1 Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member Andy Haunton, Audit Team Leader Version Status Date A Audit report issued to Client 16 th June 2014

2 1.0 INTRODUCTION 1.1 Commission This report results from a Stage 2 Road Safety Audit carried out on the proposed remodelling of Queen s Circus roundabout to incorporate on-carriageway cycle facilities The Audit was undertaken by Capital Traffic in accordance with the Audit Brief confirmed by the Design Organisation on 10 th June It took place at the Great Yeldham offices of Capital Traffic on 16 th June 2014 and comprised an examination of the documents provided as listed in Appendix A At the instruction of the Design Organisation no site visit was undertaken for this audit. The Audit Team did, however, visit the site when undertaking the Stage 1 Audit during September Terms of Reference The Terms of Reference of this Audit are as described in TfL Procedure SQA-0170 dated May The Audit Team has examined and reported only on the road safety implications of the scheme as presented and how it impacts on all road users and has not examined or verified the compliance of the designs to any other criteria. However, to clearly explain a safety problem or the recommendation to resolve a problem the Audit Team may, on occasion, have referred to a design standard without touching on technical audit. An absence of comment relating to specific road users / modes in Section 3 of this report does not imply that they have not been considered; instead the Audit Team feels they are not adversely affected by the proposed changes This Safety Audit is not intended to identify pre-existing hazards which remain unchanged due to the proposals; hence they will not be raised in Section 3 of this report as they fall outside the remit of Road Safety Audit in general as specified in the procedure SQA-0170 dated May Safety issues identified during the Audit and site visit that are considered to be outside the Terms of Reference, but which the Audit Team wishes to draw to the attention of the Client Organisation, are set out in Section 4 of this report Nothing in this Audit should be regarded as a direct instruction to include or remove a measure from within the scheme. Responsibility for designing the scheme lies with the Designer and as such the Audit Team accepts no design responsibility for any changes made to the scheme as a result of this Audit In accordance with TfL Procedure SQA-0170 dated May 2014, this Audit has a maximum shelf life of 2 years. If the scheme does not progress to the next stage in its development within this period, then the scheme should be re-audited Unless general to the scheme, all comments and recommendations are referenced to the detailed design drawings and the locations have been indicated on the plan located in Appendix B It is the responsibility of the Design Organisation to complete the Designer s response section of this Audit report. Where applicable and necessary it is the responsibility of the Client Organisation to complete the Client comment section of this Audit report. Signatures from both the Design Organisation and Client Organisation must be added within Section 5 of this Audit report. A copy of which must be returned to the Audit Team. Date: June Version: A

3 1.3 Main Parties to the Audit Client Organisation Client contact details: Design Organisation Design contact details : Audit Team Audit Team Leader: Audit Team Member: Audit Team Observer: Other Specialist Advisors Specialist Advisor Details: London Borough of Wandsworth / Transport for London Carl Morrish, Steer Davies Gleave Andy Haunton Capital Traffic Jonathan Thompson Capital Traffic None None appointed 1.4 Purpose of the Scheme The scheme proposes to replace the existing off-carriageway Cycle Superhighway Route 8 facilities around Queen s Circus roundabout with segregated, signalised on-carriageway facilities. Date: June Version: A

4 2.0 ITEMS RAISED IN PREVIOUS ROAD SAFETY AUDITS The proposals were subject to a Stage 1 Road Safety Audit carried out in September 2013 by Capital Traffic (ref: 1073-RSA-01). All problems raised in that audit are considered to have been satisfactorily addressed in the Designer s Response Report completed by Steer Davies Gleave, dated October Date: June Version: A

5 3.0 ITEMS RAISED AT THIS STAGE 2 ROAD SAFETY AUDIT 3.1 JUNCTIONS PROBLEM Location: Summary: General Approaching Prince of Wales Drive (W). Drivers of large vehicles may be guided towards the width restriction. The proposed spiral markings may provide more positive guidance towards Prince of Wales Drive (W) than the existing spiral markings, this arm of the junction not currently being fully incorporated into the layout. Hence, there may be an increased risk of large vehicles headed towards the width restriction on Prince of Wales Drive (W) despite ADSs warning of it on all approaches to the junction. Such vehicles would then have to reverse back into the circulatory carriageway, at risk of colliding with circulating traffc. IMAGE: GOOGLE RECOMMENDATION Provide additional warning of the width restriction around the circulatory carriageway. Design Organisation Response Rejected Rejected. The primary route through the roundabout for vehicles including large goods vehicles is north-south, therefore it is only vehicles approaching from Prince of Wales Drive (E) that may experience this issue. Existing width/weight restriction signs on Prince of Wales Drive (W) are being retained, and existing advanced warning signs on all approaches to the roundabout are also being retained, and are considered to provide adequate warning to approaching drivers. Client Organisation Comments Date: June Version: A

6 In agreement with designer s response. There appears to be sufficient forward visibility of the restriction to enable HGVs to abort their manoeuvre and continue northwards. 3.2 PEDESTRIAN CROSSING FACILITIES PROBLEM Location: Summary: A Crossing points adjacent to combined lighting column / signal poles. Thick pole may adversely affect intervisibility between pedestrians and cyclists. At three locations there will be combined lighting column / signal poles to the right at pedestrian crossing points. In these locations the thickness of the column (given as a minimum of 229mm) over a normal signal pole may adversely affect intervisibility between pedestrians and cyclists. There may be an increased risk of collision between these two user groups as a result of poor intervisibility if either does not respect the status of their respective aspect. RECOMMENDATION Ensure that street furniture does not have an unduly adverse effect on visibility at pedestrian crossing points. Design Organisation Response Rejected Rejected. The proposed columns are to be installed with a setback of 800mm from the kerb edge, therefore pedestrians waiting at the crossings are generally expected to be standing closer to the kerb than this and visibility should not be obscured. It is noted that the combined columns are wider than standard traffic signal columns, however they are not considered large enough to fully obscure pedestrians and should not have a significant impact on road safety (in accordance with Manual for Streets 2 guidance on obstructions within visibility envelopes). It is also noted that all crossings at the roundabout are controlled, and therefore do not rely on eye contact between drivers and pedestrians in the way that zebra or uncontrolled crossings do. Client Organisation Comments In agreement with designer s response. Date: June Version: A

7 3.2.2 PROBLEM Location: Summary: Various Pedestrian crossings. Longer crossings may be difficult for slower moving pedestrians to complete in one movement. The existing uncontrolled pedestrian crossings are completed in two stages, there being a refuge island on each arm of the junction. These will be replaced by single stage controlled crossings, with the refuge islands being removed on all bar Prince of Wales Drive (W). The crossings will be in the region of 10m in length and are approaching the 11m length where LTN 2/95 recommends that a staggered crossing should be considered. Hence, there is a concern that slower moving pedestrians may find it difficult to complete a crossing in a single stage and either wait in the centre of the carriageway until the pedestrian phase is called up again, or continue to cross with traffic. This may increase the risk of collisions involving pedestrians occurring. RECOMMENDATION Ensure that slower moving pedestrians are able to cross in safety. Design Organisation Response Rejected Rejected. The junction has been modelled to ensure that sufficient time is allocated to enable pedestrians to cross safely at all controlled crossings. In addition the lack of central refuge islands should prevent pedestrians from attempting to wait in the centre of the carriageway. Client Organisation Comments In agreement with designer s response PROBLEM Location: Summary: B Pedestrian crossings. Push button may be difficult to locate for sight impaired pedestrians. Each of the four controlled crossings will be located on the radii of the entry / exit flaring of their respective arm. This will result in the push buttons for the crossing points on each exit flare being set back along the stem of the tactile paving, away from the dropped crossing point. This may make it more difficult for a sight impaired pedestrian to locate the push button, increasing the risk of them crossing with traffic. RECOMMENDATION An additional push button should be installed to the left of each crossing point located on an exit flare. Design Organisation Response Rejected Rejected. The signal poles incorporating the push buttons will be located 800mm back from the kerb face, which is the standard offset for traffic signal poles. The push buttons are located on the right hand side of all crossings to enable blind/partially sighted pedestrians to locate the push buttons using the stem of the tactile paving, in accordance with guidelines. Client Organisation Comments Date: June Version: A

8 In agreement with designer s response. 3.3 GENERAL PROBLEM Location: Summary: C Splitter island at Prince of Wales Drive (E). Lighting column on the island may be vulnerable to being struck. There will be a combined lighting column / signal pole on the splitter island at Prince of Wales Drive (E). In this location it may be especially vulnerable to being struck by an errant circulating vehicle. A stiff structure such as a lighting column could increase the severity of injury to the occupants of an errant vehicle. RECOMMENDATION Either relocate the column to a less vulnerable location, or provide a passively safe design. Design Organisation Response Rejected Rejected. This is considered common practice to provide lighting columns within islands which are located in urban environments which are subject to a 30 mph speed limit. As the carriageway has been widened it is necessary to provide additional lighting to ensure that this area is adequately lit. It is also noted that passively safe posts, whether they be lighting columns, posts or traffic signal poles, are typically only used on roads with a speed limit of 50mph or greater. Client Organisation Comments In agreement with designer s response. End of list of problems identified and recommendations offered in this 2 Road Safety Audit Date: June Version: A

9 4.0 ISSUES IDENTIFIED DURING THE STAGE 2 ROAD SAFETY AUDIT THAT ARE OUTSIDE THE TERMS OF REFERENCE Safety issues identified during the audit and site inspection that are considered to be outside the Terms of Reference, but which the Audit Team wishes to draw to the attention of the Client Organisation, are set out in this section. It is to be understood that, in raising these issues, the Audit Team in no way warrants that a full review of the highway environment has been undertaken beyond that necessary to undertake the Audit as commissioned. *****The Audit Team has no issues to raise within this section.***** Date: June Version: A

10 5.0 SIGNATURES AND SIGN-OFF 5.1 AUDIT TEAM STATEMENT We certify that we have examined the drawings and documents listed in Appendix A. to this Safety Audit report. The Road Safety Audit has been carried out in accordance with TfL Procedure SQA-0170 dated May 2014, with the sole purpose of identifying any feature that could be removed or modified in order to improve the safety of the measures. The problems identified have been noted in this report together with associated suggestions for safety improvements that we recommend should be studied for implementation. No one on the Audit Team has been involved with the design of the measures. AUDIT TEAM LEADER: Name: Andy Haunton Signed: Position: Associate Director Date 16/06/2014 Organisation: Capital Traffic Address: The Old Council Yard, Hedingham Road, Great Yeldham, Essex CO9 4HS Contact: ) AUDIT TEAM MEMBER: Name: Jonathan Thompson Signed: Position: Director Date 16/06/2014 Organisation: Capital Traffic Address: Contact: The Old Council Yard, Hedingham Road, Great Yeldham, Essex CO9 4HS Date: June Version: A

11 5.2 DESIGN TEAM STATEMENT In accordance with SQA-0170 dated May 2014, I certify that I have reviewed the items raised in this Stage [1/2] Safety Audit report. I have given due consideration to each issue raised and have stated my proposed course of action for each in this report. I seek the Client Organisations endorsement of my proposals. Name: Position: Organisation: Carl Morrish Senior Consultant Steer Davies Gleave Signed: Dated: 18 June CLIENT ORGANISATION STATEMENT I accept these proposals by the Design Organisation. Name: Martin Hoare Position: Group Engineer Organisation: Wandsworth Council Operational Services Signed: Dated: 2 July 2014 Date: June Version: A

12 APPENDIX A Documents Forming the Audit Brief DRAWING NUMBER DRAWING TITLE Rev A Drawing List Rev A Existing Layout Drawing Rev A Existing Layout Drawing Rev - Statutory Undertakers Plant Rev A General Arrangement Drawing Rev A General Arrangement Drawing Rev - Setting Out Rev - Setting Out Rev A Site Clearance Rev A Site Clearance Rev A Traffic Signals & Ducting Rev - Earthworks Rev B Pavements Drawing Rev B Pavements Drawing Rev A Kerbs Rev A Footways & Paved Areas (Clearance) Rev A Footways & Paved Areas (Proposed) Rev - Existing Signage Rev - Existing Signage Rev - Existing Signage Schedule Rev - Proposed Carriageway Markings & Signage Rev - Proposed Carriageway Markings & Signage Rev - Proposed Carriageway Markings & Signage Schedule Rev - Street Furniture Requiring Electrical Connection Rev- Street Furniture Requiring Electrical Connection Rev- Proposed Isopachyte Cut & Fill Rev - Proposed Cross & Long Sections Rev - Proposed Long Sections Rev - Proposed Cross Sections Rev - Proposed Cross Sections Rev - Proposed Cross Sections Rev - Proposed Cross Sections & Utilities _XX-HI-P_EX-31- Rev 00 Drainage Layout MMA12813/001 Rev R0 Street Lighting Design PRO/10/000316/01B Rev B Proposed Traffic Signals Layout SD-02 Rev A SD-03 Rev SD-04 Rev SD-05 Rev - Date: June Version: A

13 SD-06 Rev SD-07 Rev SD-08 Rev SD-09 Rev SD-10 Rev - DOCUMENTS DETAILS (where appropriate) Safety Audit Brief As per Stage 1 RSA Site Location Plan Traffic signal details TfL signal safety checklist Departures from standard Previous Road Safety Audits Stage 1 RSA dated September 2013 Previous Designer Responses SDG dated October 2013 Collision data Summary data Collision plot Traffic flow / modelling data Pedestrian flow / modelling data Speed survey data Other documents Date: June Version: A

14 APPENDIX B Problem Locations Date: June Version: A

15 B A B

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Appendix C Stage 1 Road Safety Audit

Appendix C Stage 1 Road Safety Audit Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4.

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

Donegal County Council

Donegal County Council Donegal County Council Roads & Transportation Directorate PLANNING AND DEVELOPMENT REGULATIONS 2001 (as amended) Nature and Extent of proposed development in accordance with Part 8 requirements of the

More information

CAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986

CAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986 0 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS PHASE 2 STAGE 3 ROAD SAFETY AUDIT Work Order: 31986 Project Client: Cumbria County Council COUNTY COUNCIL Ju/y2004 IQUALlTY SYSTEM MANUAL I REPORT COVER

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

CAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4

CAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4 CAPTA SYMONDS. _----------------- KESWCK TOWN CENTRE ENVRONMENTAL M:PROVEMENTS Audit Nwnber: 31986/02/05 Project Client CAPTA SYMON DS STAGE 2 ROAD SAFETY AUDT.------- --------------- March 2005? - KESWlCK

More information

Prince Albert Road Towpath Ramp, Camden Feasibility Report

Prince Albert Road Towpath Ramp, Camden Feasibility Report Prince Albert Road Towpath Ramp, Camden Feasibility Report Function Location: RE-004 Date: 25 October 2012 Report No: 5016-UA003174-UT31R-03 Prince Albert Road Towpath Ramp, Camden Feasibility Report

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

POST CONSTRUCTION ROAD SAFETY AUDIT. Island Bay Cycleway

POST CONSTRUCTION ROAD SAFETY AUDIT. Island Bay Cycleway POST CONSTRUCTION ROAD SAFETY AUDIT Island Bay Cycleway Prepared for Wellington City Council 11 May 2016 This document has been prepared for the benefit of Wellington City Council. No liability is accepted

More information

Traffic Calming and Road Safety Provision Options Woore Village

Traffic Calming and Road Safety Provision Options Woore Village Traffic Calming and Road Safety Provision Options Woore Village Contents 1 Executive Summary 4 2 Introduction 6 2.1 Background 6 3 Existing Provisions and Conditions 7 3.1 Background supporting option

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

APPENDIX A RELEVANT DOCUMENTATION

APPENDIX A RELEVANT DOCUMENTATION APPENDIX A RELEVANT DOCUMENTATION A.1 RELEVANT REFERENCE MATERIAL, LEGISLATION AND REGULATIONS All documents in this appendix are subject to amendment being superseded. Any designer installer shall be

More information

Trigger Point Justification Note 30 th August 2013

Trigger Point Justification Note 30 th August 2013 1. Introduction Trigger Point Justification Note 30 th August 2013 DCC constructed a highway assignment model of Tiverton and the surrounding area and this suggested that in pure capacity terms, up to

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Scotchbarn Lane, Prescot Accessibility Statement

Scotchbarn Lane, Prescot Accessibility Statement Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including

More information

Borough High Street Low Emission Neighbourhood

Borough High Street Low Emission Neighbourhood Borough High Street Low Emission Neighbourhood Colourful Crossings Design Brief Better Bankside Business Improvement District Brief for Graphic Consultants December 2017 Page 1 of 10 1. Introduction Borough

More information

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS. August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017 traffic engineering and transport planning Arcadis LLP Proposed Secondary School () June 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NW 01482 679 911 info@local-transport-projects.co.uk

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design Next Generation Cycleway Design Improving connectivity and cycling behaviours through design Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated

More information

Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014

Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014 Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014 Please find below the English Heritage response to the DfT Consultation on the draft

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007 DESIGN MANUAL FOR ROADS AND BRIDGES volume 8 section 2 traffic signs and lighting traffic signs and road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts

More information

LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS Date: 29 th September 2015 Venue: Committee Room 4, County Hall Apologies: Cllr Melissa McGeorge, Cllr William Archibald, Cllr Ray Howard, Cllr Kerry Smith PRESENT:

More information

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1 Introduction After the Love the Bay community-based

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Part 101 Gyrogliders and Parasails, Unmanned Aircraft (Including Balloons), Kites, and Rockets Operating Rules

Part 101 Gyrogliders and Parasails, Unmanned Aircraft (Including Balloons), Kites, and Rockets Operating Rules Part 101 Compliance Matrix (To be used with Part 102 matrix when making application for a certificate under Part 102) The Rule references in this compliance matrix have been extracted from the Civil Aviation

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28)

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Maldon District

More information

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd A453 Widening M1 Junction 24 to A52 Nottingham Project Details Project Details Widen 11.5km of existing single carriageway Project

More information

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS Date: 9 April 2014 Venue: Rowan House Room G3 Apologies: Parish Cllr John Gili-Ross Item: 1. 2 3 Action: Welcome and Introductions: PRESENT: Panel Members:

More information

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE The following report provides an update on the current position of all of the

More information

1. Case Study Area and Character Sections

1. Case Study Area and Character Sections ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information

NEWSLETTER #04 June 2018

NEWSLETTER #04 June 2018 A5 Old Stratford Roundabout Improvements NEWSLETTER #04 June 2018 PROJECT TIMING UPDATE We are now entering into the final stages of the roundabout improvement works. Despite a number of operational challenges,

More information

Prepared on 06/06/ :51:19

Prepared on 06/06/ :51:19 Project: Cork CC Accessibility Audits Job No: 027821 EASTING Use Type: Capita Ref: 001 Public roads / footpaths Auditor: K Craig Name: Bray Town Outskirts Date of Audit: 01/04/2008 Address: County Wicklow

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

SCHOOL CROSSING PATROL POLICY

SCHOOL CROSSING PATROL POLICY Appendix A SCHOOL CROSSING PATROL POLICY March 2003 Page 39 SCHOOL CROSSING PATROLS IN LINCOLNSHIRE POLICY DOCUMENT INTRODUCTION 1.1 The aim of this policy is to provide an efficient and effective school

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Christ Church Grammar School, Claremont

Christ Church Grammar School, Claremont Christ Church Grammar School, Claremont TRAFFIC MANAGEMENT AND TRANSPORT PLAN Prepared for CHRIST CHURCH GRAMMAR SCHOOL Prepared by Uloth and Associates 11 Sep 2014; Updated 17 Aug 2015; 29 July 2016,

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

Cabinet Member Report

Cabinet Member Report Cabinet Member Report Decision Maker: Cabinet Member for City Highways Date: 23 August 2017 Cabinet Member for Planning and Public Realm Classification: Title: Wards Affected: City for All Summary: Key

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

Appendix 9 Melbourn Greenway Review

Appendix 9 Melbourn Greenway Review Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011 STATUTORY INSTRUMENTS 2011 No. 1040 ROAD TRAFFIC The Traffic Signs (Amendment) Regulations and General Directions 2011 Made - - - - 30th March 2011 Laid before Parliament 6th April 2011 Coming into force

More information

For the theory test you could be asked about all of them so what are the differences?

For the theory test you could be asked about all of them so what are the differences? Pedestrian Crossings There are 7 types of pedestrian (I include animals) crossings (or configurations) in England. 1. Zebra 2. Lollipop 3. Pelican 4. Puffin 5. Toucan 6. Staggered 7. Pegasus (Equestrian)

More information

THREE WAYS DISABLED RAIL CUSTOMERS CAN EXPECT DISRUPTION TO THEIR JOURNEY

THREE WAYS DISABLED RAIL CUSTOMERS CAN EXPECT DISRUPTION TO THEIR JOURNEY THREE WAYS DISABLED RAIL CUSTOMERS CAN EXPECT DISRUPTION TO THEIR JOURNEY A closer look at the issues faced by disabled rail customers 13 September, 2017 Kristian Green Divisional Director GfK kristian.green@gfk.com

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

Report for. Hampstead Garden Suburb Residents Association. Highway Safety Review - A598, Finchley Road 1. Temple Fortune, London, NW11.

Report for. Hampstead Garden Suburb Residents Association. Highway Safety Review - A598, Finchley Road 1. Temple Fortune, London, NW11. The Royal Society for the Prevention of Accidents Report for Hampstead Garden Suburb Residents Association Highway Safety Review - A598, Finchley Road, Temple Fortune, London, NW11. December 2003 A598,

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 27)

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 27) MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 27) This Potential List identifies all of the scheme requests which have been received for the consideration of the Maldon District Local

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Subject: B579 Luton Road, Chalton

Subject: B579 Luton Road, Chalton Meeting: Traffic Management Meeting Date: 7 th June 2018 Subject: B579 Luton Road, Chalton Report of: Summary: Paul Mason, Assistant Director Highways To report to the Executive Member for Community Services

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

EDINBURGH AIRPORT LTD COACHPARK

EDINBURGH AIRPORT LTD COACHPARK EDINBURGH AIRPORT LTD COACHPARK - Terms & Conditions of Use - October 2013 CONTENTS SECTION 1. 0 Introduction 1. Purpose 2. Authorised Users 2.0 Responsibilities 2.1 Edinburgh Airport Ltd 2.2 Bus and Coach

More information