1 CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018

2 Project Description

3 Existing Terminal Area

4 Existing Terminal Floor Plan

5 Preferred Concept Floor Plan

6 Loading Bridge Concept

7 Project Description Expansion of the Gate Departure Lounge/Holdroom: Expand departure lounge to better accommodate full and multiple flights. Expansion of the TSA Baggage Screening Area and the connected Baggage Makeup Area: Improve flow and processing capacity of TSA baggage screening and airline baggage handling and loading. Relocate Jet Bridge and Ramp: Improve passenger flow and allow modifications the baggage screening and make-up areas. Separate Terminal Building Entry and Exit points with a new direct Exit added from the Baggage Claim Area: Improve passenger flow and decrease concourse congestion. Modify Baggage Claim Area and Baggage Claim Belt: Reduce congestion at baggage claim area and improve passenger flow. Install new full length terminal building canopy: Improve passenger flow and provide shelter from the elements for passenger departure and arrival and fish box staging. Construct new fish box holding areas: Improve passenger flow and decrease concourse congestion and improve baggage screening, processing, and handling.

8 Existing Departure Lounge Too small for even one fully loaded 737

9 Baggage Screening Lacks adequate length for in line processing

10 Existing Baggage Screening Manual Transfer reduces capacity and increases labor Manual Transfer reduces capacity and increases labor Steep Incline creates bag jams

11 Existing Baggage Makeup Tight working conditions & does not support two simultaneous aircraft

12 Airside Bag Screening Expansion Extends screening area into bag makeup

13 Existing Concourse Congestion Fish Box Staging Baggage Check in Queues Cross Traffic Security Queues

14 Existing Baggage Claim Congestion Deplaning/Claim conflict No Direct Exit Claim Belt Length

15 Fish Box Processing

16 Preferred Concept Floor Plan

17 Justification for PFC Funding These improvements are required to address existing terminal building inadequacies. The existing terminal building was originally constructed in 1969 and modified several times in subsequent years. It is currently inadequate to meet security and passenger service requirements. A number of terminal building shortcomings are identified in the 2005 and 2011 Master Plans. The proposed improvements will help remedy some of the Terminal s deficiencies thereby increasing the airport safety, security, and capacity.

18 The specifics of the proposed PFC are as follows: PFC charge level: $4.50 Charge effective date: May 1, 2018 Estimated charge expiration date: April 30, 2038 Estimated total PFC revenue: $6,840,000 Class of carriers to be excluded from collecting the PFC: Nonscheduled airlines; currently Alaska Seaplanes

19 Budget Estimates Estimated Project Cost Bag Screening & Makeup: $ 6,618,000 Landside Additions Entry, Exit, Fish Box Area & Bag Claim: $ 2,055,000 Departure Lounge/Hold Room Expansion: $ 1,837,500 Mechanical, Electrical & Life Safety System Upgrades: $ 250,000 Total Estimated Project Cost $10,760,500

20 Project History 2005: Airport Master Plan 2011: Airport Terminal Master Plan 2014: Baggage Screening Study 2015: Delta Airlines starts service to Sitka 2017: SIT Terminal Improvements / Concept & Funding Plan March 2018: Passenger Facility Charge (PFC) Application Approved Anticipated Project Schedule May - August 2018: Schematic Design 35% Milestone September 2018 December 2019: Design Development 65% Milestone January April 2019: Bid Documents 100% Milestone Project to be phased (full scope may not be developed to 100% design at once) July - August 2019: Bidding and Review Approvals October 2019 April 2020: First phase of Construction

21 CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Moving Forward - Design Options Schematic Design: Design Development Meetings June 26 & 27, 2018

22 Design Scope Moving Forward Developing 3 design options for the Terminal 2 Single-story options evolving from the 2017 concept diagram 1 Two-story option Selecting 1 preferred option with Stakeholders and developing Deliverables for 35% Milestone in August Schematic drawings of preferred option Schematic narrative Cost Estimate of schematic design 30% Deliverables for TSA Baggage Screening

23 Concept Design Solutions -Baggage Screening

24 Baggage Screening Concept E2

25 Baggage Screening Concept E3

26 Concept Design Solutions - Terminal

27 Existing Terminal Area

28 Concept Floor Plan C4 (2017)

29 Passenger Benefits Increased efficiency and flow of the baggage check in & screening process will reduce lines and congestion at ticket counters Doubling the size of the Departure Lounge will accommodate a full plane load of passengers and reduce TSA passenger screening wait times Relocating the jet bridge ramp provides direct access to bag claim and reduces cross traffic in the concourse Direct exit from bag claim will reduce cross traffic and congestions at the building entry Lengthening and reversing the direction of the bag claim belt will reduce congestion for deplaning passengers Separation of entry and exit points from the curbside reduce cross traffic and congestion in the concourse Providing staging areas for fish boxes allows for a more organized and orderly process, reducing congestion in the concourse and conflicts with seating areas Converting the existing entry vestibule to seating provides a quieter area for passengers The full length canopy expands the weather protected sidewalk and creates a dynamic new entry façade Views to the airfield from the Nugget and Departure Lounge are preserved

30 Concept Floor Plan C7

31 Concept C7 Building Sections

32 Aircraft Parking Option C7

33 Concept Floor Plan E3

34 Concept E3 Departure Lounge Elevation & Section

35 Aircraft Parking Option E3

36 Concept Floor Plan I3 Level One

37 Concept Floor Plan I3 Level Two

38 Aircraft Parking Option I3

39 CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Questions / Discussion

40 Curbside

41 Concourse

42 Ticketing & Bag Check-in

43 Baggage Claim

44 Passenger Screening

45 Restaurant

46 Departure Lounge/Hold Room

47 Baggage Screening

48 Baggage Makeup

49 Airside

50 Fish Box Processing

51 Concourse Cross Traffic

52 Security Queues

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 Agenda Overview of PFC Program at Spokane Airport (GEG) Proposed New PFC 11 Application Project

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM FREQUENTLY ASKED QUESTIONS September 2017 Master Plan Update: 1. What is a Master Plan Update? The objective of a Master Plan Update (MPU)

More information

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit

More information

Kansas City Aviation Department. August 25, 2015

Kansas City Aviation Department. August 25, 2015 Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam ABOUT THE GUAM AIRPORT Autonomous instrumentality of the Government of Guam; created in 1975 by P.L. 13-57; only commercial

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

Kansas City Aviation Department. Update to Airport Committee Customer Service

Kansas City Aviation Department. Update to Airport Committee Customer Service Kansas City Aviation Department Update to Airport Committee Customer Service 1 Perspective An estimated 800,000 people participated in the Royals Word Series Parade On average 883,000 airline passengers

More information

Greater Orlando Aviation Authority Orlando International Airport One Jeff Fuqua Boulevard Orlando, Florida Memorandum TO: FROM:

Greater Orlando Aviation Authority Orlando International Airport One Jeff Fuqua Boulevard Orlando, Florida Memorandum TO: FROM: Greater Orlando Aviation Authority One Jeff Fuqua Boulevard Orlando, Florida 32827-4399 Memorandum TO: FROM: Participating Airlines Phil Brown, Executive Director DATE: SUBJECT: Rate Methodology for FY

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement)

Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement) Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement) Briefing to the Transportation and Environment Committee Department of Aviation October 27, 2008 Purpose Review 5-Party

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

AIRLINE CONSULTATION MEETING

AIRLINE CONSULTATION MEETING AIRLINE CONSULTATION MEETING Passenger Facility Charges Proposed Projects Bangor International Airport Bangor, Maine June 2011 Bangor International Airport intends to file an application with the Federal

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

TRACK: B TERMINAL/LANDSIDE

TRACK: B TERMINAL/LANDSIDE Salt Palace Convention Center TRACK: B TERMINAL/LANDSIDE WORKSHOP: 3 Title: Airlines and Airports Consolidation and Changing Faces Who is building the Terminals, Technology, and Flexibility? Moderator:

More information

Fort Lauderdale Hollywood International Airport

Fort Lauderdale Hollywood International Airport ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County

More information

Preliminary Draft Budget FY Airline Rates and Charges. Sea-Tac International Airport

Preliminary Draft Budget FY Airline Rates and Charges. Sea-Tac International Airport Draft Budget FY 2015 Airline Rates and Charges Sea-Tac International Airport Aviation Finance & Budget 2015 Budget Airline Rates and Charges TABLE OF CONTENTS Exhibit Contents 1 Aeronautical Revenue Summary

More information

Passenger Facility Charge Public Notice. February 14, 2018

Passenger Facility Charge Public Notice. February 14, 2018 Passenger Facility Charge Public Notice February 14, 2018 Overview The Memphis-Shelby County Airport Authority intends to submit a new Passenger Facility Charge (PFC) application for a project at Memphis

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

Kansas City Aviation Department. Airport Committee July 19, 2018

Kansas City Aviation Department. Airport Committee July 19, 2018 Kansas City Aviation Department Airport Committee July 19, 2018 AGENDA Labor Update Design Process General Updates Community Outreach LABOR UPDATE Overarching Goals: Labor Harmony on the project Ensure

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Kansas City Aviation Department. Community Listening Session

Kansas City Aviation Department. Community Listening Session Kansas City Aviation Department Community Listening Session Listening Session Purpose The Kansas City Aviation Department is moderating these community listening sessions in order to gather feedback from

More information

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 INTRODUCTION The purpose of this report is to analysis the current schedule of operations and assumptions within the 2010

More information

TERMINAL 3. tour guide booklet. April 2012

TERMINAL 3. tour guide booklet. April 2012 TERMINAL 3 tour guide booklet April 2012 T3 PRE-TOUR PARKING / RESTROOMS All attendees should park on the north side of the Department of Aviation s Administration Building, located at 1845 E. Russell

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Terminal Space and Ratemaking

Terminal Space and Ratemaking Terminal Space and Ratemaking (Written by Dafang Wu on March 19, 2016; PDF version) This article discusses classification of terminal space and options for setting terminal rates and charges methodology.

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators MEETING MINUTES Event: Date & Time: Venue: Attendees: Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2017 @ 2pm Brisbane Airport Meeting Room Ground Transport Operators Agenda Item

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES

AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES Landing Fees - per 1,000 lbs. of Maximum Gross Landed Weight Terminal Rental Rate - includes ATO, BSO, ticket counters,

More information

Forecast and Overview

Forecast and Overview Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning

More information

Implications of Construction Cost Escalation

Implications of Construction Cost Escalation Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation

More information

Logan International Airport Right Sizing and Good Terminal Planning

Logan International Airport Right Sizing and Good Terminal Planning Logan International Airport Right Sizing and Good Terminal Planning Two Case Studies: Terminal E Expansion Terminal C Checkpoint Presented by: Sam Sleiman, PE, CCM Director Of Capital Programs and Environmental

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014

Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014 Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking February 11, 2014 Presentation Agenda 1. Overview of Findings 2. Definitions 3. Airport Benchmarking Caveats 4. Benchmark

More information

LOVE FIELD MODERNIZATION PROGRAM (LFMP)

LOVE FIELD MODERNIZATION PROGRAM (LFMP) LOVE FIELD MODERNIZATION PROGRAM (LFMP) April 29, 2015 DALLAS AIRPORT SYSTEM Three Facilities Dallas Love Field Dallas Executive Airport Downtown Vertiport $90 million City of Dallas Department Operated

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. Major Renovation Evaluation for Kansas City International Airport.

City of Kansas City AIRPORT COMMITTEE BRIEFING. Major Renovation Evaluation for Kansas City International Airport. City of Kansas City AIRPORT COMMITTEE BRIEFING Major Renovation Evaluation for Kansas City International Airport February 2, 2016 1 Agenda Briefly review Exhibit K Process to establish Program Requirements

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

Separate finances from City/State, not supported by any tax dollars. Financial Reports Audited by State Annually

Separate finances from City/State, not supported by any tax dollars. Financial Reports Audited by State Annually Created in May 1986 Separate Government Authority established by S.D. Law Separate finances from City/State, not supported by any tax dollars Financial Reports Audited by State Annually Finances No Long-Term

More information

PUBLIC CONSULTATION. Projects Proposed to be Financed with Passenger Facility Charges. Proposed 2018 PFC Application C-00-BOS

PUBLIC CONSULTATION. Projects Proposed to be Financed with Passenger Facility Charges. Proposed 2018 PFC Application C-00-BOS PUBLIC CONSULTATION Projects Proposed to be Financed with Passenger Facility Charges Proposed 2018 PFC Application 18-11-C-00-BOS Boston-Logan International Airport Massachusetts Port Authority Boston,

More information

Public Notice Passenger Facility Charge PFC Application No. 2 Amendment No. 2 Charlotte Douglas International Airport. Effective: February 22, 2019

Public Notice Passenger Facility Charge PFC Application No. 2 Amendment No. 2 Charlotte Douglas International Airport. Effective: February 22, 2019 Public Notice Passenger Facility Charge PFC Application No. 2 Amendment No. 2 Charlotte Douglas International Airport Effective: February 22, 2019 Pursuant to 49 CFR Part 158.24, the city of Charlotte

More information

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package. San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Schematic Design June 10,

More information

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2. MASTER PLAN UPDATE Phase 2/3 Draft Final Summary Report Report Issued 2010 in association with Prepared for Broward County Aviation Department Main Office 555 Airport Blvd., Suite 300 Burlingame, CA 94010

More information

Frequently Asked Questions (FAQs)

Frequently Asked Questions (FAQs) Frequently Asked Questions (FAQs) 1. WHEELCHAIR SERVICE I will need a wheelchair when I arrive at the airport for my departing flight. How do I get one? Wheelchair service is provided through the airlines.

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

BUSH INTERCONTINENTAL AIRPORT

BUSH INTERCONTINENTAL AIRPORT JULY 2014 BUSH INTERCONTINENTAL AIRPORT Project 500N-Terminal D, Phase III-Gate D9 A380 Conversion Project Manager: Randy Williams Everything is Bigger Terminal D at IAH The saying everything is bigger

More information

Section (a)(1). Description of Projects Impose and Use

Section (a)(1). Description of Projects Impose and Use November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Savannah / Hilton Head International Airport Master Plan Update

Savannah / Hilton Head International Airport Master Plan Update EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,

More information

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018 s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Nikolaos Papagiannopoulos. Juan Francisco García Lopez

Nikolaos Papagiannopoulos. Juan Francisco García Lopez Nikolaos Papagiannopoulos Business Information Systems & Technology, Athens International Airport Juan Francisco García Lopez Innovation and Strategy Manager, Indra Improving Turnaround Management by Increasing

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of March 23, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

The demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following:

The demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following: Chapter Three To properly plan for the future of Monterey Regional Airport, it is necessary to examine the capacities of the key airport systems. This chapter uses the results of the forecasts prepared

More information

Transportation: Airlines

Transportation: Airlines Transportation: Airlines In times of peace, approximately 8 million people take a plane trip each day. Wright brother s first plane: 1903 Passenger travel on planes: 1919 Charles Lindberg crossed Atlantic:

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS For Immediate Release January 2, 2018 Contact: Charles H. Pannunzio (424) 646-5260 JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS Access to Parking Structure 4 from the Upper/Departure

More information

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport A Multi-Agent Microsimulation Model of Toronto Pearson International Airport Gregory Hoy 1 1 MASc Student, Department of Civil Engineering, University of Toronto 35 St. George Street, Toronto, Ontario

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Chapter 4 Terminal Facility Requirements and Alternatives

Chapter 4 Terminal Facility Requirements and Alternatives Chapter 4 Terminal Facility Requirements and Alternatives I. Terminal Facility Requirements Introduction This chapter of the master plan converts the forecasted passenger demand levels that were identified

More information

Dennis Probst, COO Metropolitan Airports Commission

Dennis Probst, COO Metropolitan Airports Commission Dennis Probst, COO Metropolitan Airports Commission Our Airports Our Vision Providing your best airport experience Our Mission Connec=ng you to your world Minneapolis- St. Paul Interna=onal Airport 16

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the

More information

STANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT

STANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT TENANT DIRECTIVE BWI: 401.1 DATE: May 31, 2018 DISTRIBUTION: A TITLE: STANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT I. REFERENCES A. This Directive

More information

Dining: Click here for a comprehensive list of dining, shopping and other services.

Dining: Click here for a comprehensive list of dining, shopping and other services. Address: Physical Address South Terminal: 5000 West International Airport Road Anchorage, AK 99502 Physical Address North Terminal: 4600 Postmark Drive Anchorage, AK 99502 Mailing address: Ted Stevens

More information

Aviation OTHER FUNDS. Positions. Percent. Change

Aviation OTHER FUNDS. Positions. Percent. Change Aviation Department Aviation OTHER FUNDS Percent Positions Change 2007-08 FY 07 Budget FY 08 Budget Aviation Operating $108,920,460 $170,490,280 $169,658,090 0% 424 484 Subtotal $108,920,460 $170,490,280

More information

Master Plan Phase 2 Workshop

Master Plan Phase 2 Workshop Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information