ACORNS PROJECTS LIMITED

Size: px
Start display at page:

Download "ACORNS PROJECTS LIMITED"

Transcription

1 ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants OCTOBER 2013 Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants Redwood House 3 Eaton Park Eaton Bray Bedfordshire LU6 2SP Telephone: Facsimile: abc@acornsprojects.com Version No: 1.0

2 Document Location A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Ensure that this document is current. Printed documents and locally copied files may become obsolete due to changes to the master document. This is a controlled document. The source of the document can be found on the file server at location: Documents\ABC\Acorns\Clients\SloughBoroughCouncil\A4LondonRoadM4J5toSuttonLane\Reports\A4Lond onm4j5tosuttonlanecombi Revision History This document has the following history: Version No. Version Date Summary of Changes Changes marked /10/2013 N/A N/A Approvals This document requires the following approvals: Name Adriano B. Cappella Sarah Taylor Title Audit Team Leader Audit Team Member Distribution This document has also been distributed to: Name Savio DeCruz Mick Hepworth Isaac Webb Title & Organisation Team Leader - Network Management - Slough Borough Council Senior Design Engineer - Transport - Slough Borough Council Engineer - Major Projects - Slough Borough Council Version 1.0 Page 2

3 1.0 INTRODUCTION 1.1 This report results from a Combined Stage 1 and 2 Road Safety Audit carried out on the Proposed Highway Improvements at the A4 London Road, from the M4 Motorway at Junction 5, to the Sutton Lane traffic signal junction, Slough, Berkshire, at the request of the Client/Design Organisation, Slough Borough Council, Department of Customer and Community Services, St. Martin s Place, 51 Bath Road, Slough, SL1 3UF. 1.2 The scheme proposals comprise the modification of existing kerblines at the existing traffic signal controlled pedestrian crossing facility, the removal of the existing bus laybys along the northern and southern kerblines to be replaced with on-carriageway bus stop facilities, the introduction of two east bound vehicular traffic lanes, amendments to an existing traffic separation island adjacent to the existing petrol filling station and, the removal of the existing right turn facility for the petrol filling station. In addition, carriageway and footway resurfacing is proposed, together with new carriageway markings. 1.3 The Audit Team membership was as follows : Adriano B. Cappella (Audit Team Leader) IEng, FIHE Director, Acorns Projects Limited Sarah Taylor (Audit Team Member) IEng, AMICE, FIHE Associate Consultant, Acorns Projects Limited 1.4 The Audit took place at the Eaton Bray office of Acorns Projects Limited during October The Audit was undertaken in accordance with the Audit Brief contained in the Slough Borough Council to Acorns Projects Limited dated the 24 th September The Audit comprised an examination of the drawings provided by the Client/Design Organisation and, are listed in Annex A. 1.5 The drawings consisted of the general arrangement, statutory undertakers plant, site clearance, drainage, earthworks, pavements, footways, lining and signs and, lining setting out. Copies of the scheme drawings at both A3 and A4 size were provided for the Audit Team s use. Road traffic accident data, vehicular traffic flow data, pedestrian flow data and, pedal cycle flow data has not been supplied for the purposes of this Combined Stage 1 and 2 Road Safety Audit. Version 1.0 Page 3

4 1.6 A visit to the site was undertaken during the morning of the 4 th October 2013 by both Audit Team Members together. During the morning site visit, the weather was mild and slightly cloudy and, the existing carriageway surface was mainly dry. Vehicular traffic conditions at the time of the morning site visit were observed to be light to moderate on occasions. A reasonable number of pedestrians and four pedal cyclists were observed during the morning site visit. 1.7 The terms of reference of the Audit are as described in HD 19/03. The Audit Team has examined and reported only on the road safety implications of the scheme as presented and, has not examined or verified the compliance of the designs to any other criteria. 1.8 No Departures from Design Standards have been reported by the Design Organisation. 1.9 All Problems and Recommendations are referenced to the design drawings and the locations have been indicated on the A4 plan supplied for use by the Audit Team in Annex B Issues identified and observations made during this Combined Stage 1 and 2 Road Safety Audit and site inspection which the Terms of Reference exclude from this report, but which the Audit Team wishes to draw to the attention of the Audit Project Sponsor (i.e. the Local Highway Authority, Slough Borough Council), will be set out in a separate letter. These issues could include maintenance items and operational issues. The Audit Team has not identified any issues during this Combined Stage 1 and 2 Road Safety Audit and site inspection that are considered to be outside the Terms of Reference. Version 1.0 Page 4

5 2.0 ITEMS RAISED AT THIS COMBINED STAGE 1 AND 2 AUDIT 2.1 GENERAL PROBLEM Locations 1 & 2 (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - Potential surface water ponding could impact upon the operational safety of the traffic signal controlled pedestrian crossing facility. The scheme drawings indicate that the width of the existing traffic signal controlled pedestrian crossing facility will be increased by removing the existing northern and southern kerb line build outs. The northern and southern channel lines will therefore align with the channel lines of the remainder of the A4 London Road. Whilst the scheme drawings indicate that levels within the existing channel lines and therefore the gradients are reasonably minimal, there does not appear to be any additional surface water drainage provision along the revised northern and southern channel lines adjacent to the existing traffic signal controlled pedestrian crossing facility. Concern arises that surface water ponding could take place and, subsequently present a slip or trip hazard for pedestrians during wet and subsequent cold/freezing weather conditions, with the resultant potential risk that personal injury could be sustained by pedestrians. RECOMMENDATION The existing surface water drainage provision relative to the existing falls and gradients of the northern and southern channel lines should be confirmed as adequate and suitable. It may prove necessary to install additional new road gullies in order to adequately capture surface water in the area of the revised layout of the existing traffic signal controlled pedestrian crossing facility PROBLEM Location 3 (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - No provision for a traffic signal maintenance engineer to stop in immediate proximity to the existing traffic signal controlled pedestrian crossing facility. Version 1.0 Page 5

6 The scheme proposals do not appear to include the provision of a traffic signal maintenance engineer s layby or hardstanding area for the existing traffic signal controlled pedestrian crossing facility. It will be important to ensure that adequate and suitable facilities are provided for the safety and benefit of site operatives and, whilst highway improvements are being undertaken along this length of the A4 London Road, the scheme proposals present an opportunity presents to provide such a facility. RECOMMENDATION Provide a traffic signal maintenance engineer s layby or hardstanding area within the northern verge area in proximity to the existing traffic signal controlled pedestrian crossing facility. The layby or hardstanding area should be sited clear of the traffic lanes, traffic signal poles and signal heads and the existing footway. 2.2 LOCAL ALIGNMENT PROBLEM Location 4 (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - The proposed removal of the west bound bus layby and the introduction of the two east bound vehicular traffic lanes could result in west bound vehicular traffic overtaking stationary buses directly into the path of potentially fast moving east bound vehicles, which could result in an increased risk of offside to offside vehicular conflicts occurring. The scheme proposals indicate that the existing bus layby along the southern kerbline of the A4 London Road will be removed and placed on the carriageway within a 33 metre long bus cage. The west bound bus stop will be sited directly opposite the east bound on-carriageway bus stop. The scheme proposals also indicate that the east bound vehicular traffic lane provision will be increased from the existing one lane to two. In the event that the northern kerbline on-carriageway bus stop is occupied by stationary buses, east bound vehicles will be able to overtake in relative safety by utilising lane two. However, for west bound vehicular traffic, in order to overtake a stationary bus at the southern kerbline bus stop, a driver will have to encroach into lane two of the east bound carriageway. Concern arises that this overtaking manoeuvre may be executed into the path of faster moving east bound vehicles in lane two, whereby there could be an increased risk of head on or offside to offside vehicular conflicts occurring. Version 1.0 Page 6

7 RECOMMENDATION Whilst the overall scheme objectives are fully acknowledged by the Audit Team, it is Recommended that under these circumstances, the existing bus lay along the southern kerbline serving west bound bus movements should be retained PROBLEM Location 5 (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - The proposed removal of the existing right turn facility for the petrol filling station and the introduction of the two east bound vehicular traffic lanes could result in an increased risk of nose to tail shunt type accidents occurring for west bound vehicular traffic. The scheme proposals indicate that the existing sub-standard right run facility for the petrol filling station will be removed and replaced with an additional east bound vehicular traffic lane. Having passed through the Sutton Lane traffic signal junction and merged as two lanes become one, in order to gain access to the petrol filling station forecourt, west bound vehicles will have to hold up all following west bound vehicles, especially if lanes one and two of the east bound A4 London Road are occupied with moving vehicles. As a consequence, concern arises that the proposed layout and the loss of the existing right turn facility will result in an increased risk of west bound vehicles being involved in nose to tail shunt type accidents. RECOMMENDATION For an appropriate and suitable length leading up to the access point of the petrol filling station, a high skid resistant carriageway surface course should be installed, in order to mitigate the potential nose to tail shunt type accident identified. Alternatively, a prohibition on right turns into the petrol filling station could be implemented as west bound vehicular traffic would always have the option to u-turn at the M4 Junction 5 interchange roundabout if necessary. 2.3 JUNCTIONS No Problems identified in this category at this Combined Stage 1 and 2 Audit. Version 1.0 Page 7

8 2.4 NON MOTORISED USER PROVISION PROBLEM Location 6 (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - Proposed layout changes of the existing traffic signal controlled pedestrian crossing facility could result in a very slight detriment to pedestrian safety. The scheme drawings indicate that the width of the existing traffic signal controlled pedestrian crossing facility will be increased by removing the existing northern and southern kerb line build outs. Whilst the widening may be considered only marginal, this in effect will increase a pedestrians exposure time to east bound and west bound vehicular traffic, which could result in a very slight operational detriment to pedestrian safety. RECOMMENDATION The existing timings should be reviewed for the traffic signal controlled pedestrian crossing facility, as a pedestrians green signal period may need to be increased accordingly. 2.5 ROAD SIGNS, CARRIAGEWAY MARKINGS & STREET LIGHTING PROBLEM Location - General (Drawing No. SBC/T/IT/00198/000/01 Rev A) Summary - Enhancing the conspicuity of the proposed highway improvements, the revised layout of the traffic signal controlled pedestrian crossing facility and, the wider carriageway areas during the hours of darkness. Street Lighting improvement proposals have not been submitted for this Combined Stage 1 and 2 Road Safety Audit. Concern arises that a new and comprehensive system of street lighting will need to be installed to suit the proposed highway improvements scheme. Version 1.0 Page 8

9 RECOMMENDATION Prior to the construction stage of the project, give careful consideration to the provision of an improved or enhanced Street Lighting installation that may be required to suit the proposed highway improvements and, to enhance the operational safety of the overall scheme proposals during the hours of darkness. END OF PROBLEMS IDENTIFIED AND RECOMMENDATIONS OFFERED IN THIS COMBINED STAGE 1 AND 2 ROAD SAFETY AUDIT Version 1.0 Page 9

10 3.0 AUDIT TEAM STATEMENT I certify that this Audit has been carried out in accordance with HD 19/03. AUDIT TEAM LEADER Adriano B. Cappella IEng, FIHE Director Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants Redwood House 3 Eaton Park Eaton Bray Bedfordshire LU6 2SP Signed : Date : 22 nd October 2013 AUDIT TEAM MEMBER Sarah Taylor I.Eng, AMICE, FIHE Associate Consultant Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants Redwood House 3 Eaton Park Eaton Bray Bedfordshire LU6 2SP Version 1.0 Page 10

11 ANNEX A

12 ANNEX A A4 LONDON ROAD, M4 J5 TO SUTTON LANE, SLOUGH, BERKSHIRE PROPOSED HIGHWAY IMPROVEMENTS COMBINED STAGE 1 AND 2 ROAD SAFETY AUDIT LIST OF SLOUGH BOROUGH COUNCIL DRAWINGS SUBMITTED FOR AUDITING DRAWING NO. SBC/T/IT/00198/000/01 Rev A SBC/T/IT/00198/100/02 Rev A SBC/T/IT/00198/200/01 Rev A SBC/T/IT/00198/500/01 Rev A SBC/T/IT/00198/600/01 Rev A SBC/T/IT/00198/700/01 Rev A SBC/T/IT/00198/1100/01 Rev A SBC/T/IT/00198/1200/01 Rev A SBC/T/IT/00198/1200/02 Rev A TITLE A4, M4 to Sutton Lane Highway Improvements - General Arrangements A4, M4 to Sutton Lane Highway Improvements - Statutory Undertakers A4, M4 to Sutton Lane Highway Improvements - Site Clearance A4, M4 to Sutton Lane Highway Improvements - Drainage A4, M4 to Sutton Lane Highway Improvements - Earthworks A4, M4 to Sutton Lane Highway Improvements - Pavements A4, M4 to Sutton Lane Highway Improvements - Footways A4, M4 to Sutton Lane Highway Improvements - Lining and Signs A4, M4 to Sutton Lane Highway Improvements - Lining Setting Out

13 ANNEX B

14 ANNEX B - PROBLEM LOCATION PLAN

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

Appendix C Stage 1 Road Safety Audit

Appendix C Stage 1 Road Safety Audit Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4.

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

CAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986

CAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986 0 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS PHASE 2 STAGE 3 ROAD SAFETY AUDIT Work Order: 31986 Project Client: Cumbria County Council COUNTY COUNCIL Ju/y2004 IQUALlTY SYSTEM MANUAL I REPORT COVER

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Derry Hill and Bingley Road, Menston. Accidents waiting to happen.

Derry Hill and Bingley Road, Menston. Accidents waiting to happen. Derry Hill and Bingley Road, Menston. Accidents waiting to happen. School Bus unable to pass on Hawksworth Drive References: Derry Hill - 10/04551/MAF Bingley Road - 10/06229/MAO Bingley Road - 11/05691/OUT

More information

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A. Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Centurion Way Chichester

Centurion Way Chichester Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Traffic Calming and Road Safety Provision Options Woore Village

Traffic Calming and Road Safety Provision Options Woore Village Traffic Calming and Road Safety Provision Options Woore Village Contents 1 Executive Summary 4 2 Introduction 6 2.1 Background 6 3 Existing Provisions and Conditions 7 3.1 Background supporting option

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

THE WELSH MINISTERS STATEMENT OF REASONS

THE WELSH MINISTERS STATEMENT OF REASONS THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

Donegal County Council

Donegal County Council Donegal County Council Roads & Transportation Directorate PLANNING AND DEVELOPMENT REGULATIONS 2001 (as amended) Nature and Extent of proposed development in accordance with Part 8 requirements of the

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017 traffic engineering and transport planning Arcadis LLP Proposed Secondary School () June 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NW 01482 679 911 info@local-transport-projects.co.uk

More information

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015 CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA (I) Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015 propose to make an Order under Sections 1, 2, 4, 29

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Volume Contents and Alpha-Numeric Index to the NRA Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) Standards

Volume Contents and Alpha-Numeric Index to the NRA Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) Standards Volume Contents and Alpha-Numeric Index to the Design Manual for Roads and Bridges (including Erratum No. 1 dated June 2015) GE-CON-01004 June 2015 General Standards TRANSPORT INFRASTRUCTURE IRELAND (TII)

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ / 019 PUBLIC INQUIRY QUESTION RAISED BY: The Inspectors DATE: 20/02/17 RESPONDED BY: Ben Sibert DATE: 10/03/17 SUBJECT: Engineering Proof of Evidence Elucidations The attached document

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

CAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4

CAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4 CAPTA SYMONDS. _----------------- KESWCK TOWN CENTRE ENVRONMENTAL M:PROVEMENTS Audit Nwnber: 31986/02/05 Project Client CAPTA SYMON DS STAGE 2 ROAD SAFETY AUDT.------- --------------- March 2005? - KESWlCK

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Woodford Community Council

Woodford Community Council Woodford Community Council MINUTES OF THE ANNUAL GENERAL MEETING HELD ON THURSDAY, 26 NOVEMBER 2015 WCC members present: Paul Rodman Chairman Helen Buszard Secretary David Buszard, Ken Coxey, Bryan Leck,

More information

Cabinet Member Report

Cabinet Member Report Cabinet Member Report Decision Makers: Cllr Davis, MBE, DL, Deputy Leader and Cabinet Member for Business, Culture and Heritage. Date: 30 March 2017. Cllr Chalkley, Cabinet Member for City Highways. Classification:

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury Final Report for JTB March 2012 Project Number B1649000 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder

More information

Report for. Hampstead Garden Suburb Residents Association. Highway Safety Review - A598, Finchley Road 1. Temple Fortune, London, NW11.

Report for. Hampstead Garden Suburb Residents Association. Highway Safety Review - A598, Finchley Road 1. Temple Fortune, London, NW11. The Royal Society for the Prevention of Accidents Report for Hampstead Garden Suburb Residents Association Highway Safety Review - A598, Finchley Road, Temple Fortune, London, NW11. December 2003 A598,

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

STRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall

STRENGTHENING LOCAL RELATIONSHIPS East Dean & Friston Parish Council Liaison Meeting 7 May 2014 at 10.00am In the Small Hall, East Dean Village Hall East Dean & Friston PC Clerk Katrina Larkin Councillor Stephen Shing Councillor Daniel Shing Ian Johnson Principal Traffic and Safety Officer Kevin Morris Highway Steward STRENGTHENING LOCAL RELATIONSHIPS

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury - Consultation Report November 2010 Project Number B1555300 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board, JOINT TRANSPORTATION BOARD 10 June 2008 Subject: Director/Head of Service: Decision Issues: Decision: CCC Ward/KCC Division: Summary: To Resolve: Southern Gas Networks Gas Main Replacement Scheme - Broad

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

Subject: B579 Luton Road, Chalton

Subject: B579 Luton Road, Chalton Meeting: Traffic Management Meeting Date: 7 th June 2018 Subject: B579 Luton Road, Chalton Report of: Summary: Paul Mason, Assistant Director Highways To report to the Executive Member for Community Services

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

TRAFFIC ADVISORY LEAFLET

TRAFFIC ADVISORY LEAFLET TRAFFIC ADVISORY LEAFLET 3/06 High Occupancy Vehicle Lanes December 2006 INTRODUCTION The concept of using designated lanes for buses is well understood and widely used by highway authorities in urban

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction

More information

CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q1, BOSTON TRANSPORT ASSESSMENT

CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q1, BOSTON TRANSPORT ASSESSMENT CHESTNUT HOMES LTD PROPOSED MIXED USE DEVELOPMENT AT THE QUADRANT, Q, BOSTON TRANSPORT ASSESSMENT May4 apk/8/v Northern Transport Planning Ltd Suite 7, Vincent House, 6 Westgate, Wakefield, WF 9SR Tel:

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Welcome. Great Yarmouth Third River Crossing.  Norfolk County Council Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

Community Highways Volunteering Cambridge City Information Pack 2017/18

Community Highways Volunteering Cambridge City Information Pack 2017/18 Community Highways Volunteering Cambridge City Information Pack 2017/18 Chief Executive Gillian Beasley www.cambridgeshire.gov.uk Contents Welcome to the Community Highways Volunteering Scheme... 2 How

More information

Public consultation exhibition

Public consultation exhibition Public consultation exhibition 2018 Welcome Improving reliability, safety, local life and regional growth Welcome to the A30 Chiverton to Carland Cross consultation, and thank you for your interest in

More information

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the

More information

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28)

MALDON DISTRICT LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Maldon District

More information

SITESOLUTIONS Highways

SITESOLUTIONS Highways SITESOLUTIONS Highways Section 1: Roads Section 1A: Privately Maintained Roads Section 1A: Privately Maintained Footpaths Section 1A: Privately Maintained Verges Section 1B: Traffic Schemes and Orders

More information

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council Senior Executive Officer, Planning Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8. 25 th February 2016 BY HAND Re: No 6 St. Mary s Road, Ballsbridge Dublin 4 Planning application for

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design Next Generation Cycleway Design Improving connectivity and cycling behaviours through design Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND

201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND STATUTORY INSTRUMENTS 201[ ] No. TRANSPORT AND WORKS, ENGLAND TRANSPORT, ENGLAND The Transport for Greater Manchester (Light Rapid Transit System) (Oldham, Manchester Street Modification) Order Made -

More information