2 About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South Carolina with the safest, most efficient and user-friendly airport in the world. OVERVIEW Greenville-Spartanburg Jetport, which later became Greenville-Spartanburg International Airport Roger Milliken Field, opened in Today, GSP currently accommodates 1.8 million passengers in a terminal building that has in excess of 226,000 square feet of space and 13 departure gates. GSP hosts six major airlines offering more than 50 non-stop daily departures to 18 major cities across the US, allowing easy access to the world. Two Federal Inspection Stations (FIS), consisting of Customs, Immigrations and Agriculture, are located at GSP. The first FIS facility, located under the south concourse, is designed to handle 250 international passengers per hour. The second FIS location on the north cargo ramp is designed to handle cargo and corporate aircraft that require international clearance. The latest runway extension, completed in June 1999, extended the runway to 11,001 feet, making it possible for GSP to accommodate any aircraft in operation today. The north end of the airport is home to a 120,000 square-foot FedEx facility. This facility, completed late summer of 2001, provides FedEx with the capability to sort up to 3,000 packages per hour, up from the previous capacity of 1,000 per hour. 2
3 WINGSPAN OVERVIEW WINGSPAN, the GSP Terminal Improvement Program, will take place over the next four years and will be the second and most substantial wave of renovations in the airport s history. WINGSPAN will: Increase Capacity Improve Efficiency Incorporate Safety Processes Integrate Sustainable Practices Impact Economic Landscape WINGSPAN is a $115 million program. Airport funds will cover 80 percent of the program, and the remaining 20 percent of funding will come from a combination of the Federal Aviation Administration s (FAA) Airport Improvement Program Fund and the Transportation Security Administration (TSA). No local taxpayer dollars will be used to fund any portion of the program. The terminal will remain operational throughout the duration of the program. Some historical elements, including the airside garden and all water features, will be preserved and integrated into the new architectural design. KEY PARTNERS Jacobs Engineering is serving as Program Manager. Skanska Moss, a joint venture between Skanska USA Building and local contractor Moss & Associates, is serving as Construction Manager at Risk for the entire length of the program. RS&H is the lead Architect / Engineer for the new facilities. 3
4 WINGSPAN continued... MILESTONES WINGSPAN is scheduled to take 48 months and will include three primary phases: PHASE 1: Enabling Work Mechanical and electrical systems overhaul will be completed throughout each phase of the program. 1A: Enabling Projects Rental Car Customer Center relocation Concourse A & B expansion for restrooms and food, beverage and retail concessions Construction of the North Wing for temporary airline facilities Utility/infrastructure relocations 1B: Baggage Claim Renovations New baggage claim carousels Construct canopy on curbside for loading/unloading in front of baggage claim Covered walkway to Garage A New glass front on the Terminal in front of baggage claim PHASE 2: Building Core Construction Grand Hall Development including new food, beverage, and retail concessions area Renovation of the existing ticketing lobby New Customer Service booths Complete new canopies on curbside for loading/unloading New Landside Garden New baggage screening equipment and facilities Security Checkpoint Consolidation & Relocation Concourse A and B Renovation Complete new glass front on the Terminal PHASE 3: Project Wrap Up Construction of the new Administrative Office for GSP Construction of the Conference Center 4
5 WINGSPAN continued... ECONOMIC IMPACT GSP has always had a major economic impact on the Upstate of South Carolina. WINGSPAN further enhances economic growth at the airport and throughout the region. Many local contractors and vendors are participating in this program thereby ensuring the circulation of local dollars within the community. No local taxpayer dollars are being used to fund the program, and GSP does not have Passenger Facility Charges (PFCs). GSP has been a draw to the Upstate for many large companies in the past. An improved airport facility will help ensure continued growth and development of the Upstate. SUSTAINABILITY Long-term sustainability initiatives are a key part of the WINGSPAN renovations, which include: Solar Hot Water The sun s energy will be used to heat water for hand washing in restrooms and concessions. There will be a backup water heater in the event that it is needed. Rain Water Harvesting Rain water will be collected for non-potable use to reduce reliance on the city water system. Regional Materials GSP will source products and materials found within the region. Day-lighting System The size and number of windows will be increased to allow more natural lighting, resulting in a reduction in electrical requirements. Automation System Proximity detection systems will be installed in certain areas, which are designed to automatically shut off lights if no movement is detected. 5
6 The New GSP: Enhancements OVER THE COURSE OF WINGSPAN, THE FOLLOWING IMPROVEMENTS AND ADDITIONS WILL BE MADE TO THE GSP TERMINAL: TSA checkpoints will be consolidated into one checkpoint for access to both concourses post screening. Canopies will be installed in front of the terminal providing covered loading/unloading areas and walkways from parking garages. The baggage claim area will include a new, third baggage carousel. New public meeting and conference spaces will be included for business travelers in the terminal. New GSP International Airport District offices will be added. A new, one-stop Rental Car Customer Center will be constructed within Garage A. New technology will be incorporated throughout the terminal. Ultra day-lighting with extensive use of windows will be used throughout the terminal. New food, beverage, and retail concession areas will be located throughout the terminal. 6
7 GSP History 1961 The airport s groundbreaking ceremony was held at 11:00am on July 7th The airport opened October 15th, becoming the first non-military airport to have a runway center line lighting system A parking garage was constructed, adding an additional 1,600 new parking spaces and bringing the total to more than 3,000 parking spaces An expansion project was completed, increasing the airport terminal and passenger waiting areas by 140,000 square feet. Boarding bridges were also added for passenger access. New lounge and dining facilities were added as well as a travel agency located inside the terminal building The runway was extended from 7,600 feet to 9,000 feet. The airport s name was changed to Greenville-Spartanburg International Airport, achieving international status because it houses two Federal Inspection Stations (FIS) consisting of Customs, Immigration and Agriculture. Per hour, 250 international passengers could be cleared through Customs at GSP A second parking garage was constructed, adding 1,500 new parking spaces, and bringing the total number of parking spaces to 4, The second runway expansion project was completed, increasing the runway to 11,001 feet. 7
8 GSP History continued Over 13,000 square feet of new terminal space was opened, increasing the available number of boarding gates to 13 total. Five new rental car service facilities were also constructed Security fencing and access control equipment was expanded and updated to improve access control to the airfield and passenger loading areas. Two new passenger-boarding bridges needed to accommodate additional airlines were purchased and installed. The airfield was renamed after founder Mr. Roger Milliken, the only Chairman of the Airport Commission until his passing on December 30, Mr. Milliken s vision and dedication to GSP has made this airport one of the best and safest airports in the nation The airport entrance road was widened to accommodate additional vehicle traffic. This project was advanced several years in order to take advantage of the South Carolina Department of Transportation s decision to close and improve the airport interchange from Interstate Approximately ten acres were purchased along Interstate 85 for the future construction of an overpass bridge to northbound traffic on the interstate Southwest Airlines arrived at GSP. Passenger traffic at GSP increased more than 38% in 2011 to 1,755,509 customers, compared to 1,268,202 customers in Phase One of WINGSPAN began in June with the Rental Car Customer Center enabling project. 8
9 Press & Media Contacts SOURCES FOR CONSTRUCTION UPDATES Greenville-Spartanburg International blog.gsptip.com If you re interested in learning more about the program, or if you have any questions, please contact: Nisha Patel WINGSPAN Communication Contact (864)
Current and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationSavannah / Hilton Head International Airport Master Plan Update
EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,
More informationElevating the Upstate
Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement
More informationBrief Recap of Project to Date
CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018 Project Description
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationKansas City Aviation Department. Update to Airport Committee Customer Service
Kansas City Aviation Department Update to Airport Committee Customer Service 1 Perspective An estimated 800,000 people participated in the Royals Word Series Parade On average 883,000 airline passengers
More informationHartsfield Jackson Update prepared for:
Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport
More informationGreenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17
Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17 1 Airline/Airport Use & Lease Agreement Greenville-Spartanburg International Airport Cost Center Boundaries
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationGreenville-Spartanburg International Airport WINGSPAN Project. ACI-NA Airport Capital Projects Showcase Presentation. September 18, 2017
Greenville-Spartanburg International Airport WINGSPAN Project ACI-NA Airport Capital Projects Showcase Presentation September 18, 2017 Introduction/Presentation Outline Airport Facts Old Terminal Facilities
More informationTABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.
TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...
More informationPUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017
PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 Agenda Overview of PFC Program at Spokane Airport (GEG) Proposed New PFC 11 Application Project
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationTRACK: B TERMINAL/LANDSIDE
Salt Palace Convention Center TRACK: B TERMINAL/LANDSIDE WORKSHOP: 3 Title: Airlines and Airports Consolidation and Changing Faces Who is building the Terminals, Technology, and Flexibility? Moderator:
More informationNorfolk International Airport History
Norfolk International Airport History As early as 1903, Hampton Roads was making a connection with aviation. The Virginian-Pilot based in Norfolk, Va. was one of the first newspapers in the country to
More informationLos Angeles International Airport (LAX) Airside $907M
Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking
More informationKansas City Aviation Department. August 25, 2015
Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationIRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN
IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN.doc TABLE OF CONTENTS SAN Appendix 1 - DOT Required Contingency Plan Appendix 2 CBP Sterile Area Procedures.doc 1.0 Purpose 1.1. The purpose of the is to provide
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationGreater Orlando Aviation Authority
Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationCharles H. Ada II Executive Manager A.B. Won Pat International Airport Guam
Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam ABOUT THE GUAM AIRPORT Autonomous instrumentality of the Government of Guam; created in 1975 by P.L. 13-57; only commercial
More informationMaster Plan Phase 2 Workshop
Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationAlternatives Analysis EXECUTIVE SUMMARY
Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected
More informationWestshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director
Presented by: Alice J. Price, AICP, Senior Project Director Back In Time: 1946 Drew Field 1952 Main Terminal 1963 Study Terminal Design Goals: Human Values Airline economics Airport financial considerations
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationPlanning, Development and Environment Committee
Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY
More informationKansas City Aviation Department. Community Listening Session
Kansas City Aviation Department Community Listening Session Listening Session Purpose The Kansas City Aviation Department is moderating these community listening sessions in order to gather feedback from
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationCVG Overview Connect with CVG March 29, 2017
CVG Overview Connect with CVG March 29, 2017 Launching Point Strategic Plan CVG Launching Point Strategies for 2016 and Beyond Vision: Make travel through CVG and unforgettably positive experience Mission:
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationLove Field Modernization Program Update: Master Planning Recommendations
Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and
More informationNew Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport
New Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport http://www.nola.com/politics/index.ssf/2013/04/new_orle ans_aviation_board_unv.html Richard Rainey, NOLA.com The Times-Picayune
More informationGerald R. Ford International Airport Authority Master Plan Update A World Class Gateway
Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land
More informationPITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM
PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM FREQUENTLY ASKED QUESTIONS September 2017 Master Plan Update: 1. What is a Master Plan Update? The objective of a Master Plan Update (MPU)
More informationAppendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis
Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS
More informationWhat is an Airport Master Plan?
What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential
More informationKansas City Aviation Department. Airport Committee July 19, 2018
Kansas City Aviation Department Airport Committee July 19, 2018 AGENDA Labor Update Design Process General Updates Community Outreach LABOR UPDATE Overarching Goals: Labor Harmony on the project Ensure
More informationAirports of the Future Taking the Terminal to the Traveler
Passenger Terminal World Expo 2011 Copenhagen, Denmark Airports of the Future Taking the Terminal to the Traveler Steven B. Cornell Assoc. Vice President Summary Aviation Timeline First Controlled Airplane
More informationNorfolk International Airport Overview Updated January 12, 2016
Norfolk International Airport Overview Updated January 12, 2016 Norfolk International Airport is the major airport serving Coastal Virginia and northeast North Carolina. Offering daily arrivals and departures
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationWhat is the ABIA 2040 Master Plan?
AUSTIN-BERGSTROM INTERNATIONAL AIRPORT What is the ABIA 2040 Master Plan? The ABIA 2040 Master Plan outlines the vision for how our airport will serve the expected 26+ million passengers by the year 2040.
More informationImplications of Construction Cost Escalation
Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation
More informationGLOBAL CONGRESS PANEL DISCUSSION. Phil Brown Executive Director, Greater Orlando Aviation Authority August 18, 2015
GLOBAL CONGRESS PANEL DISCUSSION Phil Brown Executive Director, Greater Orlando Aviation Authority August 18, 2015 In the Beginning The Orlando Experience Past, Present and Future 1977 Today 1978 2013
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More informationCHAPTER 5: Landside Facility Requirements and Development Concepts
CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant
More informationIrregular Operations (IROPS) Contingency Plan
Tri-Cities Airport Tri-Cities Airport Authority Irregular Operations (IROPS) Contingency Plan Issued: May 15, 2017 Introduction This document provides the Irregular Operations (IROPS) Contingency Plan
More informationJANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS
For Immediate Release January 2, 2018 Contact: Charles H. Pannunzio (424) 646-5260 JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS Access to Parking Structure 4 from the Upper/Departure
More informationSalt Lake City International Airport April 23, 2013 Budget Briefing. Page 1
Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment
More informationBURLINGTON INTERNATIONAL AIRPORT
BURLINGTON INTERNATIONAL AIRPORT VISION 2030 AIRPORT MASTER PLAN UPDATE Summary Presentation AIRPORT STAFF AND STUDY TEAM Robert McEwing, Director of Planning & Development Brad Worthen, Community Facilitator
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationNorfolk International Airport Overview Updated September 26, 2017
Norfolk International Airport Overview Updated September 26, 2017 Norfolk International Airport is the major airport serving Coastal Virginia and northeast North Carolina. Offering daily arrivals and departures
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationNorfolk International Airport Overview
Norfolk International Airport Overview Norfolk International Airport is the major airport serving southeast Virginia, Virginia's Eastern Shore and northeast North Carolina. Offering daily arrivals and
More informationRAPID CITY REGIONAL AIRPORT
RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationENVISIONING AUSTIN s Airport of the Future
ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A
More informationRNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan
RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally
More informationAIRPORT TERMINAL BUILDING EXPANSION FAQs
AIRPORT TERMINAL BUILDING EXPANSION FAQs Q1: What s involved in the Airport Terminal Building Expansion? A1: The expansion of the Airport Terminal Building will be conducted in two phases: First phase:
More informationJuly 21, Mayor & City Council Business Session KCI Development Program Process Update
July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,
More informationTERMINAL 3. tour guide booklet. April 2012
TERMINAL 3 tour guide booklet April 2012 T3 PRE-TOUR PARKING / RESTROOMS All attendees should park on the north side of the Department of Aviation s Administration Building, located at 1845 E. Russell
More information2018 Accomplishments
CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community
More informationState of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update
State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update Enabling Inter-Island Improvements for Mauka CC Honolulu International Airport Before After Mauka Concourse
More informationThe CLE Master Plan Includes:
The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationChallenges and Changes! Jeff Hamiel! Metropolitan Airports Commission!
Challenges and Changes! Jeff Hamiel! Metropolitan Airports Commission! Industry Consolidation! Trend: Airline Outsourcing! Above- and below-wing services! Aircraft cleaning! Wheelchair assistance services!
More informationCity of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap
More informationAviation Operating Administration/Executive
Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness, and compliance with
More informationHuntsville International Airport Master Plan Update
Huntsville International Airport Master Plan Update June 28, 2017 Agenda Welcome and introductions Master planning process Inventory of existing conditions Forecasts of aviation demand Facility requirements
More informationThe Future of Aviation for Central New Mexico
The Future of Aviation for Central New Mexico MISSION STATEMENT THE WHOLE AIRPORT EXPERIENCE HISTORY SPECIFICATIONS FACILITIES SERVICES RECENT IMPROVEMENTS FUTURE DEVELOPMENT & USE USER PROFILE The mission
More information2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017
VOLUME 1 2012 AIRPORT MASTER PLAN 2016 ADDENDUM SUBMITTED ON: SEPTEMBER 22, 2017 VOLUME 1 CONTENTS SECTION 1 - INTRO AND AIRPORT CONTEXT SECTION 2 - FORECAST SECTION 3 - AIRFIELD FACILITIES AND DEMAND/CAPACITY
More informationDallas Love Field Update. Dallas City Council Briefing February 18, 2015
Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationSAN JOSÉ INTERNATIONAL AIRPORT
SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft
More informationAviation Operating Administration/Executive
Aviation Operating Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness,
More informationMaster Plan Phase 2 Building on Partnerships
Master Plan Phase 2 Building on Partnerships June 9, 2017 Introduction Welcome Introduction of Staff Planning and Development Jeff Siddle Procurement Tom Thalheimer James Hanney DBE/WMBE Elita McMillon
More informationMASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4
MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis
More informationTRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks.
Manchester Airports Group (MAG) which owns Manchester, London Stansted, and East Midlands airports and manages Escape Lounges in the US under its MAG USA arm, says that passenger growth drove an 11.2%
More informationKansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014
Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking February 11, 2014 Presentation Agenda 1. Overview of Findings 2. Definitions 3. Airport Benchmarking Caveats 4. Benchmark
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationIAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines
IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for
More informationPROMOTION CONFERENCES ADDITIONAL BENEFITS COMPLIMENTARY PUBLICATIONS
Airports Council International-North America (ACI-NA) represents Airport Members who enplane 95 percent of all domestic and virtually all international airline passenger and air cargo traffic in North
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationVIRGI ISLA DS PORT AUTHORITY
VIRGI ISLA DS PORT AUTHORITY AVIATIO DIVISIO RATES Effective 10/01/05-1 - AVIATIO RATE SCHEDULE By virtue of authority granted under Title 29, Section 543 (12) of the Virgin Islands Code, the Virgin Islands
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationState of the Airport Robert S. Bowen, Executive Director October 18, 2018
Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing
More informationTable E-3 Phased Capital Improvement Program...E - 11
Ni ag ar af r ont i e rt r ans por t at i onaut hor i t y Buffa l oni a ga r ai nt e r na t i ona l Ai r por t Execut i vesummar y AI P#33600097010 NF T APr oj ec t#30bg0916 NYS DOTPI N#5913 11 Ma y2013
More information