What is an Airport Master Plan?
|
|
- Jasmine Simon
- 5 years ago
- Views:
Transcription
1 What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential environmental and socioeconomic impacts. -FAA Advisory Circular 150/500-6B Airport Master Plans
2 Master Plan Process Investigative Solutions Implementation Inventory Forecasts Facility Requirements Development Alternatives Program Implementation Plan Master Plan Report Airport Layout Plan
3 Master Plan Goals PUBLIC IPUT GOAL Share findings and solicit input from stakeholders and general public during the Master Plan process STRATEGIC LAD MAAGEMET GOAL Promote highest and best land use SAFETY GOAL Conform to industry regulations and guidelines EVIROMETAL AWAREESS GOAL Further environmental awareness OPERATIOAL EFFICIECY GOAL Accommodate short-term (2020), intermediate-term (2025), and long-term (205) demand ECOOMIC GROWTH GOAL Facilitate regional economic growth through airport development and operation FISCAL SUSTAIABILITY GOAL Maintain fiscal sustainability
4 Tons Forecast of Aviation Activity Operations Enplanements 140,000 1,400,000 0,000 1,200, ,000 1,000,000 0,000 00,000 60, ,000 40, ,000 20, , Total Commercial General aviation Military Total Operations Air Carrier Commuter Total Enplanements Cargo Volume Based Aircraft 10, , , ,000 6, ,000 4, Single Engine Multi Engine Jet Helicopter Total Based Aircraft
5 Airside Facility Requirements Taxiway Paved Shoulders Required All in W, E, SE Quadrants (exception Twy B and B) Additional precision instrument runway required Pavement Widths, OFAs, and Strength insufficient for ADG-III Required Runway Length =,00ft
6 Terminal Facility Requirements
7 Landside Requirements
8 GA, Cargo, and Support Requirements
9 Recommended Development Alternative Project List Airside 1 Runway 1-5 Extension GRAPHICAL SCALE Feet 2 Taxiway D Upgrade to ADG-III ew Parallel Taxiway 4 Extension of Taxiway D 5 Relocated RTR 6 Relocated ASR ew MALSR ew Airside Perimeter Road 9 ew Jet A Fuel Farm TT-6 PULL 2WS 2 TT-6 PULL 2WS BCH BCH 1900C 1900C BCH 1900C BCH 1900C A0-600F 0F A0-60 0F A0-60 A0-600F A0-60 0F A0-600F A0-60 0F A0-600F TT-6 PULL 2WS TT-6 PULL 2WS ew Remain-Over-ight (RO) Apron 1 Terminal Terminal Building Expansion Landside 1 Curbside Reconfiguration Expansion of Parking Garage 15 Expansion of Economy 1 and Cell Lot 16 Modification of Surface Lot 1 Relocation of Employee Lot General Aviation 1 GA CBP FIS Facility ew Apron 20 Realignment of Maygarden Road 21 ew GA Fuel Farm 22 Self-Serve AvGas Fueling Station 2 T-Hangar Expansion 24 Relocation of Helicopter Hardstand 25 ew Conventional Hangars 26 ew Access Road and Vehicle Parking Area c 19a b 19b 26b 26c Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201 Aeronautical Development ew Access Taxiway (ADG IV) 2 Potential Facility Site Potential Apron Site Potential Vehicle Parking Site on-aeronautical 1 Demolish Abandoned TRACO Building
10 Recommended Terminal Alternative LOWER LEVEL Legend Ticketing Public Circulation Baggage Handling Restrooms Baggage Claim Lobby Rental Car Lobby Rental Car Offices Support Feet Source: Pensacola International Airport, 200; RS&H, 201
11 Recommended Terminal Alternative UPPER LEVEL Legend Holdroom Public Circulation Restrooms Concessions Office/Administration Feet Source: Pensacola International Airport, 200; RS&H, 201
12 Terminal Recommended Development Alternative Project List Airside 10 ew Remain-Over-ight (RO) Apron GRAPHICAL SCALE 0' 1 150' 0 0' Feet Terminal Terminal Building Expansion Landside 1 Curbside Reconfiguration 14 Expansion of Parking Garage 15 Expansion of Economy 1 and Cell Lot 16 Modification of Surface Lot 1 Relocation of Employee Lot on-aeronautical 1 Demolish Abandoned TRACO Building 1 14 Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201
13 GA Recommended Development Alternative Project List Airside 1 Runway 1-5 Extension 2 GRAPHICAL SCALE ' 250' 0 500' Feet 2 Taxiway D Upgrade to ADG-III ew Parallel Taxiway 5 Relocated RTR 6 Relocated ASR ew Airside Perimeter Road 2 General Aviation 1 GA CBP FIS Facility ew Apron 20 Realignment of Maygarden Road 22 Self-Serve AvGas Fueling Station 2 T-Hangar Expansion 24 Relocation of Helicopter Hardstand 25 ew Conventional Hangars 26 ew Access Road and Vehicle Parking Area 6 5 H5 H Aeronautical Development ew Access Taxiway (ADG IV) H 24 H 19a H H 25c 2 Potential Facility Site Potential Apron Site Potential Vehicle Parking Site H b 25b 26b 26c Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) Source: Pensacola International Airport, 200; RS&H, 201
14 Future Land Use Plan Legend Airport Surveilance Radar ASR Critical Area H E Runway Protection Zone SPA IS 9T AV Building Restriction Line H TR L LAG LEY AVE ew Taxiway ADG V TDG 6 ew Airfield Pavements Airport Property Boundary RTR Site RAC Service Facility ew MALSR Fuel Farm Airport Support MALSR I SCE Stormwater and Wetlands Airfield Pavement Removal C HW Passenger Terminal Area Y Airfield Aviation Development YO BA Maygarden Road Realignment Reserved Airport & th Development Taxiway D Extension ADG III TDG Commercial Fuel Farm TH AV E D LV UB Mixed-Use Development RTR Relocation Commercial Development ASR Critical Area ew Taxiway ADG V TDG ' Runway Extension TH GA Fuel Farm AVE Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CES/Airbus DS, USDA, USGS, AeroGRID, IG, and the GIS User Community Source: Esri Imagery, 201; RS&H, ,000 Feet 2,000 º
15 Recommended Development Alternative Phasing 0-5 Years Future 1 Runway 1-5 Extension 2 0 ew Parallel Taxiway 19c ew Apron 5 Relocated RTR 2c T-Hangar Expansion ew MALSR 25c ew Airside Perimeter Road 26c 1400 TT-6 PULL 2WS BCH 1900C 1900C Expansion of Economy 1 and Cell Lot ew Jet A Fuel Farm 10 ew Remain-Over-ight (RO) Apron 2 Potential Facility Site Potential Apron Site 1 Curbside Reconfiguration Potential Vehicle Parking Site 1 Relocation of Employee Lot 1 Demolish Abandoned TRACO Building 1 GA CBP FIS Facility 9 BCH 15 ew Conventional Hangars ew Access Road and Vehicle Parking Area ew Access Taxiway (ADG IV) a TT-6 PULL 2WS BCH 1900C 1900C BCH A0-600F 0F Relocated ASR Taxiway D Upgrade to ADG-III Feet GRAPHICAL SCALE Years Future A0-60 A0-60 0F A0-600F A0-60 0F A0-600F A0-60 0F A0-600F TT-6 PULL 2WS TT-6 PULL 2WS a 21 ew GA Fuel Farm 22 Self-Serve AvGas Fueling Station 2a ew Apron b 1 T-Hangar Expansion Relocation of Helicopter Hardstand 2 19c 6-10 Years Future 4 Extension of Taxiway D 2a 2b c 19a a b 19b 26b 26c b ew Airside Perimeter Road 14 Expansion of Parking Garage 16 Modification of Surface Lot 20 2c Legend Existing Property Line Future Property Line ASR Critical Area Runway Visibility Zone (RVZ) MALSR ew Airfield Pavement Expanded Airfield Pavement ew Facility Development ew Access Roads ew Vehicle Parking Area ew Airside Perimeter Road Runway Protection Zone (RPZ) # Airside Projects # Terminal Projects # Landside Projects # General Aviation Projects # Aeronautical Projects # on-aeronautical Projects Source: Pensacola International Airport, 200; RS&H, b 20 ew Apron Realignment of Maygarden Road 2b T-Hangar Expansion 25b ew Conventional Hangars ew Access Road and Vehicle Parking Area 26b
16 1 2 Terminal Alternative Phasing LOWER LEVEL 0-5 Years Future 1 2 Bag Claim Lobby Expansion Inbound Bag Room Relocation Years Future Make-up Area Expansion - 20 Years Future ew Holdrooms Expand and Relocate SSCP Existing Holdroom Expansion Post-Security Concessions Reconfigured Ticket Lobby orth Lobby Mezzanine Support Spaces Baggage Service Office Relocation 1 14 Public Circulation Rental Car Lobby Expansion Restroom Relocation ew Restroom UPPER LEVEL 9 4 Legend Holdroom Public Circulation Restrooms 6 Concessions Office/Administration 4 Ticketing 4 5 Baggage Handling Baggage Claim Lobby 14 Rental Car Lobby Rental Car Offices Support Feet Source: Pensacola International Airport, 200; RS&H, 201
AIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationGerald R. Ford International Airport Authority Master Plan Update A World Class Gateway
Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationTABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.
TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...
More informationFort Wayne International Airport Master Plan Study. Executive Summary
Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationChapter 5 Airport Development Alternatives
Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationTable of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update
Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationPREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update
PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update AIRPORTS DIVISION DEPARTMENT OF TRANSPORTATION March 13, 2012 AGENDA Introduction Purpose and Meeting Objectives Kahului
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationAlternatives Analysis EXECUTIVE SUMMARY
Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS
EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationBRL LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Etended Clear
More informationFort Lauderdale Hollywood International Airport
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationTO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationHILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1
HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationWelcome to the Boise Airport Master Plan Update Open House
Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More information8.0 AIRPORT LAYOUT PLANS
8.0 AIRPORT LAYOUT PLANS This chapter presents a detailed graphic and narrative description of the selected development concept for General Mitchell International Airport (MKE). The plans package presented
More informationENVISIONING AUSTIN s Airport of the Future
ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A
More informationMONTROSE REGIONAL AIRPORT
MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More informationCollier County Airport Authority. Joint Automated Capital Improvement Program
Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer
More informationRNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan
RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally
More informationGrants Pass Airport Master Plan & Airport Layout Plan Update
Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationGeneral Aviation Master Plan Update
Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More informationTECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan
TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More information2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017
VOLUME 1 2012 AIRPORT MASTER PLAN 2016 ADDENDUM SUBMITTED ON: SEPTEMBER 22, 2017 VOLUME 1 CONTENTS SECTION 1 - INTRO AND AIRPORT CONTEXT SECTION 2 - FORECAST SECTION 3 - AIRFIELD FACILITIES AND DEMAND/CAPACITY
More informationThe CLE Master Plan Includes:
The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationAIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA
AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting
More informationSavannah / Hilton Head International Airport Master Plan Update
EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,
More informationCHAPTER 3 AIRPORT FACILITY REQUIREMENTS
CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationPORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM
PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs
More informationWestshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director
Presented by: Alice J. Price, AICP, Senior Project Director Back In Time: 1946 Drew Field 1952 Main Terminal 1963 Study Terminal Design Goals: Human Values Airline economics Airport financial considerations
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning
More informationCasper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM
Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationPULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project
PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update 6th Working Group Briefing 1/7/19 Study Purpose Agenda Background Summary of last stakeholder meetings Refresher on DNL,
More informationAVIATION. MichiganReportCard.com 5
MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure
More informationBlue Grass Airport (LEX) serves the needs of a multi-county area that
SUMMARY BACKGROUND This Master Plan Update balances needed airport improvements with the goals of the community and arrived at a consensus on how to best meet future demand without sacrificing those natural
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationGSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT
About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South
More informationAviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011
Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence
More information