1 New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties Scheduled Completion Date: July 2008 Project Limits/Description: Sign replacement along state highways in Genesee/Orleans counties. For More Info: NYSDOT Engineer in Charge Brian Bellan, (585) Traffic Impacts: Occasional shoulder closures in work areas Project: Replacement of Route 33 Bridge over Black Creek in Batavia, Genesee County Start Date: August 2008 Scheduled Completion Date: June 2009 Project Limits/Description: Repairs to concrete structure and replacement of bridge rail. For More Info: NYSDOT Engineer in Charge Ron Frei, (585) Traffic Impacts: Daily or short-term lane closures with alternating traffic

2 Livingston Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night Project: Reconstruction of Routes 5 & 20, Village of Avon, Livingston County Start Date: June 2008 Scheduled Completion Date: December 2009 Project Limits/Description: Rehabilitate Rts. 5 & 20 from Pole Bridge Road to River Street. In addition to improving the condition of the pavement, enhancements will be made to the landscaping, decorative street lights, signs, railroad gates and signals. For More Info: NYSDOT Engineer in Charge Laurel Barber, (585) Traffic Impacts: Lane closures.

3 Monroe Project: Reconstruct Route 104 (W. Ridge Road) in Greece- Phase II, Monroe County Start Date: October 2004 Scheduled Completion: Fall 2008 Project Limits/Description: This project will reconstruct Route 104 (Ridge Road) between the intersection at Elmgrove/N. Greece Road and NY 390. The existing pavement will be reconstructed and widened to accommodate three lanes of travel in both directions, with dedicated right turn lanes and a raised median. The drainage system will be replaced. In addition, the bridges that carry Route 104 over 390 will be replaced, as well as the entire sidewalk system within the project limits. New timed traffic signals, street lighting, pavement markings and signs will also be upgraded and replaced. Space for bicycles will be provided throughout the project area. For More Info: NYSDOT Engineer in Charge Scott Sullivan (585) Traffic Impacts: All access to homes and businesses along W. Ridge Road will be maintained. Temporary widening will maintain two lanes in either direction throughout the primary construction phase Project: Rehabilitation of Interstate 490 in Rochester (Western Gateway), Monroe County Project Start Date: July 2007 Scheduled Completion: December 2009 Project Limits/Description: The project extends from the Erie Canal (Exit 9A) to the Genesee River (Exit 15). This contract includes much bridge work including the replacement of the bridge that carries I-490 over Mt. Read Blvd. Noise barriers will be constructed between Ames Street and Mt. Read Blvd. ITS Components to manage traffic, including two dynamic message boards and a vehicle detection system will be expanded. For More Info: NYSDOT Engineer in Charge, Ken McClenathan, (585) or see the Web site at Traffic Impacts: Traffic will be controlled by reducing travel lanes and crossing over the median. Ramps between Mt. Read Blvd and Brown/Broad St. will be closed.

4 Project: Reconstruction and Resurfacing on Route 153 in East Rochester, Monroe County Start Date: July 2007 Scheduled Completion Date: December 2008 Project Limits/Description: The project limits are from Route 96 to West Commercial Street. The section between Route 96 and Route 31F will be resurfaced and essentially complete. The section between Route 31F and West Commercial Street will be reconstructed. Improvements will be made to the Route 96 intersection by removing the slip lane. For More Info: NYSDOT Engineer in Charge Len Davison, (585) Traffic Impacts: Northbound traffic on Route 153 (Washington Street) will be directed to detour at Route 31F west to the I490 West slip ramp exiting at West Commercial Street and back to Route 153. This will leave one lane of southbound travel through the village while the highway is under construction. All driveways will be accessible. 4ITV.07 Project: Installation of Traffic Management Equipment Along Interstate 390 in Gates and Chili, Monroe County Start Date: July 2007 Scheduled Completion Date: July 2008 Project Limits/Description: I390 from Scottsville Road to I390/490 interchange. The installation of fiber optic cable, closed circuit television cameras, variable message boards, and vehicle detection units will be installed for traffic management purposes. For More Info: NYSDOT Engineer in Charge Ellen Penepent, (585) Traffic Impacts: Some temporary lane or shoulder closures will be necessary. 4T37.06 Roadside and Overhead Sign Replacements- Rt. 390 and Mt. Read Blvd., Monroe County Start Date: June 2007 Scheduled Completion: June 2008 Project Limits/Description: Replacement of roadside and overhead signs along NY 390 from I490 to Lake Ontario State Parkway and on Mt. Read Blvd. from Buffalo Road to Rt. 104.

5 For More Info: NYSDOT Engineer in Charge, Gail House, (585) Traffic Impacts: Daily lane/shoulder closures as necessary. Occasional weekend closures on Mt. Read Blvd Project: Route 65 (Clover St.)/Route 252 (Jefferson Road Intersection in Pittsford, Monroe County Start Date: July 2008 Scheduled Completion: November 2009 Project Limits/Description: Intersection reconstruction and widening; milling and resurfacing on Rt. 65; Canal trail improvements. For More Info: NYSDOT Engineer in Charge, Kathy Mialki, (585) Traffic Impacts: Lane closures 4T31.0X Project: Mowing and Trimming Along Expressways, Monroe County Start Date: May 2008 Scheduled Completion Date: December 2008 Project Limits/Description: Mowing along 390/490/590 For More Info: NYSDOT Engineer in Charge, Ellen Penepent, (585) Traffic Impacts: None Project: Rehabilitation of Route 390 Bridges over Lexington, Weiland, and Latona in Gates and Greece, Monroe County Start Date: June 2008 Scheduled Completion Date: December 2008 Project Limits/Description: Repair of bridge deck and replacement of bridge bearings. For More Info: NYSDOT Engineer in Charge Scott Sullivan, (585) Traffic Impacts: Daily night-time lane closures on NY 390. Some lane restrictions on roads underneath the structures will be necessary.

6 Project: Route 286 Intersection at Creek/Blossom in Penfield, Monroe County Start Date: July 2008 Scheduled Completion Date: November 2008 Project Limits/Description: The intersection will be widened and resurfaced. For More Info: NYSDOT Engineer in Charge Karen Brown, (585) Traffic Impacts: Daytime detours for Creek and Blossom; lane closures on Rt Project: Reconstruction of Rt. 15A (East Henrietta Road) in Brighton and Henrietta, Monroe County Start Date: September 2007 Scheduled Completion Date: August 2009 Project Limits/Description: Route 15A, East Henrietta Road, will be reconstructed from Jarley Road to just north of Crittenden Road and build a new access ramp extending Clay Road from Brighton Henrietta Town Line Road to Route 15A. For More Info: NYSDOT Engineer in Charge Doug Koenig, (585) Traffic Impacts: Traffic on Route 15A (East Henrietta Road), from just north of Jefferson Road to just south of Metro Park (opposite the south entrance to Monroe Community College) will be reduced to a single lane in each direction until mid May. In May, the lane closures will be extended north to Crittenden Road to rebuild East Henrietta Road in front of the college. Lane restrictions in front of the college are expected to be in effect until September Project: Resurfacing on Route 31 in Perinton and Macedon, Monroe and Wayne Counties Scheduled Completion Date: November 2008, but travel impacts may end as early as July Project Limits/Description: Route 31 will be resurfaced from Aldrich Road to the Macedon/Palmyra village line.

7 For More Info: NYSDOT Engineer in Charge Tom Mialki, (315) Traffic Impacts: One-way traffic will alternate in each direction Project: Replacement of Lake Ontario State Parkway Bridge over Dewey Avenue in Greece, Monroe County Scheduled Completion Date: December 2008 Project Limits/Description: Structure is located between NY 390 and Greenleaf Road For More Info: NYSDOT Engineer in Charge Russ Chapell, (585) Traffic Impacts: The Lake Ontario State Parkway will be closed at Dewey Ave. A detour will be posted directing traffic onto Latta Road and Greenleaf Road Project: Long-Term Paving on Interstate 490 in Brighton and Pittsford, Monroe County Start Date: May 2008 Scheduled Completion Date: August 2008 Project Limits/Description: The road will be milled and resurfaced from North Landing Road to Route 31F. For More Info: NYSDOT Engineer in Charge Kathy Mialki, (585) Traffic Impacts: Multiple travel lanes will be closed during the overnight hours Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night

8 Project: Long-Term Paving on I490 in Gates and Chili, Monroe County Scheduled Completion Date: October 2008 Project Limits/Description: A section of Interstate 490 from Route 204 to Route 386 and a section of Route 204 from Interstate 490 to the bridge over Pixley Road will be resurfaced. For More Info: NYSDOT Engineer in Charge Chris Gardner, (585) Traffic Impacts: Travel lanes will be closed; ramps will temporarily closed on Rt. 204 on nights and weekends Project: Paving on Interstate 390 Ramps in Henrietta, Monroe County Scheduled Completion Date: October 2008 at Exits 12, 13, 14 Project Limits/Description: Milling and resurfacing on ramps For More Info: NYSDOT Engineer in Charge Scott Robinson, (585) Traffic Impacts: This work will be performed during the overnight hours. Multiple lanes will be closed.

9 Ontario Project: Replacement of Route 96 Bridge over Ontario Central Railroad in Victor, Ontario County Start Date: September 2007 Scheduled Completion Date: December 2008 (Bridge will be closed from March to September) Project Limits/Description: Structure is located just east of the Victor village limit. For More Info: NYSDOT Engineer in Charge Tom Mialki, (585) Traffic Impacts: The road is closed A passenger vehicle detour will be posted using Plastermill Road and McMahon Road. A truck detour will be posted using Maple Street to Boughton Hill Road to Route Project: Replacement of Rt. 64 Bridges and Culverts over Mud and Center Gully Creeks in Bristol and S. Bristol, Ontario County Start Date: March 2008 Scheduled Completion Date: September 2008 Project Limits/Description: Four bridges and one box culvert that carry Route 64 in the Towns of Bristol and S. Bristol, Ontario County, between Bristol Center and Bristol Mountain Ski Resort will be replaced. For More Info: NYSDOT Engineer in Charge Joe Hendee, (585) Traffic Impacts: The roadway will remain open at all locations. Traffic will be reduced to a single lane with alternating one-way traffic patterns controlled with temporary traffic signals. Three of the five locations will be under construction from late March to late June. The other two locations will be under construction from early July through late September.

10 Orleans Project: Replacement of Route 98 Bridge over Beardsley Creek in Carlton, Orleans County Start Date: Spring 2008 Scheduled Completion Date: December (Bridge will be re-opened by June 30) Project Limits/Description: The bridge is located one half mile south of the intersection of Route 18. The existing structure will be replaced and the approaches will be reconstructed. For More Info: NYSDOT Engineer in Charge, Brian Bellan, (585) Traffic Impacts: The road will be closed at the bridge. Traffic will be detoured to Baker Road to Sawyer Road to Route 18 beginning from March 2008 through June All businesses will be accessible. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties Scheduled Completion Date: July 2008 Project Limits/Description: Sign replacement along State Highways in Genesee/Orleans Counties. For More Info: NYSDOT Engineer in Charge Brian Bellan, (585) Traffic Impacts: Occasional shoulder closures in work areas Project: Rehabilitation of Keitel Road Bridge over Erie Canal in Albion, Orleans County Start Date: May 2008 Scheduled Completion Date: August 2009 Project Limits/Description: The bridge is located east of Route 31. For More Info: NYSDOT Engineer in Charge Carl Jarvis, (585) Traffic Impacts: Bridge will be closed during construction. No detour will be posted.

11 Wayne Project: Resurfacing on Route 31 in Perinton and Macedon, Monroe and Wayne Counties Scheduled Completion Date: November 2008, but travel impacts may end as early as July Project Limits/Description: Route 31 will be resurfaced from Aldrich Road to the Macedon/Palmyra village line. For More Info: NYSDOT Engineer in Charge Tom Mialki, (315) Traffic Impacts: One-way traffic will alternate in each direction Project: Crack Sealing in Monroe, Livingston, and Wayne Counties Scheduled Completion Date: October 2008 Project Limits/Description: A preventative maintenance project in select locations along area expressways including (Rts. 104, 590, 390, Lake Ontario State Parkway, Mt. Read Blvd.) For More Info: NYSDOT Engineer in Charge Art Geary, (585) Traffic Impacts: Single lane closures on expressways during the day. Ramp closures and multi-lane closures at night

12 Wyoming Project: Realignment of Route 63 (Peoria Curve) in Covington, Wyoming County Start Date: November 2007 Scheduled Completion Date: December 2008 Project Limits/Description: The road will be realigned to eliminate the sharp curve between Court St. and Livingston County Line. For More Info: NYSDOT Highway Designer, Mike Janes, (585) Traffic Impacts: In 2008, Peoria Road will be closed for four weeks while the new intersection is constructed. Upon completion of the intersection work, Route 63 will be closed for four weeks. Traffic will be detoured to Route 20 to Route Project: Long-Term Paving on Route 39 from Route 16 to East Arcade Village Line, Wyoming County Start Date: June 2008 Scheduled Completion Date: October 2008 Project Limits/Description: Pavement resurfacing. The number of travel lanes between Tops Plaza and Liberty Street will change to two lanes with center left turn lane and wide shoulders. For More Info: NYSDOT Engineer in Charge Todd Clark, (585) Traffic Impacts: Lane closures

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

Regional Trails Initiative EXECUTIVE SUMMARY

Regional Trails Initiative EXECUTIVE SUMMARY Regional Trails Initiative EXECUTIVE SUMMARY PHASE 1 Rochester TMA Prepared By: Alta Transportation Consulting, Inc. Northeast Greenways, Inc. Larsen Engineers, PC ACKNOWLEDGEMENTS REGIONAL TRAILS INITIATIVE

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20

PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20 PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20 DUNMORE (June 13, 2008) PennDOT announces its work schedule for June 14-20. Be alert for

More information

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO Welcome to the Business Owners Task Force Perry Leonard Blagg Tire and Service President/COO Safety: West Nile Virus Alyssa Tenorio NorthGate Constructors Public Information Manager West Nile Virus Carried

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

MoDOT Southwest District

MoDOT Southwest District Barry County Route 39: Pavement sealing between Route 248 near Jenkins and Stone County line Route 60: Add eastbound through lane and right turn lane at Route 37 in Monett Route VV: Bridge replacement

More information

Rochester Genesee Regional Transportation Authority

Rochester Genesee Regional Transportation Authority Rochester Genesee Regional Transportation Authority Public Hearing RTS Routes 10 & 15 April 3, 2012 Presenter: Dan Kenyon Transportation Planner Commenting at the Public Hearing Individuals wishing to

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

PennDOT MAJOR ROAD PROJECTS

PennDOT MAJOR ROAD PROJECTS 1 file:lancastercountyroadwork Revision #1 Page 1. Lancaster County Road Work Mar 03 through Mar 07 www.co.lancaster.pa.us/planning Prepared by LCPC - Transportation Division Notes: >Headlights: Must be

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

PHILIPPI, WEST VIRGINIA

PHILIPPI, WEST VIRGINIA AVAILABLE SPACE FOODFRESH PLAZA LOCATION Building Address - US Route 250 South Philippi, WV 26416 Located in City Limits - Yes Zoning - C-1 County - Barbour Located in Business/Industrial Park - No Can

More information

THE CTI STUDIO AT COBO CENTER. (800) Broadcast - Commercial - Photo - Webcast

THE CTI STUDIO AT COBO CENTER. (800) Broadcast - Commercial - Photo - Webcast THE CTI STUDIO AT COBO CENTER Broadcast - Commercial - Photo - Webcast A full-service production studio located in Detroit at Cobo Center (800) 743-6051 www.conferencetech.com FULL-SERVICE FACILITY CTI

More information

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD

I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD Florida Department of TRANSPORTATION I-95 WIDENING INCLUDING THE INTERCHANGES AT I-4 AND US 92 DESIGN-BUILD From North of State Road (SR) 44 to North of US 92 (International Speedway Boulevard) Volusia

More information

Aurora Hills. Getting There

Aurora Hills. Getting There Aurora Hills Aurora Hills is neighborhood near Crystal City and Pentagon City. Ball fields, ball courts, a very short trail, and a combination ibrary/fire Station are the central pieces of a recreation

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 4 2017 CONSTRUCTION PROGRAM SERVING ASHTABULA, MAHONING, PORTAGE, STARK, SUMMIT AND TRUMBULL COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT

More information

FORT ASHBY, WEST VIRGINIA

FORT ASHBY, WEST VIRGINIA AVAILABLE SPACE MINERAL COUNTY MULTI-TENANT BUILDING LOCATION Building Address - Frankfort Drive Fort Ashby Business & Technology Park Fort Ashby, WV 26719 Located in City Limits - No County - Mineral

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

AVAILABLE SPACE KANAWHA MANUFACTURING BUFFALO PLANT

AVAILABLE SPACE KANAWHA MANUFACTURING BUFFALO PLANT AVAILABLE SPACE KANAWHA MANUFACTURING BUFFALO PLANT LOCATION Building Address - Route 62 Located in City Limits - No County - Putnam Located in Business/Industrial Park - No Can the Building be Multi-Tenant

More information

AVAILABLE SPACE COLD STORAGE BUILDING NO. 2

AVAILABLE SPACE COLD STORAGE BUILDING NO. 2 AVAILABLE SPACE COLD STORAGE BUILDING NO. 2 LOCATION Building Address - Cold Storage Road Located in City Limits - Yes County - Jefferson Located in Business/Industrial Park - No Can the Building be Multi-Tenant

More information

FORT ASHBY, WEST VIRGINIA

FORT ASHBY, WEST VIRGINIA AVAILABLE SPACE MINERAL COUNTY MULTI-TENANT BUILDING LOCATION Building Address - Frankfort Drive Fort Ashby Business & Technology Park Fort Ashby, WV 26719 Located in City Limits - No County - Mineral

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Building A MARTINSBURG, WEST VIRGINIA

Building A MARTINSBURG, WEST VIRGINIA AVAILABLE SPACE 1315 AIRPORT ROAD FACILITY Building A Building B Garage LOCATION Building Address - 1315 Airport Road Martinsburg, WV 25405 Located in City Limits - No County - Berkeley Located in Business/Industrial

More information

PRINCETON, WEST VIRGINIA

PRINCETON, WEST VIRGINIA AVAILABLE SPACE THE OLD HYDROPLATE BUILDING LOCATION Building Address - 300 Elmer Street Princeton, WV 24740 Located in City Limits - No County - Mercer Located in Business/Industrial Park - No Can the

More information

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE:

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE: College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Print directions and name of assigned building. Write your room number and phone number under the name of your

More information

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Neighbourdhood Committee NDG-Westmount. October 16, 2017 Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase

More information

FRANKLIN, WEST VIRGINIA

FRANKLIN, WEST VIRGINIA AVAILABLE SPACE PENDLETON BUSINESS CENTER (FORMERLY HANOVER SHOE BUILDING) LOCATION Building Address - 100 Thorn Creek Road Franklin, WV 26807 Located in City Limits - No Zoning - None County - Pendleton

More information

Directions to Schools Compiled by Vernon A. Tryon

Directions to Schools Compiled by Vernon A. Tryon Name Amsterdam, Lynch Auburn Avon, C. W. Baker Durgee J Ray Address Coolidge Amsterdam, NY 12010 Lake Avenue, Auburn, NY 13021 245 Clinton Avenue, Avon, NY 14414 29 East Oneida St., NY 13027 East Oneida

More information

MARTINSBURG, WEST VIRGINIA

MARTINSBURG, WEST VIRGINIA AVAILABLE SPACE ARCADIA AVIATION FACILITY LOCATION Building Address - 254 A B Parks Drive Martinsburg, WV 25405 Located in City Limits - No Zoning - County - Berkeley Located in Business/Industrial Park

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

PARK AND RIDE FROM THE GOLDEN TRIANGLE (DOWNTOWN) GARAGES WITH CONVENIENT SHUTTLE BUSES

PARK AND RIDE FROM THE GOLDEN TRIANGLE (DOWNTOWN) GARAGES WITH CONVENIENT SHUTTLE BUSES The current development taking place on the North Shore will be affecting a lot of things during the 2009 season at Heinz Field especially the parking situation. Unless you have pre-sold parking, the best

More information

Batavia Brighton Brockport Canandaigua, Churchville - Chili East Irondequoit East Rochester

Batavia Brighton Brockport Canandaigua, Churchville - Chili East Irondequoit East Rochester Batavia -14020 From Linden Park Batavia Admin, 39 Washington Avenue 39.38 From Linden Park Batavia High School, 260 State St 38.55 From Linden Park Batavia Middle School, 96 Ross St 37.94 From Linden Park

More information

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION June 1,2017 TO: FROM: SUBJECT: ATTACHMENTS: Traffic & Parking Commission Aaron Kunz, Deputy Director North Santa Monica Boulevard Reconstruction Project

More information

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017 2017 Work and Launch of the Next Phase Information meeting, Montréal-Ouest September 14, 2017 2 Presentation Outline Work progress Launch of the next phase Mitigation measures Dismantling Communications

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

AVAILABLE SPACE CENTRAL VAN & STORAGE BUILDING POCA, WEST VIRGINIA

AVAILABLE SPACE CENTRAL VAN & STORAGE BUILDING POCA, WEST VIRGINIA AVAILABLE SPACE CENTRAL VAN & STORAGE BUILDING LOCATION Building Address - 301 Jacobson Drive Poca, WV 25159 Located in City Limits - No County - Putnam Located in Business/Industrial Park - Yes Can the

More information

Canada and Alberta announce 33 new infrastructure projects

Canada and Alberta announce 33 new infrastructure projects January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First 2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box

More information

Central Park (practice) Used as a practice location for soccer, baseball and softball. Enter the park on 97 th street and 5 th Ave.

Central Park (practice) Used as a practice location for soccer, baseball and softball. Enter the park on 97 th street and 5 th Ave. In Manhattan HUNTER COLLEGE HIGH SCHOOL HOME GAME/PRACTICE LOCATIONS: Hunter College High School, Main Campus. 71 East 94 th Street, enter school 94 th street btw Park and Madison. All home high school

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

ANNUAL REPORT DOING MORE KANSAS TURNPIKE AUTHORITY

ANNUAL REPORT DOING MORE KANSAS TURNPIKE AUTHORITY ANNUAL REPORT 2015 KANSAS TURNPIKE AUTHORITY 236 MILES From Kansas City, Kansas to the Oklahoma Border South of Wichita 6 SERVICE AREAS Near Lawrence, Topeka, Emporia, Matfield Green, Towanda and Belle

More information

Leg 1 (4.0 miles, Easy)

Leg 1 (4.0 miles, Easy) Leg 1 (4.0 miles, Easy) Leg Description: Steady, but controlled downhill (paved). Leg Notes: Great views of the Grayson Highlands balds and mountains. Watch for wild ponies. 0.0 Grayson Highlands State

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

UPPER TRACT, WEST VIRGINIA

UPPER TRACT, WEST VIRGINIA AVAILABLE SPACE UPPER TRACT INDUSTRIAL PARK SHELL BUILDING 2 LOCATION Building Address - 29 Industrial Park Road Upper Tract, WV 26866 Located in City Limits - No Zoning - None County - Pendleton Located

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

MILLWOOD, WEST VIRGINIA

MILLWOOD, WEST VIRGINIA AVAILABLE SPACE 158 JACK BURLINGAME DRIVE LOCATION Building Address - 158 Jack Burlingame Drive Millwood, WV 25262 Located in City Limits - No Zoning - Restrictions County - Jackson Located in Business/Industrial

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster

I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,

More information

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club Arkansas State Highway and Transportation Department Rotary Club of West Pine Bluff Pine Bluff Country Club Thursday, November 7, 2013 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS The Town of The Blue Mountains MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY R.J. Bur nside & Associat es Limit ed Study Area Issues Traffic congestion

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

San Martin Drive. January 2016 Pre-Project Update

San Martin Drive. January 2016 Pre-Project Update San Martin Drive January 2016 Pre-Project Update Overview The San Martin Drive Pedestrian Improvements project has the goal of providing a continuous pedestrian pathway on San Martin Drive from University

More information

Directions to US Drives

Directions to US Drives Directions to US Drives From Interstate Highway 90 (East or West of Buffalo) (Via Interstate 290 & Interstate 190) Follow the highway signs to Niagara Falls, one of the Seven Natural Wonders of the World.

More information

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE FIRST EDITION, SEPTEMBER 2011 Covers Section TN1 Base of Lookout Mountain to Soddy Daisy, TN THIS GUIDE IS NOT FOR SALE OR RESALE Guide To The Great Eastern

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

DIRECTIONS TO HMG OFFICES

DIRECTIONS TO HMG OFFICES DIRECTIONS TO HMG OFFICES AVON, ROUTE 10 100 Simsbury Road, Avon, CT 06111 (860)-284-5111 FROM I-84 WEST BOUND Take exit 43 (Park Road/West Hartford Center). Turn left at light at end of ramp. At second

More information

Monday, September 18, 2017 Sunday, October 1, 2017

Monday, September 18, 2017 Sunday, October 1, 2017 Monday, September 18, 2017 Sunday, October 1, 2017 CONSTRUCTION UPDATE* Hurricane Irma cleanup is complete and some landscaping repairs are underway. The project was secure and no major damages were encountered.

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

ALS Express Bike Ride. Saturday, June 15, 2013

ALS Express Bike Ride. Saturday, June 15, 2013 Presented by DIRECTIONS TO 75-MILE START POINT Camden County College Gabriel E Danch CIM Center 200 College Drive Blackwood, NJ **Overnight Parking in LOT 5 of the CIM Center is allowed. HOWEVER, you must

More information

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City): Directions IBM Recovery Center One Evertrust Plaza Jersey City, NJ 07302 1. Path Train From World Trade Center site (Downtown New York City): - Path Train service from World Trade Center site to Exchange

More information

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda - Revised Thursday, March 22, 2018 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

Pan Am Games: July 10 26, 2015 Parapan Am Games: August 7 15, 2015

Pan Am Games: July 10 26, 2015 Parapan Am Games: August 7 15, 2015 TORONTO2015 PAN AM/PARAPAN AM GAMES Pan Am Games: July 10 26, 2015 Parapan Am Games: August 7 15, 2015 TEMPORARY HIGH OCCUPANCY VEHICLE HIGHWAY LANES There will be approximately 235 km of temporary HOV

More information

District One Contacts

District One Contacts District 1 District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE

More information

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan New Jersey Turnpike Authority 2018 Capital Project & Investment Plan New Jersey Turnpike Authority / PO Box 5042 / Woodbridge, NJ 07095-5042 / www.njta.com - 2 - Table of Contents 1. Introduction 2. Capital

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Electrical Inspection Agencies New York

Electrical Inspection Agencies New York Electrical Inspection Agencies New York CAPITAL & NORTHEAST REGION City of Albany ONLY VERIFY CUSTOMER LIVES IN CITY OF ALBANY Note: City of Albany electrical inspections are done by the City Electrical

More information

CITY OF LAREDO, TEXAS CAPITAL IMPROVEMENTS FUND PROJECT BUDGET FY

CITY OF LAREDO, TEXAS CAPITAL IMPROVEMENTS FUND PROJECT BUDGET FY OPENING BALANCE - - - 7,572,445 - - REVENUES Intergovernmental Revenue: National Park Service 385,200 385,200 64,124 321,076-385,200 Texas Parks & Wildlife 668,523 668,523 88,245 580,278-668,523 Texas

More information

SCVAS & MROSD Summer Camp

SCVAS & MROSD Summer Camp SCVAS & MROSD Summer Camp Driving Directions to: Picchetti Ranch Preserve 13100 Montebello Rd, Cupertino (Map provided below) Monday, July 20th ( Nature Explorations ) ONLY If coming from 280: 1. Take

More information

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes Committee Members Attending: Ronald L. Brand, Director

More information

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

ATL. Advanced Technology Laboratories. Maps and Locations

ATL. Advanced Technology Laboratories. Maps and Locations ATL Maps and Locations TABLE OF CONTENTS Lockheed Martin is headquartered in Cherry Hill, NJ with offices in Arlington, VA Eagan, MN Kennesaw, GA 3 Cherry Hill 4 Driving Directions To 5 Driving Directions

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

A History of the Construction of the Radial Expressway System in Cook County

A History of the Construction of the Radial Expressway System in Cook County ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation

More information