LATIN AMERICA AND CARIBBEAN Country

Size: px
Start display at page:

Download "LATIN AMERICA AND CARIBBEAN Country"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Argentina Norte Grande Road Infrastructure Project Region LATIN AMERICA AND CARIBBEAN Country Argentina Sector Roads and highways (70%); Sub-national government administration (20%); General transportation sector (10%) Lending Instrument Specific Investment Loan - SIL Project ID P Parent Project ID Borrower(s) The Argentine Republic, Argentina Implementing Agency Ministry of Federal Planning, Public Investment and Services - Unidad de Coordinacion de Programas y Proyectos con Financiamiento Externo Environmental Screening { }A { }B { }C { }FI Category Date PID Prepared November 9, 2010 Estimated Date of Appraisal November 11, 2010 Completion Estimated Date of Board Approval December 20, 2010 Decision Project authorized to proceed to negotiations upon agreement on any pending conditions and/or assessments. Other Decision I. Country Context 1. Recovery from 2001 crisis. Between 2002 and 2008, real GDP in Argentina grew on average 8.5 percent per year1. This strong growth performance was supported by a dynamic expansion of private investment, internal consumption and exports. Strong export growth, fueled by favorable commodity prices, and improved fiscal performance due to increased tax collection generated persistent twin surpluses (fiscal and external), which in turn favored reserves accumulation and debt reduction. Continued primary surpluses, together with a successful restructuring of sovereign debt in 2005, led to a marked reduction in the debt-to-gdp ratios from percent of GDP in 2002 to 56.4 percent at the end of The Government s economic strategy, aimed at supporting the growth momentum, included expansionary fiscal and monetary measures as well as active income policies. As a result, poverty more than halved from 58 percent in 2003 to 23.4 percent in 2007, and unemployment fell from 21.5 percent in 2003 to 8.3 percent in By mid-2005 real GDP had recovered to the level immediately before the recession. 1

2 2. Economic slowdown and recovery. Economic activity started to slow in 2008 due to a conflict with farmers over export duties during the first semester and the impact of the global financial crisis in September. Real GDP growth declined to 6.8 percent in 2008 from 8.7 percent in 2007 according to official statistics. Economic activity declined further in 2009 due to a drop in external demand, declining commodity prices, a deteriorating domestic investment climate and a severe drought that weighed on agricultural production. Fiscal performance deteriorated considerably in 2009 on account of lower economic activity, counter-cyclical stimulus measures and a sharp decline in foreign trade (primary fiscal surplus fell from 3.1 percent of GDP in 2008 to 1.5 percent of GDP in 2009). The economy rebounded strongly in 2010, fueled by fast growth in internal absorption, external demand (mainly Brazil and China) and commodity prices. A significant revitalization of industrial activity in automotives, basic metals and textiles, and a normalization of agricultural production following 2009 s severe drought, have contributed to the economy s dynamism. Internal absorption has been boosted by consumption and an expansion of public spending. Real GDP grew by 7.0 percent in the first quarter of 2010, and economic activity is expected to expand by about 7 percent in With the onset of the worldwide economic crisis and domestic economic slowdown, the GoA has prioritized an infrastructure investment program as a key part of a countercyclical economic stimulus package. Following the crisis, infrastructure investment grew every year, reaching levels of 4.67 percent of GDP in 2008, and has continued to grow strongly despite the recent economic slowdown. The GoA s Strategic Plan for Territorial Development sets out the two main objectives for its investment agenda: (i) consolidating market forces for the country s inclusion in the global economy and (ii) mitigating isolation asymmetries in the development of disadvantaged regions and communities to ensure a more equitable and sustainable growth for the country, particularly by bridging infrastructure deficits in poorer provinces. The infrastructure investment program is key to overcoming potential bottlenecks to competitiveness and an essential means of tackling endemic poverty and regional inequalities as well as enhancing living standards in different regions of Argentina. 4. The Norte Grande region epitomizes the marginalization, underdevelopment and extreme poverty enduring in parts of Argentina notwithstanding the economic recovery. The region includes the nine provinces of Catamarca, Chaco, Corrientes, Formosa, Jujuy, Misiones, Tucumán, Salta and Santiago del Estero. Although it covers one-third of the national territory and comprises about 7.5 million people, representing 21 percent of the population, it produces only 10 percent of the GDP and 8 percent of the country s total exports. In contrast to declining national poverty levels, poverty stands at 48 percent of the population (3.6 million people), with 24.6 percent (1.85 million people) living in extreme poverty. According to the latest Bank Provincial Development Index, which compiles measures of poverty and deficits in social and basic infrastructure services for all twenty-four provinces in Argentina, eight of the nine Norte Grande provinces occupy the bottom eight spots. Moreover, illiteracy (at 5.4 percent) is more than double the national average, the infant mortality rate (at 16.2 per 1000 live births) is above the national average of 13.3 per 1000, and the proportion of homes with Basic Unsatisfied Needs Argentina del Bicentenario: Plan Estratégico Territorial. 2

3 (Necesidades Básicas Insatisfechas, NBI3) is 18.6 percent compared to the national average of 14.3 percent. II. Sectoral and Institutional Context 5. The financing of infrastructure investment in Norte Grande is an essential building block for sustained economic growth and reduced inequality in the most marginalized and impoverished region of Argentina. The GoA has requested Bank support to the ongoing Development Program for the Norte Grande Provinces, which has thus far been financed by the Inter-American Development Bank (IADB) through a US$2.5 billion loan (with US$500 million in counterpart financing) covering the energy, transport, water and competitiveness sectors. The overall objective of this Program has been to contribute to the sustainable economic development of the Norte Grande provinces and to raise living standards of the local population by promoting increased productive activities and social well-being. This Program is part of the federal Government s efforts to correct historical imbalances among regions, including infrastructure works to stimulate and integrate production in these provinces, with a view to narrowing the social and economic divide between this region and the rest of the country. The development rationale for the project is supported by recent research by Calderon and Serven (2004) who underline the importance of infrastructure development for inclusive growth Of the US$ 8.6 billion spent on infrastructure in 2009, the road sector constituted about one-quarter (equivalent to 0.7 percent of GDP). In the road sector, executed and planned works include: construction of highways (autopistas), rehabilitation of the national road network, upgrading of gravel roads to paved standard, road safety works, and the paving and rehabilitation of provincial and municipal roads plus maintenance works on the paved road network. 7. In order to increase its infrastructure endowment and to ensure the sustainability of an efficient transportation network. It is therefore critical to strengthen the competitiveness of the regional economy by focusing on the following: - Road quality enhancement: The Norte Grande region lags behind other regions of Argentina by far in terms of paved road km/1000 inhabitants for both the national roads 1.32 km/ 1000 inhabitants for Norte Grande versus 2.42 km/1000 inhabitants for the other regions (excluding Norte Grande provinces), and provincial roads (1.15 km/ 1000 inhabitants for Norte Grande versus 2.36 km/1000 inhabitants for the other regions). While almost 90 percent of the national road network is paved, the provincial road type statistics are not as positive with only about 20 percent of the provincial network paved, and surface condition faring much worse than the national average in most of the Norte Grande provinces (See Annex VI and Table A7-5 for more detail). These statistics reflect the extent to which investments in improvement and expansions in road infrastructure 3 The NBI is a method of measuring poverty which uses indicators related to people s basic needs, namely shelter, sanitation, education, and minimum income. 4 In a panel study of 100 countries, these authors shows that increased availability and quality of infrastructure can lead to both growth acceleration and inequality reduction. Calderon, C; Serven, L. (2004): The Effects of Infrastructure Development on Growth and Income Distribution. World Bank Working Paper

4 have bypassed this region. Considerable resources are needed to improve and expand the road network in these provinces and reduce the regional disparity. - Improving access to markets: The Norte Grande region is not only distant from major domestic consumption centers (Buenos Aires, Cordoba and Rosario) but also far from the main export nodes (the ports of Buenos Aires and Rosario). In addition, existing transport networks are of low quality and efficiency (e.g. a lack of good intermodality, and unproductive empty freight transport return journeys on the south-north axis). - Institutional support and enhancement of planning tools: In comparison to other road agencies in Argentina, provincial road agencies in the Norte Grande region lag behind in the quality of their management processes and the efficiency of planning policies. They need to build a culture of sustainability (maintenance as well as road safety, environmental and social management practices) and improve governance, transparency and efficiency. Institutional support in the roads sector, in terms of better planning and prioritization, and establishing road asset management systems is a foundation on which the Project can build for better development outcomes. 8. Enhancing the quality and performance of the provincial road networks in the Norte Grande region, will contribute to improving service delivery, improving regional integration, productivity and competitiveness, and fostering economic growth. The Project is being prepared in parallel with a proposed Norte Grande Water Infrastructure Development Project, and both projects aim to complement the ongoing Development Program for the Norte Grande Provinces. These two projects provide an entry point for further work in this impoverished region. During implementation, close coordination with the Water Project and with the ongoing IADB-financed Norte Grande Road Project operation will be sought, carrying out joint supervision missions and seeking, in particular, full coordination and complementarity of institutional strengthening activities. 9. In line with the Bank s Country Partnership Strategy (CPS)5 and GoA s strategic priorities, the Bank is supporting a large investment lending program to finance other sectors with intervention in this region, including these two proposed Norte Grande Infrastructure Projects, the PROSAP Project (aimed at improving agriculture productivity and basic agricultural support service effectiveness to increase competitiveness and market access of agricultural products), and the PROINDER Project (aimed at increasing productive and organizational capacity in participating poor rural communities). III. Project Development Objectives 10. The development objective of the proposed project is to reduce transport costs for users of provincial roads along selected corridors of the Norte Grande provinces, through the improvement of the quality of those roads and the introduction of improved road asset 5 World Bank (2009), Country Partnership Strategy for the Republic of Argentina , dated May 6, Report No AR discussed by the Executive Directors on June 9,

5 management tools and methods. This objective will contribute to the high level goal of improving the integration and competitiveness of the Norte Grande Region. IV. Project Description 11. The proposed Project cost is estimated to be US$500 million (including physical and price contingencies and taxes and duties applicable), of which US$400 million would be provided by IBRD, and will have two main components: (i) Rehabilitation, Upgrading and Reconstruction of Provincial Roads; and (ii) Institutional Development and Project Management (see Annex II for a detailed project description). 12. Component 1: Rehabilitation, Upgrading and Reconstruction of Provincial Roads (Total amount US$ 465 million, IBRD financing US$ 365 million): This component will finance the implementation of rehabilitation, upgrading and reconstruction of civil works through the realization of Subprojects (such as base reconstruction, resurfacing, paving and/or asphalt concrete overlaying, as the case may be, including associated shoulder, sidewalks, drainage, masonry, signage, lighting and ancillary works plus road safety improvements) of selected roads under the jurisdiction of Participating Provinces in the Norte Grande region. For a road segment to be considered eligible for financing under the project, it must fulfill the following requirements: (i) presentation of a formal request and justification by a Norte Grande Province that focuses on the productive and poverty reduction impacts of the proposed work; (ii) proposed work section must be included in Argentina s Federal Strategic Road Infrastructure Development Plan (EDIVIAR) 6 and intersect with a provincial road or national road of similar or higher level of service; (iii) all technical, legal, institutional, economic, financial, social and environmental viability studies must have been carried out to the satisfaction of the implementing agency and the Bank; and (iv) an accompanying investment plan for the sustainability of the road asset when works are complete must be presented, including a commitment from the Province to guarantee its maintenance as part of the Participation, Transfer and Maintenance Agreement (PTA) between the Federal Government and the beneficiary province. 13. Three provinces have already been identified with eligible works for funding under this component, adding up km, as follows: (a) Province of Chaco: Provincial Road: RP No. 3, Pampa del Indio Villa Río Bermejito (59.45 km); (b) Province of Tucuman: Provincial Road: RP No. 304, Los Gutiérrez Rio Urueña (86.80 km); and (c) Province of Corrientes: Provincial Road: RP No. 94, Santo Tomé Arroyo Chimiray (66.5 km). 6 The EDIVIAR strategy, approved in 2004 by the Federal Road Council, reflects the agreement reached by the provincial and national governments on the conservation, expansion, and improvement of an integrated road network model, in response to the historical shortfall of road infrastructure investment due to scarce public resources and the gradual decrease in specific road funds of previous decades. See: Esquema Director Vial Argentino (EDIVIAR) available at 5

6 14. Additional provincial roads are foreseen to be prepared for presentation by the provinces and to be declared eligible during the loan implementation stage depending on available financing. 15. Component 2: Institutional Development and Project Management (Total amount US$ 35 million, IBRD financing US$ 35 million). This component will finance the following subcomponents: (i) Institutional Development: This subcomponent will finance the provision of support to strengthen the institutional capacity of DPVs, and improve their investment planning and management capabilities through the carrying out of eligible activities that may include, inter alia: (a) the acquisition of road data collection equipment, computers and software, traffic equipment, weights, and related training; (b) building or updating of DPV websites, (c) the setting up of GIS-based transport observatories; (d) preparation of multi-annual road maintenance plans and annual performance reports; (e) preparation of revised design standards documents; (f) technical assistance to review the institutional framework, management and financing of provincial roads, current maintenance practices, and recommendations for their improvement; (g) provision of non-consulting services for data collection; (h) training to provincial staff on social, environmental, and fiduciary aspects of project implementation, and (i) provision of technical assistance to review institutional framework, management and financing of provincial roads, current maintenance practices, and recommendations for improvement. The Project will fund a case-by-case tailor-made strengthening program for each participating DPV to support the preparation and implementation of comprehensive and efficient road management strategies and multi-year road maintenance programs. At a minimum, the goal is that at the end of the Project, 5 provinces have the following: Road Asset Management Systems in place (with road inventory, condition and traffic data collected and entered into the system; as well as the use of economic decision models like HDM-4 and RED); Preparation of strategic multi-annual road investment plans (suggested five years), with yearly updates; and Preparation of road safety plans. (ii) Project Management and Supervision: This subcomponent will finance the provision of support and strengthening of the operational, social and environmental supervision capacities of UCPyPFE and Participating Provinces to carry out its functions and responsibilities under the Project (including Project audits) through, inter alia, the provision of tailored technical assistance and training in the preparation of potential road and institutional strengthening investments, including the preparation of related feasibility studies, project designs, economic impact studies, social and environmental impact assessments, and sector strategic studies. 7 7 This sub-component will finance impact evaluation studies on different types of users of the intervened roads, including specific analysis on impact on indigenous populations and women, adding the opportunity to address specific social impacts and gender issues at later stages of project implementation. 6

7 V. Financing Source: ($m.) Government of Argentina International Bank for Reconstruction and Development Total VI. Implementation 16. Borrower and Implementing Agency: The Borrower is the Argentine Republic and the implementing agency will be the Unit for Coordination of Externally Financed Programs and Projects (UCPyPFE), within the Ministry of Federal Planning, Public Investment, and Services (MPF).8 At present, the UCPyPFE is coordinating several programs financed by multilateral development banks, including the Norte Grande Road Subprogram co-financed by the IADB, and already contains a specialized unit dealing with road projects in the Norte Grande Program. 17. Project Management and Implementation: The UCPyPFE will be in charge of overall project administration and execution. This unit will coordinate and implement all program activities, including the handling of procurements, contracts, and payments to contractors. It will act as necessary to meet the Bank s contractual conditions. Flow of funds will be centralized; there will be no transfers of funds to provinces. Provincial road directorates (DPVs) or supervision firms (in cases where the DPV lacks the capacity or is over-stretched) will be in charge of the day-to-day inspection of works. Details on the relationship between the different parties, and the flow of funds are provided in Annex III. Upon completion, the works will be transferred to the respective province for maintenance and management under transfer and donation arrangements included in the PTA between the national Government and the respective province. The PTA will delimit jurisdictional responsibilities with respect to the provincial road under intervention between the UCPyPFE and the participating province. 18. The administrative structure of the UCPyPFE will be strengthened in order to meet the incremental needs associated with the administration and execution of program components. The incremental technical, administrative, financial and human resources costs will be borne by the project component. Also, as an effectiveness condition, evidence must be presented that the executing agency and at least one participating province have signed a PTA. The entry into force of the PTA with each participating provinceis a supplemental commitment for program execution. 19. The main responsibilities of the UCPyPFE will be to: (a) Coordinate with Provinces on identifying sub-projects for financing and carry out the necessary appraisals to ensure compliance with eligibility requirements; 8 The UCPyPFE was created by Resolution 165/2000 of the Ministry of Infrastructure and Housing, and its duties and responsibilities were modified by Executive Decree 1,142/

8 (b) Provide guidance and support to Provinces on technical, economic, social and environmental aspects as needed in the preparation and implementation of sub-projects; (c) Coordinate with provinces on the preparation and implementation of the institutional strengthening component; (d) Handle the financial management, procurement and disbursement functions of the Project including keeping Project files and records; (e) Retain auditors acceptable to the Bank to audit the Project accounts; (f) Oversee compliance with Bank Safeguard policies on social and environmental issues; (g) Make official requests for no-objections to the Bank, and liaise with the Borrower on official requests for changes in the Project scope or terms; and (h) Submit semi-annual progress reports detailing progress in achieving project objectives. The format and content of these progress reports will be approved by the Bank. 20. Technical and environmental supervision. DPVs will undertake technical and environmental supervision of works. The UCPyPFE will provide further due-diligence by carrying out site visits to assess project progress, as well as the implementation of the Environmental Management Plan and any social impact mitigation measures that take place during construction. If necessary (due to capacity constraints) consulting services for the supervision of works will be hired before the contracts for the respective works are signed, according to terms agreed upon with the Bank. VII. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Involuntary Resettlement (OP/BP 4.12) Indigenous Peoples (OP/BP 4.10) Forests (OP/BP 4.36) Safety of Dams (OP/BP 4.37) Projects in Disputed Areas (OP/BP 7.60) * Projects on International Waterways (OP/BP 7.50) VIII. Contact point at World Bank and Borrower World Bank Contact: Veronica Raffo Title: Infrastructure Specialist Tel: (54-11) * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas 8

9 Borrower/Client/Recipient Contact: Pablo Abal Medina Title: Coordinador Unidad de Coordinacion de Programas y Proyectos con Financiamiento Externo, Ministry of Federal Planning, Public Investment, and Services Tel: (54-11) Implementing Agencies Contact: Victor Hugo Alonso, Gustavo Barcos Title: Unidad de Coordinacion de Programas y Proyectos con Financiamiento Externo Tel: (54-11) I. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web: 9

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name Norte

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC849 Project Name Lombok

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2164 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2164 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2164 Project Name AR Santa

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195 (The report # is automatically generated by IDU and should not be changed) Project Name Tonga Aviation Infrastructure Investment Project

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

MERCOSUR. r e p o r t. EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester

MERCOSUR. r e p o r t. EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester 16 MERCOSUR r e p o r t EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester Integration & Trade Sector Institute for the Integration of Latin America and the Caribbean MERCOSUR Report N 16 Executive

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC2258 Project Name Djibouti

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

LATIN AMERICA AND CARIBBEAN. Investment Project Financing P Ministerio de Economia y Finanzas - MEF

LATIN AMERICA AND CARIBBEAN. Investment Project Financing P Ministerio de Economia y Finanzas - MEF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2550 Project Name

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

The Value of Investing in Local Economic Development and Sustainable Tourism

The Value of Investing in Local Economic Development and Sustainable Tourism The Value of Investing in Local Economic Development and Sustainable Tourism Ji You Urban Specialist Sustainable Development Department The World Bank August 1, 2013 Dunhuang, China The World Bank Group

More information

International economic context and regional impact

International economic context and regional impact Contents I. GDP growth trends in Latin America and the Caribbean in 2012 II. Regional performance in 2012: Inflation, employment and wages External sector Policies: Fiscal and Monetary III. Conclusions

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection

More information

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach URBAN DEVELOPMENT Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach Urban Week,January 31, 2011 Chantal Reliquet, Sr. Urban Specialist 1 World Bank Lending in Historic City Regeneration

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: The Republic of Peru Project: Amazonas Rural Development Project Loan Agreement: January 9, 213 Loan Amount:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Caribbean: Outlook and Challenges

Caribbean: Outlook and Challenges Caribbean: Outlook and Challenges Nicole Laframboise International Monetary Fund Views expressed are those of the speaker alone and should not be reported as representing the official position of the International

More information

Latin America: Outlook and Challenges Alejandro Werner Director Western Hemisphere Department

Latin America: Outlook and Challenges Alejandro Werner Director Western Hemisphere Department International Monetary Fund Washington, DC. May, 3 Latin America: Outlook and Challenges Alejandro Werner Director Western Hemisphere Department Developments and Outlook Policy Challenges and Priorities

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF.

LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF. LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF. MANAGEMENT DISCUSSION INDUSTRY REVIEW Civil Aviation Industry in

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES SECTION 1 - CONTACT AND BACKGROUND INFORMATION 1.1 Contact Information Name of the Authority : Ghana Civil Aviation Authority Point of Contact

More information

Tourism and the G20. Ian Goldin Director, James Martin 21 st Century School Professorial Fellow, Balliol College University of Oxford

Tourism and the G20. Ian Goldin Director, James Martin 21 st Century School Professorial Fellow, Balliol College University of Oxford Tourism and the G20 G20 Travel and Tourism Summit 24 th February 2010 Ian Goldin Director, James Martin 21 st Century School Professorial Fellow, Balliol College University of Oxford Presentation Outline

More information

Concept Note. And Call for Papers

Concept Note. And Call for Papers Concept Note And Call for Papers SWAZILAND ECONOMIC CONFERENCE 2017 Economic Recovery and Sustainable Growth in Swaziland Mbabane, Swaziland, October 25 27, 2017 The Swaziland Economic Policy Analysis

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR 2014 2015 Trade Centre Limited Business Plan 2014 2015 Table of Contents Message from the CEO and the Chair... Mission... Planning Context... Strategic

More information

ARGENTINA: A Strategic Investment and Business Destination

ARGENTINA: A Strategic Investment and Business Destination ARGENTINA: A Strategic Investment and Business Destination Undersecretariat for Investment Development and Trade Promotion Secretariat of International Economic Relations Ministry of Foreign Affairs and

More information

Latin America Logistics Overview. Brazil, Argentina and Chile

Latin America Logistics Overview. Brazil, Argentina and Chile Latin America Logistics Overview Brazil, Argentina and Chile Brazil Country Overview Brazil has the largest and most modern industrial park in Latin America. Brazil's diverse industries range from automobiles,

More information

MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE. Chapter XI: Regional Cooperation Agreement and Competition Policy - the Case of Andean Community

MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE. Chapter XI: Regional Cooperation Agreement and Competition Policy - the Case of Andean Community UNCTAD/DITC/TNCD/2004/7 UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Geneva MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE Chapter XI: Regional Cooperation Agreement and Competition Policy -

More information

Alianza del Pacífico. October, Germán Ríos May 2012

Alianza del Pacífico. October, Germán Ríos May 2012 Alianza del Pacífico October, 2011 Germán Ríos May 2012 Table of Contents The integration process in Latin America The future is Asia Latin America and Alianza del Pacífico The integration process in Latin

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Net Income of US$6.2 Million and EPS of US$0.14 for the Third Quarter of 2015 Excluding special items, adjusted net income came in at $37.4 million, or EPS of $0.85 per share Panama

More information

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income

More information

Session III: Closing the gap Placing tourism within the wider urban agenda

Session III: Closing the gap Placing tourism within the wider urban agenda UNWTO Mayors Forum for Sustainable Urban Tourism Cities for all: building cities for citizens and visitors Session III: Closing the gap Placing tourism within the wider urban agenda April 5, 2019 Lisbon,

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA104159

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA104159 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Net Income of US$32.0 Million and EPS of US$0.72 for the Second Quarter of 2012 Excluding special items, adjusted net income came in at $58.6 million, or EPS of $1.32 per share Panama

More information

5th NAMIBIA TOURISM SATELLITE ACCOUNT. Edition

5th NAMIBIA TOURISM SATELLITE ACCOUNT. Edition 5th NAMIBIA TOURISM SATELLITE ACCOUNT Edition PREFACE I am pleased to present to you the 5 th edition of the Tourism Satellite Account (TSA). TSA is an accounting framework and economic statistical tool

More information

Airlines across the world connected a record number of cities this year, with more than 20,000 city pair connections*

Airlines across the world connected a record number of cities this year, with more than 20,000 city pair connections* 1 Airlines across the world connected a record number of cities this year, with more than 20,000 city pair connections*. This is a 1,351 increase over 2016 and a doubling of service since 1996, when there

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Trade Policy Review Body RESTRICTED 1 October 2007 (07-3988) Original: English TRADE POLICY REVIEW Report by SAINT KITTS AND NEVIS Pursuant to the Agreement Establishing the Trade

More information

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Panama City, Panama --- March 7, 2007. Copa Holdings, S.A. (NYSE: CPA), parent company of Copa

More information

AIR CANADA REPORTS THIRD QUARTER RESULTS

AIR CANADA REPORTS THIRD QUARTER RESULTS AIR CANADA REPORTS THIRD QUARTER RESULTS THIRD QUARTER OVERVIEW Operating income of $112 million compared to operating income of $351 million in the third quarter of 2007. Fuel expense increased 49 per

More information

Papua New Guinea Disaster Risk Reduction Framework

Papua New Guinea Disaster Risk Reduction Framework 2018/SOM1/EPWG/014 Agenda Item: 8.2 Papua New Guinea Disaster Risk Reduction Framework Purpose: Information Submitted by: Papua New Guinea 13 th Emergency Preparedness Working Group Meeting Port Moresby,

More information

From: OECD Tourism Trends and Policies Access the complete publication at:

From: OECD Tourism Trends and Policies Access the complete publication at: From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Slovak Republic Please cite this chapter as: OECD (2014), Slovak Republic, in OECD

More information

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION NOVEMBER 2011 - YEAR III MARKETWATCH LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION THE REGION IN PERSPECTIVE LAC in Perspective - 2011 Facts % of the world 595 mi people 9,3 $ 5,8 tri

More information

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa Egyptian Minister of Tourism YEHIA RASHED JULY 21, 2016 International tourism highlights (2015): Introduction: Tourism

More information

Statement on Turks and Caicos Islands' Country Strategy Paper

Statement on Turks and Caicos Islands' Country Strategy Paper AS PREPARED FOR DELIVERY Statement on Turks and Caicos Islands' Country Strategy Paper Dr. Justin Ram Director of Economics Caribbean Development Bank Press Briefing by Turks and Caicos Islands' Minister

More information

Output volume and order backlog at record levels Renewed significant increases in net profit and operating profit Dividend bonus announced

Output volume and order backlog at record levels Renewed significant increases in net profit and operating profit Dividend bonus announced Bilfinger Berger AG Carl-Reiss-Platz 1-5 68165 Mannheim Germany www.bilfingerberger.com Contact: Sascha Bamberger Phone: +49 6 21/4 59-24 55 Fax: +49 6 21/4 59-25 00 E-mail: sbam@bilfinger.de Date: February

More information

DaHar Danube Inland Harbour Development

DaHar Danube Inland Harbour Development The European Union's Southeast Europe programme supporting DaHar Danube Inland Harbour Development DaHar WP 4 A4: Local Action Plan of the Port of Novi Sad Final version: 30 th of December 2013 This project

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT Country Partnership Strategy: Papua New Guinea, 2016 2020 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Inadequate provision of transport

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

Provincial Review 2016: KwaZulu-Natal KwaZulu-Natal

Provincial Review 2016: KwaZulu-Natal KwaZulu-Natal Provincial Review 2016: KwaZulu-Natal KwaZulu-Natal KwaZulu-Natal has a strong role in South Africa s manufacturing and agriculture, and has its largest port and main North-South freight corridor. Its

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Net Income of US$113.1 Million and EPS of US$2.57 for the First Quarter of 2015 Excluding special items, adjusted net income came in at US$106.0 million, or EPS of US$2.41 per share

More information

Contribution from UNCTAD dated: 29 June 2010

Contribution from UNCTAD dated: 29 June 2010 Report of the UN Secretary-General: Necessity of ending the economic, commercial and financial embargo imposed by the United States of America against Cuba (A/65/83) Contribution from UNCTAD dated: 29

More information

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY 1. INTRODUCTION (22 July 2015) 1.1 These administrative

More information

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano Jefatura de Gabinete de Ministros Plan Belgrano Plan Belgrano Strategic Guidelines Plan Belgrano Social, Production and Infrastructure plan to reduce Inequality and promote Economic Growth in Northern

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Financial Results for the Third Quarter of 2016 Excluding special items, adjusted net income came in at $55.3 million, or adjusted EPS of $1.30 per share Panama City, Panama --- November

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Net Income of US$18.6 Million and EPS of US$0.42 for the Second Quarter of 2010 Excluding special items, adjusted net income came in at $26.3 million, or $0.60 per share Panama City,

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:MON 36240 TECHNICAL ASSISTANCE TO MONGOLIA FOR CIVIL AVIATION POLICY DEVELOPMENT October 2002 CURRENCY EQUIVALENTS (as of 14 September 2002) Currency Unit tugrik (Tug) Tug1.00

More information

Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013

Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013 Copa Holdings Reports Net Income of US$113.9 Million for the Fourth Quarter of 2013 Panama City, Panama --- February 12, 2014. Copa Holdings, S.A. (NYSE: CPA), today announced financial results for the

More information

Transport Infrastructure Concessions: Chilean Experience

Transport Infrastructure Concessions: Chilean Experience Critical Success Factors in Large Scale Transport Infrastructure Projects Transport Infrastructure Concessions: Chilean Experience Eduardo Bitran Colodro, Minister of Public Works, Chile March 26th, 2007

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy 08/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 2: Accountability

More information

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES The Canadian Airport Authority ( CAA ) shall be incorporated in a manner consistent with the following principles: 1. Not-for-profit Corporation

More information

Largest Hotel & Tourism Investment Conference in Latin America Returns to Argentina Sept

Largest Hotel & Tourism Investment Conference in Latin America Returns to Argentina Sept Largest Hotel & Tourism Investment Conference in Latin America Returns to Argentina Sept. 13-14 SAHIC Celebrates its 10 th Anniversary by Returning to Buenos Aires, where it held its 1st conference in

More information

INTEGRATION AND TRADE IN THE AMERICAS

INTEGRATION AND TRADE IN THE AMERICAS INTER-AMERICAN DEVELOPMENT BANK Department of Integration and Regional Programs Division of Integration, Trade and Hemispheric Issues Institute for the Integration of Latin America and the Caribbean Statistics

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 5.5.2010 COM(2010)210 final COMMUNICATION FROM THE COMMISSION Developing an EU civil aviation policy towards Brazil COMMUNICATION FROM THE COMMISSION Developing

More information

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES ANSConf-WP/23 4/2/00 ITEM 6 CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES (Montreal, 19-28 June 2000) Agenda Item 6: Guidance and assistance by ICAO ICAO ACTIVITIES IN THE FIELD OF

More information

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS The participants of the International Workshop for CEE Countries Tourism in Mountain Areas and the Convention on Biological Diversity",

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Quarterly Aviation Industry Performance

Quarterly Aviation Industry Performance Quarterly Aviation Industry Performance ALAFCO Aviation Lease and Finance Company K.S.C.P. Quarterly Aviation Industry Performance (March - June 17) Prepared by: Strategic Planning department 1 Quarterly

More information

Community Based Development through Tourism in Bangladesh: Possibilities and Limitations

Community Based Development through Tourism in Bangladesh: Possibilities and Limitations Community Based Development through Tourism in Bangladesh: Possibilities and Limitations Mr. Haque Md. Monzorul Joint Secretary Ministry of Civil Aviation & Tourism Introduction Initiatives have been taken

More information

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

The Civil Aviation Sector as a Driver for Economic Growth in Egypt The Civil Aviation Sector as a Driver for Economic Growth in Egypt EDSCA Conference Cairo, November 10, 2013 Agenda 1. Facts and figures 2. Socio-economic impact of the civil aviation sector 3. Options

More information

Frequently Asked Questions

Frequently Asked Questions CAA Funding Review Why has CAA s funding been reviewed? New Zealand has a well-regarded civil aviation system and a good aviation safety record. However, both the government and a range of reviews (including

More information

BHP Billiton Global Indigenous Peoples Strategy

BHP Billiton Global Indigenous Peoples Strategy BHP Billiton Global Indigenous Peoples Strategy Indigenous Peoples are critical partners and stakeholders in many of BHP Billiton s operations both within Australia and around the world. Many of our operations

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial

More information

CDB Lending Activities

CDB Lending Activities CDB Lending Activities Responding to the Impact of the Global Crisis on Caribbean Economies Ian Durant Country Economist Economics Department July 2011 Structure of Presentation Main Aspects of CDB Borrowing

More information

The results of the National Tourism Development Strategy Assessments

The results of the National Tourism Development Strategy Assessments The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for

More information

COUNTRY CASE STUDIES: OVERVIEW

COUNTRY CASE STUDIES: OVERVIEW APPENDIX C: COUNTRY CASE STUDIES: OVERVIEW The countries selected as cases for this evaluation include some of the Bank Group s oldest (Brazil and India) and largest clients in terms of both territory

More information

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE CONTENTS 1. Preconditions of formation of the Strategy of development of the CCI system...4 2. Conceptual grounds of the Strategy...5 3. Mission,

More information

UBS 14 th Global Emerging Markets Conference. New York, November 2016

UBS 14 th Global Emerging Markets Conference. New York, November 2016 UBS 14 th Global Emerging Markets Conference New York, November 2016 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating

More information

WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 ATConf/6-IP/13 7/3/13 WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key issues and related regulatory framework Agenda Item 2.1 :

More information

POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY

POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY A paper contributed by the ITC Export-led Poverty Reduction Programme Team (EPRP) POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM

More information

ANNEX V. List of Abbreviations

ANNEX V. List of Abbreviations ANNEX V List of Abbreviations SEE R&D EU TEN-T GROSEE FP NUTS LAU ESPON Cohesion SMART SWOT MEGA FUA GDP PUSH PIA TRACC RO BG GR EUROSTAT BBU OTP FYROM EC FMA FOCI ECR2 South East Europe Research and Development

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information