1 NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis MONTHLY O & M INSPECTION REPORT (Completed stretch from Km: to Km ) BY INDEPENDENT CONSULTANT for the month of Concessionaire Ircon Soma Tollways Pvt. Ltd Independent Consultant PIU NHAI NASHIK

2 K&J/DPNH ttlt2o1st Oh 8 4 To, The Project Director, Natronal Highways Authority of India, PlU, Nashik, "subodh House",S.N o ,Plot No.4' Off Mumbai Agra HighwaY Nashik DTIULE-PIMPALGAON (NH-3) BOT PROJECT Date: 05rn SeP 2015 SubTlmprovement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 laneroadandwideningto4- anedividedhighwayfromkm tokm of NH-3(Dhu e-pimpa gaon)inthestateofmaharashtraonbui doperateandtransfer (BOT) basis - o & M Inspection Report (cod stretch New Km to Km )for the month of August Reg' Ref: Clause 19.2, Volume I of Concession Agreement' Dear Sir, As perclause 19.2, Volume lof ConcessionAgreement, pleasefind O & M Inspection Report of lc for the month of August 201S.This is for your kind information please' With Best Regards, &'6-eh$Y A K Mittal Team Leader Dhule Pimpalgaon Section of NH-3. Encl: As above. CC: 1)The COO, ISTPL, Laling Toll Plaza, 2) Mr. J. N. Dabe, Executive Director, 3) Office Files. Laling, Tal-Dist Dhule for inf &n/a. M/s. K&J Projects Pvt' Ltd Nagpur for perusal' Plot No. 4,

3 Monthly O & M Inspection Report - August Improvement,Operation and Maintenance,Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4/6 Lane of Dhule to Pimpalgaon(Km Km 380) Section of NH-3 on BOT basis. MONTHLY O & M INSPECTION REPORT (AUGUST 2015 ) TABLE OF CONTENTS Sl.No. Description of work Page No. 1 Shoulder, slopes, earthworks 1 2 Road Maintenance 2 to 6 3 Structure 7 to 8 4 Road Furniture 9 to 17 5 Drainage 18 6 Misc. Maintenance Activities 19 7 Horticulture Enchroachmnet Encroachment Median Encroachment Annexures Annexure -A : Encroachments 8.2 Annexure -B : Highway Lighting 8.3 Annexure -C : Avenue plants 8.4 Annexure - D : Recovery of Damages to to to 34

4 Monthly O and M Inspection Report - August 2015 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of August Shoulder, slopes, earthworks Sl.No 1 2 Description of Maintenance work to be done Blading/grading shoulder and slope Reconstruction & regravelling of slopes/shoulders Location in Km Type of Damages noticed Action taken by IC Remarks Km to Km Km Km to Km Km to Km to Km Km to Km Km to Km Km to Km Km Km to Km Km to Km Km Shoulder to be dressed scouring of soft shoulders,hence stagnation of water during rainy season and to be repaired by exacavation,filling and compaction scouring of soil below the standpost of MBCB needs to be refilled with soil Stone pitching damged on emb. Defects to be rectified immediately Defects to be rectified immediately complying with MORT&H specification Section 3000 requirement Furnishing & laying turf Km Quadrant pitching on Nashik side is damaged and the bed of slab culvert at Km is filled with disposed litter and all rubbish, debris etc obstructing the flow of water K & J Projects Pvt. Ltd

5 Monthy O and M Inspection Report - August 2015 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH- 3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of August Road Maintenance Sl.No. Description of Maintenance work to be done Location in Km Type of Damages Notice Action taken by IC Remarks 1 Clearance of Embankment 2 Cleaning Carriage ways Sealing Cracks a) covered with 6-7mm stone 3 chipping@ 0.1cum/10sgm b) covered with dry coarse sand surface dressing 4 Second coat of surface dressing Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to km Km to Km Km to Km Km Footpath Cleaning (S/R) Garbage lying in ROW Garbage on Drain Cover Cow dung lying in ROW Km to Km Garbage lying in ROW Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Vegetation on embankment to be cleared Defects to be rectified immediately. Cow dung heap lying along shoulder Porous and hungry surface To be rectified pertaining to Clause (iv) of Schedule L, Volume-II of CA and Swachh Bharat Mission of NHAI Activities in NHAI To be rectified pertaining to Clause (iv) of Schedule L, Volume-II of CA and Swachh Bharat Mission of NHAI Activities in NHAI Defects shall be rectified immediately by providing two coat surface dressing with 10mm aggregates

6 Monthy O and M Inspection Report - August 2015 Sl.No Description of Maintenance work to be done Repair to Rutted portion and edge breaking Sealing to closely spreaded cracks at scatterd locations Treatment of Bleeding a) Providing treatment and repair to potholes b) Deep potholes depth< 75mm Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km O & M Inspection Report by IC for the month of August Road Maintenance Location in Km Type of Damages Notice Action taken by IC Remarks Rutting on BC surface To be rectified immediately by full depth patching as Clause Schedule L of Volume-II of Concession Agreement. 100 m length for a width of 300mm to be rectified 50 m length for a width of 300mm to be rectified 50 m length for a width of 300mm to be rectified 100 m length for a width of 300mm to be rectified 600 m length for a width of 300mm to be rectified 400 m length for a width of 300mm to be rectified 620m length for a width of 300mm to be rectified 8 Dense Bituminous Macadam 9 10 Bituminous Macadam (Profile corrective course) Laying Bituminous concrete Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Cracks of moderate severity of width 3-6mm on microsurfacing done BC surface with surface deformation.to be rectified immediately by milling and filling the millled surface with BC material 400 m length for a width of 3.5m to be rectified 9.6 m length for a width of 3.5m to be rectified m length for a width of 3.5m to be rectified 550 m length for a width of 3.5m to be rectified 13.5 m length for a width of 3.5m to be rectified 21 m length for a width of 3.5m to be rectified 2.7 m length for a width of 3.5m to be rectified 17 m length for a width of 3.5m to be rectified 10 m length for a width of 3.5m to be rectified 550 m length for a width of 3.5m to be rectified 13.6 m length for a width of 3.5m to be rectified 200 m length for a width of 3.5m to be rectified 100 m length for a width of 3.5m to be rectified 590 m length for a width of 3.5m to be rectified 80 m length for a width of 3.5m to be rectified 150 m length for a width of 3.5m to be rectified 200 m length for a width of 3.5m to be rectified 276 m length for a width of 3.5m to be rectified 395 m length for a width of 3.5m to be rectified 28 m length for a width of 3.5m to be rectified 260 m length for a width of 3.5m to be rectified

7 Monthy O and M Inspection Report - August 2015 O & M Inspection Report by IC for the month of August Road Maintenance Sl.No Description of Maintenance work Location in Km Type of Damages Notice Action taken by IC Remarks to be done Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km Cracks of moderate severity of width m length for a width of 3.5m to be rectified Laying Bituminous concrete Km to Km mm on microsurfacing done BC surface 300 m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified with surface deformation.to be rectified Km to Km m length for a width of 3.5m to be rectified immediately by milling and filling the Km to Km m length for a width of 3.5m to be rectified Km to Km millled surface with BC material 50 m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Laying Bituminous concrete Alligator cracks on BC surface. Defects Km to Km m length for a width of 3.5m to be rectified shall be rectified by doing full depth Km to Km m length for a width of 3.5m to be rectified patching Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Km to Km m length for a width of 3.5m to be rectified Single course semi-dense bituminious concrete Using paving bitumen as per IS:73 Patching of built up spray grout in layers

8 Monthy O and M Inspection Report - August 2015 Sl.No. Description of Maintenance work to be done O & M Inspection Report by IC for the month of August Road Maintenance Location in Km Type of Damages Notice Action taken by IC Remarks Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km Logitudinal cracks on BC 150 m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified surface.defects shall be rectified Slurry seal Km to Km m length for a width of 2.0 m to be rectified immediately complying to Clause Km to Km m length for a width of 2.0 m to be rectified /Clause 516 of MORTH specification. Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Km to Km Logitudinal cracks on BC 570 m length for a width of 2.0 m to be rectified Slurry seal Km to Km surface.defects shall be rectified 300 m length for a width of 2.0 m to be rectified Km to Km immediately complying to Clause m length for a width of 2.0 m to be rectified Km to Km /Clause 516 of MORTH specification. 200 m length for a width of 2.0 m to be rectified Km to Km m length for a width of 2.0 m to be rectified Sealing the cracks using fog seal Km to Km Km to Km Km to Km Km to Km (Slow Lane) Km to Km (Slow lane) Km to Km Km to Km (Slow lane) Km to Km Km to Km Km to Km (Slow lane) Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Alligator /hair line crack of less severity i.e width less than 3mm formed on BC surface Defects shall be rectified immediately by spraying Low viscosity (SS-1) emulsion complying to MORT&H specification.

9 Monthy O and M Inspection Report - August 2015 Sl.No Description of Maintenance work to be done Tack coat a) With Bituminous emulsion /cut back of specified grade Premix patching with stone chipping mixed with binder. a) Using straight run bitumen (3.5 to 4%) compacted thickness upto 25mm. b) Patch work using cationic bitumen emulsion RS Scarifying existing damaged BC surface Scarifying existing stone metal layers. Missing of distressed road pavement in depth. a) in variable depth up to 50mm in single pass b) for depth mm in single pass c) for depth mm in single pass Carriageway sweeping Watch and ward on highway O & M Inspection Report by IC for the month of August Road Maintenance Location in Km Type of Damages Notice Action taken by IC Remarks MBCB and hand railing c) Anti glare median railling Km to Km Km to Km Km to Km Road Roughness Km to Km Roughness value exceeds the Km to Km specification limit. Km to Km Km to Km Km to Km Km to Km m length for a width of 3.5m to be rectified 57.9 m length for a width of 3.5m to be rectified m length for a width of 3.5m to be rectified 90.5 m length for a width of 3.5m to be rectified m length for a width of 3.5m to be rectified 70 m length for a width of 3.5m to be rectified 1000 m length for a width of 3.5m to be rectified 1000 m length for a width of 3.5m to be rectified 2 m length for a width of 3.5m to be rectified

10 Monthly O and M Inspection Report - August 2015 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of Monthy O and M Inspection Report - August Structure Sl. No Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. Cleaning the upstream/downstream sides of C.D.works. 1 Km a) Minor Bridge Km Km Replacing damaged/broken railing Km Km to Km Repair stone/brick masonry 4 pointing to existing pointing works 5 Cement plaster & repair Painting exposed concrete/mansonry portion 6 of bridge /CD works a) Dry distemper of approved brand or lime Km to Km Km to Box culvert cleaning required Box culvert cleaning required Box culvert cleaning required RCC parapet damaged To be rectified immediately b) Enamel paint of approved brand 7 Sealing of cracks by injection through nipples a) Cement Grout b) Epoxy Resign Grout i) 25mm ii) 40mm iii) 50mm

11 Monthly O and M Inspection Report - August 2015 O & M Inspection Report by IC for the month of Monthy O and M Inspection Report - August Structure Sl. No Description of Maintenance work to be done Location in Km / Structure ID Type of Damages noticed Action taken by IC Remarks. 8 Repair to foundation Applying epoxy mortar treatment over leached 9 combed and pilled concrete 10 Periodic maintenance of expansion joint Km Km Km Km Km Km Km Metal strip broken, cracking of concrete Metal strip broken Metal strip broken, cracking of concrete, knocking sound, loss of sealing compound Metal strip broken Metal strip broken, cracking of concrete, knocking sound, loss of sealing compound Metal strip broken, loss of sealing compound To be rectified immediately Km Metal strip broken,cracking of concrete,knocking sound,loss of sealing compound 11 Periodic maintenance of expansion joint Km Km Km Km Km Km Metal strip broken Metal strip broken Metal strip broken,loss of sealing compound To be rectified immediately 12 Dismantling/breaking of damaged cement concrete floor 13 Maintenance to all type of bearings Providing and fixing weep holes 75 mm dia in walls Providing and laying required dia RCC hume pipe 16 Survey for Monitoring the Settlement

12 Monthly O and M Inspection Report -August 2015 Sl. No. 1 1 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule- Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Description of Maintenance work to be done Maintenance of road signs a) Road sign board mounted on single post a) Road sign board mounted on single post Location in Km Type of Damages noticed Action taken by IC Remarks Avdhan village Village name boards missing.to be replaced Devgaon village Dhule city Missing Two Way Hazard Marker at Bus Bay Locations Km Arvee Bus bay island separator Km O & M Inspection Report by IC for the month of August Road Furniture Purmepada Bus bay island separator Km Mungse Bus bay island separator Km Chinchve Bus bay island separator Km Bus bay island separator Km Shirwade Vani Bus bay island separator Km Arvee Bus bay island separator Km Purmepada Bus bay island separator Missing Two Way Hazard Marker at start of Service Road Km On Separator of service road Km On Separator of service road Km On Separator of service road Km On Separator of service road Km On Separator of service road Km On Separator of service road Missing Object Marker in Median Opening Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Km Missing Object Marker Missing Hazard Marker To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement

13 Monthly O and M Inspection Report -August 2015 Sl. No. 1 Description of Maintenance work to be done a) Road sign board mounted on single post b) Road sign board mounted on double post c) Road stud O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km Km to Km Km to Km Km to Km Km (median) Km (median) Km (median) Km (median) Median Hazard Marker erected after MBCB Chevron board in MEDIAN Before Median wall of minor Bridge Chevron board Chevron board Chevron board Kerb mount Guard rail damaged To be rectified immediately as per Clause (ii) & (iii) Schedule L of Volume-II of Concession Agreement Defects to be rectified immediately

14 Monthly O and M Inspection Report -August 2015 Sl. No. Description of Maintenance work to be done 2 Replacing/Installing Delineators 2 Replacing/Installing Delineators O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Delineators provided on Dhule & Nashik side at these median opening locations are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Delineators provided on Dhule & Nashik side are blackened/ missing/damaged needs cleaning/ replacement/repairs respectively. Delineators provided on Dhule & Nashik side are blackened/ 2 Replacing/Installing Delineators missing/damaged needs cleaning/ replacement/repairs respectively. Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II Defects to be rectified as per Clause (ii) & (iii) Schedule L of CA,Vol-II

15 Monthly O and M Inspection Report -August 2015 Sl. No. 3 Description of Maintenance work to be done Reflective stickers on MBCB crash barrier Fixing of distance measurement stone O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km to Km Km to Km Km to Km Km to Km Km to km Km Km km km (Missing) Km /600 (Missing) Km (Missing) Km (Missing) Km /800 (Missing) Km (not painted)/600 4 Km (not designated) a) Hectometer stone Km (Paint Feded) HM stone damaged/missing/cleaning required Km /600 (Missing) Km (distrub) Km (not painted) Km (Missing) Km (Missing) Km (Missing) Km /800 (Missing) Km /800 (Missing) Km /400 (Missing) Km /600/800 (Missing) Km /800 Km /800 Km Km Km (Missing) 4 a) Hectometer stone HM stone damaged/missing/cleaning required Km /800 Km (Paint Feded) Km (Paint Feded) Km (Paint Feded) To be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume-II of Concession Agreement

16 Monthly O and M Inspection Report -August 2015 Sl. No. Description of Maintenance work to be done O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks 4 a) Hectometer stone Km (Paint Feded) Km (Not Deginated) Km (Not Deginated) Km (Not Deginated) Km (Damaged) Km /600/800 (Missing) Km (Missing) Km (Distrub) Km (Not Deginated) Km (Not Deginated) Km (Missing) Km Km (Damaged) Km /800 Km Km /400 (Not Painted) Km ( Damaged) Km /600 Km Km Km Km Km /800 Km Km Km Km Km Km Km /600 Km /800 Km Km (Not Designated) Km not painted Km not painted Km /600 (not designated) Km (Not Deginated) Km ( Damaged) Km (Not Designated) HM stone damaged/missing/cleaning required Defects shall be rectified as and when necessary as per Clause (vii) Schedule L of Volume-II of Concession Agreement

17 Monthly O and M Inspection Report -August 2015 Sl. No. Description of Maintenance work to be done O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km (Not Deginated) Km /800 (Not Designated) Km /400 ( Not Deginated) Km (Paint Feded) Km (Not Deginated) Km ( Distrub) Km ( Paint Feded) Km ( Not Deginated) Km (Not Deginated) Km Km (Not Painted) Km (Damaged) Km /600/400 ( Missing) Km Not Deginated Km Km stone to be raised Km Km stone missing Km Km stone damaged Km Km stone damaged Km Km stone missing Km Km stone damaged Km Km stone damaged 4 b) Kilometer stone Km Km stone to be raised Km Km stone missing Km Km stone damaged Km Km stone damaged Km Km stone damaged Km Km stone painting faded km Km stone painting faded Km Km stone damaged Km Km stone painting faded Km Km stone painting faded Km Km stone damaged Km Km stone damaged 5 Boundary stone Painting two coat on old surface a) Hectometer stone 6 b) Kilometer stone c) 5th kilometer stone d) Boundary stone Defects shall be rectified as and when necessary as per Clause (vii) Sch L of Vol-II of CA

18 Monthly O and M Inspection Report -August 2015 Sl. No. Description of Maintenance work to be done O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks 7 8 Painting faded surface of kerb a) Damages of kerb stone Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km Median kerb faded/blackened -needs repainting. Median opening Bell Mouth damaged Km Separator Bell Mouth damaged a) Damages of kerb stone Km Median opening Bell Mouth dmaged Service Road Km to Km Km to Km Km to Km Service Road Km to Km b) Unauthorized Median break Km to Km MCW Km Km km Km km Unauthorised median breaks to be closed Defects shall be rectified immediately Defects shall be rectified immediately Defects shall be rectified immediately Concessionaire is requested to furnish a list of unauthorized median opening to Police Authorities and close the median opening with the help of Police Authorities as discussed in the meeting of Road Safety Committee Dtd

19 Monthly O and M Inspection Report -August 2015 Sl. No. 9 Description of Maintenance work to be done Raised pavement marker O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km Km km Km Km Km Km to Km to Km to Km to Km Km to Km Km to Km Km to Km Km to Km Center Line Faded Shoulder Edge line Faded Shoulder Edge line Faded Center Line Faded Center Line Faded Center + Inner line Faded Center + Shoulder Edge line Faded Shoulder Edge line Faded 10 Removal of encroachment of ROW As per annexure A (enclosed) Encraochment to be removed 11 Removal of unauthorized approaches Defects to be rectified as per Clause (vi) Schedule L of CA,Vol-II Km Km Km Km Km Km Km Km Km Km Warning sign board not provided Needs to be provided for warning of the presence of the speed breakers to the drivers cat-eyes not provided.needs to be provided to enhance night visibility.

20 Monthly O and M Inspection Report -August 2015 Sl. No. Description of Maintenance work to be done O & M Inspection Report by IC for the month of August Road Furniture Location in Km Type of Damages noticed Action taken by IC Remarks Km Km Km Km Km Km Km Km Km Km Rumbler Strip Km cat-eyes not provided.needs to be provided to enhance night visibility. the Rumble strip provided at Devarpada village is of more height than the IRC specification causing heavy jerks while passing over the strips. This is dangerous from safety point of view and needs to be rectified as per the IRC specification by reducing the height. To be rectified as per the order of the Bombay High Court for direction with Speed Breakers

21 Monthly O and M Inspection Report - August 2015 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km: to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of August Drainage Sl.N o. Description of Maintenance work to be done Location in Km Type of Damage noticed Action taken by IC Remarks. 1 3 Cleaning road side unlined drains Lined Drain Km to Km Median Km to Km Km Km Km Km Km service road 01Nos Km service road 01Nos Km to Km Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Km service road 01 Nos Cleaning of chute drain on embankment portion required Km to Km Km to Km side drain choked up,filled with soil 2 Cleaning road side lined drains Km to Km Drain Cleaning (S/R) To be rectified immediately Km to Km Median cross drain cleaning Drain Cover Damage (S/R) Drain Cover Damage & Cleaning (S/R) Drain Cover Damage(S/R) Drain Cover Damage & Cleaning (S/R) Drain Cover Damage(S/R) Drain Cover Damage(S/R) RCC Drain Cover Missing to be provided To be rectified immediately To be rectified immediately

22 Monthly O and M Inspection Report - August 2015 Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km: to Km ) of NH-3 (Dhule-Pimpalgaon) in the state of Maharashtra on Build Operate and transfer (BOT) basis Sl. No Description of Maintenance work to be done Km Km Km O & M Inspection Report by IC for the month of August 2015 Misc. Maintenance Activities Location in Km Type of Damages noticed Action taken by IC Remarks Busshelter damaged 1 Bus shelter Km to Km Vegetation and human excreta on Notice Issued Defect to be rectified immediately (Tehare) the Busbay footpath to be cleaned Km to Km Vegetationon the Busbay footpath to be cleaned 2 3 Street light Guard stone Separate sheet enclosed Annx- B Km Km to Km Km to Km Km Guard stone missing/damaged at the start of MBCB Notice Issued Defect to be rectified immediately Km at the start of MBCB These locations are replaced with Object 5 Erection of non standard signages Km at the start of MBCB Marker in lieu of Hazard Marker; previously it Notice Issued Km at the start of MBCB was Hazard marker. To be rectified Km at the start of MBCB immediately as per IRC-79 Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB Km at the start of MBCB 5 Erection of non standard signages Km at the start of MBCB These locations are replaced with Object Km at the start of MBCB Marker in lieu of Hazard Marker; previously it Km at the start of MBCB Notice Issued was Hazard marker. To be rectified Median immediately as per IRC-79 Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge Km median wall of minor bridge

23 Monthly O and M Inspection Report - August 2015 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH- 3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis O & M Inspection Report by IC for the month of August Horticulture Sl. No Description of Maintenance work to be done Location in Km Type of Damages noticed Action taken by IC Remarks 1 2 Avenue Plantation Median Plantation Separate sheet enclosed Annx C Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km To be rectified immediately as per IRC Missing median plants to be replanted Km to Km :SP:21 Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Km to Km Pruning in Seperator required Km to Km Pruning in Median 3 Pruning Km to Km Pruning + Weeding To be rectified immediately as per IRC Km to Km Pruning in Median :SP:21 Km to Km Pruning in Median Km to Km Pruning in Median Km to km Weeding in Median

24 Monthly O and M Inspection Report - August 2015 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Details of Encroachment () Nature of Hoardings and other Sl. No Chainge (Km) Description of Encroachment Encroachment Unauthorised Boards Length x Width Temporary Permanent Remarks 1 Km of service road Navkar Ford has created an encroachment inside ROW by 100mm thick concreting upto the existing RCC drain as a parking place for vehicles 30m length Permanent 2 Km Sai car dhaba - double post mounted board Permanent 3 Km Compound wall 7m length Permanent 4 Km UP - Bihar dhaba - double post mounted board Permanent 5 Km Indian Oil petrol pump - double post mounted board Permanent Not acceptable pertaining to Clause 5.0 of Schedule L, Volume-II of Concession Agreement 6 Km UP dhaba - double post mounted board Permanent 7 Km Hotel Moonlight -double post mounted board Permanent 8 Km Hotel Navrang - double post mounted board Permanent

25 Monthly O and M Inspection Report - August 2015 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and Transfer (BOT) basis Details of Encroachment () Sl. No Chainge (Km) Description of Encroachment Encroachment Length x Width Nature of Hoardings and other Unauthorised Boards Temporary Permanent 1 Km Hotel city point -Double post mounted board 900mm x 600mm Permanent 2 Km Hotel city point -Single post truss mounted board 1.25m x 1.25m Permanent 3 Km Hotel Fountain - Double post mounted board 1.25m x 1.25m Permanent 1 Km to Km m length Permanent 2 Km to Km Unauthorized erection of cement concrete post for fencing inside ROW 50m length Permanent 3 Km to Km m length Permanent Remarks To be rectified pertaining to Clause 5.0 (a), Schedule -L of Volume -II of Concession agreement

26 Monthly O and M Inspection Report - August 2015 Improvement, Operation and maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4-lane divided Highway from Km to Km (New Km to Km ) of NH-3 (Dhule-Pimpalgaon) in state of Maharashtra on Build Operate and transfer (BOT) basis Details of Encroachment (Median) Nature of Hoardings and Sl. No Chainge (Km) Description of Encroachment Encroachment Length x Width other Unauthorised Boards Remarks Temporary Permanent NIL NIL NIL NIL NIL NIL NIL

27 Monthly O and M Inspection Report August Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (August ) 8. Annexures 8.1. Annexure - A: Encroachments 8.2. Annexure - B: Highway Lighting 8.3. Annexure -C: Status of Avenue plants 8.4. Annexure - D: Recovery of Damages K&J Projects Pvt. Ltd. Page 24

28 Monthly O and M Inspection Report August Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (August ) 8.1. Annexure - A Encroachments K&J Projects Pvt. Ltd. Page 25

29 Monthly O and M Inspection Report August Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (August ) 8.2. Annexure - B Highway Lighting K&J Projects Pvt. Ltd. Page 26

30 Monthly O and M Inspection Report - August Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4- S. No lane divided highway from Km to Km of NH-3 (Dhule Pimpalgaon) in the state of Maharashtra on Description of Maintenance work to be done Preparation of load shedding details & submission to NHAI Name of Town/Village From To At Arvi village At Sayane village At Umrane village (without transformer) At Sangvi village At Chandwad village At Sogras village (without transformer). Build Operate and Transfer (BOT) basis Annexure -B HIGHWAY LIGHTING Location in Km At Wadali-Bhoi village At Dhule Urban Area Types of Damage Notice Remarks 2 Any luminary status At Laling village At Arvi village At Sayane village At Chandanpuri (Malegaon) At Umrane village (without transformer) At Sangvi village At Rahud village At Chandwad village Any lamps missing at these locations to be verified Details to be gathered immediately and rectify the problem at high priority At Chandwad Toll Plaza. At Sogras village (without transformer) At Wadali-Bhoi village At Dhule Urban Area Cleaning & Washing of Luminaries once in a month At Laling village At Arvi village At Zodge village At Sayane village At Chandanpuri (Malegaon) At Umrane village (without transformer) Cleaning & Washing of Luminaries at these locations to be done once in a month Details to be gathered immediately and rectify the problem at high priority At Sogras village (without transformer) At Wadali-Bhoi village At Dhule Urban Area Check the lux levels every month by lux meter At Laling village At Arvi village At Sayane village At Chandanpuri (Malegaon) Check the lux levels every month at these locations by lux meter Details to be gathered immediately and rectify the problem at high priority At Umrane village (without transformer)

31 Monthly O and M Inspection Report - August S. No Description of Maintenance work to be done Name of Town/Village Location in Km From To At Sangvi village At Rahud village Types of Damage Notice Remarks At Chandwad village At Sogras village (without transformer) At Wadali-Bhoi village At Arvi village At Zodge village At Sayane village At Chandanpuri (Malegaon) At Umrane village (without transformer) At Rahud village At Chandwad village At Sogras village (without transformer) At Wadali-Bhoi village At Dhule Urban Area Testing & Replacing At Laling village At Arvi village At Zodge village At Sayane village At Chandanpuri (Malegaon) At Umrane village (without transformer) At Sangvi village At Rahud village At Sogras village (without transformer) Testing to be done at these locations (after verifying the status of lights at the above mentioned locations ion item no.1) and replacement; if any Cleaning,washing and realignment of luminaries to be carried out immediately At Wadali-Bhoi village At Arvi village At Sayane village At Chandanpuri (Malegaon) At Umrane village (without transformer) At Sogras village (without transformer) At Wadali-Bhoi village Checking of fuses,cables,replacin g luminary etc At Arvi village At Chandanpuri (Malegaon) At Umrane village (without transformer). At Sogras village (without transformer) Checking of fuses,cables,replacing luminary etc. at these locations Details to be gathered immediately and rectify the major problems At Wadali-Bhoi village

32 Monthly O and M Inspection Report August Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (August ) 8.3. Annexure -C Status of Avenue plants K&J Projects Pvt. Ltd. Page 29

33 Name of the PIU Monthly O and M Inspection Report August Status of Avenue Plantation along Project Highway As per monitoring of IE, in 1 st fortnight i.e. from to , the status of Plantation is as under Number If not of No of completed, Name of the Mechanism of Plants plants Survival tentative project plantations* propos planted percentage date of ed to be so far completion planted Action taken against any default Nashik Nashik Km to Km Both side of Project Highway Km to Km Median Plantation Concessionaire Completed N.A. Concessionaire 1,29,218 1,40,000 >100 Completed N.A. Name of the PIU The re-plantation done along Project Highway from Dt to Dt is 102 trees. The dead trees in 1 st fortnight are 219 no. Thus as on dt , total no s of trees surviving is and as no of trees surviving is more than required as per environmental clearance thus no action proposed. In median, the new Plantation done form to is Thus as on , the total no. of trees in median is 1,34,136 which is more than required and thus no action proposed. As per monitoring of IE, in 2 nd fortnight i.e. from to , the status of Plantation is as under Name of the project Mechanism of plantations Number of Plants proposed to be planted No of plants planted so far Survival percentage If not completed, tentative date of completion Nashik Km to Km Both side of Project Highway The re-plantation done along Project Highway from Dt to Dt is 147 trees. The dead trees in 2 nd fortnight are 719 no. Thus as on dt , total no s of trees surviving is and as no of trees surviving is more than required as per environmental clearance thus no action proposed. In median, the new Plantation done form to is 452. Thus as on , the total no. of trees in median is 1, 34,588 which is more than required and thus no action proposed. Action taken against any default Concessionaire Completed N.A. K&J Projects Pvt. Ltd. Page 30

34 Monthly O and M Inspection Report August Improvement, Operation & Maintenance, Rehabilitation and Strengthening of existing 2-lane road and widening carriageway to 4-lane divided dual carriageway configuration of Dhule to Pimpalgaon (Km 265 to Km 380) section of NH-3 on BOT basis MONTHLY O & M INSPECTION REPORT (August ) 8.4. Annexure - D Recovery of Damages K&J Projects Pvt. Ltd. Page 31

35 Monthly O & M Inspection Report August RECOVERY OF DAMAGES TILL AUGUST DETAILS OF IMPOSITION OF RECOVERIES Sr. no. Rate of recovery per day (in Rs.) Date of effect Items Total items NHAI Ltr. no. Period for rectification given by NHAI 1 34, Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.severe alligator cracking, 5.Depressed soft shoulder 5 no.s NHAI/PIU/NSK/ DP/2013/3002 dated days 2 95, Cracks on BC surface, 2.Longitudinal cracks 3.Roughness exceeding limit 3000mm/km 4.Severe alligator cracking, 5.Depressed soft shoulder, 6.Rutting, 7.Unauthorizedmedian opening 8.painting faded kerb, 9.BI test 10.damaged expansion joint, 11. Highway lighting. 11 no.s NHAI/PIU/NSK/ DP/2014/1048 dated days 3 1,15, Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.severe alligator cracking, 5.Depressed soft shoulder, 6.Rutting, 7.Unauthorized median opening, 8.Painting faded kerb, 9.BI test, 10.damaged expansion joint, 11.Highway lighting, 12. Avenue plantation. 12 no.s NHAI/PIU/NSK/ DP/2014/1085 dated days 4 72, Cracks on BC surface, 2.Longitudinal cracks, 3.Roughness value exceeding limit 3000mm /km, 4.Severe alligator cracking, 5.Rutting, 6.Unauthorized median opening, 7.Painting faded kerb, 8.Damaged expansion joint, 9. Avenue plantation. 9 no.s NHAI/PIU/NSK/ DP/2014/1877 dated days K&J Projects Pvt. Ltd. Page 32

MONTHLY O & M INSPECTION REPORT DECEMBER

MONTHLY O & M INSPECTION REPORT DECEMBER NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

6rKL+tv. Ref: As per Schedule-P, Volume-ll of Concession Agreement.

6rKL+tv. Ref: As per Schedule-P, Volume-ll of Concession Agreement. K&J/DPNH rrlt2}lsl Q \2,5 DITULE- PTMPALGAON (NH_) BOT PROJECT o he Project Director, National Highways Authority of India, PlU. Nashik "Subodh House",S. N o.g 2,plot No.4, Off MumbaiAgra Highway Nashik

More information

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL) National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44

More information

DETAIL OF THE PROJECT

DETAIL OF THE PROJECT Page 1 Page 2 DETAIL OF THE PROJECT A CONTRACT DETAILS Project State Operation & Maintenance Phase of 4 Lane dual carriageway from Km 50.000 to Km. 100.000 of NH 6 (Kondhali Talegaon Section ) in the State

More information

Article 13, clause no of the Concession Agreement states that:

Article 13, clause no of the Concession Agreement states that: BACKGROUND Article 13, clause no. 13.2 of the Concession Agreement states that: 13.2 Inspection During the Construction Period the Independent Engineer shall inspect the Project Highway at least once a

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH-45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section

More information

DATA BOOK IV : COST ESTIMATE

DATA BOOK IV : COST ESTIMATE The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

MINUTES OF PROJECT REVIEW MEETING HELD ON

MINUTES OF PROJECT REVIEW MEETING HELD ON MINUTES OF PROJECT REVIEW MEETING HELD ON 4 th July 2016 1 The project review meeting started at 2.30 pm on 4 th July 2016 at the H.O of with the Managing Director of Shri A P M Mohammed Hanish IAS in

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012 Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris

More information

Permit Application Requirements For Temporary Tents, and Membrane Structures

Permit Application Requirements For Temporary Tents, and Membrane Structures CTY OF PAM DESERT Building & Safety Department Permit Application Requirements For Temporary Tents, and Membrane Structures F O R M A T O A B U E T Revised 1-30-14 73510 Fred Waring Drive Palm Desert,

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

Pavement Strength Analysis Prepared by Molzen Corbin September 2016 Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number REPORT Pavement Evaluation Summary Brookshire Way & Duluth Park Duluth, Georgia Project Number 2013.4154.01 February 11, 2014 Revised March 20, 2014 UNITED CONSULTING 625 Holcomb Bridge Road Norcross,

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris

Mayor and Councillors. District Engineer and Roading Manager. Councillor Harris Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 1 st February 2011 File reference: Document: 690387 Portfolio holder: Councillor Harris Meeting date: 9 th February 2011

More information

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,

More information

Inspection Check-off Sheet

Inspection Check-off Sheet Inspection Check-off Sheet Combustible vegetation that could create a fire hazard shall be removed from the area occupied by a tent or membrane structure, and from areas within 30 ft of. (Section 2404.20

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

ISOM & ISSOM forbidden symbol comparison

ISOM & ISSOM forbidden symbol comparison & forbidden symbol comparison Forbidden symbols and their relatives Symbol 2000 (Long, Middle) 2007 (Sprint) 201 Impassable cliff An impassable cliff, quarry or earth bank (see 106) is shown with a 0.35

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase)

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Indian Maritime University (A Central University Govt. of India) East Coast Road, Uthandi, Chennai - 600 119. Tele:(044) 2453 0343/45, Fax: 2453 0342,

More information

THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended, 2 hereby orders as follows: -

THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended, 2 hereby orders as follows: - 1 Road Traffic (Jersey) Law, 1956. ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER, 1969. THE DEFENCE COMMITTEE, in pursuance of Articles 34A and 42 of the Road Traffic (Jersey) Law, 1956, 1 as amended,

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

Whakapirau and Kaipara District Council Working in Partnership

Whakapirau and Kaipara District Council Working in Partnership Whakapirau and Kaipara District Council Working in Partnership Plan Update 4 August 2015 2 Roading: Main road leading into Whakapirau. Rehabilitation work has been carried out on this road recently to

More information

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings Page: 1 7 Scope: These standards shall apply to any temporary membrane structure, tent, or canopy, in accordance with the California Code Regulations (CCR) Title 19 and California Fire Code (CFC). Temporary

More information

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog APPENDIX A (i) (ii) (iii) (iv) Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog Report IPRF-01-G-002-05-7 Appendix

More information

BAXTER LAKE RECREATION AREA ASSOCIATION

BAXTER LAKE RECREATION AREA ASSOCIATION Baxter Lake Recreation Area Association SITE CONTROL COMMITTEE RULES TABLE OF CONTENTS Notes 2 Introduction 2 Campsites 2 Common Grounds 2 Green Areas 2 Cutting Trees 3 Application for Site Alteration

More information

KP Lasnaya 1 River

KP Lasnaya 1 River KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno

More information

DATABASE HEALTH INDEX - DASHBOARD

DATABASE HEALTH INDEX - DASHBOARD Page 1 of 8 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Area: Date: CENTRAL WAIKATO M&O 10/10/2013 Category Measures Result Measure Capital Projects Surfacing Pavement Layer Major capital

More information

City of Tallahassee, FL Department of Aviation

City of Tallahassee, FL Department of Aviation City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

City Of Kingston Municipal Heritage Committee Meeting Number Agenda Monday August 25, 2014 at 1:00 p.m. Council Chamber, City Hall

City Of Kingston Municipal Heritage Committee Meeting Number Agenda Monday August 25, 2014 at 1:00 p.m. Council Chamber, City Hall City Of Kingston Meeting Number 10-2014 Agenda Monday August 25, 2014 at 1:00 p.m. Council Chamber, City Hall Please provide regrets to Mr. James Thompson, Committee Clerk at 613-546- 4291, extension 1268

More information

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation) ANNEXURE Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation).. SCHEDULES FOR SLUM/SOCIO-ECONOMIC SURVEY IN CITIES & TOWNS Part A: Part B: Part C: Annexure-I:

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Cable Management System. Metal Raceway Product Range

Cable Management System. Metal Raceway Product Range Cable Management System Metal Raceway Product Range TRAY Ventilated Type Trays: (Standards, Load Capacity, Support Location and Electrical Grounding) KMC Australia manufactures Ventilated type cable trays

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES: 30 95 15 20mm Radius x 100 white painted Timber post 900 700 125 dia Timber Post Ground Level 500 500 TYPE I TYPE ll NOTES: 1. Type I Bollards are generally to be installed in grass verge areas. 2. Type

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Enhanced Emergency Shelter Kit (EESK)

Enhanced Emergency Shelter Kit (EESK) Finalized on 9 th of August 2017 Enhanced Emergency Shelter Kit (EESK) Introduction The enhanced emergency shelter kit was designed to cover the surface area of 15 m 2 with volume of 37.5 m 3. The size

More information

Specification for Grip blocking using Peat Dams

Specification for Grip blocking using Peat Dams Technical Guidance Note 1 Specification for Grip blocking using Peat Dams 1. Introduction Moorland drains (grips) have been dug across much of the Yorkshire upland peatlands. Many of these grips have become

More information

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP 16. Prior to construction, Mountain Valley shall file with the Secretary, for review and approval by the Director of OEP, a segment-specific construction and operation access plan for the area between

More information

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS Monday, September 17, 2012 8:30 a.m. to 10:00 a.m. Lanark County Administration Building Drummond/North Elmsley Boardroom Page President,

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017

Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Helvetia Shop 12/19/2017 Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

WEXEL BUILDING PRODUCTS. Roof Outlets. and. Floor Drains

WEXEL BUILDING PRODUCTS. Roof Outlets. and. Floor Drains WEXEL BUILDING PRODUCTS Roof Outlets and Floor Drains Unit 2, 34 Collinsvale St Rocklea Q4106 Ph: 07 3275 0800 ROOF OUTLETS A standard profile roof drain for conventional run-off collection. Suitable for

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka-Raiganj Section of NH -34 from Km 294.800 to Km 395.000 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

AVERY DENNISON Traffic Sign Fabricator

AVERY DENNISON Traffic Sign Fabricator STANDARD TRAFFIC SIGN SIZES: 45cm x 45cm 60cm x 60cm 75cm x 75cm 90cm x 90cm 75cm x 75cm 90cm x 90cm 60cm x 60cm 75cm x 75cm 90cm x 90cm 120cm x 120cm 30cm x 30cm 40cm x 40cm 45cm x 45cm 60cm x 60cm 75cm

More information

Moraine Valley Community College Campus Tree Care Plan Table of Contents

Moraine Valley Community College Campus Tree Care Plan Table of Contents Moraine Valley Community College Campus Tree Care Plan 2016-2021 Table of Contents I. CAMPUS TREE CARE PLAN PURPOSE:... 1 II. RESPONSIBLE DEPARTMENT... 1 III. THE CAMPUS TREE ADVISORY COMMITTEE... 1 IV.

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Cedars RV Resort Owners Handbook. Phases 1,2,3

Cedars RV Resort Owners Handbook. Phases 1,2,3 Cedars RV Resort Owners Handbook Phases 1,2,3 NOTICE TO READER This document can and will evolve over time. Every effort has been made to provide simple clarity to common topics requiring definition. Should

More information

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen).

Total No. of prospective bidders/ representatives present in the pre-bid meeting are: 18(Eighteen). PRE-BID CLARIFICATIONS / AMENDMENTS IN RESPONSE TO THE QUERIES RAISED BY PROSPECTIVE BIDDERS IN THE PRE-BID MEETING HELD ON 01.07.2016 11.00 A.M. IN THE CONFERENCE HALL, OSMCL FOR THE TENDER OF MOBILE

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road transport & Highways) Department of Road Transport & Highways Two lanning with paved shoulder of Khagaria Purnea Section of NH 31 from Km

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Rebuilding Plan For Mosul International Airport

Rebuilding Plan For Mosul International Airport Rebuilding Plan For Mosul International Airport Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety APPENDIX D Lot Specific Permit Compliance & Forest Plan (FP) Requirements Porter Fork Recreation Residence Tract (Items noted were documented in compliance letter, 8/12/2005, sent to all Rec. Residence

More information

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date: ICAO Recommended Airport Signs, Runway And Taxiway Markings Revision Date: 20051230 MANDATORY INSTRUCTION SIGNS A mandatory instruction sign identifies a location beyond which an aircraft taxiing shall

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H Road Network in India, Public Private Partnership Financing & Case Study 20.04.2018 Narendra Sharma, SE(PPP), MoRT&H Functions of Ministry of Road Transport and Highways, Govt. of India Formulation of

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from: PASS Recycle/RAP Applications Definition RAP = Recycled Asphalt Pavement also called millings or grindings from: bump grinding of hot mix pavements millings from mill and fill operations large chunks of

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES A code summary is a compilation of code sections related to a specific topic and does not contain any interpretations or District standards. This code summary

More information

Property access tracks

Property access tracks Property access tracks Planning, location, construction and maintenance The need for farm roads and tracks The efficient running of a property depends on, among other things, ready access to various locations

More information

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR Installation & Maintenance LISTED Tested to *UL 103HT & ULC-S641 Instructions MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR

More information