NATIONAL HIGHWAYS AUTHORITY OF INDIA

Size: px
Start display at page:

Download "NATIONAL HIGHWAYS AUTHORITY OF INDIA"

Transcription

1 NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH-45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in the State of Tamil Nadu under BOT basis (Package 2A) CDM SMITH INDIA PRIVATE LIMITED AUGUST-26

2 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26. LOCATION MAP

3 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August PROJECT DATA 2. PROJECT DETAILS: Project Name : Length : Kms. Client : National Highways Authority of India. Independent Engineer : M/s. CDM Smith India Pvt. Ltd. Name of the Concessionaire : M/s. Indu Navayuga Infra Project Pvt.Ltd., Concession Agreement Signed Date : 3th May 26 Appointment Date Contract Commencement Date Financial Closure : 25th November 26 : 8th November 26 Project Cost : Financial Grant : Rs.6 Crores Performance Security : 5% of the total project cost till the financial closure & 3% of the total Project Cost after Financial Closure. Construction Period : 3 Months & Extension approved by NHAI from to ( months & days). Completion Date : Provisional Completion Certificate issued on and completion certificate requested to NHAI after completion of Punch List period on Completion Certificate is awaited. Concession Period : 25 Years (Including Construction Period). Four laning and Strengthening of Padalur to Trichy Section from 285. to Ch of NH 45 (VI C) in the State of Tamil Nadu, BOT Basis. Rs. 32 Crores 2

4 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August EXECUTIVE SUMMARY The Government of India through National Highways Authority of India had been contemplating to enhance the traffic capacity and safety of goods and passenger traffic on the selected heavy traffic density corridors in India and had identified one such stretch of Road in Tamil Nadu i.e. existing 2 lane highway of NH-45 between Chennai Dindigul. A joint venture of Indu Projects Ltd., of Hyderabad, Navayuga Engineering Company Ltd of Hyderabad and Abhisekh Developers of Bangalore won the concession through the competitive bidding process of NHAI in February 26. Subsequently the JV formed a SPV in the name of Indu Navayuga Infra Projects Pvt. Ltd., which entered into a Concession agreement with NHAI on 3 th May 26. The Package VI-C between km & km i.e. between Padalur and Trichy and the project is allotted to Indu Navayuga Infra Projects Private Limited on BOT basis. INIPPL, the Concessionaire Company had broadly divided the project into 2 major packages to simplify the execution process. These 2 packages are framed under separate EPC contracts and these EPC contracts were handed over to Indu Projects Ltd. and Navayuga Engineering Company Ltd. as per the broad scope of works described below. Package-A: Consists of all road works including earth works, pavement works, cross drainage works, road furniture s and bus stops. This package was entrusted to M/s Indu Projects Ltd. Package-B: Consists of all structural works including Major bridges, Minor bridges, flyovers, rail over bridges and road under bridges. It also includes approach filling and reinforced earth walls / retaining walls. This package was entrusted to M/s Navayuga Engineering Company Ltd. PLUS Expressways Berhad, Malaysia took 49% of shares and entered as a partner on 2st January 2. PLUS has also agreed to take 74% of shares after 3 years of COD as per Concession Agreement. 3

5 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August INDEPENDENT ENGINEER DETAILS Name of the Independent Engineer : M/s. CDM Smith India Pvt. Ltd. Date of LOA : 5th February, 23 Contract Agreement Signed Date : 2st March, 23 Date of start of service : 5th April, 23 Contract Period : 36 months Contract Amount : INR 3,6,3,72/- Head Office Address : No.75, 2nd Floor, 4th Cross, st Block, R.T. Nagar, Bangalore India. Tel: Fax: Site Office Address : No.37, st Floor, Thamirabarani Square, Periyar Nagar, Villupuram 65 4 Tel:

6 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August CONCESSIONAIRE CONTRACT DETAILS Name of the Concessionaire : M/s. Indu Navayuga Infra Project Pvt.Ltd., Contract Agreement Signed Date : 3th May 26 Commencement Date : 25th November 29 Date of completion as per contract : 24th May 29 Actual Date of Completion : 5th May 2 Original Contract Period : 3 Months Commercial Operation Date : 5th May 2 Site Office Address : 2nd Floor, J.C.Tower Karur Bypass Road, Trichy Tel:

7 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August SALIENT FEATURES OF THE PROJECT BC 5 DBM 5 WMM 25 GSB 5 Drainag e layer Sub Grade (CBR %) Varies according to sub grade strength, total required thickness and available Design, Engineering, Construction, Development, Finance, Operation and maintenance of 4 Laning the Existing 2 Lane Section from Km 285 (Near Padalur) to Km 325(Near Trichy) on NH-45 in the State of Tamilnadu on Build Operate Transfer (BOT) basis. Widening of existing carriage way to 4 lane divided into two carriageways of 7.25 m wide with.5m wide paved shoulder adjoining at left extreme divided with a median ranging from.2m to 5m width. Flexible pavement provided new carriageway and for strengthening of existing pavement, flexible over lays are provided as shown below. Layer Composition of New Pavement. As per Concession Agreement Vol. of 3, Page.6, Para7.2, Table B-4 5 Composition of Overlay strengthening of Exist Carriage way (Thickness in mm) ( Thickness In mm) thickness. Pavement composition on service roads will be as under. Pavement Layer As per Concession Agreement Vol. of 3, Page.7, Table B-6 Thickness in mm BC 25 DBM 75 WMM 5 GSB 2 Sub Grade 5 6

8 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August Summary of Structures: Sl.No. Type of Structure Total No of structures. Major Bridges 3 2. Minor Bridges 3. ROB 4 4. RUB 5. Grade Separator 3 6 Pedestrian Underpass 3 7 Pipe Culvert on main carriageway 3 8 Slab Culvert & Box on main carriageway 39 9 Bus Passenger Shelter 3 Rainwater Harvesting Unit 7. Toll Plaza 2. Administrative Building at Toll Plaza Flexible Pavement : Kms (Existing & New carriageway) Bypass Candidate :.85 Kms at Samayapuram Toll Plaza : Toll Plaza is located at km There are total of 2 [twelve] lanes, 6 lanes for each directions. Out of these 6 lanes 5 lanes have clear width of 3.2m each lane and 5.5m wide lane provided on the 6th lane on each direction. Out of 2 lanes lanes are functioning. 5 in each direction. Service Roads : locations Kms (.95 on LHS on RHS) in town and villages at Road Safety and Traffic Management 7

9 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 The road safety has been given due importance for the safe movement of traffic. At areas where the works are in progress, signboards are displayed, safety cones are placed as per IRC codes. Warning sign fixed along the road. Reflective tape is fixed around the working area wherever required. Regular monitoring is carried out in the entire stretch 6.3.Highway Traffic Management System In order to have a better control over the movement of traffic, a state of art HTMS is set up. The components of HTMS are. a. Emergency Call Boxes b. Variable Message Sign Boards c. CCTV d. Automatic Traffic Counter cum Classifier e. Metrological data Station f. Power Supply System Other than this following ground support also provided. a. Ambulance - No. b. Highway Patrol vehicle 2 Nos. with Highway Patrolling team. c. Crane - No Lighting system The following lighting facilities were provided in the entire stretch of Package :VI-C for reducing the frequent accident and help the road users. a. Street Lights 54 Nos. b. Flood lights 4 Nos. c. Tube Lights provided in the PUP 2 Nos. d. Solar Lights erected on the median 26 Nos. e. High mast lights provided in the important junctions 8 locations total 72 fittings. f. Solar Blinkers provided in important median Openings 5 locations fittings Median Plantations, Avenue Plantations & Landscaping We have appointed M/s.AB Construction for maintaining the Median Plantations provided in the entire stretch. They are watering the plants at regular interval with a frequency of alternate day and providing manure to the plantations once in three months. The median plantations help as lighting barrier for opposite moving vehicle in night times and aesthetic look in day time Route Operations 8

10 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 As per concession agreement two patrol vehicles are available in the projects. Their main activities are; a. Patrolling the Highway b. Managing the Incidents/Accidents c. Implementation of lane closure procedure d. Calling for Assistance, Medical or Tow services. e. Co-ordination with the HTMS control center. f. Interacting with the local agencies like Police, Fire Brigade, Trauma care Hospital etc. g. Protecting the assets on the Project Highway h. Reporting of damages on the road/assets i. Encroachment control & removal One tow away crane provided as per concession agreement and stationed at Toll Plaza for removing the accident vehicles & cleaning the carriageway. One Ambulance duly equipped with the first aid medical equipment and a Para Medical Officer is stationed at Toll Plaza Other Amenities a. Truck Parking Facilities : Truck parking facilities with restaurant and toilets at km The restaurant has functioning smoothly from April 2. We had provided additional bore well to avoid the scarcity of water in the Truck Lay by. b. Water Kiosk and Dust Bin at Bus Passenger Shelters: 3 Nos. of Bus passenger shelters were provided in the entire stretch. Water kiosk and dustbin also provided in the bus passenger shelters for helping the bus passenger and road user. Pedestrian Facilities : In order to facilitate pedestrian to cross the road without any hindrance, pedestrian crossings have been provided with Zebra crossing painting, marking and lighting/solar lighting provision/solar Blinker. Rumbling strips are made in the important junctions with thermoplastic road marking paint for avoiding the accident as per the instruction of NHAI and District Administration. Solar Road Studs/Ordinary Road Studs: 9

11 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 Nearly 389 Solar road studs are available in the important curve and accident zone. Ordinary road studs/cat eyes were provided throughout the stretch on the road marking. The solar studs help the road user in the night hours/rainy season/ heavy fog time.

12 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August MAINTENANCE ACTIVITIES CARRIED OUT DURING THE MONTH Maintenance activities like cleaning of carriage way, cleaning of drains, removal of garbage, repairing of sign boards, repairing or replacement of damaged metallic crash barriers, pedestrian guard rails, kerb, etc are in progress. Accident victims have been rescued through ERP (Emergency Response Protocol), intimating to the nearest police and ambulances and in coordination with hospitals. All project facilities like wayside amenities, truck lay byes including attending repairs to illumination, landscaping, water supply, drainage, waste disposal system, litterbins, and toilets have been maintained properly. Round the clock patrolling is being done for surveillance of the ROW in respect of the Project / Project Facilities. Maintenance of illuminations Toll plazas, Truck lay byes, Rest rooms, Bus shelters, Major junctions is in progress. Maintenance of bus bays, truck lay byes, rest rooms, toll plazas, toll plaza buildings, etc is in progress. Replacing of dead / missing plants, watering, manuring, etc. in progress for median / avenue plantation. Repair to the damaged portions of lined drains is in progress. Cleaning of vents of culverts and bridges is in progress. Encroachments are being removed periodically at service roads and ROW areas. Cleaning of lined drains and toe drains are in progress. Guard post fixing and painting is in progress in high embankment. Rectification of earthen shoulder is in progress. Trimming median plants in median is in progress. Replacement of damaged pedestrian grills is in progress. Cutting and trimming of grass and weeds in the median and ROW is in progress. Replacing of missed / damaged cluster boards, sign boards, etc. is in progress. Numbering and replacing of missed / damaged HM / KM stones are in progress.

13 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August INSPECTION REMARKS AND COMPLIANCE REPORT (Padalur to Trichy section of NH 45 (VI-C) Km 285/ to 325/) BY TEAM LEADER Chief of Operation & Maintenance INIPPL has promised to engage Road Expert from IIT to study the road surface and to suggest remedial measures. The concessionaire has been instructed to engage the expert and submit the report at the earliest. Necessary field test conducted and the opinion of the road experts will be obtained and action taken accordingly. The concessionaire is instructed to submit the report not later than BBD and Roughness test were conducted in July-23 and renewal of riding surface was done for 3.3 Km. Similar BBD test have been completed in September 24 and roughness test will be conducted in before Based on the test results, remedial measures will be taken up. Hence separate field study is not found necessary. Report on remedial measures may be submitted. A professor of Civil Engineering from IIT Chennai along with Engineers of M/s. Velcity Consulting Engineers are expected to inspect the bridge on..24. On receipt of their Technical opinion the report will be sent. Report not yet submitted. The concessionaire has instructed to obtain and submit the report of the consulting engineer before For all the major, minor bridge and culverts, close inspection has to be carried out. Though inspection has to be carried out for following.. Stage of bearing 2. stage of expansion joint Action is being taken to study the condition of bearing. Ms. Bainyas, Bangalore the consulting specialists for bridge has been addressed to visit the bridge and given their opinion. The concessionaire is instructed to submit the report not later than M/s. Velcity Engineers have been requested to depute an expert to study the bearing position and offer technical opinion. Action will be taken on receipt of the technical opinion. Report may be submitted. Report not yet submitted. The concessionaire has instructed to obtain and submit the report of the consulting engineer before

14 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 INSPECTION NOTES FOR CHIEF GENERAL MANAGER(T) & REGIONAL OFFICER, NHAI, CHENNAI ON Display Boards: Display boards with safety messages and speed limits as per Motor Vehicles Act and Rules to be provided at every 5 km intervals / Toll plazas / Rest areas. Work is in progress. 2. Overall cleaning has to be improved. Periodic cleaning is in progress. 3. Median / Avenue plantation: Avenue plantation and median plantation in gaps have to be taken up. Nursery saplings order placed and the work will be started onset monsoon Work is in progress. 3

15 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August LANE AVAILABILITY REPORT 4

16 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 ACCIDENT REPORT 5

17 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 6

18 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in S.No TYPE of ACCIDENT (Injuries) No. of Persons Affected Minor 22 2 Major 5 3 Fatal 5 TOTAL 32 S.No TYPE of ANIMALS (Injuries) No. of Animals Affected Dog 2 Total 2 August- 26 7

19 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26. STAFFING INDEPENDENT ENIGINEERS STAFF Sl. No 2 Name K.G. Rajasekharan R. Krishnamurthy 3 R.Suresh Babu 4 P.Manimaran K.Kannan P.Gopi K. Kurinchiselvan Designation Team Leader Road Safety Expert Asst. Highway cum Maintenance Engineer- Asst. Highway cum Maintenance Engineer-2 Asst. Quality cum Material Engineer Horticulture Office Manager Contact Number

20 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August WEATHER REPORT 3. MONTHLY FEE STATEMENT. Name of work: Four laning and strengthening of Padalur to Trichy section from Km 285/ to 325/ of NH 45 on BOT Basis. 2 Date of Commencement of fee collection: 6/5/2. 3. Report for the month ending: August Fee rates (in. ): Vehicle Type Fee rates on commenc ement Hrs Rates during the year applied w.e.f Hrs Rates during the year applied w.e.f.9.2 Hrs Present rates applied w.e.f.9.22 Hrs Present Rate applied w.e.f.9.24 Hrs Present Rate applied w.e.f.9.25 Hrs Car, Passenger Van or Jeep Light commercial Vehicle (LMV) including minibus Trucks/Bus Multi Axle Vehicle (>2 axle) 9

21 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2

22 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 2

23 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

24 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Vehicle Type Type of Journey Rates during previous year applied w.e.f. Sep 2 SJ 3 DP SJ Car, Passenger Van or Jeep Light Commercial Vehicle Truck Multi Axle Vehicle ( > 2 Axle) Rates during previous year applied w.e.f..sep.22 Rates during previous year applied w.e.f..sep.23 Rates during previous year applied w.e.f..sep.24 Present Rates applied w.e.f..sep DP SJ DP SJ DP Collection during Month Under Report Vehicle Type Type of Journey Fee Rates (in Rs) Rates during previous year applied w.e.f. Sep 2 ( Amount in Rs. Laks) Corresponding Month during Previous Year Previous Month Nos Amount Nos Amount DP L C - Pass L C -2 Pass General pass SJ SJ 5 General pass DP Truck Nos 4 Light Commercial Vehicle Current Month Amount 3 SJ Car, Passenger Van or Jeep August

25 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in DP 346 Concession Pass SJ Gross Total 37,426,79 TNSTC/SETC Without Smartcard Grand Total General pass DP 22 Multi Axle Vehicle ( > 2 Axle) Bus/School Bus General pass August ,24,24 49,8 Gross Total TNSTC/SETC Without Smartcard 37,7, ,4 Gross Total TNSTC Without Smartcard 37,783,9 Grand Total 36,74,4 G.Total 38,8, ,9 24

26 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

27 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

28 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

29 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

30 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description VISUAL INSPECTION Side Slope - Turfing - Pitching/Masonry Location Comment Poor August- 26 Severity Fair Good Generally good Generally good Generally good Generally good Remark CLOSE INSPECTION Pavement Potholes formed in few locations due to recent rain Rut Generally good Cracks Generally good Shoving Generally good Bleeding / Ravelling Generally good Edge Deformation None Depression None Roughness Foot path & Median Damaged / Crack Side Slope Retaining Wall Roughness and deflection are found in certain stretches Generally good Nil Generally good Small portion of drainage wall damaged at g corner due to heavy flow of rain water BC patch work will be attended. Renewal work completed for 3.3Km in May 24 Renewal work completed for 3.3Km in May 24 Renewal work completed for 3.3Km in May 24 The affected stretches milled and BC relaid in May 24 Roughness & BBD test conducted Renewal of wearing coat will be done in January 25 Reconstruction work completed 29

31 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark CLOSE INSPECTION Other Facilities Unwanted Vegetation Obstruction Landscape Damaged/ Missing Truck Lay by Facilities Damaged/Missing Public Amenities Facilities Bus Shelter Base Camp Facilities THOUGH INSPECTION Traffic Operation Facilities Damaged /Missing Signs Faded Sign Painting Dirty Sign Face Damaged Gantry Sign Damaged/Missing temporary sign vegetation grown up in the berms Some of the plants dead and dried New plants to be planted in gaps Removed periodically 29 Nos. of new sapling planted for avenues in the place of dead plants in December Nos. of palmyrah palm nuts planted in the avenue so far None None None None Nil Sign board post painting faded Dirty sign faces to be cleaned None Nil The faded posts of sign boards painted to the entire length Cleaned periodically Other accessories CLOSE INSPECTION drainage Side /Toe drain Gullies and catch pit Bridge/Overpass Damaged/faded Handrail Generally good Generally good Generally good Generally good Silt and vegetation in toe drain and median drain removed periodically Repainting of handrail at 3

32 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark cauvery, kollidam,upper and all minor bridges were completed Rain water harvesting Unit Vent pipe and cover slab damaged in certain locations to replaced. The structures are generally good condition Median Openings Damaged metal beam crash barrier The vegetation around RWHU removed and cleaned. 44 Damaged cover slab with new slab in September & October 24 Bull nose and object markers provided in all median openings Metal Beam Crash barrier damaged at Km &Km of New metal beam crash barrier were fixed at Various lacations including Km and Km 33.8 Good Road studs closely fixed in all median openings and edge of road in curve portion. CLOSE INSPECTION Traffic operating Facilities Road Marking good Faded marking Kerb painting Damaged missing delineator THROUGH INSPECTION good Road marking done center line and pedestrian crossing, speed breaker to the entire stretch Kerb painting done to the entire stretch Object marker fixed in all median openings. Traffic condition good Traffic Flow smooth Stalled Vehicle none T.V Kovil Junction, Accident prone Area Transverse bar, Accident prone 3

33 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in Description Location Comment Poor August- 26 Severity Fair Good Remark zone board fixed, solar blinkers fixed to reduce the accident. The metal beam crash barrier between LCW and left Service road is opened to avoid opposite driving near to ABT median opening ABT median opening, YJunction and Km.39/6 RHS (Sharp curve) encroachment Illegal settlement Damaged/missing Highway property Nil Nil Illegal construction Public Complaint Environmental watch nil Debris & garbage dumped in the berm at some locations. Service road none Encroachment Road Bus Bay Reply sent to road users. Nil Debris and garbages are removed periodically Action taken for encroachment Cleaning attended regularly 32

34 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August WORK PHOTOGRAPHS Month of August 26 Apply of Tack coat Progress of BC laying provided road marking and studs 33

35 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 COMPLAINTS RECEIVED FROM ROAD USER & REPLY 34

36 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

37 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August

38 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 Incident Management Data Aug-6 Reference is made to NHAI HQ letter No. NHAI/CM/Inc.Man/2 dated Genaral Information 2 3 PIU NH Nos. Stretch 4 Location of Incident management vehicle Trichy Registration No Total number of accidents reported Number of accident cases attended Number of injured shifted to hospital Number of other help provided by Route Patrol (other than acidents) Number of help provided by Tow Away Vehicle (Other than to to Route Patrol Vehicle Ambulance RO: Chennai Tow Away Crane TN 48 AD 533 TN 48 AD 5285 TN 45 AU 6994 TN2 AL Total Remarks/ reasons for non-compliance

39 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 accidents) No. of vehicles painted in stripes as per approved colour scheme No. of vehicles with requisite T & P and accessories as per contract No. of vehicles as per approved illuminated boards on top No. of vehicles with Requisite man power as per contract No. of vehicles fitted with GPS/VTS No. of reflective signages showing emergency contact no. No. of plazas where emergency contact details boards are installed No. of plaza where information is being printed on back of toll tickets Date of last inspection by PD/RO 38

40 of 4-lane divided carriageway facility of Tambaram Tindivanam Section of NH45 (Km 28/ to 2/), Tindivanam to Ulundurpet Section of NH-45 (VI-A) (Km 2/ to 92/25), Ulundurpet Padalur Section of NH-45 (VI-B) (Km 92/25 to 285/) and Padalur Trichy Section of NH-45 (VI-C) (Km 285/ to 325/) in August- 26 SR.NO DATE/TIME EVENTS Bi-Monthly review meeting by The Project Director, NHAI, Trichy.. AM Site Inspected by Chief General Manager, Regional Office, NHAI,Chennai Shri. N.Jayaprakash, Member, National Road Safety Council. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai. Chief General Manager, RO Chennai Chief General Manager, RO Chennai 39

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL) National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Consultancy Services as Independent Engineer during Operation & M aintenance of 4-lane divided carriagew ay facility of Tambaram

More information

DETAIL OF THE PROJECT

DETAIL OF THE PROJECT Page 1 Page 2 DETAIL OF THE PROJECT A CONTRACT DETAILS Project State Operation & Maintenance Phase of 4 Lane dual carriageway from Km 50.000 to Km. 100.000 of NH 6 (Kondhali Talegaon Section ) in the State

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Consultancy Services as Independent Engineer during Operation & Maintenance of -lane divided carriageway facility of Tambaram

More information

Article 13, clause no of the Concession Agreement states that:

Article 13, clause no of the Concession Agreement states that: BACKGROUND Article 13, clause no. 13.2 of the Concession Agreement states that: 13.2 Inspection During the Construction Period the Independent Engineer shall inspect the Project Highway at least once a

More information

MINUTES OF PROJECT REVIEW MEETING HELD ON

MINUTES OF PROJECT REVIEW MEETING HELD ON MINUTES OF PROJECT REVIEW MEETING HELD ON 4 th July 2016 1 The project review meeting started at 2.30 pm on 4 th July 2016 at the H.O of with the Managing Director of Shri A P M Mohammed Hanish IAS in

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka-Raiganj Section of NH -34 from Km 294.800 to Km 395.000 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

MONTHLY O & M INSPECTION REPORT DECEMBER

MONTHLY O & M INSPECTION REPORT DECEMBER NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

Development of Road Infrastructure in India

Development of Road Infrastructure in India Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways Road Network in India Total Road Length about

More information

MONTHLY O & M INSPECTION REPORT

MONTHLY O & M INSPECTION REPORT NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2 lane road

More information

1. Case Study Area and Character Sections

1. Case Study Area and Character Sections ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona

More information

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H Road Network in India, Public Private Partnership Financing & Case Study 20.04.2018 Narendra Sharma, SE(PPP), MoRT&H Functions of Ministry of Road Transport and Highways, Govt. of India Formulation of

More information

First time sewerage scheme from

First time sewerage scheme from First time sewerage scheme from Important information Anglian Water s first time sewerage programme 2010-2015 03 Over the next five years Anglian Water plans to invest some seventy million pounds in the

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012 Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris

More information

PPP Days 2010 PPPs Lessons from the Last 18 Months

PPP Days 2010 PPPs Lessons from the Last 18 Months PPP Days 2010 PPPs Lessons from the Last 18 Months Rajiv B Lall March 22, 2010 1 Private Sector Participation (PSP) in India Works & Services Contracts Management Contracts Operation Concessions Build

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.) Press release Bangalore, 08 th Aug, 2010 GMR Infrastructure Limited, Q1-FY 11 Performance Highlights Financial Highlights for Q1 2010-11 (Rs. Cr.) Particulars 30th June 10 30th June 09 % change 31st March

More information

HILGAY PARISH COUNCIL

HILGAY PARISH COUNCIL HILGAY PARISH COUNCIL Draft minutes of the Parish Council meeting held on Thursday 9 th January 2014 7.00pm in Hilgay village hall. Present: Chairman Cllr G Carter, vice chair Cllr R Houghton, Cllr C Wills,

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONA HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Consultancy Services as Independent Engineer during Operation & M aintenance of -lane divided carriagew ay facility of Tambaram

More information

One year of Olympia Odos

One year of Olympia Odos Operation services: 24 hours/day by the drivers side OLYMPIA PASS: The new electronic toll service One year of The first refurbishment works are now completed One year of! Twelve months have already elapsed

More information

Leicester Square Action Plan Summary

Leicester Square Action Plan Summary Leicester Square Action Plan Summary The Leicester Square Action Plan was developed by Westminster City Council, together with the Leicester Square Association, the Metropolitan Police Service, and the

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

BROUGHTON PARISH COUNCIL. A meeting of the Broughton Parish Council was held in the Village Hall, Little Broughton on Tuesday 24 th January 2012

BROUGHTON PARISH COUNCIL. A meeting of the Broughton Parish Council was held in the Village Hall, Little Broughton on Tuesday 24 th January 2012 BROUGHTON PARISH COUNCIL A meeting of the Broughton Parish Council was held in the Village Hall, Little Broughton on Tuesday 24 th January 2012 PRESENT: J Wilson (Chairman), S Hannah (Vice Chairman), V

More information

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS Return to Contents Page Liverpool John Lennon Airport 0 20161012LJAAOI26V6.0pdf AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

More information

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS Monday, September 17, 2012 8:30 a.m. to 10:00 a.m. Lanark County Administration Building Drummond/North Elmsley Boardroom Page President,

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

Tri-Glide Instruction Manual

Tri-Glide Instruction Manual Tri-Glide Instruction Manual 12 Timber Lane Marlboro NJ 07746 09/09/2011 tel: 732.462.6277 fax:732.462.6355 email: sales@hilmanrollers.com CONTENTS Contents Page Warnings 3 Operating Instructions 4 General

More information

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May 2017 Total land planned for the project - 2061 acres Already acquired & available with KIAL - 1277.93 acres Balance land under acquisition

More information

G.O.Ms.No.142 Dated:

G.O.Ms.No.142 Dated: Abstract Tourism - Promotion of Tourism- Government of India Assisted Scheme - 2010-2011- Development of Pilgrimage Heritage Circuit (Madurai-Rameswaram- Kanniyakumari) in Tamil Nadu under Mega Tourism

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

BUNKHOUSE ASSESSMENT REPORT

BUNKHOUSE ASSESSMENT REPORT FEBRUARY 2014 EXECUTIVE SUMMARY As a response to the need to provide temporary shelters for the victims of Typhoon Haiyan, the Philippine government through the DSWD and the DPWH decided to build bunkhouses.

More information

DRAYCOTT IN THE CLAY PARISH COUNCIL

DRAYCOTT IN THE CLAY PARISH COUNCIL Page 1530 DRAYCOTT IN THE CLAY PARISH COUNCIL Minutes of Parish Council Meeting held on 13 July 2017 Apologies: Present: Chairman Cllr Mark Flavell, Vice Chairman Cllr Nigel Powlson and Cllr Barbara Marshall

More information

Chapter Five. Schedule 0.21: Particulars of Slum

Chapter Five. Schedule 0.21: Particulars of Slum Schedule 0.21: Particulars of Slum 5.0 Introduction: The first nationwide survey on the economic condition of slum dwellers in urban cities was conducted by the NSSO in its 31 st round (July 1976 - June

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road transport & Highways) Department of Road Transport & Highways Two lanning with paved shoulder of Khagaria Purnea Section of NH 31 from Km

More information

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices Nasser Hossain Senior Engineer, Roads & Structural Assets, City of Sydney City of Sydney (COS) LGA The City of Sydney LGA

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

11 th Annual Conference Road Development in India Telangana State Initiatives

11 th Annual Conference Road Development in India Telangana State Initiatives 11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period) DETAILED PROJECT INFORMATION GENERAL INFORMATION Project High Speed Rail Link to BtA State Karnataka Location Place of the Project Bangalore City District Bangalore Urban Sector Urban Transport Capacity

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Roadside assistance and Concierge Services Terms and Conditions provided by IMC:

Roadside assistance and Concierge Services Terms and Conditions provided by IMC: RAK PLATINUM CREDIT CARD CUSTOMERS Roadside assistance and Concierge Services Terms and Conditions provided by IMC: Free Roadside Assistance is provided for vehicles registered under customer s name. Roadside

More information

S E L E C T I O N. Abdominal Crunch. User manual

S E L E C T I O N. Abdominal Crunch. User manual and S E L E C T I O N T H E S T R E N G T H E V O L U T I O N User manual and and The identification plate of the and manufacturer, affixed along side the seat on the frame of the weight stack, gives the

More information

Hungarian Public Road Nonprofit PLC

Hungarian Public Road Nonprofit PLC Hungarian Public Road Nonprofit PLC 2 Magyar Közút Nonprofit Zrt. The Hungarian Public Road Nonprofit PLC is responsible for the operation and maintenance of more than 31 000 km of national roads. www.kozut.hu

More information

American Avalanche Association Forest Service National Avalanche Center Avalanche Incident Report: Long Form

American Avalanche Association Forest Service National Avalanche Center Avalanche Incident Report: Long Form American Avalanche Association Forest Service National Avalanche Center Avalanche Incident Report: Long Form Please send to: CAIC; 325 Broadway WS1; Boulder CO 80305; caic@qwest.net; Fax (303) 499-9618

More information

Culpeper District. Albemarle County Monthly Report. September 2012

Culpeper District. Albemarle County Monthly Report. September 2012 Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase)

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Dr. S.K. Balasundaram Deputy Registrar (Purchase) Indian Maritime University (A Central University Govt. of India) East Coast Road, Uthandi, Chennai - 600 119. Tele:(044) 2453 0343/45, Fax: 2453 0342,

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day Employment North Chennai is primarily an industrial area and is governed by business and trader community, locomotive workshops, government offices and port related activities. Chennai Port and Ennore

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

EDINBURGH AIRPORT LTD COACHPARK

EDINBURGH AIRPORT LTD COACHPARK EDINBURGH AIRPORT LTD COACHPARK - Terms & Conditions of Use - October 2013 CONTENTS SECTION 1. 0 Introduction 1. Purpose 2. Authorised Users 2.0 Responsibilities 2.1 Edinburgh Airport Ltd 2.2 Bus and Coach

More information

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES* CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES* *Cross reference(s)--drainage commission, 2-111 et seq.; drainage districts created, 2-114; planning commission shall select and recommend to the

More information

CITY OF MURFREESBORO BOARD OF ZONING APPEALS

CITY OF MURFREESBORO BOARD OF ZONING APPEALS CITY OF MURFREESBORO BOARD OF ZONING APPEALS Regular Meeting, April 28, 2010, at 1:00 p.m. City Hall, 111 West Vine Street, Council Chambers, 1 st Floor 1. Call to order A G E N D A 2. Consideration of

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

NEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections

NEIGHBOURHOOD INSPECTIONS. A pictorial guide for neighbourhood inspections NEIGHBOURHOOD INSPECTIONS A pictorial guide for neighbourhood inspections A PICTORIAL GUIDE FOR NEIGHBOURHOOD INSPECTIONS CONTENTS Introduction 4 EXTERNAL AREAS Descriptions of estate standards Car parks

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

DATABASE HEALTH INDEX - DASHBOARD

DATABASE HEALTH INDEX - DASHBOARD Page 1 of 8 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Area: Date: CENTRAL WAIKATO M&O 10/10/2013 Category Measures Result Measure Capital Projects Surfacing Pavement Layer Major capital

More information

Community Development

Community Development Community Development City & Borough of Juneau Community Development 155 S. Seward Street Juneau, AK 99801 (907) 586 0715 Phone (907) 586 4529 Fax DATE: February 11, 2016 TO: FROM: Planning Commission

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

TMC Monthly Operational Summary

TMC Monthly Operational Summary TMC Monthly Operational Summary December Bureau of Transportation Systems Management & Operations (TSMO) NH Department of Transportation s Mission Transportation excellence enhancing the quality of life

More information

Rhino-Rack FOXWING Awning by OZTENT

Rhino-Rack FOXWING Awning by OZTENT Important: Please read these instructions carefully prior to installation. Please refer to your fitting instruction to ensure that the roof racks are installed in the correct locations. Check the contents

More information

Proposal for the Development of Bus Stops

Proposal for the Development of Bus Stops Proposal for the Development of Bus Stops NATIONAL TRANSPORT COMMISSION Sri Lanka 2005 Objective Providing protection for passengers from extreme weather conditions like Sun, rain, wind, splash while waiting

More information

Rangitikei District Council

Rangitikei District Council Rangitikei District Council Assets/Infrastructure Committee Meeting Order Paper Thursday 14 July 016 9:30 a.m. Contents 1 3 4 Welcome Council Prayer Apologies/Leave of absence Confirmation of Order of

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING INSTRUCTION MANUAL for ALEKO RETRACTABLE AWNING www.alekoproducts.com FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY! 1 Important Safety Precautions WARNING NOTE: FOR PERSONAL SAFETY,

More information

Briarhill Neighborhood Polecat Priority List. Exhibit D-4

Briarhill Neighborhood Polecat Priority List. Exhibit D-4 Briarhill Neighborhood Polecat Priority List Exhibit D-4 March 11, 2013 The following list of trail head issues and design elements was developed by Briarhill 2/3 neighborhood residents living near the

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Minutes of the Annual Meeting of the Parish Council held in Torpenhow Village Hall on Wednesday 10 th May, 2017 at 7.15 pm

Minutes of the Annual Meeting of the Parish Council held in Torpenhow Village Hall on Wednesday 10 th May, 2017 at 7.15 pm Minutes of the Annual Meeting of the Parish Council held in Torpenhow Village Hall on Wednesday 10 th May, 2017 at 7.15 pm Present: Cllrs. J. Bowe, A. Little, W. Powley and A. Raine Also present: Cllr.

More information

Roadside Assistance and Concierge Services Terms and Conditions

Roadside Assistance and Concierge Services Terms and Conditions Roadside Assistance and Concierge Services Terms and Conditions We welcome you to enjoy the Road Assistance and Concierge services provided by IMC. We request you to go through the Terms and Conditions

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd A453 Widening M1 Junction 24 to A52 Nottingham Project Details Project Details Widen 11.5km of existing single carriageway Project

More information

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation) ANNEXURE Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation).. SCHEDULES FOR SLUM/SOCIO-ECONOMIC SURVEY IN CITIES & TOWNS Part A: Part B: Part C: Annexure-I:

More information

Enhanced Emergency Shelter Kit (EESK)

Enhanced Emergency Shelter Kit (EESK) Finalized on 9 th of August 2017 Enhanced Emergency Shelter Kit (EESK) Introduction The enhanced emergency shelter kit was designed to cover the surface area of 15 m 2 with volume of 37.5 m 3. The size

More information