1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2164 Project Name AR Santa Fe Road Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Roads and highways (100%) Project ID P Borrower(s) Ministry of Finance, Province of Santa Fe Implementing Agency Dirección Provincial de Vialidad, Province of Santa Fe Subsecretaría de Proyectos de Inversión y Financiamiento Externo Argentina Tel: (54-342) Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared February 10, 2006 Estimated Date of April 25, 2006 Appraisal Authorization Estimated Date of Board July 29, 2006 Approval 1. Key development issues and rationale for Bank involvement Overview: Argentina s recovery from the deep economic crises of has been impressive. Sparked by increased exports and a gradual increase of consumption, GDP has recovered to the pre-crises level, growing at an average rate of 8.5% between 2003 and The recovery has been pro-poor as incomes of the poor have grown faster during the upturn than the average for the population as a whole. The challenge for Argentina is to build on the strong recovery laying the foundations for sustainable, more equitable shared economic growth. Restoring public investment in a sustainable and efficient path to remove infrastructure bottlenecks fostering productivity and increasing competitiveness are necessary conditions to achieve sustained high rates of economic growth. The Province of Santa Fe within the Argentine context: the Province of Santa Fe (PSA) with an area of 133,007 km2 and a population of 3.2 million accounts for, respectively, 4.8% and 8.9% of Argentina s size and population. The Province favorable location in the Center Region (comprised by Córdoba, Entre Ríos and Santa Fe) along 700 kms of navigable waterways (Hidrovía Paraguay-Paraná) provides the most convenient gateway for Argentina s agricultural exports. Besides, it is in the heart of a land corridor that connects the south of Brazil with ports in the north of Chile. The PSA has enjoyed, since 2003, an average rate of growth of 6.5% and is currently the second largest provincial economy in Argentina. Table 1 compares the evolution of a series of economic indicators in the PSA and Argentina.

2 Table 1: Economic indicators SANTA FE ARGENTINA EXPORTS (million of USD and change between 2004 and 2003) Primary products (wheat, soybean) 930 6, % 6.0% Agroindustrial (soybean oil, sunflower oil, flour) 5,229 11, % 19.7% Industrial 875 9, % 24% Total 7,169 34,550 INDUSTRIAL PRODUCTION (first semester of 2005 vs 2004) Industrial Monthly Estimator 7.4% 7.4% UNEMPLOYMENT Unemployment rate (average of Gran Rosario and Gran Santa Fe) POVERTY Percentage of population under the poverty line 12.5% 13.0% 41.6% 40.2% Source: Sintesis de Coyuntura Económica Provincial, Ministerio de Hacienda y Finanzas, Santa Fe The PSA is making substantial progress toward diversifying its economy with the emergence of industrial clusters (Rafaela being the most cited example) dedicated to the production of auto parts, agricultural machinery and dairy products. However, the primary sector and the agroindustrial exports continue to drive its economy. The PSA accounts for 43% of Argentina s agroindustrial exports and is the largest exporter of soybean oil in the world (47% of world exports in 2004). During the period , agricultural lands increased 70% in the provinces of northern Argentina 1. In the PSA, the expansion of the agricultural frontier has concentrated in the north of the province, which is the poorest and the most difficult to access region. The production of this region needs to get to the export gateways and industrial processing plants located in the southeast of the province. The increased dynamism experienced by local and rural economies in the PSA depends on higher rates of physical mobility and a reliable transport network. The current state of road infrastructure and the extremely inefficient service provided by the railroad Belgrano Cargas causes significant logistics costs reducing the likelihood of future expansions of the agricultural production. All sectors of the economy face serious transport and logistics problems. The competitiveness of the agro-businesses established in the center and north regions is affected by the poor condition of the road corridors to the ports of Gran Rosario and the city of Santa Fe. Given the nature of the productive activities in the PSA, the road network is heavily congested during the harvest 1 Argentina :Agriculture and Rural Development. The World Bank, Even though the PSA is considered a Central Province, for the cited study, Santa Fe is considered a northern province.

3 months and the limited success of intermodal transport is creating social problems 2 for towns located near ports. The pattern of economic development in the PSA resembles the one observed for the whole country. A high share of the population (around 35%) and level of economic activity concentrates in one city (Rosario in the PSA and Buenos Aires in Argentina). Rosario has concentrated the PSA s industrial production since the beginning of the twentieth century. It displaced the city of Santa Fe as the main export gateway when dredging in the Parana River and the size of ships became a barrier to access to ports. The PSA wants to reduce the concentration of economic activity around the city of Rosario and considers alternative road corridors (Road 19 being the most important) and the relocation of the Port of Santa Fe as priorities in its infrastructure plans. In order to address transport and logistics issues, the PSA has been concentrating efforts to design and implement an agenda to increase the efficiency of the road sector. The change started during the 90s, when the national government decided to decentralize expenditures and financing responsibilities to the provinces. The PSA has been gradually transforming its operations within the road sector, transferring the execution of works to private contractors, focusing the capacity of its road agency towards more efficient planning, and the prioritization of investments based on cost-efficient criteria. The conversion of the National Highway 19 in a four lane road is a key component of the PSA s strategic plan to improve the efficiency of the road sector, reduce the concentration of the provincial road network towards the city of Rosario and improve the reliability of a bi-oceanic corridor that links the Center Region with demand centers. Given that National Highway 19 is a key component of a bi-oceanic corridor, improvements in competitiveness will not be restricted to the Province of Santa Fe, having positive effects on economic growth in neighboring provinces as well as in Brazil and Chile who make intensive use of this road to transport their bilateral trade 3. An indication of the importance of National Highway 19 to the PSA is the fact that the road is owned by the federal government but the PSA is still willing to finance the improvement of this road. The PSA will be able to finance, execute and supervise the construction of parallel carriage ways along National Highway 19 based on an agreement ( Convenio ) signed with the federal road agency ( Vialidad Nacional ) which lays out the conditions for the intervention of the PSA. According to said agreement, both parties will sign a complementary agreement specifying how and when the federal government will reimburse the PSA the construction expenses. The sustainability of this investment will remain the responsibility of the existent toll road concessionaire 4 who has the legal obligation to cover the maintenance costs of new roads built 2 Mayors of small towns have complained about the influx of sex workers during the harvest months as trucks usually wait for days before delivering their load to ports. 3 There is another bi-oceanic corridor with a road segments in the PSA and it connects the cities of Villa Maria (Province of Cordoba) with Rosario in the PSA. The Federal Government is currently adding capacity to this road (National Highway 9). Due to lack of project execution capabilities, the Federal Government opted to add capacity only to National Highway 9, relegating capacity expansions in National Highway The current concessionaire, Vial3 S.A, was awarded on October 2003, is a concession that is not under renegotiation, and is expected to expire as originally planned in 2008.

4 within the concession corridor. Tolls for the use of National Highway 19 will be adjusted to maintain the financial and economic equilibrium as defined in the concession contract The current fiscal situation of the PSA marks a stark contrast compared to the period between 1999 and From 2002 the PSA has had growing overall balances (primary surplus minus interest payments) that are estimated to have reached 19.8% of total revenues in 2005 and the total debt stock was reduced 28.8% between 2002 and If the favorable macroeconomic framework and prudent fiscal management continues in the next few years, the projections indicate there is sufficient fiscal space to accommodate the PSA s road improvement program. The budget of the PSA s road department reached a peak of US$ 78 million in 1998, fell to a minimum of US$ 2 million in 2002 when all construction and maintenance activities were halted and recovered to US$ 79 million in The overall and specific objectives of this operation are in line with the Country Assistance Strategy (CAS) to be discussed by the Board in April 2006, which contemplates the improvement of infrastructure assets as key to sustained economic growth and reduction of the incidence of poverty. By enhancing the quality and performance of provincial road corridors and networks, transport costs are expected to be substantially reduced thus contributing to foster regional productivity and competitiveness. In addition to the long term impact of infrastructure on growth, they are of particular relevance at this time for Santa Fe and the Center Region, given the favorable terms of trade of Argentine commodities and the emergence of productive clusters. This project fits adequately in the Bank s road strategy in Argentina. The Bank is implementing an integrated vision, working both at the federal and provincial levels, helping Argentina increase the availability and reliability of road assets. By working with the federal and provincial governments, it is possible to improve the major roads as well as feeder roads having a network based approach. The Bank s road strategy goes far beyond the financing of road assets. It pays particular attention to the following areas: (i) sustainability and quality of expenditures: to place infrastructure investments within a broader fiscal framework in an attempt to ensure that investment and maintenance expenditures do not suffer the stop-and-go pattern that has often characterized them in the past, and that they are consistent with broader fiscal and debt management policy (ii) performance based programs: relying on CREMAs to improve the efficient delivery of road services, (iii) incentives to avoid excessive prices: working with government agencies to improve the design of bidding documents; and (iv) road safety: an area that needs urgent improvements and has not been yet prioritized by the national and provincial road agencies. The most recent road investment loan approved by the Bank (7301AR) includes a component to finance the rehabilitation of roads in the PSA through CREMA schemes. The roads to be improved cover, for the most part, the northern region of the PSA and are connected to the National Highway 19. Thus, both projects complement each other and seek to implement a strategy to build an efficient road network in the PSA. Building on the experience obtained in other Bank projects that addressed institutional problems in provincial road agencies, and at the request of the PSA, the proposed project will include an 5 Source: Ministerio de Hacienda, Province of Santa Fe.

5 institutional component aimed at increasing the road agency s capacity to design and implement a road safety program. Despite its relevance 6, road safety has not attracted enough attention and resources both at the national and provincial levels. In the context of this project, the National Highway 19 will be taken as a pilot but a comprehensive program that includes minor works in hot spots, public awareness campaigns, inclusion of road safety activities in schools and training of public servants will be developed. Considering the institutional capabilities beyond the road sector, the PSA wants to improve its capacity to develop a strategic plan to foster economic growth in lagged regions, having a more balanced growth across regions in the province. Even though an improved road network will be a key component to reach lagged regions, open new markets and improve competitiveness, there is a need to have a clear vision and conduct a planning exercise to identify needs and the most efficient policies to overcome those needs. 2. Proposed objective(s) The proposed project aims at fostering the Province of Santa Fe competitiveness and economic growth through increasing the availability of road assets. Adding capacity to a key component of a major bi-oceanic corridor that links the Province of Santa Fe and the Center Region with Chile and Brazil will reduce logistics costs, facilitate access to major regional consumption and export markets, create new business opportunities and foster the effective economic integration of the Center Region provinces. The project also aims at providing institutional support to the Province of Santa Fe to achieve the following specific objectives: (a) improve road safety by implementing a comprehensive action plan, (b) reinforce the Province s planning capacity to foster economic growth in lagged regions; and (d) set up a system to measure logistics costs in the Province of Santa Fe and design benchmarks to identify infrastructure and trade facilitation constraints 3. Preliminary description To meet the proposed Development Objectives two main components were preliminarily identified based on a proposed Loan amount of US$126.7 million and a maximum financing percentage of 75%: Component 1 Construction of a parallel carriage way along the National Highway 19 in the Province of Santa Fe, converting it into a four lane road, with two lanes in each direction. (Estimated cost US$159 million of which US$116.7 million would be financed by the Bank Loan). A total of km will be constructed, linking the towns of Santo Tomé in Santa Fe with San Francisco in the Province of Córdoba. The existing carriage way will be used for West- East traffic flow while the new lanes will carry East-West traffic. Preliminary designs are being 6 According to the Institute of Road Safety (ISEV), the costs directly associated with road accidents in Argentina represented 1.75% of the GDP in 2005.

6 prepared by three engineering consulting firms and the Government of the Province of Santa Fe is coordinating the work with the environmental and social experts to make sure Bank safeguards are enforced. Component 2 Institutional Strengthening (Estimated cost US$10 million). In line with the objective to increase the availability of road assets to create an efficient road network capable of effectively accompany a process of economic growth, this component will support the following institutional building program: (i) Increase the capacity within the Provincial Road Agency to design and implement a road safety program. Argentina is one of the countries with the highest incidence of fatal road accidents. Despite this fact, provincial road agencies do not have adequate plans to improve road safety and Santa Fe is no exception. The objective is to help the road agency to implement a comprehensive road safety program in the PSA. In the context of this project, National Highway 19 will be taken as a pilot but a comprehensive program that may nclude minor works in hot spots, public campaigns, inclusion of road safety activities in schools and training of public servants will be developed. (ii) Reinforce the planning capacity of the PSA to elaborate a new strategic development plan to foster growth in lagged regions of the province. The PSA has enjoyed high rates of growth in the last three years, but growth has been uneven across regions. With the objective of having a more balanced growth, the province has requested guidance to elaborate a new strategic development plan. The first step of this plan would be to define a vision for the PSA followed by an assessment of the infrastructure demand needs derived from the strategic vision, matching them with the existing supply and measuring the gaps or infrastructure bottlenecks. The second step would be to make a portfolio of projects, coordinate its prioritization with the relevant levels of government (national, municipal) and provide a menu of possible financing options. (iii) Systemic measurement of logistics costs in the PSA. The PSA has significant competitive advantages in production of agroindustrial products. However, in order to gain new export markets, in particular for high value added products, the PSA needs to reduce its logistics costs. All available logistics cost estimates are aggregated at the country level which makes it difficult for provincial governments to assess their relative position through benchmarks. A series of studies will be conducted to: measure logistics costs in the PSA (ideally to be extended to the Center Region through agreements with Córdoba and Entre Ríos) through firm-level surveys. The surveys will allow the identification of infrastructure bottlenecks or trade facilitation practices that hinder the optimization of logistics costs and will provide valuable inputs for the identification of investment policies and regulations with high economic impacts. Social and Environmental Management & World Bank safeguards: Based on a screening exercise carried out by the project team, safeguard issues have been preliminarily identified. The project is proposed to be Category B for environmental purposes. The project is located in a highly intervened area with little or nonexistent natural habitats or native vegetation. Most impacts will be localized and associated with the current and future right-of-way. Most areas on both sides of

7 the existing road are under intensive agricultural production (soy, corn, cattle ranching). As most of the current and future traffic consists of long distance, international trucks, induced development issues are expected to be minimal. Social issues will be associated manly with (i) resettlement of some dwellings, small businesses, and rural schools (an initial count has identified the need to relocate three houses, two small road-side businesses and two provincial rural schools); and (ii) the socioeconomic impact of three by-passes which would need social programs in the affected communities. There are no indigenous peoples along the road. In summary, the following safeguards will be triggered: Environmental Assessment, Involuntary Resettlement, and Physical Cultural Property. A stand-alone Environmental Assessment will be prepared to address issues such as road safety, construction management, archaeological survey and chance finding procedures, landscaping measures, and alignment of by-passes. A Social Assessment will be carried out in communities affected by by-passes and an intensive consultation program will be implemented. An environmental manual for road construction is already available, based on the environmental manual prepared at the federal level. The provincial Road Agency has a functioning environmental unit. 4. Safeguard policies that might apply Based on a screening exercise carried out by the project team, safeguard issues have been preliminarily identified. The project is proposed to be Category B for environmental purposes. The project is located in a highly intervened area with little or nonexistent natural habitats or native vegetation. Most impacts will be localized and associated with the current and future right-of-way. Most areas on both sides of the existing road are under intensive agricultural production (soy, corn, cattle ranching). As most of the current and future traffic consists of long distance, international trucks, induced development issues are expected to be minimal. Social issues will be associated manly with (i) resettlement of some dwellings, small businesses, and rural schools (an initial count has identified the need to relocate three houses, two small road-side businesses and two provincial rural schools); and (ii) the socioeconomic impact of three by-passes which would need social programs in the affected communities. There are no indigenous peoples along the road. In summary, the following safeguards will be triggered: Environmental Assessment, Involuntary Resettlement, and Physical Cultural Property. A stand-alone Environmental Assessment will be prepared to address issues such as road safety, construction management, archaeological survey and chance finding procedures, landscaping measures, and alignment of by-passes. A Social Assessment will be carried out in communities affected by by-passes and an intensive consultation program will be implemented. An environmental manual for road construction is already available, based on the environmental manual prepared at the federal level. The provincial Road Agency has a functioning environmental unit.

8 5. Tentative financing Source: ($m.) BORROWER 42.3 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Total Contact point Contact: Tomas S. Serebrisky Title: Infrastructure Economist Tel: (202) Fax: (202)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC849 Project Name Lombok

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name. Norte Grande Transport Infrastructure Development Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5489 Project Name Norte

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection

More information

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION NOVEMBER 2011 - YEAR III MARKETWATCH LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION THE REGION IN PERSPECTIVE LAC in Perspective - 2011 Facts % of the world 595 mi people 9,3 $ 5,8 tri

More information

Latin America Logistics Overview. Brazil, Argentina and Chile

Latin America Logistics Overview. Brazil, Argentina and Chile Latin America Logistics Overview Brazil, Argentina and Chile Brazil Country Overview Brazil has the largest and most modern industrial park in Latin America. Brazil's diverse industries range from automobiles,

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Session III: Closing the gap Placing tourism within the wider urban agenda

Session III: Closing the gap Placing tourism within the wider urban agenda UNWTO Mayors Forum for Sustainable Urban Tourism Cities for all: building cities for citizens and visitors Session III: Closing the gap Placing tourism within the wider urban agenda April 5, 2019 Lisbon,

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

International economic context and regional impact

International economic context and regional impact Contents I. GDP growth trends in Latin America and the Caribbean in 2012 II. Regional performance in 2012: Inflation, employment and wages External sector Policies: Fiscal and Monetary III. Conclusions

More information

Alianza del Pacífico. October, Germán Ríos May 2012

Alianza del Pacífico. October, Germán Ríos May 2012 Alianza del Pacífico October, 2011 Germán Ríos May 2012 Table of Contents The integration process in Latin America The future is Asia Latin America and Alianza del Pacífico The integration process in Latin

More information

Concept Note. And Call for Papers

Concept Note. And Call for Papers Concept Note And Call for Papers SWAZILAND ECONOMIC CONFERENCE 2017 Economic Recovery and Sustainable Growth in Swaziland Mbabane, Swaziland, October 25 27, 2017 The Swaziland Economic Policy Analysis

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

ARGENTINA: A Strategic Investment and Business Destination

ARGENTINA: A Strategic Investment and Business Destination ARGENTINA: A Strategic Investment and Business Destination Undersecretariat for Investment Development and Trade Promotion Secretariat of International Economic Relations Ministry of Foreign Affairs and

More information

LATIN AMERICA AND CARIBBEAN Country

LATIN AMERICA AND CARIBBEAN Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 57839 Argentina

More information

LATIN AMERICA AND CARIBBEAN. Investment Project Financing P Ministerio de Economia y Finanzas - MEF

LATIN AMERICA AND CARIBBEAN. Investment Project Financing P Ministerio de Economia y Finanzas - MEF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2550 Project Name

More information

Preliminary Overview of the Economies of Latin America and the Caribbean

Preliminary Overview of the Economies of Latin America and the Caribbean Inter-American Dialogue Preliminary Overview of the Economies of Latin America and the Caribbean - 2006 José Luis Machinea Executive Secretary Economic Commission for Latin America and the Caribbean Washington

More information

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR 2014 2015 Trade Centre Limited Business Plan 2014 2015 Table of Contents Message from the CEO and the Chair... Mission... Planning Context... Strategic

More information

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala 8.INFRASTRUCTURE #INVESTINGUATEMALA Industry in Guatemala General information of the country Capital City Currency Exchange Rate (2013) Official Language Population Labor Force (2013) GDP (2013) FDI inflows

More information

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5 29 December 2014 BHP Billition Canada Inc. 130 3rd Avenue South Saskatoon SK S7K 1L Canada Tel +1 306 385 8400 www bhpbilliton.com Canada Transportation Act Review Secretariat 350 Albert Street Ottawa

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1412 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1412 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1412 Project Name Paraguay

More information

POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY

POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY A paper contributed by the ITC Export-led Poverty Reduction Programme Team (EPRP) POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

L.F. Wade International Airport Redevelopment

L.F. Wade International Airport Redevelopment L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport Purvis Primary January 27, 2015 History of the L.F. Wade

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Chile. Tourism in the economy. Tourism governance and funding

Chile. Tourism in the economy. Tourism governance and funding Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated

More information

MERCOSUR. r e p o r t. EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester

MERCOSUR. r e p o r t. EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester 16 MERCOSUR r e p o r t EXECUTIVE SUMMARY 2010 Second Semester 2011 First Semester Integration & Trade Sector Institute for the Integration of Latin America and the Caribbean MERCOSUR Report N 16 Executive

More information

Crown Corporation Business Plans. Trade Centre Limited

Crown Corporation Business Plans. Trade Centre Limited Crown Corporation Business Plans Trade Centre Limited Contents Message from the CEO and the Chair... 5 Mandate... 7 Alignment with Government s Priorities... 7 Core Responsibilities... 9 Budget Context...

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC2258 Project Name Djibouti

More information

Economic development in Africa: Tourism for transformative and inclusive growth

Economic development in Africa: Tourism for transformative and inclusive growth United Nations United Nations Conference on Trade and Development Distr.: General 30 June 2017 Original: English TD/B/64/2 Trade and Development Board Sixty-fourth session Geneva, 11 22 September 2017

More information

Safe Skies for Air Navigation over Africa

Safe Skies for Air Navigation over Africa AMCOMET-3 Praia, Cabo Verde, 10 to 14 February 2015 Safe Skies for Air Navigation over Africa Dimitar Ivanov Chief, Aeronautical Meteorology Division, WMO WMO; WDS/AeMP WMO Convention Introduction one

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING MEETING CONCLUSIONS Andean South America Regional Meeting Lima, Peru 5-7 March 2002 1.0 ECOTOURISM PLANNING 1.1 Protected Areas Ecotourism in Protected Areas is part of an integrated vision of tourism

More information

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport History of the L.F. Wade International Airport The airfield

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

From: OECD Tourism Trends and Policies Access the complete publication at: Chile

From: OECD Tourism Trends and Policies Access the complete publication at:   Chile From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Chile Please cite this chapter as: OECD (2014), Chile, in OECD Tourism Trends and

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

5th NAMIBIA TOURISM SATELLITE ACCOUNT. Edition

5th NAMIBIA TOURISM SATELLITE ACCOUNT. Edition 5th NAMIBIA TOURISM SATELLITE ACCOUNT Edition PREFACE I am pleased to present to you the 5 th edition of the Tourism Satellite Account (TSA). TSA is an accounting framework and economic statistical tool

More information

Optimizing the Benefits of Regional Tourism Cooperation

Optimizing the Benefits of Regional Tourism Cooperation Optimizing the Benefits of Regional Tourism Cooperation - good practice & lessons from the Greater Mekong Subregion 5 th UNWTO Asia-Pacific Executive Training Program on Tourism Policy and Strategy Brunei

More information

GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES

GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES GUYANA : PUBLIC POLICIES FOR THE PROMOTION OF EXPORTS AND NATIONAL EXPERIENCES FOR THE INTERNATIONALIZATION OF SMALL AND MEDIUM-SIZED ENTERPRISES PRESENTED BY LEROY ADOLPHUS, MA FOREIGN TRADE OFFICER,

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Getting Rural Youth Ready for Work in Burma. (Myanmar) Project No:

Getting Rural Youth Ready for Work in Burma. (Myanmar) Project No: Final Technical Report Getting Rural Youth Ready for Work in Burma Supported by (Myanmar) Project No: 108265-001 Implemented by Tag International Development Yangon, Myanmar 31 st January 2017 Implemented

More information

Belt and Road Initiative (BRI) in Belarus - assessment from an economic perspective

Belt and Road Initiative (BRI) in Belarus - assessment from an economic perspective Policy Briefing Series [PB/06/2018] Belt and Road Initiative (BRI) in Belarus - assessment from an economic perspective Jörg Radeke, Dmitry Chervyakov Berlin/Minsk, September 2018 Structure 1. Introduction

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195. Tonga Aviation Infrastructure Investment Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6195 (The report # is automatically generated by IDU and should not be changed) Project Name Tonga Aviation Infrastructure Investment Project

More information

ISA AND ITS BUSINESS UNITS

ISA AND ITS BUSINESS UNITS Directly and through its 30 affiliates and subsidiaries, ISA executes important projects in linear infrastructure systems that enhance continental development. For such purpose, its activities are focused

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT Country Partnership Strategy: Papua New Guinea, 2016 2020 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Inadequate provision of transport

More information

Airport Privatization:

Airport Privatization: Airport Privatization: Focus on Concessions Hemant Mistry Director, Global Airport Infrastructure and Fuel Dorian Reece Director, Government and Infrastructure, Deloitte During our AGM in Sydney last year

More information

ASHGABAT, TURKMENISTAN

ASHGABAT, TURKMENISTAN Republic of Zambia MINISTRY OF TRANSPORT AND COMMUNICATIONS STATEMENT BY H.E. BRIAN MUSHIMBA MINISTER OF TRANSOPORT AND COMMUNICATION, REPUBLIC OF ZAMBIA AND GLOBAL CHAIR OF THE GROUP OF LLDCS Delivered

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 ATConf/6-IP/13 7/3/13 WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key issues and related regulatory framework Agenda Item 2.1 :

More information

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE From a landlocked to a land linked Zambia CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE Presented by Ministry of Transport Works Supply and Communications and October 2013 Presented to PUBLIC-PRIVATE DIALOGUE FORUM

More information

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

The Civil Aviation Sector as a Driver for Economic Growth in Egypt The Civil Aviation Sector as a Driver for Economic Growth in Egypt EDSCA Conference Cairo, November 10, 2013 Agenda 1. Facts and figures 2. Socio-economic impact of the civil aviation sector 3. Options

More information

BIOSPHERE LANZAROTE MEMORANDUM POSITIONING AS A SUSTAINABLE TOURISM ENTERPRISE MEMORANDUM FOR LANZAROTE 2017

BIOSPHERE LANZAROTE MEMORANDUM POSITIONING AS A SUSTAINABLE TOURISM ENTERPRISE MEMORANDUM FOR LANZAROTE 2017 MEMORANDUM POSITIONING AS A SUSTAINABLE TOURISM ENTERPRISE MEMORANDUM FOR LANZAROTE 2017 Tourism, characterized for its diversification and constant change, is nowadays one of the most influential industries

More information

Airport Privatization

Airport Privatization Airport Privatization Seventeenth ACI World Annual General Assembly Conference Bijan Vasigh, Ph.D. Professor College of Business Embry-Riddle Aeronautical University Daytona Brach, Fl 32114 bijan@avionconsult.com

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

Investment Highlights

Investment Highlights Third Quarter 2014 Investment Highlights 1 Mexican airport portfolio positioned to take full advantage of global growth. 2 Diversified business model contributing to earnings resilience. 3 Well-defined

More information

SASP Advisory Committee Meeting #2

SASP Advisory Committee Meeting #2 SASP Advisory Committee Meeting #2 MnDOT Office of Aeronautics #FlyMN www.minnesotago.org 1 Agenda Introductions Progress since last meeting Assessment of Prior Efforts Objectives and Strategies Trends

More information

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE CONTENTS 1. Preconditions of formation of the Strategy of development of the CCI system...4 2. Conceptual grounds of the Strategy...5 3. Mission,

More information

Geneva, November 2007

Geneva, November 2007 Meeting on the Trade and Development Implications of Tourism Services for Developing Countries: UNCTAD XII pre-event Geneva, 19-20 November 2007 FDI IN TOURISM AND COMPETITIVENESS IN KENYA by Samuel MWAKUBO

More information

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS The participants of the International Workshop for CEE Countries Tourism in Mountain Areas and the Convention on Biological Diversity",

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE. Chapter XI: Regional Cooperation Agreement and Competition Policy - the Case of Andean Community

MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE. Chapter XI: Regional Cooperation Agreement and Competition Policy - the Case of Andean Community UNCTAD/DITC/TNCD/2004/7 UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Geneva MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE Chapter XI: Regional Cooperation Agreement and Competition Policy -

More information

Notice on the Publication of The Outline for National Tourism and. Leisure ( ) by the General Office of the State Council

Notice on the Publication of The Outline for National Tourism and. Leisure ( ) by the General Office of the State Council Guobanfa (2013) No. 10 Notice on the Publication of The Outline for National Tourism and Leisure (2013-2020) by the General Office of the State Council The people s governments of all provinces, autonomous

More information

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands Leveraging Cultural Heritage for Sustainable Development MIDDLE EAST & NORTH AFRICA Hedi Larbi Sector Manager April 16, 2007 AGENDA MENA Region Economic Context/Challenges Importance of Cultural Heritage

More information

DaHar Danube Inland Harbour Development

DaHar Danube Inland Harbour Development The European Union's Southeast Europe programme supporting DaHar Danube Inland Harbour Development DaHar WP 4 A4: Local Action Plan of the Port of Novi Sad Final version: 30 th of December 2013 This project

More information

DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES

DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES Standing Committee for Economic and Commercial Cooperation of the Organization of Islamic Cooperation (COMCEC) DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES COMCEC COORDINATION

More information

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana THE COMMONWEALTH SECREATARIAT SEEKS APPLICATIONS FOR THE POST OF REGIONAL TRADE ADVISER (RTA) FOR AN ASSIGNMENT WITH THE CARIBBEAN COMMUNITY (CARICOM) SECRETARIAT DATE REQUIRED: December 2014 REPORTING

More information

DIRECT PUBLIC INVESTMENT

DIRECT PUBLIC INVESTMENT DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Public Transport funding in a crisis: A National Treasury perspective

Public Transport funding in a crisis: A National Treasury perspective Public Transport funding in a crisis: A National Treasury perspective Presented by: Marissa Moore: Chief Director, Urban Development and Infrastructure Public Finance 28 February 2013 Overview Public transport

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

Re: Response to Article Titled The Big Gamble

Re: Response to Article Titled The Big Gamble A DIVISION OF MACRANALD ENTERPRISES INCORPORATED 2070 Old Burwash Road, Sudbury, ON P3E 4Z4 Tel (705) 522-1430 Fax (705) 522-9242 Racetrack Site: Tel (705) 855-9001 Fax (705) 855-5434 Race Secretary: (705)

More information

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs) Airport Economics presented by Eileen Poh Assistant Director (ICAO Affairs) 1 Outline Regulated and non-regulated Revenues Price Cap-Regulation: Single or Dual Till Financial State of Airports Airports

More information

Nature Conservation and Developing Sustainable tourism in Myanmar

Nature Conservation and Developing Sustainable tourism in Myanmar Nature Conservation and Developing Sustainable tourism in Myanmar Myanmar Tourism O Tourism in Myanmar has boomed in recent years, with the industry generating nearly $1.8 billion in revenue in 2014 as

More information

COLOMBIA: STRATEGIC PARTNER FOR OUTSOURCING. Luis Carlos Villegas President National Business Association of Colombia MAY 2011

COLOMBIA: STRATEGIC PARTNER FOR OUTSOURCING. Luis Carlos Villegas President National Business Association of Colombia MAY 2011 COLOMBIA: STRATEGIC PARTNER FOR OUTSOURCING Luis Carlos Villegas President National Business Association of Colombia MAY 2011 1. Colombia: A country building its future 2. The Latin American context 3.

More information

The Latin America & Caribbean Market!

The Latin America & Caribbean Market! Light up the path to The Latin America & Caribbean Market! 6-8 July, 2016 ATLAPA Convention Center, Panama www.inter-lumi.com Interlumi Panama, organized by America Expo Group, as a new member of the global

More information

STRATEGIC CHOICES. Building upon the issues and lessons mentioned above, the following strategic choices were made:

STRATEGIC CHOICES. Building upon the issues and lessons mentioned above, the following strategic choices were made: Copan Valley Regional Sustainable Tourism and Cultural Heritage Project: An Innovative Approach to Poverty Reduction and Local Development from Central America CONTEXT. Honduras possesses exceptional cultural

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Prospects for international tourism

Prospects for international tourism Prospects for international tourism Project LINK UN DESA Expert Group Meeting on the World Economy, NYC, USA 24-26 October 211 John G.C. Kester Programme Manager, Tourism Trends and Marketing Strategies

More information

MEDIUM SIZE STADIUM STRATEGY

MEDIUM SIZE STADIUM STRATEGY MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy 08/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 2: Accountability

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Tulsa Airports Improvement Trust Strategic Plan Update

Tulsa Airports Improvement Trust Strategic Plan Update Tulsa Airports Improvement Trust Strategic Plan Update 2016-2026 TABLE OF CONTENTS I. Background II. III. IV. Existing Conditions and Future Requirements Mission, Vision, & Goals Strengths, Weakness, Opportunities

More information

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa Egyptian Minister of Tourism YEHIA RASHED JULY 21, 2016 International tourism highlights (2015): Introduction: Tourism

More information

Why Colombia Investment Environment & Business Opportunities

Why Colombia Investment Environment & Business Opportunities Why Colombia Investment Environment & Business Opportunities Tobias Meurer Mai 2017 Table of Content 1. Recent Macroeconomic Developments 2. Investment Environment 3. Export Platform 4. Wood processing

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information