1 O Hare Modernization Program Presentation to Airports Council International April 27, 2009

2 O Hare Modernization Program

3 Today s Presentation OMP Overview Benefits of OMP Accomplishments Future of the OMP Sustainable initiatives Importance of OMP Completion

4 OMP Overview

5 O Hare Airfield Modernization

6 O Hare Modernization Program Completed Projects Runway 9L-27R NATCT (North Airport Traffic Control Tower) November Runway 10L-28R Sept. 25, 2008

7 Benefits of the OMP

8 OMP Benefits to Travelers Runway Extension 10/28 13,000 foot east/west runway for international long haul flights

9 OMP Benefits to Travelers New Runway 9L/27R Catalyst for removal of flight caps since 2004

10 OMP Benefits to Travelers Simultaneous Triple Approach First time for O Hare to land three planes simultaneously in all weather conditions

11 Triple Simultaneous Approach

12 O Hare s Improved Performance DEC 2007 DEC % 53% DEC 2008 DEC % 60% JAN 2008 JAN % 58% JAN 2009 JAN % 73% FEB 2008 FEB % 55% FEB 2009 FEB % 84% 15% 15% On-time Arrival Rate Increased: On-time Arrival Rate Increased:

13 North Airport Traffic Control Tower

14 The Future of the OMP

15 Runway 10C-28C Construction in C-28C Delays fall to 10 minutes per flight Built to handle New Large Aircraft Design Group VI

16 Runway 10C-28C Construction in C-28C Concrete paving begins this spring Construction of replacement cargo facilities Relocation of rail line and cemetery

17 PFC Application No Local or State Taxpayer Dollars

18 Completion Phase Runways Runway 9C-27C Runway 9R-27L Runway 10R-28L

19 Western Terminal Design Team Western Terminal

20 Western Terminal Planning Study

21 Program Timeline Lead Runway Designers & Western Terminal Area Planner Selected Scope and Fee Negotiations Completed Notices-To- Proceed issued for Runway/ Terminal Planner Design Work Completion Phase Construction Begins Full OMP Completed March 2009 April 2009 May

22 Sustainable Initiatives

23 OMP Sustainable Design Manual Sustainable Design Manual December 2003 A model for green building practices Invited to share with other cities

24 Rating & Measurement System Green Airplane rating system Civil - Airside Civil - Landside Buildings - Occupied Buildings - Unoccupied Total Points Possible

25 Rating & Measurement System

26 Balanced Earthwork Plan 15 million cubic yards of soil Phase 1

27 Balanced Earthwork Plan Over $100 million saved in reduced truck trips and fees for dumping at landfills

28 OMP Balanced Earthwork Plan Runway 10C Mass Grading East

29 OMP Balanced Earthwork Plan Runway 10C Mass Grading East

30 Impact of Going Green Ultra Low Sulfur Diesel Fuel (ULSD) for vehicles + 50hp 5 years ahead of Federal Government s requirement Oxidation catalysts and particulate traps for cleaner emissions OMP saved $2 million by crushing and reusing concrete and asphalt

31 Impact of Going Green Green Roofs Alleviate urban heat island typical at airports

32 Impact of Going Green FAA Tower Design Phase Minimum 20% energy efficiency 30% reduction from baseline water use 50% of waste diverted from landfills Low VOC emitting sealants, paints, coatings Preferred parking for carpools and vans Dual flush toilets Building products at least 5% recycled content 20% of materials from local sources 10,000 sq. ft. Vegetated green roof Construction Phase 100% Purple Board drywall - interior buildings Adding shrubs, trees, and planting beds to landscaping Recycling asphalt grindings from the job site for use on other OMP projects Applying for for USGBC LEED LEED Certification

33 Future Green Roof: United Cargo Building 130,000 sq. ft. GREEN Roof Strategically placed windows for optimum use of daylight 75% materials diverted from landfills through recycling/reuse Energy Star compliant equipment Indoor CO2 monitoring - ventilation 10% of parking spaces for fuel efficient and carpool vehicles Use of refrigerants that protect against ozone depletion 20% Construction Materials with Recycled Content Low VOC-emitting adhesives, sealants, paints, and carpeting 10% Local and Regional Materials

34 Future Green Roof: FedEx Cargo Building 200,000 square foot Vegetated GREEN Roof 30% reduction from baseline water use Refrigerant Management: No R-11 or R-22 refrigerants 20% of building materials from Local Sources 75% of Construction Waste to be Diverted from landfills Low VOC emitting sealants, paints, and coatings Provide Preferred Parking for Carpools and Vans Pursuing Pursuing USGBC USGBC LEED LEED Silver Silver Certification Administration/World Service Service Center Center

35 OMP Sustainable Initiative Awards US Green Building Council 2006 ENR Top 25 Newsmakers 2008 United Nation s Environmental Programme for Liveable Communities U.S. Congress: It has been a model project, and I would hope that other airports throughout the country would take a look at what Mayor Daley and the City of Chicago have done U.S. Environmental Protection Agency: A unique opportunity to think creatively and look for innovation in design, construction and operation FAA: A visionary and effective initiative that provides a strong foundation for ongoing environmental stewardship

36 Future OMP Sustainability Initiatives Issue revised edition of SDM based on lessons-learned and emergence of new technologies Host 2 nd Green Construction Conference August 5-7 with American Association Airport Executives CTE: Creating the Airport Sustainability Institute to certify sustainable initiatives based on OMP Sustainable Design Manual Continue to build on O Hare s green initiatives in operations and maintenance

37 OMP Completion

38 Airline Industry is Cyclical 900 U.S. Revenue Enplanements (in millions) World Events Fuel Impacts R Recession Enplanements Fuel Shock Hijackings Cuban Missle Crisis Fuel Shock PATCO Strike WTC 1993 Pan Am 103 Persian Gulf War Fuel Shock Fuel Shock Credit Iraq Crisis War R R R R R R R 2008E Sources: Air Transport Association, National Bureau of Economic Research, Landrum & Brown Analysis -1/16/2009

39 OMP Increases Capacity and Efficiency O Hare remains one of the world s most congested airports Modernization will increase efficiency and reliability Benefits to traveling public, airline partners, and national aviation system

40 OMP Benefits Job Creation OMP has been our region s stimulus package for years 550 design and engineering jobs and 12,000 construction jobs Additional 1,400 construction jobs for R/W 10C 200 design jobs for completion phase

41 OMP Benefits Economic Activity 195,000 new jobs $18 Billion annually to our region s economy 450,000 jobs and $38 billion today O Hare generates 450,000 jobs

42 Global Connectivity 70 million passengers annually 1.5 million tons of mail, freight and cargo Chicago-O Hare NONSTOP International Markets

43 Increased Traffic = Economic Activity 1.2 million operations 100 million passengers Additional passengers means increased spending

44 Cargo Operations Each freighter landing leads to an additional $3 million in business Increase in flight capacity means more cargo on passenger aircraft and freighter airlines

45

46 Chicago 2016

47 Welcome to Chicago

48 O Hare Modernization Program Runway 9L-27R Runway 9C-27C Runway 9R-27L Western Terminal COMPLETE COMPLETE NATCT (North (North Airport Airport Traffic Traffic Control Control Tower) Tower) Runway 10L-28R COMPLETE Runway 10C-28C SATCT (South Airport Traffic Control Tower) Runway 10R-28L

49

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

Welcome Sustainability Initiatives of. International Airport

Welcome Sustainability Initiatives of. International Airport Hartsfield-Jackson Atlanta International Airport 1 Welcome Sustainability Initiatives of Hartsfield-Jackson Atlanta International Airport Tom Nissalke, Ph.D. Director Environmental and Technical Services

More information

Nancy Graham Director, Air Navigation Bureau, ICAO

Nancy Graham Director, Air Navigation Bureau, ICAO Nancy Graham Director, Air Navigation Bureau, ICAO ICAO and its Role The International Civil Aviation Organization (ICAO) is a UN specialized agency, created in 1944 upon the signing of the Convention

More information

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 TRACK: TRACK C (AIRSIDE/ENGINEERING) Title: Upcoming Airfield Programs WORKSHOP: Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017 Image: O

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

Will it Fit? Preliminary Findings

Will it Fit? Preliminary Findings Will it Fit? Preliminary Findings Presented by John Dickson Airport System Development Committee, Chair Transportation Committee October 24, 2018 Agenda Introduction & overview Airport site planning considerations

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 File No. 04-01/2010-AED Dated: 13 th June

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

KJFK Runway 13R-31L Rehabilitation ATFM Strategies Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal KJFK Runway 13R-31L Rehabilitation ATFM Strategies

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

Industry perspective Current Market Outlook

Industry perspective Current Market Outlook Industry perspective Current Market Outlook Sam Bolooki Director International Business Development & Programs Boeing Global Air Traffic Management Oct. 2013 Agenda Aviation industry 20-year commercial

More information

Market Outlook. Michael Warner, Director Market Analysis. Boeing Commercial Airplanes October October 7 10, 2012 Atlanta, Georgia, USA

Market Outlook. Michael Warner, Director Market Analysis. Boeing Commercial Airplanes October October 7 10, 2012 Atlanta, Georgia, USA Market Outlook Michael Warner Director, Market Analysis Boeing Commercial Airplanes October 2012 Agenda Aviation environment Current products Product strategy & development 2012 719 net orders through

More information

FLL s international traffic has tripled in the last 10 years and it is now 16% of total traffic

FLL s international traffic has tripled in the last 10 years and it is now 16% of total traffic FLL in Perspective FLL in Perspective 2013- FLL ranked as the 21 st busiest airport in the U.S. with 23,559,779 total passengers, 15 th in international passengers and 13 th in domestic Origin and Destination

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

2011 AIRPORT UPDATE. March 25, 2011

2011 AIRPORT UPDATE. March 25, 2011 2011 AIRPORT UPDATE March 25, 2011 1 Airports are important economic engines for the regions they serve; creating jobs, facilitating commerce and providing access to the global marketplace 2 AIRPORT HIGHLIGHTS

More information

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History MIA BASELINE ACTIVITY FORECASTS, DERIVATIVE DATA AND FLEET MIX PROJECTIONS RESULTS SUMMARY ACCEPTANCE BRIEFING FOR THE AIRPORT AND SEAPORT COMMITTEE (ASC) JULY 15, 2010 Study Design Outline Background

More information

ENVISIONING AUSTIN s Airport of the Future

ENVISIONING AUSTIN s Airport of the Future ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

NASA s Air Traffic Management Research Shon Grabbe SMART-NAS for Safe TBO Project Manager. Graphic: NASA/Maria Werries

NASA s Air Traffic Management Research Shon Grabbe SMART-NAS for Safe TBO Project Manager. Graphic: NASA/Maria Werries NASA s Air Traffic Management Research Shon Grabbe SMART-NAS for Safe TBO Project Manager Graphic: NASA/Maria Werries 1 Why is aviation so important? The air transportation system is critical to U.S. economic

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Memphis International Airport Enplanements by Fiscal Year (000 s)

Memphis International Airport Enplanements by Fiscal Year (000 s) Enplanements (000's) Memphis International Airport Enplanements by Fiscal Year (000 s) 6000 5000 4000 3000 International Domestic 2000 1000 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Enplanements

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017 Toronto Pearson Master Plan 2017-2037 Greater Toronto Airports Authority October 4, 2017 Stakeholder engagement The GTAA has been proactively engaging stakeholders to outline how it is preparing to meet

More information

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015 Port Everglades: Making The Last Mile Count AAPA Annual Convention November 3, 2015 Port Everglades Overview Enterprise Fund of Broward County Government Operations are supported 100% by user fees; no

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

Kansas City Aviation Department. Airport Committee July 19, 2018

Kansas City Aviation Department. Airport Committee July 19, 2018 Kansas City Aviation Department Airport Committee July 19, 2018 AGENDA Labor Update Design Process General Updates Community Outreach LABOR UPDATE Overarching Goals: Labor Harmony on the project Ensure

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

2018 Accomplishments

2018 Accomplishments CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

AMG Airport Management

AMG Airport Management AMG 1204 Airport Management By Zuliana Ismail, 2010 Airport Managements Course Outlines Chapter 1: Introduction To Airport Chapter 2: Airport Components Chapter 3: Air Traffic Control Tower Chapter 4:

More information

BURLINGTON INTERNATIONAL AIRPORT

BURLINGTON INTERNATIONAL AIRPORT BURLINGTON INTERNATIONAL AIRPORT VISION 2030 AIRPORT MASTER PLAN UPDATE Summary Presentation AIRPORT STAFF AND STUDY TEAM Robert McEwing, Director of Planning & Development Brad Worthen, Community Facilitator

More information

Airline Operations A Return to Previous Levels?

Airline Operations A Return to Previous Levels? Airline Operations A Return to Previous Levels? Prof. R John Hansman, Director MIT International Center for Air Transportation rjhans@mit.edu Impact of Sept on Demand Schedule Cutbacks -2% Currently about

More information

A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA

A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA The 3 rd ENRI International Workshop on ATM/CNS A STUDY ON OPERATION CONCEPT FOR NEXT GENERATION AIR VEHICLES IN KOREA February 20, 2013 Presented by Jae-Hyun HAN Dept. of Aviation Policy and Technology

More information

AUGUST 2008 MONTHLY PASSENGER AND CARGO STATISTICS

AUGUST 2008 MONTHLY PASSENGER AND CARGO STATISTICS Inter-Office Memo Reno-Tahoe Airport Authority Date: October 2, 2008 To: Statistics Recipients From: Tom Medland, Director Air Service Business Development Subject: RENO-TAHOE INTERNATIONAL AIRPORT PASSENGER

More information

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of This document is scheduled to be published in the Federal Register on 10/02/2017 and available online at https://federalregister.gov/d/2017-21045, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

NASA Aeronautics: Overview & ODM

NASA Aeronautics: Overview & ODM NASA Aeronautics: Overview & ODM Douglas A. Rohn Program Director, Transformative Aeronautics Concepts Program Aeronautics Research Mission Directorate July 21-22, 2015 1 100 Years of Excellence The NACA

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018 AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO

More information

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009 Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board

More information

REMARKS FOR THE HONORABLE MARY PETERS SECRETARY OF TRANSPORTATION FAA FORECAST CONFERENCE WASHINGTON, D.C. MARCH 10, 2008 NOON

REMARKS FOR THE HONORABLE MARY PETERS SECRETARY OF TRANSPORTATION FAA FORECAST CONFERENCE WASHINGTON, D.C. MARCH 10, 2008 NOON REMARKS FOR THE HONORABLE MARY PETERS SECRETARY OF TRANSPORTATION WASHINGTON, D.C. MARCH 10, 2008 NOON Thank you, Bobby, for that kind introduction. And thank you all for being here. Before I begin my

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

State of the Aviation Industry

State of the Aviation Industry State of the Aviation Industry Presentation to the ACI Airport Economics & Finance 10 th 11 th February London, United Kingdom Laurie N. Price Director of Aviation Strategy Mott MacDonald Aviation Current

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

Chapter 1. Inventory

Chapter 1. Inventory Chapter 1. Inventory Chapter 1. INVENTORY The collection and inventory of data pertinent to James M. Cox Dayton International Airport (DAY) is the initial step in a Master Plan Study and serves as the

More information

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration Presented to: AFCEA International Los Angeles By: William C. Withycombe Regional Administrator, Western-Pacific Region Date: Overview! Major Safety Initiatives! Organizational Structure! Destination 2025!

More information

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 Agenda Overview of PFC Program at Spokane Airport (GEG) Proposed New PFC 11 Application Project

More information

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018 Agenda» Website Update» Alternatives» Discussion» Evaluation» Schedule Agenda» Website Update» Alternatives» Discussion» Evaluation»

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

Captain Jeff Martin Senior Director Flight Operations Southwest Airlines

Captain Jeff Martin Senior Director Flight Operations Southwest Airlines Captain Jeff Martin Senior Director Flight Operations Southwest Airlines Southwest s Fleet Southwest achieves one of its primary competitive strengths low operating costs by operating only one aircraft

More information

Airports for the Future: ACI-NA Grassroots Campaign. AirportsForTheFuture.org

Airports for the Future: ACI-NA Grassroots Campaign. AirportsForTheFuture.org Airports for the Future: ACI-NA Grassroots Campaign AirportsForTheFuture.org 1 Learning From the Past 111 th Congress (2009-2011) House passed an FAA bill with a $7 PFC. Senate bill had no increase. ACI-NA

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting AIRPORTS DIVISION Department of Transportation AIRPORTS DIVISION The Hawaii Airports System Is Self-Supporting The State of Hawaii s General Fund (tax revenues) does not fund the operation of the Airports

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

The O Hare Noise Compatibility Commission (ONCC) Fly Quiet Committee met on August 23, 2018 in Chicago, IL.

The O Hare Noise Compatibility Commission (ONCC) Fly Quiet Committee met on August 23, 2018 in Chicago, IL. O HARE NOISE COMPATIBILITY COMMISSION Fly Quiet Committee August 23, 2018 Chicago Department of Aviation 10510 W. Zemke Road, Chicago, IL Approved Meeting Minutes The O Hare Noise Compatibility Commission

More information

AirportInfo. ACI-NA 2011 Traffic Report

AirportInfo. ACI-NA 2011 Traffic Report AirportInfo ACI-NA 2011 Traffic Report July 2012 2011 ACI World Airport Traffic Summary North America 2011 % Change 2010 Worldwide 2011 % Change 2010 Total Passengers 1.5B Up 1.8% 5.1B Up 5.2% Total International

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG UNDERGRADUATE REPORT National Aviation System Congestion Management by Sahand Karimi Advisor: UG 2006-8 I R INSTITUTE FOR SYSTEMS RESEARCH ISR develops, applies and teaches advanced methodologies of design

More information

Welcome to the Boise Airport Master Plan Update Open House

Welcome to the Boise Airport Master Plan Update Open House Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update

More information

An Economic Engine in our Region

An Economic Engine in our Region DULUTH INTERNATIONAL AIRPORT An Economic Engine in our Region Brian Ryks Executive Director Duluth Airport Authority Duluth Airport Authority Mission/Vision: The Duluth Airport Authority is dedicated to

More information

Brief Recap of Project to Date

Brief Recap of Project to Date CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018 Project Description

More information

UNFCCC Facilitative Dialogue on Enhancing Ambition and Support (Marrakech, Morocco, 16 November 2016)

UNFCCC Facilitative Dialogue on Enhancing Ambition and Support (Marrakech, Morocco, 16 November 2016) UNFCCC Facilitative Dialogue on Enhancing Ambition and Support (Marrakech, Morocco, 16 November 2016) Statement by the Secretary General of the International Civil Aviation Organization Dr. Fang Liu Ladies

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

2014 SUSTAINABILITY REPORT 1,850 DFW FLIGHTS A DAY ENVIRONMENTAL STEWARDSHIP DOMESTIC DESTINATIONS 62M INTERNATIONAL DESTINATIONS PASSENGERS

2014 SUSTAINABILITY REPORT 1,850 DFW FLIGHTS A DAY ENVIRONMENTAL STEWARDSHIP DOMESTIC DESTINATIONS 62M INTERNATIONAL DESTINATIONS PASSENGERS TRUSTED WITH TOMORROW 2014 SUSTAINABILITY REPORT DFW 1,850 FLIGHTS A DAY ENVIRONMENTAL STEWARDSHIP 147 DOMESTIC DESTINATIONS 55 INTERNATIONAL DESTINATIONS 62M PASSENGERS Arrivals Departures Table of Contents

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

By providing more capacity than any other twin-engine freighter, the 777F brings new levels of efficiency to the long-haul market.

By providing more capacity than any other twin-engine freighter, the 777F brings new levels of efficiency to the long-haul market. By providing more capacity than any other twin-engine freighter, the 777F brings new levels of efficiency to the long-haul market. 04 aero quarterly qtr_02 09 777 Freighter: Efficiency for Long-Haul Operators

More information

Office of Economic and Small Business Development. Sandy-Michael McDonald, Director. June 26, 2017

Office of Economic and Small Business Development. Sandy-Michael McDonald, Director. June 26, 2017 Office of Economic and Small Business Development Sandy-Michael McDonald, Director June 26, 2017 1 OESBD Directly Supports the County Commission s Values Ensuring economic opportunities for Broward s diverse

More information

Kansas City Aviation Department. August 25, 2015

Kansas City Aviation Department. August 25, 2015 Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning

More information