ADDENDUM NO. TWO AB

Size: px
Start display at page:

Download "ADDENDUM NO. TWO AB"

Transcription

1 ADDENDUM NO. TWO AB Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County McDade Administration Building, 640 South Broad Street, Room 321Third Floor, Trenton, New Jersey for: RECONSTRUCT TAXIWAY F TRENTON-MERCER AIRPORT Clarifications, amendments, additions, deletions, revisions, and modifications are part of the Contract and change the original documents only in the manner and to the extent stated. Respondents shall complete the Acknowledgement of Receipt of Addendum No. Two and shall include the Acknowledgement with their response. Specifications and instructions may be obtained by contacting the Department of Purchasing at or on the Mercer County Website at: Respondents are required to comply with the requirements of N.J.S.A.10:5-31 et seq. and N.J.A.C. 17:27. Purchasing Department County of Mercer AB AB RECONSTRUCT TAXIWAY F Page 1 of 4

2 COUNTY OF MERCER ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA ADDENDUM AB RECONSTRUCT TAXIWAY F TRENTON-MERCER AIRPORT The undersigned Respondent hereby acknowledges receipt of: Addendum No. One June 4, 2018 Addendum No. Two: - June 12, 2018 Date: Signed: Title: Printed Name: Date: Company: AB RECONSTRUCT TAXIWAY F Page 2 of 4

3 ADDENDUM NO. TWO TO THE CONTRACT DOCUMENTS FOR RECONSTRUCT TAXIWAY F TRENTON-MERCER AIRPORT WEST TRENTON, NEW JERSEY AB June 12, 2018 TO: ALL HOLDERS OF CONTRACT DOCUMENTS A. Your attention is directed to the following clarifications, amendments, additions, deletions, revisions, and modifications to the Specifications for Bid and Contract Drawings for the above named project at Trenton-Mercer Airport, West Trenton, New Jersey. B. This Addendum is part of the Specifications for Bid and Contract Drawings, and the Bidders are required to acknowledge receipt of this Addendum on the Acknowledgement of Receipt of Addenda. This Addendum includes the following (with attachments as noted): 1. Modifications to the Specifications For Bid, as follows: 1.1 On page 4 Delete and replace the Bid Opening: date to be June 22, 2019 at 11:00 A.M. 1.2 On page 9 Delete and replace the Bid Opening: date to be June 22, 2019 at 11:00 A.M. 1.3 Remove and replace the Bid Form (pages Proposal-3 through Proposal-6) in its entirety with the attached. 1.4 Item P-620 Runway and Taxiway Marking, paragraph under Basis of Payment delete and replace Items P and P A with the following: Item P Item P A Runway and Taxiway Marking Thermoplastic for Surface Painted Hold Sign Markings only, Permanent, -per square foot Runway and Taxiway Marking Thermoplastic for Surface Painted Hold Sign Markings only, Permanent, -per square foot 1.5 Item F-162 Chain-Link Fence, paragraph Fabric under Materials delete and replace the paragraph in its entirety with the following: Fabric. The fabric shall be woven with a 9-gauge galvanized steel wire in a 2-inch (50mm) mesh and shall meet the requirements of ASTM A392, Class 2. AB RECONSTRUCT TAXIWAY F Page 3 of 4

4 2. Modifications to the Contract Drawings (attached), as follows: 2.1 Drawing CT 111, revised the call-out for thermoplastic preformed markings for the hold bar and the enhanced centerline markings 2.2 Drawing CT 112, revised the call-out for thermoplastic preformed markings for the enhanced centerline markings 2.3 Drawing CT 113A, revised the call-out for thermoplastic preformed markings for the hold bar and the enhanced centerline markings 2.4 Drawing CT 501, revised the following details: Taxiway Centerline Markings - the width of the centerline markings for all taxiways shall be 6 (yellow) revised title to -Runway Hold Position Markings calls out the surface painted hold sign markings as preformed thermoplastic. 2.5 Drawing CT 502, revised detail 8 title to Enhanced Taxiway Centerline Markings calls out the width for all enhanced taxiway centerlines shall be 6 (yellow) 2.6 Drawing CU 502, revised detail 1 Type E Inlet calls for the station and offset location of the proposed inlets shown on the grading plans to be 2 further away from the Taxiway F centerline. 2.7 Drawing EL 203, calls for existing sign 16 to sign to be demolished. 2.8 Drawing EL 301, revised signs letters and colors for No: 19, 20, and 25. Removed proposed sign Drawing EL 303, revised signs letters and colors for No: 17, 18, 63, 73, and 82. Added proposed sign 16. END OF ADDENDUM TWO AB RECONSTRUCT TAXIWAY F Page 4 of 4

5 Trenton - Mercer Airport (TTN) AB Reconstruct Taxiway F Proposal BASE BID Item No. FAA Spec. No. Description Qty. Unit Unit Price Total 1 P CLEARING AND GRUBBING 0.24 AC 2 P UNCLASSIFIED EXCAVATION 6,500 CY 3 P COMMON EMBANKMENT 1,630 CY 4 P BITUMINOUS PAVEMENT REMOVAL 28,670 SY 5 P NONHAZARDOUS SOIL/MATERIAL OFF-SITE SPOILING 200 CY 6 P NONHAZARDOUS PETROLEUM SOILS OFF-SITE SPOILING 200 CY 7 P HAZARDOUS SOIL/MATERIAL OFF-SITE SPOILING 25 CY 8 P A 9 P B 10 P C COMPLIANCE FOR STAGE A EROSION AND SEDIMENTATION CONTROL COMPLIANCE FOR STAGE B EROSION AND SEDIMENTATION CONTROL COMPLIANCE FOR STAGE C EROSION AND SEDIMENTATION CONTROL 1 LS 1 LS 1 LS 11 P SEDIMENT FILTER LOG/SILT FENCE 4,640 LF 12 P STORM DRAIN INLET PROTECTION 16 EA 13 P STABILIZED CONSTRUCTION ENTRANCE 1 EA 14 P EROSION CONTROL BLANKET 3,150 SY 15 P CRUSHED AGGREGATE BASE COURSE 7,780 CY 16 P BITUMINOUS SURFACE COURSE 4" 5,440 TON 17 P BITUMINOUS BASE COURSE 8" 10,990 TON 18 P BITUMINOUS TACK COAT 4,560 GAL 19 P RUNWAY AND TAXIWAY MARKING - WATERBORNE, TEMPORARY 3,200 SF 20 P RUNWAY AND TAXIWAY MARKING - WATERBORNE, PERMANENT 6,400 SF 21 P RUNWAY AND TAXIWAY MARKING - THERMOPLASTIC, PERMANENT 790 SF 22 P RUNWAY AND TAXIWAY MARKING - REMOVAL 950 SF 23 P FUEL PRICE ADJUSTMENT 1 LS 24 P ASPHALT PRICE ADJUSTMENT 1 LS 25 F FOOT CHAIN-LINK FENCE WITH BARBED WIRE AND WILDLIFE DETERRENT PROPOSAL LF

6 Item No. FAA Spec. No. Description Qty. Unit Unit Price Total 26 D a 15 INCH RCP 790 LF 27 D b 18 INCH RCP 320 LF 28 D c 24 INCH RCP 2,310 LF 29 D PIPE UNDERDRAINS 1,000 LF 30 D MANHOLES 3 EA 31 D INLETS 15 EA 32 T SEEDING 54,000 SY 33 T TOPSOILING (ON-SITE EXCAVATED AND STOCKPILED) 8,000 CY 34 T MULCHING 54,000 SY 35 X MOBILIZATION 1 LS 36 X MAINTENANCE AND PROTECTION OF AIRFIELD TRAFFIC 1 LS 37 L L L L L L L L /C NO. 8 AWG 5KV,L-824C CABLE IN CONDUIT OR DUCTBANK, 2-1/C NO. 8 AWG 5KV,L-824C CABLE IN CONDUIT OR DUCTBANK, 1-1/C NO. 6 AWG, STRANDED GREEN INSULATED COPPER SAFETY EQUIPMENT GROUND CONDUCTOR IN CONDUIT OR DUCTBANK, 1-1/C NO. 6, SOLID BARE COUNTERPOISE WIRE ABOVE CONDUIT OR DUCTBANK, INCLUDING ¾ X 10 GROUND RODS, AND GROUND CONNECTORS, ELECTRICAL CONDUIT, 2 INCH PVC SCHEDULE 40, DIRECT BURIED CONDUIT IN NON-PAVED AREAS, ELECTRICAL DUCT BANK, 1-2 INCH PVC SCHEDULE 40 CONDUIT, CONCRETE ENCASED, ELECTRICAL DUCT BANK, 2-2 INCH PVC SCHEDULE 40 CONDUITS, CONCRETE ENCASED, CONNECTIONS TO EXISTING LIGHT FIXTURE, EXISTING JUNCTION STRUCTURE, AND EXISTING CONDUITS/DUCT BANKS, ANY TYPE, 5,500 LF 4,500 LF 7,500 LF 7,500 LF 7,500 LF 150 LF 500 LF 7 EA 45 L JUNCTION BOX PLAZA, 6 EA 46 L L L L SEMI-FLUSH RUNWAY EDGE LIGHT WITH L-868B CLASS 1A LIGHT BASE IN AC PAVEMENT, ELEVATED TAXIWAY EDGE LIGHT WITH L-867B CLASS 1A LIGHT BASE WITH CONCRETE MAINTENANCE PAD IN TURF, INSTALLED COMPLETE IN PLACE ELEVATED RUNWAY EDGE LIGHT WITH L-867B CLASS 1A LIGHT BASE WITH CONCRETE MAINTENANCE PAD IN TURF, INSTALLED COMPLETE IN PLACE L-867B CLASS 1A LIGHT BASE WITH CONCRETE MAINTENANCE PAD IN TURF, 1 EA 95 EA 1 EA 8 EA 50 L NEW TAXIWAY EDGE MARKER, COMPLETE IN PLACE 6 EA 51 L L REMOVE EXISTING COVER PLATE AND INSTALL ELEVATED TAXIWAY EDGE LIGHT FIXTURE ON EXISTING LIGHT BASE, L-858(L) GUIDANCE SIGN ON FOUNDATION, ANY LENGTH, PROPOSAL-4 5 EA 8 EA

7 FAA Spec. Item No. Description Qty. Unit Unit Price Total No. 53 L REPLACEMENT PANEL WITH NEW MESSAGE FOR L-858 GUIDANCE SIGN, 3 EA 54 L RELOCATE L-858 GUIDANCE SIGN ON NEW FOUNDATION INCLUDING REPLACEMENT PANEL(S) FOR NEW MESSAGE, 2 EA 55 L REMOVAL OF CABLE FROM CONDUIT 5700 LF 56 L REMOVAL OF ELEVATED EDGE LIGHT FIXTURE AND LIGHT BASE 77 EA 57 L REMOVAL OF IN-PAVEMENT EDGE LIGHT FIXTURE AND LIGHT BASE 1 EA 58 L REMOVAL OF GUIDANCE SIGN 12 EA 59 L REMOVAL OF 1W-2" CONDUIT 800 LF 60 L REMOVAL OF TAXIWAY EDGE MARKER 9 EA 61 L TEMPORARY ELECTRICAL WORK 1 LS BASE BID TOTAL CONSTRUCTION COST BASE BID GRAND TOTAL IN THE WRITTEN WORD BID ALTERNATE A FAA Spec. Item No. Description Qty. Unit No. Unit Price Total A1 P A COLD MILLING (4" AVERAGE DEPTH) 2,670 SY A2 P A UNCLASSIFIED EXCAVATION 220 CY A3 P A COMMON EMBANKMENT 1,650 CY A4 P A BITUMINOUS PAVEMENT REMOVAL - TYPE 1 6,040 SY A5 P C-A COMPLIANCE FOR STAGE C EROSION AND SEDIMENTATION CONTROL 1 LS A6 P A SEDIMENT FILTER LOG 210 LF A7 P A STORM DRAIN INLET PROTECTION 5 EA A8 P BITUMINOUS SURFACE COURSE 2" (FOR OVERLAY) 320 TON A9 P A BITUMINOUS TACK COAT 270 GAL A10 P A RUNWAY AND TAXIWAY MARKING - WATERBORNE, TEMPORARY 1,030 SF A11 P A RUNWAY AND TAXIWAY MARKING - WATERBORNE, PERMANENT 3,200 SF A12 P A RUNWAY AND TAXIWAY MARKING - THERMOPLASTIC, PERMANENT 790 SF A13 P A RUNWAY AND TAXIWAY MARKING - REMOVAL 880 SF PROPOSAL-5

8 Item No. FAA Spec. No. Description Qty. Unit Unit Price Total A14 D bA 18 INCH RCP 130 LF A15 D A INLETS 2 EA A16 T A SEEDING 5,660 SY A17 T A TOPSOILING (ON-SITE EXCAVATED AND STOCKPILED) 630 CY A18 T A MULCHING 5,660 SY A19 X A MAINTENANCE AND PROTECTION OF AIRFIELD TRAFFIC 1 LS A20 L A 1-1/C NO. 8 AWG 5KV,L-824C CABLE IN CONDUIT OR DUCTBANK, 900 LF A21 L A 2-1/C NO. 8 AWG 5KV,L-824C CABLE IN CONDUIT OR DUCTBANK, 1,400 LF A22 L A 1-1/C NO. 6 AWG, STRANDED GREEN INSULATED COPPER SAFETY EQUIPMENT GROUND CONDUCTOR IN CONDUIT OR DUCTBANK, 1,600 LF A23 L A 1-1/C NO. 6, SOLID BARE COUNTERPOISE WIRE ABOVE CONDUIT OR DUCTBANK, INCLUDING ¾ X 10 GROUND RODS, AND GROUND CONNECTORS, 1,500 LF A24 L A ELECTRICAL CONDUIT, 2 INCH PVC SCHEDULE 40, DIRECT BURIED CONDUIT IN NON-PAVED AREAS, 2,250 LF A25 L A ELECTRICAL DUCT BANK, 1-2 INCH PVC SCHEDULE 40 CONDUIT, CONCRETE ENCASED, 140 LF A27 L A CONNECTIONS TO EXISTING LIGHT FIXTURE, EXISTING JUNCTION STRUCTURE, AND EXISTING CONDUITS/DUCT BANKS, ANY TYPE, 2 EA A29 L A SEMI-FLUSH RUNWAY EDGE LIGHT WITH L-868B CLASS 1A LIGHT BASE IN AC PAVEMENT, 1 EA A30 L A ELEVATED TAXIWAY EDGE LIGHT WITH L-867B CLASS 1A LIGHT BASE WITH CONCRETE MAINTENANCE PAD IN TURF, INSTALLED COMPLETE IN PLACE 20 EA A31 L A ELEVATED RUNWAY EDGE LIGHT WITH L-867B CLASS 1A LIGHT BASE WITH CONCRETE MAINTENANCE PAD IN TURF, INSTALLED COMPLETE IN PLACE 1 EA A32 L A REPLACEMENT PANEL WITH NEW MESSAGE FOR L-858 GUIDANCE SIGN, 2 EA A33 L A RELOCATE L-858 GUIDANCE SIGN ON NEW FOUNDATION INCLUDING REPLACEMENT PANEL(S) FOR NEW MESSAGE, 3 EA A34 L A REMOVAL OF CABLE FROM CONDUIT 2,500 LF A35 L A REMOVAL OF ELEVATED EDGE LIGHT FIXTURE AND LIGHT BASE 19 EA A36 L A REMOVAL OF IN-PAVEMENT EDGE LIGHT FIXTURE AND LIGHT BASE 1 EA A37 L A REMOVAL OF GUIDANCE SIGN 3 EA A38 L A REMOVAL OF 1W-2" CONDUIT 300 LF A39 L A TEMPORARY ELECTRICAL WORK 1 LS BID ALTERNATE A TOTAL CONSTRUCTION COST BID ALTERNATE A GRAND TOTAL IN THE WRITTEN WORD PROPOSAL-6

9

10

11

12

13

14

15

16

17

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max: Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR 7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

ADDENDUM NUMBER THREE

ADDENDUM NUMBER THREE RUNWAY 7-25 COMPLEX LIGHTING AND PAVEMENT REHABILITATION Contract No. 201737338 ADDENDUM NUMBER THREE This Addendum Number Three supersedes and/or supplements all portions of the Contract Documents with

More information

Ground Clamps Cable Tray

Ground Clamps Cable Tray COMMERCIAL AND INDUSTRIAL FITTINGS: GROUNDING FITTINGS AND SOLDERLESS CONNECTORS Clamps Cable Tray Terminates ground wire to cable tray. For aluminum or copper conductors. 1 4 hex wrench tightens both

More information

2004 Spa Pre-Delivery Guide

2004 Spa Pre-Delivery Guide 2004 Spa Pre-Delivery Guide The guide to making your new Cal Spa installation easy. Duplication without written consent is strictly prohibited. This is for spas manufactured after May19, 2003 Revised July

More information

Application to Impose and Use Passenger Facility Charges - #16

Application to Impose and Use Passenger Facility Charges - #16 Application to Impose and Use Passenger Facility Charges - #16 Submitted to: The Federal Aviation Administration By: The Des Moines International Airport June 23, 2017 Ms. Sheila Bridges PFC Coordinator

More information

PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017

PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017 PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport December 28, 2017 Introduction Pursuant to 14 Code of Federal Regulations ( CFR ) Part 158.24, the San Francisco

More information

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico.

Passenger Facility Charge: No. 7 Application. Public Notice Materials. Luis Muñoz Marín International Airport San Juan Puerto Rico. Passenger Facility Charge: No. 7 Application December 2013 Public Notice Materials Luis Muñoz Marín International Airport San Juan Puerto Rico INTRODUCTION Aerostar Airport Holdings has initiated the process

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008 SECTION 1 - PURPOSE AND SCOPE 1.1 Purpose This document is designed to serve as a guide for private and commercial hangar construction

More information

Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable

Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable Zinc Cable & Conduit Connectors For Armored Cable, Flexible Metal Conduit & Metal Clad Cable Type FC Set Screw To terminate regular wall steel or aluminum flexible conduit to a 1/2 knockout in a dry location

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Submitted By 2018 0531 Legistar File ID November 20th, 2018 City Council Meeting Date Agenda Item Only N/A for Non Agenda Item Matt Mihalevich 10/25/2018 ENGINEERING

More information

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total

Item Description Unit Quantity Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total AGENCY: KENDALL Builders Paving D Construction, Inc. Gallagher Asphalt Corp. Geneva Construction Co. P. T. Ferro Construction Co. SECTION: 16-00000-00-GM, Plainfield Road, HMA Resurfacing, CMF 4413 Roosevelt

More information

Council Agenda Item Meeting of Ma.y 3, 2016

Council Agenda Item Meeting of Ma.y 3, 2016 Ci Council Agenda Item Meeting of Ma.y 3, 2016 TO: The Honorable Mayor ~nd Mev/~ rs of the City Council FROM: James R. O'Connor, City Man r:: I DATE: April 26, 2016 SUBJECT: Award of Contract to Rehabilitate

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES The County of Montrose, Colorado is accepting Statements of Qualifications from qualified firms

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

COON CREEK WATERSHED DISTRICT Request for Board Action

COON CREEK WATERSHED DISTRICT Request for Board Action Item 13: Request to Award Work on Woodcrest Creek Bank Stabilization Project Page 1 of 6 COON CREEK WATERSHED DISTRICT Request for Board Action MEETING DATE: December 8, 2014 AGENDA NUMBER: 13 ITEM: Request

More information

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Third Parties/Crossing

Third Parties/Crossing Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Installation Instructions

Installation Instructions Installation Instructions For use in and IE only C i4 FS www.contura.eu 2 CERTIFICATE DECLARATION OF PERFORMANCE No. Ci4FS-CPR-130619-SE-1 PRODUCT Product type Type designation Manufacturing number Intended

More information

print materials visit information on free live seminars, online courses, and

print materials visit   information on free live seminars, online courses, and The AOPA Air Safety Foundation is dedicated to making flying easier and safer for general aviation pilots. For information on free live seminars, online courses, and print materials visit. ILS Critical

More information

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL

SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL

More information

Hollaway Consulting Engineers, LLC Statement of Qualifications

Hollaway Consulting Engineers, LLC Statement of Qualifications Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri

More information

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216 Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION

More information

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET SHEET ID. SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET SHEET ID. SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET 1 2 3 4 5 SEAL \\acp3server.pondco.com\resources\vol1\national Guard Bureau\Projects\1160085 VTANG - VTANG Repair Apron and Taxiway\04.DRAWINGS\CURZ152810G-001-002.dwg jordanj 07/27/16-5:30 P D C B A SHEET

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

Grounding Clamp. Pins and Ball-Socket Clamps for Temporary Grounding

Grounding Clamp. Pins and Ball-Socket Clamps for Temporary Grounding Grounding Clamp Pins and Ball-Socket Clamps for Temporary Grounding Pins and Ball-Socket Clamps have been designed to solve several temporary grounding situations, where the physical space or the contact

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET ID. SHEET SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET ID. SHEET SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET 1 2 3 4 5 M:\National Guard Bureau\Projects\1160085 VTANG - VTANG Repair Apron and Taxiway\04.DRAWINGS\CURZ152809G-001-002.dwg jordanj 07/27/16-12:04 P D C B A SHEET ID. INDEX OF DRAWINGS SHEET TITLE G-001

More information

The lowering of the existing watermain was added to the Catenary B Contract through a change

The lowering of the existing watermain was added to the Catenary B Contract through a change Project 300-099 - Catenary B Replacement Utility Work at Rowayton Avenue Early in the project it was determined that the electric, telephone, and cable TV services hanger from the existing Rowayton Avenue

More information

Insulated Scissors. Handles made with shock-proof plastic. Length Blade Std. Part No. Type mm shape Pk.

Insulated Scissors. Handles made with shock-proof plastic. Length Blade Std. Part No. Type mm shape Pk. Cutting Tools Cable Cutter - For copper and aluminum cables only. Extremely high cutting capacity with adjustable screw joint. for cable Length Std. Part No Type Ømm mm 2 AWG mm Pk. AP1017 N 15 50 1/0

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

LAKE MOUNTAIN PRELIMINARY

LAKE MOUNTAIN PRELIMINARY VICINITY MAP VICINITY MAP PREPARED FOR:. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON THESE S WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS, TO THE

More information

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT

PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE REGIONAL AIRPORT PUBLIC NOTICE FOR PASSENGER FACILITY CHARGE APPLICATION NO. 2 AUGUST 6, 2014 Prepared By: PUBLIC NOTICE PEE DEE REGIONAL AIRPORT AUTHORITY FLORENCE

More information

Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport

Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport Passenger Facility Charge New Application #8 Phoenix Sky Harbor International Airport Airline Consultation and Public Notice Materials Date: May 4, 2017 Agenda PFC Program Status PFC #8 New Application

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Plans and Design Calculations for the Alder Creek Diversion Fish Screen TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

MODELS: 440 SM & 440 SMSS

MODELS: 440 SM & 440 SMSS Most Dependable Fountains, Inc. OPERATIONS MANUAL MODELS: 440 SM & 440 SMSS Most Dependable Fountains, Inc 5705 Commander Drive Arlington, TN 38002 800-552-6331 FOUNTAINS, MOST DEPENDABLE FOUNTAINS, INC.

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

ELECTRICAL PROPERTIES PVC FILLER NOMINAL VOLTAGE 0,6/1 kv CLOURS CORES CLOURS

ELECTRICAL PROPERTIES PVC FILLER NOMINAL VOLTAGE 0,6/1 kv CLOURS CORES CLOURS STANDART PRODUCT CODE TS IEC 60502-1 / IEC 60502 / VDE 0276-603 COPPER CLASS 1&2 PVC INSULATION NYRY 0,6/1kV 0.6/1 kv PVC insulated steel wire armoured multi-core cables with copper ELECTRICAL PROPERTIES

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

CONSTRUCTION COMMITTEE MEETING AGENDA

CONSTRUCTION COMMITTEE MEETING AGENDA CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, February 13, 2018 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

Aviation Summit Design and Construction Services

Aviation Summit Design and Construction Services Aviation Summit 2017 Design and Construction Services Agenda: Terminal 3 Modernization PHX Sky Train Stage 2 Terminal 4 S1 Concourse & Apron Other Capital Program Projects Terminal 3 Modernization Processor

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings Page: 1 7 Scope: These standards shall apply to any temporary membrane structure, tent, or canopy, in accordance with the California Code Regulations (CCR) Title 19 and California Fire Code (CFC). Temporary

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses; B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly

More information

Steel Mill Products 1999

Steel Mill Products 1999 Steel Mill Products 1999 Issued December 2002 MA331B(99)-1(RV) (Formerly Series No. MA33B) Information about the scope of the survey, methodology, explanation of terms and historical notes for this survey

More information

inside diameter wire part no. color length I.D. after recovery gauge red Single Wall Polyolefin 2:1 Shrink Tube - Flexible

inside diameter wire part no. color length I.D. after recovery gauge red Single Wall Polyolefin 2:1 Shrink Tube - Flexible PVC 2:1 Shrink Tube Use to insulate terminals after the terminal has been crimped to the wire. Tubing remains flexible and will shrink to approximately 50% of its original size when 160 C (320 F) heat

More information

# RFP 50KW GENERATORS # RFP EQUIPMENT SHELTERS ADDENDUM #1

# RFP 50KW GENERATORS # RFP EQUIPMENT SHELTERS ADDENDUM #1 Return to: Dawson County Purchasing Department 25 Justice Way, Suite 2223 Dawsonville, GA 30534 #205-13 RFP 50KW GENERATORS #206-13 RFP EQUIPMENT SHELTERS ADDENDUM #1 Bid Closing Date: May 17, 2013 at

More information

Airport Advisory Board Meeting Minutes June 26, 2017

Airport Advisory Board Meeting Minutes June 26, 2017 Board Members Present: Robert Spivey John Barber Jr Ronald Stutes James Wynne III Joshua Ebright Board Members Absent: Lindsey Birdsong Kelly Walker Others Attending: Davis Dickson, Airport Manager, COT

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

JOHNSTON COUNTY AIRPORT AUTHORITY

JOHNSTON COUNTY AIRPORT AUTHORITY JOHNSTON COUNTY AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS FOR AIRPORT PLANNING SERVICES For JOHNSTON REGIONAL AIRPORT (JNX) 3149 Swift Creek Rd. Smithfield, NC 27577 PHIL LANIER AIRPORT DIRECTOR (919)

More information

CareGiver 360 Barrier-Free Shower Floor with Entry Ramp

CareGiver 360 Barrier-Free Shower Floor with Entry Ramp with 360.100 Entry Ramp Design features: SEE PGES 2-5 FOR LIST OF CCESSORIES! Code ccepted Produced from high-grade, reinforced, molded fiberglass for optimum strength and impact resistance using matched

More information

Office of Airport Safety and Standards

Office of Airport Safety and Standards Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office

More information

LOOK. CP Test Stations! Your Key to Corrosion Monitoring & Utility Locating. P.O. Box 311 Kearny, N.J

LOOK. CP Test Stations! Your Key to Corrosion Monitoring & Utility Locating.   P.O. Box 311 Kearny, N.J CP_Monitoring_0912AB_Layout 1 9/10/12 5:50 PM Page 1 P.O. Box 311 Kearny, N.J. 07032 201.998.1500 www.cptestproducts.com Your Key to Corrosion Monitoring & Utility Locating LOOK CP Test Stations! CP_Monitoring_0912AB_Layout

More information

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.

More information

532 - PAVEMENT MARKING - OPSS 532

532 - PAVEMENT MARKING - OPSS 532 532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance

More information

Airworthiness Directive

Airworthiness Directive Airworthiness Directive AD No.: 2018-0200 Issued: 06 September 2018 EASA AD No.: 2018-0200 Note: This Airworthiness Directive (AD) is issued by EASA, acting in accordance with Regulation (EC) 216/2008

More information

MODELS: 500 SM & 500 SMSS

MODELS: 500 SM & 500 SMSS Most Dependable Fountains, Inc. OPERATIONS MANUAL MODELS: 500 SM & 500 SMSS Most Dependable Fountains, Inc 5705 Commander Drive Arlington, TN 38002 800-552-6331 FOUNTAINS, MOST DEPENDABLE FOUNTAINS, INC.

More information

This AC cancels AC 150/ , Construction or Establishment of Landfills Near Public Airports, dated August 8, 2000.

This AC cancels AC 150/ , Construction or Establishment of Landfills Near Public Airports, dated August 8, 2000. U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: CONSTRUCTION OR ESTABLISHMENT OF LANDFILLS NEAR PUBLIC AIRPORTS Date: January 26, 2006 Initiated by: AAS-300

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information