1 TRACK: TRACK C (AIRSIDE/ENGINEERING) Title: Upcoming Airfield Programs WORKSHOP: Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017

2 Image: O Hare International Airport October 2013 O Hare Modernization Program & Runway 10C-28C

3 Airport Delays 1999 and 2000 saw significant increase in delays at US system-wide airports. This triggered Congress request to FAA to assess the problems and take action In 2000 O Hare was the 3 rd most delayed airport in the U.S.

4 Airport Delays Flight capacity (ops/hour) at O Hare in 2000: during Good Weather during Adverse Weather Scheduled demand at O Hare in 2000 was at or above the airfield capacity: 3.5 hours/day during Good Weather 8 hours/day during Adverse Weather Demand was expected to grow 18% over the next 10 years, resulting in more delays. It was time to look at fixing the problem

5 2001: Starting Point of Modernization Seven Runways: 3 sets of parallels 2 sets of low visibility arrivals Intersecting runways Longest: 13,000 feet (2 over 10,000 feet) One FAA Control Tower and 3 ARFF Stations

6 O Hare s Modernization Program Purpose Reduce Delays Increase capacity and efficiency Scope Reconfigure O Hare s intersecting runways into modern, parallel layout Six east-west parallel runways and two crosswind runways Economic Impact Creates 195,000 jobs and adds $18 billion in annual economic activity

7 2001: Runway Configurations Annualized Airport Arrival Rate was 94 operations/hour Annualized Airport Departure Rate was 95 operations/hour 27% use 46.5% use 17.1% use 6% use 3.3% use 96 Arrivals 96 Arrivals 96 Arrivals 76 Arrivals 68 Arrivals 96 Departures 96 Departures 96 Departures 96 Departures 72 Departures

8 The Proposed Modernization Plan 8 Runways: 6 east/west parallels (all low visibility) 1 alternate set of parallels 2 sets closely spaced (arrival/departure) 3 FAA Control Tower & 4 ARFF Stations

9 Concept Plan Simulation Results West Flow 70% East Flow 30% Visual Instrument Visual Instrument 134 Arrivals 106 Arrivals 114 Arrivals 106 Arrivals 150 Departures 116 Departures 140 Departures 116 Departures

10 Modernization Plan Benefits

11 OMP Economic Impact The O Hare Modernization Program projected to create up to 195,000 new jobs and add an additional $18 billion in annual economic activity to our region. In addition, the construction activities associated with the OMP provide for significant job growth

12 OMP Funding Sources ($000) PFC Funding $1,523 FAA LOI Grants $925 GARBs $2,882 AIP Funds $74 Total $5.4B

13 Pre-OMP and Current Aerial Views

14 Pre-OMP and Current Aerial Views

15 OMP Delay Reduction Per Runway

16 Components per Phase of OMP

17 Projects Delivered

18 Aerial Photograph of Runway 10C-28C Taken October 2013 O Hare Runway 10C-28C: Case Study

19 Runway 10C-28C Stats Final piece of OMP Phase 1 and the cornerstone of the $8 billion OMP plan to reconfigure O'Hare International Airport. Schedule Design by OAE JV (AECOM, Jacobs, Milhouse and Delta Engineering) Construction Budget $780M runway construction $1.3B with enabling projects

20 Project Description Scope Runway: 10,800 long by 200 wide Full parallel taxiway with high speed and perpendicular entrance/exit taxiways Group VI, CAT II/III runway Runway status lights Two cargo aprons Cargo access tunnel Site grading, drainage and utilities Perimeter service road

21 Project Statistics 7.2 million CY of earthwork 950,000 SY of pavement 250 Miles of airfield cable 2,800+ airfield lights 17.5 Miles of subsoil drains 680,000 tons of asphalt From Chicago Tribune article

22 Runway 10C-28C Critical Elements Project Complexity Project Successes Lessons Learned

23 ORD Runway 10C-28C: Complexity CEMETERY RELOCATION & PROTECTION ST. JOHANNES (1) RESTHAVEN (2) R/W 10L NAVAIDS R/W 10L PAVING & ELECTRICAL R/W 10L MASS GRADING CARGO AREA SITE PREP NORTH R/W 10C-28C CARGO TUNNEL EXTENSION R/W 10C-28C CONSTRUCTION CENTER R/W 10L TAXIWAYS RUNWAY 10C-28C CONSTRUCTION EAST 10C BERMS 5 AND 6 & 10L SITE PREPARATION RUNWAY 10C-28C CONSTRUCTION WEST (1) (a) CARGO APRON (b) (2) (c) R/W 10C-28C MASS GRADING (EAST) SOUTH BASIN SITE PREPARATION BENSENVILLE LAND ACQUISITION AREAS INTERIM BENSENVILLE DITCH RELOCATION FEDEX CARGO BUILDING FEDEX VEHICLE MAINTENANCE BUILDING CARGO AREA SITE PREP SOUTH FINAL RAIL RELOCATION UNITED CARGO BUILDING INTERIM RAIL RELOCATION & CARGO ACCESS RD FUELING SYSTEM REPLACEMENT AIRFIELD VAULTS & ASSOCIATED DUCT BANKS SOUTH RTR S R & S and LLWAS LLWAS (a) RTR R (b) RTR S (c)

24 Complexity: Project Integration & Delivery Integration / Incorporation of other designs into the Runway 10C-28C design Extensive and on-going coordination with other designers Rapidly changing site conditions Incorporation of other designs into Runway 10C-28C bid packages Creation of project coordination plans for each bid package Project Delivery Design / Bid / Build Constructed in 8 bid packages - 5 site preparation projects and 3 paving packages

25 Complexity: Project Phasing Key Concerns Maintaining airfield operations during construction Integration with other construction & enabling projects Stakeholder input and buy-in Seasonal weather conditions & moratoriums Earthwork management Constructability Site access Staging areas

26 Project Successes Packaging - Coordination & timing allowed the project to be completed 2 months early and $139M under budget ($641M total) Redesign and re-phasing of storm sewers allowed for $4M in savings Detailed understanding of design codes identified reduction in paving limits saving $16M Installation of first low voltage approach lighting system in the United States

27 Runway 10C-28C Lessons Learned Track & Document Decisions/Assumptions On a long program it is a must to document for reference as time goes by on the program and staff changes Don t Overdesign Leave flexibility in designs to allow for changes in fleet mix, traffic patterns and airfield functionality in the future Flexibility in the Construction Phasing Define work restrictions/requirements and leave the means and methods to the construction contractor Get Construction Personnel Involved Early Incorporation of construction personnel in the design process can save construction time and reduce cost

28 Runway 10C-28C Lessons Learned Detailed Existing Utility Investigation Detailed investigation in design prevents utility outages and down time for the contractor Standardized Quality Documentation & Procedures With a large number of stakeholders coordination and consistency is a must to track comments and changes Develop a Procedure for Expediting Change/Field Orders Change will happen. Quick resolution can keep design and construction on track. Size and Timing of Bid Packages is Important Look to take advantage of the broader construction market and economy of scale Restrictions on Availability of Work Areas for Contractor Don t just specify worst case conditions to minimize contractor claims. Additional costs will be built into the bid price that cannot be recouped if restrictions are relaxed during construction.

29 Runway 10C-28C Lessons Learned Public Engagement You need public support for your program. Look for innovative ways to provide a positive impact to the community.

30 FAA Standards Pavement Geometry FAA AC150/ Airport Design Used for Runway 10C-28C Geometry (Dated 9/29/89) Current FAA Standard is AC 150/ A, Change 1 (Dated 2/26/2014) Some Differences Between Standards: Taxiway Design Group (TDG) Fillet Geometry Shoulder Widths Taxiway Width Change Advantages Taxiway Width 82 vs. 100 for TDG 7 vs. ADG VI Reduced Taxiway Shoulder Width in some cases Segmented Fillet Geometry

31 Thanks for your time

32 Federal Aviation Administration Airfield Safety Design & Construction Presented to: ACC / AAAE Planning, Design & Construction Symposium New Orleans, LA <Audience> By: Khalil E. Kodsi, P.E. PMP Manager, Airport Engineering Division, AAS-100 Date: February 22, 2017 <Date> Federal Aviation Administration 1

33 Avoid Wide Expanses Of Pavement Federal Aviation Administration 2

34 Avoid Wide Expanses Of Pavement Federal Aviation Administration 3

35 Increase Pilot Situational Awareness Federal Aviation Administration 4

36 Increase Pilot Situational Awareness Federal Aviation Administration 5

37 Avoid Direct Access Federal Aviation Administration 6

38 Avoid Direct Access Federal Aviation Administration 7

39 Avoid Direct Access Federal Aviation Administration 8

40 Avoid Direct Access Federal Aviation Administration 9

41 Supplemental Videos FAA TV Runway Incursion Prevention Basic Taxiway Geometry Taxiway Design Groups Airplane Maneuvering High Speed Exits End-Around Taxiways n/airport_design_technical_videos/ Federal Aviation Administration 10

42 New Fillet versus Old Fillets 150/ Federal Aviation Administration 11

43 Taxiway Safety Areas (TSA)? Federal Aviation Administration 12

44 TSA & Object Free Area Limits Federal Aviation Administration 13

45 Temporary Orange Construction Signs Federal Aviation Administration 14

46 Taxiway Center Line Deviation CONSTRUCTION AREA TAXIWAY CENTERLINE TEMPORARILY RELOCATED NOTE: FOR PROPER PLACEMENT OF SIGN REFER TO AC 150/ Federal Aviation Administration 15

47 RWY 33 TAKEOFF RUN AVAILABLE 8320 FT CONSTRUCTION AHEAD Phasing Plan Application - simplified 8,320 (TORA, TODA, ASDA) 8,320 (TORA, TODA, ASDA, LDA) 7,820 (LDA) RUNWAY TAXIWAY G RWY 15 TAKEOFF RUN AVAILABLE 8320 FT NORTH TAXIWAY H (SECURED TO BARRICADE) NEW CONSTRUCTION CLOSED CLOSED FOR LANDING - DISPLACED THRESHOLD LEGEND Federal Aviation Administration 16

48 Use of a Lighted X For a multiple runway environment, If the lighted X on a designated number will be located in the RSA of an adjacent active runway, locate the lighted X farther down the closed runway to clear the RSA of the active runway. In addition, the closed runway numbers located in the RSA of an active runway must be marked with a flat yellow X. Federal Aviation Administration 17

49 Temporary Displaced Threshold OBLITERATE AIMING POINT MARKING INSTALL TEMPORARY RUNWAY DESIGNATION, ARROWHEADS AND DISPLACED THRESHOLD BAR INSTALL TEMPORARY RUNWAY THRESHOLD LIGHTING (INBOARD LIGHT IS YELLOW/GREEN, ALL OTHERS ARE BLANK/GREEN) INSTALL TEMPORARY ARROWS TO EXISTING CENTERLINE MARKING, SEE NOTE TURN CENTERLINE LIGHTS OFF IF DISPLACEMENT OF THRESHOLD IS MORE THAN 700' OBLITERATE RUNWAY DESIGNATION MARKING CHANGE EXISTING LIGHTS TO YELLOW/RED NOTES: 1. THIS FIGURE IS A SCHEMATIC REPRESENTATION AND NOT INTENDED FOR INSPECTION PURPOSES. REFER TO THE APPLICABLE ACs FOR GUIDANCE. 2. THIS FIGURE DIPICTS A TYPICAL TEMPORARY DISPLACED THRESHOLD. THE ACTUAL TEMPORARY MEASURES WILL VARY PER EACH SPECIFIC SITUATION. 3. DURING CONSTRUCTION VASI AND PAPI SYSTEMS SHOULD BE TAKEN OUT OF SERVICE. CONSTRUCTION AREA INSTALL TEMPORARY REIL (OPTIONAL) USE DECLARED DISTANCES TO PROVIDE RSA AND CLEAR APPROACH/DEPARTURE SURFACE OBLITERATE TOUCHDOWN ZONE AND CENTERLINE MARKING RUNWAY SAFETY AREA EXTENDS REQUIRED DISTANCE PRIOR TO THRESHOLD OBLITERATE THRESHOLD MARKINGS INSTALL RED/RED LIGHTS BLAST FENCE OUTSIDE TOFA TO PROTECT CONSTRUCTION ZONE (MAY BE REQUIRED) NOT TO SCALE Federal Aviation Administration 18

50 Temporary Partially Closed Runway OBLITERATE AIMING POINT MARKING LOW PROFILE BARRICADES WITH FLASHERS SEE NOTE 1 OBLITERATE RUNWAY DESIGNATION AND CENTERLINE MARKINGS DISCONNECT/COVER TAXIWAY DIRECTION SIGNS DISCONNECT LIGHTS OBLITERATE THRESHOLD MARKINGS RWY 2 TAKEOFF RUN AVAILABLE 6750 FT CHANGE LENSES AS NECESSARY COVER DISTANCE REMAINING SIGN IN THIS DIRECTION INSTALL SIGN AT BOTH ENDS OF THE RUNWAY (OPTIONAL) OBLITERATE TAXIWAY CENTERLINE MARKINGS TO CLOSED AREAS INSTALL TEMPORARY TAXIWAY CLOSED MARKING BLAST FENCE TO PROTECT CONSTRUCTION ZONE (MAY BE REQUIRED). IF BLAST FENCE IS NOT USED, INSTALL LOW PROFILE BARRICADES DISCONNECT/COVER TAXIWAY DIRECTION SIGN CONSTRUCTION AREA USE DECLARED DISTANCES TO PROVIDE RSA AND CLEAR APPROACH AND DEPARTURE SURFACE INSTALL TEMPORARY RUNWAY DESIGNATION AND THRESHOLD BAR INSTALL TEMPORARY RUNWAY THRESHOLD/END LIGHTING INSTALL TEMPORARY REIL (OPTIONAL) OBLITERATE TOUCHDOWN ZONE MARKING RUNWAY SAFETY AREA EXTENDS REQUIRED DISTANCE PRIOR TO THRESHOLD INSTALL TEMPORARY CHEVRONS NOTES: 1. PLACE LOW PROFILE BARRICADES AT ALL ACCESS POINTS TO CLOSED SECTION OF RUNWAY. 2. THIS FIGURE IS A SCHEMATIC REPRESENTATION AND NOT INTENDED FOR INSPECTION PURPOSES. REFER TO THE APPLICABLE ACs FOR GUIDANCE. 3. THIS FIGURE DIPICTS A TYPICAL TEMPORARY PARTIALLY CLOSED RUNWAY. THE ACTUAL TEMPORARY MEASURES WILL VARY PER EACH SPECIFIC SITUATION. 4. DISCONNECT/COVER LIGHTS IN CLOSED AREAS. 5. DURING CONSTRUCTION VASI AND PAPI SYSTEMS SHOULD BE TAKEN OUT OF SERVICE. NOT TO SCALE Federal Aviation Administration 19

Date: 12/13/2017 Initiated By: AAS-100

Date: 12/13/2017 Initiated By: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Operational Safety on Airports During Construction Date: 12/13/2017 Initiated By: AAS-100 AC No: 150/5370-2G

More information

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date: ICAO Recommended Airport Signs, Runway And Taxiway Markings Revision Date: 20051230 MANDATORY INSTRUCTION SIGNS A mandatory instruction sign identifies a location beyond which an aircraft taxiing shall

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Appendix A - Glossary

Appendix A - Glossary Appendix A - Glossary The terms and definitions here are relevant to airport design standards and retrieved from AC 150/5300-13A, Airport Design. A Accelerate-Stop Distance Available (ASDA). See Declared

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues 50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Runway and Taxiway Marking

Runway and Taxiway Marking Lecture-38 10CV63 TE-II Runway and Taxiway Marking In order to aid pilots in guiding the aircraft on runways and taxiways, pavements are marked with lines and numbers. These markings are of benefit primarily

More information

Navigation - Runways. Chap 2, Nolan

Navigation - Runways. Chap 2, Nolan Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When

More information

Facility Requirements

Facility Requirements 4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

O Hare Modernization Program

O Hare Modernization Program O Hare Modernization Program Presentation to Airports Council International April 27, 2009 O Hare Modernization Program Today s Presentation OMP Overview Benefits of OMP Accomplishments Future of the OMP

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

8.0 AIRPORT LAYOUT PLANS

8.0 AIRPORT LAYOUT PLANS 8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented

More information

Dallas Executive Airport

Dallas Executive Airport 648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8

More information

RALEIGH-DURHAM INTERNATIONAL AIRPORT RALEIGH, NORTH CAROLINA

RALEIGH-DURHAM INTERNATIONAL AIRPORT RALEIGH, NORTH CAROLINA RALEIGH, NORTH CAROLINA CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) RUNWAY 14-32 REHABILITATION RDU Project No.: 211100 Client: RALEIGH-DURHAM AIRPORT AUTHORITY Prepared by: TABLE OF CONTENTS DEFINITION

More information

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs Chapter 4 Airport Capacity Assessment and Identification of Facility Needs 4.1 Introduction The purpose of the airport capacity assessment and identification of facility needs is to evaluate the single

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS 4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

print materials visit information on free live seminars, online courses, and

print materials visit   information on free live seminars, online courses, and The AOPA Air Safety Foundation is dedicated to making flying easier and safer for general aviation pilots. For information on free live seminars, online courses, and print materials visit. ILS Critical

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

AERODROME LIGHTING SYSTEM

AERODROME LIGHTING SYSTEM AERODROME LIGHTING SYSTEM 1. Introduction This chapter will show the wide variety of approach lighting systems before the runway threshold and systems present on runways. 2. Runway approach ramps 2.1.

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

Technical Advisory Committee Meeting February 29, 2016

Technical Advisory Committee Meeting February 29, 2016 Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

What is an Airport Master Plan?

What is an Airport Master Plan? What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential

More information

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Trick or Treat Process M

Trick or Treat Process M AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Appendix D Airfield Ongoing Projects Alternatives

Appendix D Airfield Ongoing Projects Alternatives Appendix D Appendix D D.1 Introduction The set of alternatives for each of the airfield facilities was compared with respect to each other and the existing condition. 1 The screening and evaluation process

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Acronyms. Airport Layout Plan Report Appendix A A-1

Acronyms. Airport Layout Plan Report Appendix A A-1 Appendix A Acronyms AC... Advisory Circular ADG... Airplane Design Group ADO... Airport District Office AGL... Above Ground Level AIM... Aeronautical Information Manual AIP... Airport Improvement Program

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

BRL LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Etended Clear

More information

Airport Design-3 Geometric Design

Airport Design-3 Geometric Design Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Assignment 7: Airport Geometric Design Standards

Assignment 7: Airport Geometric Design Standards CEE 4674: Airport Planning and Design Spring 2018 Date Due: March 23, 2018 Instructor: Trani Problem 1 Assignment 7: Airport Geometric Design Standards An airport is designing a new pier terminal to accommodate

More information

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014 1. Purpose and Need 1.1 Introduction The City of Los Angeles, through its aviation department, Los Angeles World Airports (LAWA), proposes to construct improvements to the Runway Safety Area (RSA) for

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for

More information

Subject: Standards for Airport Markings Date: 9/3/2010 AC No: 150/5340-1K Initiated by: AAS-100 Change:

Subject: Standards for Airport Markings Date: 9/3/2010 AC No: 150/5340-1K Initiated by: AAS-100 Change: Consolidated AC includes Change 1 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Standards for Airport Markings Date: 9/3/2010 AC No: 150/5340-1K Initiated

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Facility Requirements

Facility Requirements C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over

More information

Airport Layout Plan Narrative Report

Airport Layout Plan Narrative Report Airport Layout Plan Narrative Report Yuba County Airport Olivehurst, California Prepared for County of Yuba Prepared by Mead & Hunt, Inc. March 23, 2017 YUBA COUNTY AIRPORT AIRPORT LAYOUT PLAN NARRATIVE

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

This advisory circular (AC) contains the Federal Aviation Administration (FAA) standards for markings used on airport runways, taxiways, and aprons.

This advisory circular (AC) contains the Federal Aviation Administration (FAA) standards for markings used on airport runways, taxiways, and aprons. U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Standards for Airport Markings Date: 9/27/2013 Initiated by: AAS-100 AC No: 150/5340-1L Change: 1. What is the

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Ref. AIM Para AOPA Air Safety Foundation   Supported by the FAA   Ref. AIM Para Supported by the FAA ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements The evaluation of airport facility requirements uses the results of the inventory and forecasts contained in Chapters Two and Three, as well as established planning

More information

National Transportation Safety Board Washington, D.C

National Transportation Safety Board Washington, D.C E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Safety Recommendation Date: June 25, 2004 In reply refer to: A-04-48 through -50

More information