRPORT HISTORY The first airport for the Fort Lauderdale-Hollywood area opened on May 1, 1929, on an abandoned golf course located southwest
More informationII. Purpose and Need. 2.1 Background
II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and
More informationChapter One PROJECT DESCRIPTION
Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationAPPENDIX E AIRFIELD PLANNING, DESIGN, & CONSTRUCTABILITY REVIEW
APPENDIX E AIRFIELD PLANNING, DESIGN, & CONSTRUCTABILITY REVIEW The identification, evaluation, and refinement of the airfield development alternatives were subject to a variety of planning, engineering,
More informationEXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.
MASTER PLAN UPDATE Phase 2/3 Draft Final Summary Report Report Issued 2010 in association with Prepared for Broward County Aviation Department Main Office 555 Airport Blvd., Suite 300 Burlingame, CA 94010
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationChapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update
Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside
More informationChapter 1 Introduction and Project Overview
Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationEXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1
Workshop Briefing Package Airport Master Plan Update, Phase I Fort Lauderdale-Hollywood International Airport October 18, 2005 Leigh Fisher Associates A Division of Jacobs Consultancy Inc. EXECUTIVE SUMMARY
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationNew Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together
Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationAirports and UAS: Integrating UAS into Airport Infrastructure and Planning
ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements
More informationCHAPTER FIVE ENVIRONMENTAL CONSEQUENCES
CHAPTER FIVE ENVIRONMENTAL CONSEQUENCES Pursuant to the environmental documentation requirements of FAA Order 1050.1E, Environmental Impacts, Policies and Procedures, this chapter describes the reasonably
More informationSafety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013
New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts
More informationFort Lauderdale Hollywood International Airport
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationPUBLIC SCOPING MEETING APRIL 2018
Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the
More informationStakeholders Meeting
Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements
More informationMONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES
MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationExisting Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationOffice of Commercial Space Transportation: Notice of Availability, Notice of Public
This document is scheduled to be published in the Federal Register on 04/20/2018 and available online at https://federalregister.gov/d/2018-08345, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationNotice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport
Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County
More informationAlternatives. Introduction. Range of Alternatives
Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,
More informationCHAPTER 2.0 ALTERNATIVES
CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives
More informationPassenger Facility Charge Application #1
Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures
More informationCHAPTER 1.0 INTRODUCTION 1.1 ABOUT THE WASHINGTON DULLES INTERNATIONAL AIRPORT DRAFT EIS
CHAPTER 1.0 INTRODUCTION 1.1 ABOUT THE WASHINGTON DULLES INTERNATIONAL AIRPORT DRAFT EIS The Federal Aviation Administration (FAA) prepared this Draft Environmental Impact Statement (DEIS) to identify
More informationMorristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment
1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationChapter 1 Introduction and Project Overview
EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal
More informationCHAPTER FOUR AIRPORT ALTERNATIVES
4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify
More informationDallas Executive Airport
648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationAGENCY SCOPING MEETING
AGENCY SCOPING MEETING Environmental Impact Statement (EIS) Conducted for the Friedman Memorial Replacement Airport in the Wood River Region of South Central Idaho December 4, 2007 1:00 p.m. 4:00 p.m.
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationPreferred Alternative Summary
Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More information6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS
6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities
More informationOffice of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN
Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationFAA RECORD OF DECISION. Appendix B AGENCY LETTERS: CONCURRENCE, CERTIFICATIONS, CORRESPONDENCE
Fort Lauderdale-Hollywood International Airport ENVIRONMENTAL IMPACT STATEMENT FAA RECORD OF DECISION Appendix B AGENCY LETTERS: CONCURRENCE, CERTIFICATIONS, CORRESPONDENCE This appendix contains copies
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationFor Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018
COUNTY OF INYO REQUEST FOR QUALIFICATIONS For Airport Environmental Services Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 County of Inyo Public Works Department P.O.
More informationAppendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION RUNWAY 17-35
Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION Master Plan Update RUNWAY 17-35 Hector International Airport SUFFICIENCY ANALYSIS Near the completion of the Master Plan Update
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationPUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application
PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationLAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013
LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development
More informationFriedman Memorial Airport Authority. Regular Meeting September 4, 2012
Friedman Memorial Airport Authority Regular Meeting September 4, 2012 UNFINISHED BUSINESS Airport Solutions Blaine County Report Airport Solutions City of Hailey Report Airport Solutions Airport Manager
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationUpdate on FAA Standard Operating Procedures (SOP)
Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationCHAPTER 1 BACKGROUND AND PROPOSED ACTION
CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance
More informationForeign Civil Aviation Authority Certifying Statements. AGENCY: Federal Aviation Administration (FAA), DOT.
This document is scheduled to be published in the Federal Register on 02/22/2019 and available online at https://federalregister.gov/d/2019-02634, and on govinfo.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview of progress of efforts to reduce
More informationPartnership for Quieter Skies Report
Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department July 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview
More informationAIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION
30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationCatExes vs. EAs When and How to Prepare
CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have
More information6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT
6.C.1 AIRPORT NOISE The existing land uses are described in Chapter Five, Affected Environment. The methodologies used to develop the Geographic Information System (GIS) land use database, the estimated
More informationFlying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward
: Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationFinance and Implementation
5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationI-3 DFW Extension Public Hearing. June 2, 2011
1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation
More information