1 Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit The Route 29 Solutions Package is a $230 million investment into the improvement of Albemarle County s infrastructure to address congestion in the Route 29 corridor. This investment will boost economic development and improve mobility in this critical transportation corridor through new road construction, existing roadway improvements, streamlined signalization, and funding for increased rail service. The selection of projects was the result of a process that included input from the Route 29 Solutions Advisory Panel, local governments, business and environmental groups. The $230 million in funding will support: Route 29/250 interchange improvements (Best Buy Ramp) Hillsdale Drive Extension Widening and improving Route 29 from Polo Grounds Road to Town Center Drive Adaptive signal technology on Route 29 Hillsdale Drive extension south to Holiday Drive Berkmar Drive extension north to Hollymead Town Center Route 29/Rio Road grade-separated intersection Study and preliminary engineering for improvements to the intersection of Hydraulic Road and Route 29 Study the extension of Hillsdale Drive south to Holiday Drive A second passenger train between Lynchburg and Washington, D.C. Provide Feedback / Get Engaged comments Route29Solutions@VDOT.Virginia.gov Join the Comments Forum Visit and choose Share Your Views Attend/Watch Project Delivery Advisory Panel Meetings Visit and choose Advisory Panel Comments to the Board of Supervisors bos@albemarle.org Share Your Thoughts on Engage Albemarle engage.albemarle.org Comment Directly to the Board during upcoming meetings for full details and continued engagement visit:
2 Berkmar Drive Extension Purpose This new 2.3-mile long road will parallel Route 29 to the west and will offer an alternative for local traffic traveling north or south between Charlottesville and What is Proposed? This project will construct an extension of Route 1403 (Berkmar Drive) north from its current terminus at Route 1438 (Hilton Heights Road) to Route 1719 (Towncenter Drive). The 2.3-mile long road is proposed as a two-lane facility built on a four-lane right of way to allow for possible future expansion. The project includes a bridge spanning the South Fork Rivanna River to the west of the Route 29 bridges. Bike lanes, sidewalks and a paved multi-use path will be included in the project. The inclusion of these facilities will be an important addition to Albemarle County s existing network of similar facilities. Albemarle County s urban ring to the developed Hollymead area, the Charlottesville Albemarle Airport and the county s park at Chris Greene Lake. The bike lanes and multi-use path will provide links with existing facilities that will provide additional transportation options for those using the Route 29 corridor. The project is included in the Route 29 Solutions projects and is proposed to advance through construction as part of a design-build contract that also includes the widening of Route 29 between Route 643 (Polo Grounds Road) and Route 1719 (Towncenter Drive) and construction of a grade-separated intersection at Route 29 and Route 631 (Rio Road). Schedule Location Public Hearing: Held Thursday, Sept. 18, 2014, 5-7 p.m., DoubleTree Hotel, 990 Hilton Heights Road, Charlottesville, VA Design Public Hearing: Held Tuesday, Oct. 14, 2014, 5-7 p.m., Albemarle High School cafeteria, 2775 Hydraulic Road Charlottesville, VA Design-Build contract award: February 2015 Construction begins: Late 2015 Construction complete: October 2017 Total Cost: $54.5 million Engineering of Roadway Plans: $2.4 million Right of Way Acquisition and Utility Relocation: $13.9 million Construction: $38.2 million These costs are preliminary planning estimates and subject to change as the project is finalized.
3 Route 29 Widening Purpose The purpose of this project is to widen Route 29 (Seminole Trail) from a four-lane divided highway to a six-lane divided highway from Route 643 (Polo Grounds Road) to Route 1719 (Towncenter Drive) in northern Albemarle County. The project will increase the What is Proposed? This project will widen Route 29 from four to six lanes by adding an additional lane on both sides of the highway between Route 643 (Polo Grounds Road) and Route 1719 (Towncenter Drive). The roadway will be designed with curb and gutter and sidewalks on both sides. The project will include a paved multi-use path on the east side of Route 29 from the southern end of the project to Hollymead Drive. A pedestrian crosswalk at that intersection will allow pedestrians and other users to cross Route 29 to a paved sidewalk on the west side that will extend north to Towncenter Drive. roadway capacity, which will reduce congestion on this heavily traveled section of Route 29. The project also includes safety improvements at previously identified locations. Improvement of this 1.8-mile-long section will complete the widening of Route 29 north to Route 649 (Airport Road) and will also include reconstruction of some sections of the existing highway to eliminate sightdistance deficiencies and improve overall safety. During construction, two lanes of traffic and all existing access points will be maintained in both directions. The project is included in the Route 29 Solutions projects package and is proposed to advance through construction as part of a design-build contract that also includes Berkmar Drive Extended and construction of a grade-separated intersection at Route 29 and Route 631 (Rio Road). Schedule Environmental document review/comments: Sept. 9-24, 2014 Design public hearing: Held Tuesday, Oct. 14, 2014, 5-7 p.m. at Albemarle High School cafeteria, 2775 Hydraulic Road, Charlottesville, VA Design-build contract award: February 2015 Construction begins: 2016 Construction complete: October 2017 Total cost: $46.8 million Engineering: $2.2 million Right of Way and Utility Relocation: $3.4 million Construction: $41.2 million These costs are preliminary planning estimates and subject to change as the project is finalized.
4 Rio Road Intersection Rendering of Route 29 / Rio Road grade-separated intersection Purpose Grade separation will move traffic more efficiently through one of the most congested intersections on the Route 29 corridor. Separating local and through traffic at this intersection, which has a history of high crash rates, will improve safety. What is Proposed? This project will separate traffic on Route 29 from traffic on Rio Road by replacing the current at-grade intersection with a grade-separated intersection. Rio Road will remain at roughly the current grade while Route 29 will be reconstructed to separate through traffic and local traffic exiting at Rio Road. Four through lanes (two each direction) will be constructed underneath Rio Road to carry traffic with destinations north or south of Rio Road. Local lanes will be built to the outside of the through lanes so traffic with local destinations can leave Route 29 onto Rio Road or access the businesses near the intersection. The project is included in the Route 29 Solutions projects and is proposed to advance through construction as part of a design-build contract that also includes the widening of Route 29 between Route 643 (Polo Grounds Road) and Route 1719 (Towncenter Drive) and construction of an 2.3 mile-long extension of Berkmar Drive from its current end at Route 1438 (Hilton Heights Road) north to Route 1719 (Towncenter Drive). Construction is scheduled to begin in 2015 and will be completed no later than Dec. 2, Construction that restricts movement on Rio Road through the intersection must be done between May 23 and Sept. 2, During that time, Rio Road will be closed to through traffic and left turns at the Route 29 intersection.the Rio Road intersection must be reopened to all traffic movements no later than Sept. 2, Four lanes in each direction on Route 29, and two lanes in each direction on Rio Road, will be maintained during construction except during the period between May 23 and Sept. 2, During that time traffic on Rio Road will be limited to right turns onto Route 29 and traffic will not be able to cross the intersection. On Route 29 two southbound lanes and three northbound lanes will be maintained between 6 a.m. and 9 p.m. and right turns onto Rio Road will be allowed at all times. A temporary intersection at Route 29 and Berkmar Drive, controlled by a signal, will serve as a detour and allow traffic from Berkmar to turn right or left onto Route 29 and travel north or south to Rio Road and businesses along Route 29 north or south of Berkmar. That signal will also have preemption equipment that allows priority access for emergency vehicles.traffic from Route 29 north and south will be able to access Berkmar at the temporary intersection.
5 Route 29-Route 250 Interchange Improvements What is proposed? This project will improve the southbound entrance ramp from Route 29 onto the Route 250 Bypass by adding an additional lane on the ramp and an associated merge lane on Route 250 westbound to the Barracks Road exit. It also adds an additional southbound lane to Route 29 by widening in the median from just south of Hydraulic Road to the Route 250 Bypass interchange. Noise barriers will be constructed along the lanes of the U.S. 250 Bypass between U.S. 29 and Barracks Road to mitigate neighborhood impacts. A final design for the surface finish of the barriers was selected by the city and Albemarle County in early October. Also included in this project is the construction of new sidewalk between Morton Drive and Angus Road. The proposed sidewalk will be located in the U.S. 29 median, which provides the safest and quickest pedestrian route. The project, known locally as the "Best Buy ramp project," is a priority for both Charlottesville and Albemarle County. The improvements are intended to reduce congestion and improve safety and the movement of traffic from Route 29 onto the Route 250 Bypass, as well as the flow of traffic continuing south on Route 29 (Emmet Street) into the city. The Commonwealth Transportation Board awarded an $11.1 million construction contract to Fielder s Choice Enterprises, of Charlottesville, at its January meeting. Construction is expected to begin in Spring History Information collected during project scoping supports the proposed improvements to address traffic volumes and crash history. From February 2006 to December 2008 there were 34 crashes on the Route 250 Bypass ramp and its immediate vicinity. In 2010, Route 29 between Hydraulic Road and the Route 29/250 interchange carried an average of 52,000 vehicles per day. On the Route 250 Bypass from Route 29 west to the Charlottesville city limits, an average of 38,000 vehicles used that road daily. Development of the project began in 2007 by Charlottesville under the Urban Construction Initiative, with technical engineering work performed by a consultant engineering firm. In June 2011, VDOT assumed management of the project. Engineering of Roadway Plans: $2,509,436 Right of Way Acquisition and Utility Relocation: $336,669 Construction, including noise barriers: $14,303,865 Total Cost: $17,150,000 are subject to change as the design is finalized.
6
7 Schedule Environmental document review/comments: Sept. 9-24, 2014 Design Public Hearing: Held Tuesday, Oct. 14, 2014, 5-7 p.m. Albemarle High School cafeteria, 2775 Hydraulic Road, Charlottesville, VA Design-build contract award: February 2015 Construction begins: Late 2015 Construction complete: No later than Dec. 2, 2016 Total Cost: $84.3 million Engineering of Roadway Plans: $2.7 million Right of Way Acquisition and Utility Relocation: $4.2 million Construction: $77.4 million These costs are preliminary planning estimates and subject to change as the project is finalized.
Frequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationConcord Road Interchange. Standard hours of work
Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass
More informationAGENCY NAME TRANSPORTATION
TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationSTRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012
Strategic Priorities (Projects 1-20) STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS VDOT's Secondary Program County's Proposed Ranking Route Number and Name Location
More informationFuller Road/Fuller Heights Road Improvements
Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017
Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationNortheast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015
Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationSOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationArlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager
Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak
More informationMcLean Citizens Association Transportation Committee Project Briefing
McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight
More informationuser s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:
The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationSecond Street Improvements Project Project Update Archive
Second Street Improvements Project Project Update Archive 12/03/18: In observance of the Holiday Moratorium, crews have paused a majority of construction activity on 2nd Street until January 2, 2019. A
More informationLake Erie Commerce Center Traffic Analysis
LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table
More informationMay 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014
May 16, 2014 Chuck McGinness, (954) 777-4090 chuck.mcginness@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 FORT LAUDERDALE -- Construction and maintenance-related lane
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More information2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First
2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box
More informationOhio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.
Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More information1.0 Purpose and Organization of the Community Impact Assessment Addendum
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationBOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING
BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationNeighbourdhood Committee NDG-Westmount. October 16, 2017
Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase
More informationCulpeper District. Albemarle County Monthly Report. September 2012
Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road
More informationPardon Our Dust Public Information Meeting
Pardon Our Dust Public Information Meeting Robert G. Ridgell, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer July 12, 2018 Project Team and Leadership Virginia
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More information6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning
More informationDesign Public Hearing
Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,
More informationFOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69
FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationI-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour
More informationUpdate on Route 1 Efforts
County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section
More informationNDG-Westmount Neighbourhood Committee. November 16, 2015
NDG-Westmount Neighbourhood Committee November 16, 2015 2 Feedback on previous questions Order-in-Council 890-2010 - condition 8 The ministère des Transports must : Establish a buffer zone at the foot
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationPublic Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street
Public Meeting: Metropolitan Washington Airports Authority (MWAA) Transportation Network Company (TNC) Lot on S. Eads Street Arlington County Department of Environmental Services Transportation Division
More informationElected Officials and Media Briefing I-395 Express Lanes Northern Extension
Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationIntroduction. Project Overview
Washington Blvd./Andora Widening Project Community Open House & Public Scoping Meeting Summary Wednesday, September 21, 2016 6:00 7:30 p.m. Vencil Brown Elementary School, Roseville Introduction On Wednesday,
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationNortheast Corridor Transportation Update
Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated
More informationReplace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure
Ramp Removed By Others Roadway Improvements By Others Ramp Improvements By Others Install ew Sign Structure Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Close
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationSUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia
Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across
More information