1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure (P120198) Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive : 31-Dec-2013 Country: Argentina Approval FY: 2011 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 20-Dec-2010 Original Closing Planned Mid Term Review 15-Aug-2013 Last Archived ISR 14-Jun-2013 Effectiveness 23-Dec-2011 Revised Closing Actual Mid Term Review Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objective of the proposed project is to reduce transport costs for users of provincial roads along selected corridors of the Norte Grande provinces, through the improvement of the quality of those roads and the introduction of improved road asset management tools and methods. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Component 1: Rehabilitation, Upgrading and Reconstruction of Provincial Roads Component 2: Institutional Development and Project Management Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status Overview The Norte Grande Road Infrastructure Project was approved by the Board on December 20th, 2010 for an amount of US$ 400 million, and loan effectiveness was declared on December 23, The project is in its second year of implementation. Pipeline: the following sub-projects are under implementation: Contracts under Execution: Page 1 of 7

2 -Provincial Route (PR) 3 in Chaco: Works started on March The work is completed with 99% of the contract certificated (by October 2013). This segment is sensitive form a social and environmental point of view. The Bank supported an analytical work to develop a conservation landscape in the Region of Chaco with a Special Focus on Road Infrastructure Works (results are available online). As part of the project's Environmental Plan, the civil works contracts required to the implementation of safe corridors for fauna. It is important to highlight that eight ground and aerial passages for faunas where executed, becoming the first road project in Argentina to include this type of ecological infrastructure. Also, a 4 km cycle path by the side of the road connecting an indigenous bilingual school with the surrounding towns was constructed as per the requests by local residents. Among the identified positive impacts, approximately 235 people were employed directly and an estimated of 390 people considering indirect jobs. Although it has not been measured yet by the DPV, there is a substantial increase in transit; also there is a new bus service connecting the town of Pampa del Indio with Villa Bermejito and other locations, which did not have public transport services before. Finally, another important initiative under this sub-project to highlight is the launching of the "Ruta de la Cultura Qom" initiative, aimed at generating economic opportunities for indigenous women and preserving the cultural heritage of the Qom culture. This is also the result of the communication strategy, IPP and GRM frameworks in place. During the last mission, the team expressed high satisfaction with the performance of these tasks and congratulated the technical team of the Province, the PIU and contractors. -PR 5 in Santiago del Estero: The original implementation period was 24 months, with a completion date of January 15, 2015; as of September 2013, 91.42%.of the works has been certified. The works was done much faster than the time provisions (near half of it) of the Work Plan, and it is scheduled for completion in late November This time difference, driven by the use of more equipment and labor, represents significant savings in terms of redetermination of prices. -PR 304 Tucuman: The contracts of each of the 3 lots are in place, the works started in July 2013, and each segment is moving forward at a different pace with an execution progress of near 10%. In the first segment, the Implementation Unit, the DPV and Contractor company, raised the need for a modification of the reconstruction technical solution specified under the contract, since the solution proposed in the bidding document was recently executed in another road work in the Province with IDB financing (RP No. 303 ), and the results were not satisfactory. In view of the modification of the project which involves a change in type of work, the Team requested the technical studies, specifications of the new items and an updated economic evaluation with new costs to accept the proposed modification. Also, the team requested teh DPV and the PIU to issue a formal technical approval of the proposed modification. - PR 9, Chaco: Project and bidding documents were reviewed and approved by the Bank. Proposals were evaluated and the evaluation report was approved by the Bank. The RPM gave the No Objection to the PIU decision of awarding the contract to the lowest bid. The contract was signed on October 29th, 2013, and initial works have started. Sub-projects under Review: - PR 18, Santiago del Estero: Procurement process finalized with RPM clearance of no objection letter to Borrower's Bid Evaluation Report and proposal for award of the contract. The No Objection Letter was sent on December 2, Project Implementation Unit (PIU) is in the process of finalizing documentation to sign the contract. On the Institutional Development component, the PIU presented to the Bank an Institutional strengthening plan to work with the provincial s DPV executing projects. The Province of Chaco has completed the diagnosis of its current status, and a similar process is in progress for the DPVs of Tucuman and Santiago del Estero Provinces. The applied methodology coincides with the model prepared for other projects, and follows the criteria developed for the Program. An external consultant was hired to booster the process. Also, on November 12th, 2013 a note was published asking for expressions of interest for a consulting firm to develop a five years investment plan for road network in Tucuman. A proposal for an Institutional Strengthening Plan is expected to be presented to the Bank before the end of December The Bank team has expressed its concern to the Borrower regarding delays in the implementation of activities under the Institutional Strengthening component. After an initial delays in launching the procurement process, some progress has been done in the for the joint Impact Evaluation Study for PR No. 3 in Chaco (Pampa del Indio-Villa Rio Bermejito) and the Potable Water project in Pampa del Indio under the Norte Grande Water Project I. During the recent mission, the Bank Team advanced the work on the design of the sample for the study with the Statistics Office in Chaco. The PIU and the Province of Chaco (Ministry of Planning) are finalizing the Cooperation Agreement to be signed for the loan to finance the fieldwork to be coordinated by Chaco for baseline data collection (household surveys, etc). Locations Page 2 of 7

3 Country First Administrative Division Location Planned Actual Argentina Not Entered Departamento de Concepción Argentina Not Entered Departamento de Santo Tomé Argentina Not Entered Santo Tomé Argentina Not Entered Pampa del Indio Argentina Misiones Provincia de Misiones Argentina Not Entered Partido de Libertador General San Martín Argentina Formosa Provincia de Formosa Argentina Corrientes Provincia de Corrientes Argentina Not Entered Concepción de la Sierra Argentina Not Entered Departamento de Apóstoles Argentina Tucumà n Provincia de Tucumà n Argentina Santiago del Estero Provincia de Santiago del Estero Argentina Salta Salta Argentina Not Entered Los Gutiérrez Argentina Jujuy Provincia de Jujuy Argentina Not Entered Partido de General Güemes Argentina Not Entered Departamento de Cruz Alta Argentina Chaco Provincia del Chaco Argentina Catamarca Provincia de Catamarca Argentina Not Entered Departamento de Burruyacú Argentina Not Entered Villa Río Bermejito Argentina Not Entered Urueña Results Project Development Objective Indicators Page 3 of 7

4 Indicator Name Core Unit of Measure Baseline Current End Target Evolution of average network roughness on targeted provincial roads Evolution of average network roughness on targeted provincial roads (i) Rehabilitation and Reconstruction Evolution of average network roughness on targeted provincial roads (ii) Upgradings Quality of service measured through user's perception Quality of service measured through user's perception (RP 3 Chaco) reduction in generalized travel in constant US dollars using HDM4 reduction in generalized travel in constant US dollars using HDM4 (i) for light vehicles (with base of US$ 0.28 per veh-km) Nov-2010 (4,52 IRI RP 9*40,96 + 6,5 RP 304 T1*22,37 +4,23 RP304 T2*33,17 +2,2 RP5 *71,8+7,2 RP 18*42,10)/210,40 Km Nov-2010 (1,8 IRI RP 3 S 1*33,35 + 1,9 RP 3 S 2*26,10 + 8,06 IRI RP304 T3*31,36)/90,81 Km Baseline established for RP3 (Chaco). Other provinces that enter project will have baselines established too. target end value is X+20% Jul Sep-2016 Baseline of users expressing satisfaction with the quality of their road network End target originally supposed to be baseline + 20% Nov Jul-2012 Page 4 of 7

5 reduction in generalized travel in constant US dollars using HDM4 (ii) for omni-buses (with base of US$ 5.55 per veh-km) reduction in generalized travel in constant US dollars using HDM4 (iii) for heavy vehicles (with base of US$ 1.60 per veh-km) of provinces with multi-annual road maintenance plans and road database management systems in place (cumulative) Nov Jul Nov Jul Nov Jul-2012 There are three provinces working on the institutional strengthening plan that will lead to a multi-annual road maintenance plan. Chaco has completed the diagnosis and Tucuman and Santiago del Estero are in the process of contracting an external consultant to assist on the plan. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Roads rehabilitated, Non-rural Kilometers Nov Km rehabilitated along PR No. 3 in Chaco. Annual Average Daily Traffic (AADT) on targeted roads Share of rural population with access to an allseason road Km already rehabilitated along PR No. 5 in Sgo. del Estero Nov Jul-2012 Baseline value obtained form RP 94 in Corrientes Province 17-Nov Apr-2013 Page 5 of 7

6 of rural people with access to an allseason road Share of rural population with access to an all weather road (RP 3 Chaco Province) Annual Performance Reports indicating results achieved by DPVs participating in the institutional development component prepared and publicly disseminated Supplemental Results for the baseline indicator in the province of Chaco (for RP3) have been obtained. Other provinces getting into the project have been informed about the need to collect and validate this indicator. Baseline value has been obtained: PR 3 in Chaco: 20,849 inhab. PR 5 in Sgo. del Estero: 2,873 inhab. PR 304 in Tuc.: nhab. End target value Y+10% Jul-2012 Baseline data from Chaco province survey and analysis. 28-Apr-2013 Target from Chaco province survey and analysis Text None Yes Data on Financial Performance (as of 19-Nov-2013) Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IBRD Effective 20-Dec May Dec-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD Disbursement Graph Page 6 of 7

7 Key Decisions Regarding Implementation The Norte Grande Road Infrastructure Project was approved by the Board on 20th December 2010 for an amount of US$ 400 million. The project was declared effective on December 23, Two of the sub-projects are almost completed: Provincial Road No. 3 in Chaco (2contracts awarded in December 15, 2011), and Provincial Road No. 5 in Santiago del Estero (contract Awarded in December 2012); and there has been important progress for another two sub-projects: Provincial Road No. 304 in Tucuman (3 contracts awarded in April 2013) and Provincial Road No. 9 in Chaco (2 contracts awarded in October 2013). There is one sub-project that is in the process of signing the contract: Provincial Road No. 18 in Santiago del Estero (the evaluation report and proposal for contract award was reviewed by the RPM and the No objection was issued December 2nd, 2013). The PIU has anticipated that they will send a new sub-project for the Province of Catamarca in the next weeks for Bank review. The project disbursed over US$140 million in CY2013, the largest amount disbursed by an investment loan in the entire Argentina portfolio, with important consequences for net flows in the country, as highlighted with satisfaction by representatives of the Ministry of Economy at the opening and closing meetings of the mission held in November In its second year of implementation, the project has disbursed 49.33% of the loan amount. Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Page 7 of 7

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)

More information

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name Norte

More information

LATIN AMERICA AND CARIBBEAN Country

LATIN AMERICA AND CARIBBEAN Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 57839 Argentina

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE GEF GRANT (TF-96758) Approved by the Board on June 17, 2010 TO THE ITAIPÚ BINACIONAL February

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

Results of Tourism Activity. July, 2017

Results of Tourism Activity. July, 2017 Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean. Wilfrido M. Paiva Paraguay - CRIA

Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean. Wilfrido M. Paiva Paraguay - CRIA Overview of soybean rust in South America during 2005-06 06 Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean Wilfrido M. Paiva Paraguay - CRIA 2004 2003 2001 2002 2005/06 production area Soybean

More information

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano Jefatura de Gabinete de Ministros Plan Belgrano Plan Belgrano Strategic Guidelines Plan Belgrano Social, Production and Infrastructure plan to reduce Inequality and promote Economic Growth in Northern

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

Assessing the Impacts of ENSO on South American Agriculture

Assessing the Impacts of ENSO on South American Agriculture Assessing the Impacts of ENSO on South American Agriculture Mark Brusberg United States Department of Agriculture Office of the Chief Economist / Presented to: The International Symposium on Synergistic

More information

Buyondo Herbert. January 15 th to 18 th 2017

Buyondo Herbert. January 15 th to 18 th 2017 PILOTS FOR PERPETUAL CENSUSES: COMMUNITY BASED DATA COLLECTION UGANDAN EXPERIENCE Presentation made at the UN World Data Forum Cape Town South Africa By Buyondo Herbert Principal Statistician Uganda Bureau

More information

High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States

High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States Natural disasters, risk reduction, economic and social sustainability for Caribbean

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information

FY RESULTS ROADSHOW PRESENTATION

FY RESULTS ROADSHOW PRESENTATION 1 FY RESULTS 2014 ROADSHOW PRESENTATION FY 2014 HIGHLIGHTS FOCUS ON EXECUTION 2 Strong financial performance Revenues: 61 bn, +5% vs. 2013 EBIT* before one off: 4.1 bn, +15% vs. 2013 EPS: 2.99, +61% vs.

More information

Results of Tourism Activity Mexico, February 2017

Results of Tourism Activity Mexico, February 2017 Results of Tourism Activity Mexico, February Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Procurement Plan National PPFD

Procurement Plan National PPFD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan National PPFD I. General 1. Project information: Republic of Mozambique,

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, July 2016 Lago de San Miguel Regla, Hidalgo. Jardín en Hacienda San Gabriel, Morelos. Parras, Coahuila. Paseo Santa Lucía, Monterrey. Undersecretariat of Planning and

More information

Agenda. Introduction Christine Ourmières-Widener. Financial Review Ian Milne. Performance Update & Outlook Christine Ourmières-Widener

Agenda. Introduction Christine Ourmières-Widener. Financial Review Ian Milne. Performance Update & Outlook Christine Ourmières-Widener 1 Agenda Introduction Christine Ourmières-Widener Financial Review Ian Milne Performance Update & Outlook Christine Ourmières-Widener 2 Strategy of regional connectivity is working Important to UK economy,

More information

Regional Economic Report July- September 2014

Regional Economic Report July- September 2014 Regional Economic Report July- September 2014 December 11, 2014 Outline I. Introduction II. Results July September 2014 A. Economic Activity B. Inflation C. Economic Outlook III. Final Remarks Introduction

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 2, 2016

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 2, 2016 Presentation on Results for the 3rd Quarter FY 2015 Idemitsu Kosan Co.,Ltd. February 2, 2016 Table of Contents 1. 3 rd Quarter FY 2015 Financials (1) Overview (2) Segment Information 2. Forecast for FY

More information

Results of Tourism Activity Mexico, March 2017

Results of Tourism Activity Mexico, March 2017 Results of Tourism Activity Mexico, March Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING MEETING CONCLUSIONS Andean South America Regional Meeting Lima, Peru 5-7 March 2002 1.0 ECOTOURISM PLANNING 1.1 Protected Areas Ecotourism in Protected Areas is part of an integrated vision of tourism

More information

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November

More information

Interim Management Report First Half Results 2010/11. October 29, 2010

Interim Management Report First Half Results 2010/11. October 29, 2010 Interim Management Report First Half Results 2010/11 October 29, 2010 Disclaimer Certain information included in these statements is forward-looking and involves risks and uncertainties that could cause

More information

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA 2016-2019 MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA OVERVIEW 2018 1 2 3 Population: 45 million 8 country on surface 24 provinces 4 55 airports 5 39 millions of passengers

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

Road Rehabilitation Project

Road Rehabilitation Project Indonesia Road Rehabilitation Project Report Date: March 2001 Field Survey: September 2000 1. Project Profile and Japan s ODA Loan Location Map of Project Area Improved Road Section in Lampung Province,

More information

Telecommunication Projects for Regions of Peru Fund for Investments in Telecommunications - FITEL

Telecommunication Projects for Regions of Peru Fund for Investments in Telecommunications - FITEL Telecommunication Projects for Regions of Peru Fund for Investments in Telecommunications - FITEL What is FITEL? FITEL is a fund for the provision of universal access, meaning such access in the country

More information

FIRST QUARTER 2017 RESULTS. 4 May 2017

FIRST QUARTER 2017 RESULTS. 4 May 2017 FIRST QUARTER 2017 RESULTS 4 May 2017 A resilient start of the year, traffic up 4.2% 20.9 million passengers carried, up 5.2%, traffic (RPK) up 4.2%, capacity (ASK) up 3.3% and load factor up 0.7pts Confirmation

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 14, 2018

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 14, 2018 Presentation on Results for the 3rd Quarter FY 2017 Idemitsu Kosan Co.,Ltd. February 14, 2018 Table of Contents 1. FY 2017 3rd Quarter Results (1) Overview (2) Segment Information 2. Forecast for FY2017

More information

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Unofficial translation of the original document produced in Czech language Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Assessment team:

More information

METRO OPERATIONS COMMITTEE

METRO OPERATIONS COMMITTEE Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June

More information

Presidential Aircraft Recapitalization

Presidential Aircraft Recapitalization Presidential Aircraft Recapitalization Solicitation Number: FA8625-15-C-6599 Agency: Department of the Air Force Office: Air Force Materiel Command Location: AFLCMC/PK - WPAFB (includes PZ, WL, WW, WI,

More information

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 14, 2019

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 14, 2019 Presentation on Results for the 3rd Quarter FY 2018 Idemitsu Kosan Co.,Ltd. February 14, 2019 Table of Contents 1. FY 2018 3rd Quarter Results (1) Overview (2) Segment Information 2. Forecast for FY 2018

More information

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015 Statistics of Air, Water, and Land Transport 2014 2013 1 Released Date: August 2015 Table of Contents Introduction... 4 Key Points... 5 1. Air Transport... 6 1.1 Aircraft movements... 6 1.2 Number of passengers...

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX OCTOBER 2018 CTI reading of 51.6 in October 2018 indicates that travel to or within the U.S. grew 3.2% in October 2018 compared to October 2017. LTI predicts travel

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

J.P. Morgan Aviation, Transportation and Industrials Conference

J.P. Morgan Aviation, Transportation and Industrials Conference J.P. Morgan Aviation, Transportation and Industrials Conference March 3, 08 Scott Kirby President Safe Harbor Statement Certain statements included in this presentation are forward-looking and thus reflect

More information

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective NEXTOR NEXTOR Moving Moving Metrics: Metrics: A Performance-Oriented View View of of the the Aviation Aviation

More information

TUI GROUP INVESTOR PRESENTATION

TUI GROUP INVESTOR PRESENTATION TUI GROUP INVESTOR PRESENTATION German Investment Conference UniCredit / Kepler Munich, 26-27 September 2012 Future-related statements This presentation contains a number of statements related to the future

More information

Public Works Research Institute

Public Works Research Institute Public Works Research Institute INTERNATIONAL WORKSHOP ON WATER HAZARD AND RISK MANAGEMENT SOME EXPERIENCES OF FLOOD MANAGEMENT IN ARGENTINA VÍCTOR POCHAT National Director for Water Policies,Coordination

More information

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX MAY 2018 CTI reading of 51.7 in May 2018 shows that travel to or within the U.S. grew 3.4% in May 2018 compared to May 2017. LTI predicts moderating travel growth

More information

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records

More information

Driving Ridership Strategic Partnerships

Driving Ridership Strategic Partnerships Driving Ridership Strategic Partnerships Feb 29, 2012 Presented by Priya Bhasin-Singh, Strategic Marketing Associate priya.bhasin-singh@edmonton.ca 2012 APTA Marketing & Communications Conference About

More information

Presentation on Results for the 2nd Quarter FY Idemitsu Kosan Co.,Ltd. November 1, 2016

Presentation on Results for the 2nd Quarter FY Idemitsu Kosan Co.,Ltd. November 1, 2016 Presentation on Results for the 2nd Quarter FY 2016 Idemitsu Kosan Co.,Ltd. November 1, 2016 Table of Contents 1. 2nd Quarter FY 2016 Financials (1) Overview (2) Segment Information 2. Reference Materials

More information

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach URBAN DEVELOPMENT Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach Urban Week,January 31, 2011 Chantal Reliquet, Sr. Urban Specialist 1 World Bank Lending in Historic City Regeneration

More information