Urban Transport in Metropolitan Areas (P095485)

Size: px
Start display at page:

Download "Urban Transport in Metropolitan Areas (P095485)"

Transcription

1 Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies: Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:20-Oct-2009 Planned Mid Term Review Date:04-Nov-2013 Original Closing Date:29-Feb-2016 Project Development Objectives Effectiveness Date:26-Nov-2010 Actual Mid-Term Review Date:16-Dec-2013 Revised Closing Date:31-Jan-2017 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The overall development objective of the program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The project (APL1) development objectives contribute to the overall program development objective by: (i) supporting the design and creation of a multijurisdictional Metropolitan Transport Agency for the Buenos Aires Metropolitan Area (AMBA); (ii) strengthening the institutional capacity of the transport authorities in decision making, planning, priority setting, and resource allocation in urban transport; (iii) improving the quality and performance of urban transport infrastructure and/orservices in medium size Metropolitan Areas; and (iv) improving the physical integration and access to public transport networks in the Buenos Aires Metropolitan Area. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Public Disclosure Authorized Components Name Creation of the MTA:(Cost $17.61 M) Urban Transport Improvements in Medium Size Metropolitan Areas:(Cost $24.46 M) Public Transport Access and Modal Integration in AMBA:(Cost $99.28 M) Sectoral Training:(Cost $2.50 M) Project Management:(Cost $5.77 M) Overall Ratings Name Previous Rating Current Rating 5/9/2016 Page 1 of 12

2 Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The loan has been effective since November 2010 and has disbursed USD67 million or 47% as of April The project was restructured in August The level 2 restructuring of the project resulted in: (i) a reallocation of funds within the components to allow the execution of selected high priority investments for urban transport in the metropolitan areas; (ii) a formal transfer of the implementing unit to the Ministry of the Interior and Transport; (iii) modification of the key indicators for the Project; and (iv) modification of certain Project activities. The restructured project is now focused primarily on three public transport investments under preparation: a BRT project in greater Buenos Aires with proposed works in the municipalities of La Matanza and the city of Buenos Aires; segregated lanes projects in the municipalities of Santa Fe and Rosario. The project is also financing technical assistance to strengthen planning and data platforms for urban mobility planning and management in medium-sized Argentine cities. The project is expected to achieve its development objectives. No key issues to raise. 5/9/2016 Page 2 of 12

3 5/9/2016 Page 3 of 12

4 5/9/2016 Page 4 of 12

5 5/9/2016 Page 5 of 12

6 Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Moderate Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- Moderate Substantial Institutional Capacity for Implementation and Sustainability -- Substantial Moderate Fiduciary -- Substantial Substantial Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other Overall -- Substantial Substantial Results Project Development Objective Indicators PHINDPDOTBL Existence of a legal agreement for creating the AMT, signed inter-jurisdictionally. (Yes/No, Custom) Value N Y Y Y Date 20-Oct Sep Mar Jan-2017 In August 2014 the Ministry of Interior and Transportation, approved the tripartite agreement between the National Government, the Province of Buenos Aires and the Autonomous City of Buenos Aires, which was originally signed on October 2012, creating the Metropolitan Transportation Agency (MTA). 5/9/2016 Page 6 of 12

7 PHINDPDOTBL Produce transport planning instruments based on systematic data collection such as: Urban Transport Planning Model, Transportation Master Plan, and/or Urban Transport Center or Observatory. (Number, Custom) Value Date 20-Oct Sep Mar Jan-2017 The full four step urban transport planning model for the AMBA was finalzied by LOGIT. The technical assistance projects to create a Urban Mobility Plan in La Rioja has finalized; and the Integral Mobility Plan for the metropolitan area of Salta is is underway, and expected to finish in 3 months. PHINDPDOTBL Existence of a portfolio of projects with feasibility studies or detailed designs for the implementation of projects in Metropolitan Areas of Argentina. (Number, Custom) Value Date 20-Oct Sep Mar Jan-2017 Among the Transport Projects that have been prepared are: 1. Rosario: Segregated Bus Lane - North Corridor 2. Santa Fe: Segregated Bus Lane - Av. Bias Parera 3. Salta: Bicycle Segregated Lanes 4. Tucuman: Bicycle Segregated Lanes 5. AMBA: RN3 corridor BRT R3 Juan Manuel de Rosas 6. Corrientes--Segregated Lanes to be completed. The detail design proyect for the first phase of the Urbann Trnsport Integrated System for the city of Corrientes is under progress. PHINDPDOTBL Segregated corridor constructed in Argentina s medium size Metropolitan Areas that provides a 10% reduction in generalized cost of travel. (Percentage, Custom) Value Date 20-Oct Sep Mar Jan-2017 The civil works for construction of segregated bus lanes in Santa Fe (5.7km & US$13 million) and Rosario (2.5km & US$4.5 million) are under construction. Since last supervision mission, significant progress can be reported. The civil work in Rosario has a progress of 76% and is expected to be completed by mid-year; the one in Santa Fe has a progress of 40% and is expetected to be finished by the end of the 5/9/2016 Page 7 of 12

8 PHINDIRITBL year. Progress on these infrastructure investments will lead to attainment of this results indicator. PHINDPDOTBL Improved mobility in the RN3 corridor BRT R3 Juan Manuel de Rosas which provides at least a 10% reduction in generalized cost of travel. (Percentage, Custom) Value Date 20-Oct Aug Mar Feb-2017 On October 21, 2015, the contract was signed for the construction of a BRT system of 14 Km in the Municipality of La Matanza. The works started on January 4, 2016, and the proyect is currently under construction, with a 6% progress by April The completion of the BRT will lead to attainment of this results indicator. Overall Intermediate Results Indicators Evidence of AMT performance, such as: creating a project with inter-jurisdictional participation and/or inter-jurisdictional agreements on specific transport issues. (Yes/No, Custom) Value N Y Y Y Date 20-Oct Sep Apr Jan-2017 The Bus Rapid Transit system connecting the Municpality of La Matanza and the dowtown of the City of Buenos Aires will be the first multijurisdictional transport project in the Metropolitan Area of Buenos Aires (AMBA). The implentation of this project under the new political alignment between the National Government, the Province of Buenos Aires and the City of Buenos Aires is expected to strengthen the metropolitan governance agenda. 5/9/2016 Page 8 of 12

9 PHINDIRITBL PHINDIRITBL PHINDIRITBL Existence of a valid statute for the internal organization of the AMT and appointed representatives for each jurisdiction. (Yes/No, Custom) Value N Y Y Y Date 20-Oct Sep Apr Jan-2017 The decree to create the AMT was approved by the city of Buenos Aires (Decree No. 513 of October 23, 2012) and the Province of Buenos Aires (Decree No. 490 of July 26, 2013) and the State (Decree 1359 of August 14, 2014). Each jurisdiction appointed a representative to constitute the board of directors of the Agency. Number of minutes of the AMT meetings per year. (Number, Custom) Value Date 20-Oct Sep Apr Jan-2017 It was recently infromed that the number of meetings held since the cretation of the AMT in 2012 were fifteen; including two of them wich took place during the last year. Number of Metropolitan Areas with updated OD Home Mobility Surveys. (Number, Custom) Value Date 20-Oct Sep Apr Jan-2017 The Household Mobility Survey have been updated, processed and published for: Resistencia-Corrientes 2013 Neuquén-Cipolletti 2012 Santa Fe y Paraná 2012 Salta Metropolitan Area 2012 Tucumán Metropolitan Area 2011** Mendoza Metropolitan Area 2010** Posadas Metropolitan Area 2010** Buenos Aires Metropolitan Area ** **These surveys were started with financing from PTUBA 5/9/2016 Page 9 of 12

10 PHINDIRITBL PHINDIRITBL Kilometers of segregated bus lanes constructed in Metropolitan Areas of Argentina. (Kilometers, Custom) Value Date 20-Oct Sep Apr Jan-2017 The construction of segregated bus lanes in Santa Fe (2.3kmprogress) and Rosario (1.9km progress ) are currently under construction. The civil work in Rosario is expected to be completed by mid-year and the one in Santa Fe to be finished by the end of the year. Kilometers of segregated bus lanes constructed in the AMBA. (Kilometers, Custom) Value Date 20-Oct Sep Apr Jan-2017 On October 21, 2015, the contract was signed for the construction of a BRT system of 14 Km in the Municipality of La Matanza. The works started on January 4, 2016, and the proyect is currently under construction w 0.6km constructed. The completion of the BRT will lead to attainment of this results indicator. 5/9/2016 Page 10 of 12

11 PHINDIRITBL PHINDIRITBL Improvement of access conditions in trains stations in AMBA (Percentage, Custom) Value Date 20-Oct Sep Sep Jan-2017 Post-graduate course in urban transport is approved and created by Buenos Aires University (Yes/No, Custom) Value N Y Y Y Date 20-Oct Sep Sep Jan-2017 The Graduate Studies of a "Maestria de Planification de Transporte Urbano" started with its first cohort of student in March 2014 and continued with the second cohort in The Bank recently granted a NO to finance the third cohort in Overall Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IBRD Effective USD % Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IBRD Effective 20-Oct Aug Nov Feb Jan-2017 Cumulative Disbursements 5/9/2016 Page 11 of 12

12 Restructuring History Level 2 Approved on 19-Aug-2014,Level 2 Approved on 29-Sep-2015 Related Project(s) There are no related projects. 5/9/2016 Page 12 of 12

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)

More information

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Jun-2017 ISR28350 Implementing Agencies:

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA 2016-2019 MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA OVERVIEW 2018 1 2 3 Population: 45 million 8 country on surface 24 provinces 4 55 airports 5 39 millions of passengers

More information

Tourism Sector Development: JICA s Approach

Tourism Sector Development: JICA s Approach Tourism Sector Development: JICA s Approach April 26, 2013 Japan International Cooperation Agency (JICA) JICA s Vision and Mission Mission1 Addressing global agenda Vision Inclusive and Dynamic Development

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE GEF GRANT (TF-96758) Approved by the Board on June 17, 2010 TO THE ITAIPÚ BINACIONAL February

More information

Driving Ridership Strategic Partnerships

Driving Ridership Strategic Partnerships Driving Ridership Strategic Partnerships Feb 29, 2012 Presented by Priya Bhasin-Singh, Strategic Marketing Associate priya.bhasin-singh@edmonton.ca 2012 APTA Marketing & Communications Conference About

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Argentina is returning to the world markets. Leandro Pierbattisti, BA September 25th

Argentina is returning to the world markets. Leandro Pierbattisti, BA September 25th Argentina is returning to the world markets Leandro Pierbattisti, BA September 25th Federation of Country Elevators: some figures The Federation is a second level organization, in charge of carrying out

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

The Value of Investing in Local Economic Development and Sustainable Tourism

The Value of Investing in Local Economic Development and Sustainable Tourism The Value of Investing in Local Economic Development and Sustainable Tourism Ji You Urban Specialist Sustainable Development Department The World Bank August 1, 2013 Dunhuang, China The World Bank Group

More information

2007/08 Full Year Results Investor Briefing

2007/08 Full Year Results Investor Briefing 2007/08 Full Year Results Investor Briefing Highlights of Result Profit before tax up 46% to $1,408 million Up 36% on the reported result Margin improvement $3 billion of Sustainable Future Benefits achieved

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

IATA FUEL EFFICIENCY CAMPAIGN

IATA FUEL EFFICIENCY CAMPAIGN IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track

More information

Review of Airport Noise Issues East Airfield Development Area

Review of Airport Noise Issues East Airfield Development Area Review of Airport Noise Issues East Airfield Development Area Orlando International Airport April 21, 2011 Agenda Review of Meeting Minutes from April 21 When last we met Airport Noise 101 Cyrus Callum

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés Buenos Aires, December 5 th 2014 Bioceanico Aconcagua - Video http://youtu.be/ty2ljemubc4?list=uucj5hpq1jmbzksz7zc35h3q 2 Location CÓRDOBA

More information

Thursday, May 30, :00 to 3:30 PM Eastern Time. Preliminary Program

Thursday, May 30, :00 to 3:30 PM Eastern Time. Preliminary Program Thursday, May 30, 2013 2:00 to 3:30 PM Eastern Time Preliminary Program To register for this webinar go to http://www.planning.org/cm/search/event.htm?eventid=23347 For more information contact us at rleiter9@san.rr.com

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( ) Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African (2017 2020) Activities and Actions AVIATION INFRASTRUCTURE PROGRAMMES/PROJECTS

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC2258 Project Name Djibouti

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Assessing the Impacts of ENSO on South American Agriculture

Assessing the Impacts of ENSO on South American Agriculture Assessing the Impacts of ENSO on South American Agriculture Mark Brusberg United States Department of Agriculture Office of the Chief Economist / Presented to: The International Symposium on Synergistic

More information

Results of Tourism Activity. July, 2017

Results of Tourism Activity. July, 2017 Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister

More information

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015 Statistics of Air, Water, and Land Transport 2014 2013 1 Released Date: August 2015 Table of Contents Introduction... 4 Key Points... 5 1. Air Transport... 6 1.1 Aircraft movements... 6 1.2 Number of passengers...

More information

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011 Activity Report 2011 IIRSA Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011 Areas of Work 2011 Integration Priority Project Agenda Project Portfolio Sectoral Integration Processes

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information

Landing in Latin America & Peering Landscape in Argentina

Landing in Latin America & Peering Landscape in Argentina Landing in Latin America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet

More information

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities

More information

The Effect of an Efficient Public Transport System on Poverty: Lessons for Johannesburg from Bogotá Eugenia Mpofu

The Effect of an Efficient Public Transport System on Poverty: Lessons for Johannesburg from Bogotá Eugenia Mpofu The Effect of an Efficient Public Transport System on Poverty: Lessons for Johannesburg from Bogotá Eugenia Mpofu A research report submitted to the Faculty of Engineering and the Built Environment: University

More information

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists MARKET REPORT Argentina: Low-Cost Airlines - the New Protagonists SEPTEMBER 2018 Low-Cost Airlines: The New Protagonists in Argentina Since its creation, the Argentine air market has been extremely closed,

More information

Sound Transit Operations December 2014 Service Performance Report. Ridership

Sound Transit Operations December 2014 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Dec-13 Dec-14 % YTD-13 YTD-14 % ST Express 1,266,130 1,396,787 10.3% 16,605,299 17,661,976 6.4% Sounder 248,710 285,016 14.6% 3,035,735 3,361,317 10.7% Tacoma Link

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

Scoping Paper Belo Horizonte - Brazil

Scoping Paper Belo Horizonte - Brazil Author: María Rosa Muñoz Barriga (Wuppertal Institute) Editor: Oliver Lah (Wuppertal Institute) Implementing Partners: UN-Habitat Wuppertal Institute Climate Action Implementation Facility UEMI Secretariat

More information

SHAPING A SUSTAINABLE FUTURE

SHAPING A SUSTAINABLE FUTURE SHAPING A SUSTAINABLE FUTURE Full Year Results Year ended 31 March 2017 Analyst and Investor Presentation 8 June 2017 Agenda Introduction Christine Ourmieres-Widener Financial Review Philip de Klerk Performance

More information

Annual Transit Ridership Monitoring Report Fiscal Year

Annual Transit Ridership Monitoring Report Fiscal Year Annual Transit Monitoring Report Fiscal Year 214-15 May 2, 216 Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area Annual Transit Monitoring Report Fiscal Year 214-15

More information

Landing in South America & Peering Landscape in Argentina

Landing in South America & Peering Landscape in Argentina Landing in South America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet

More information

TOURISM PERFORMANCE 2017

TOURISM PERFORMANCE 2017 4 th QUARTER TOURISM PERFORMANCE 2017 TOTAL STAYOVER ARRIVALS 105,658 TOTAL CRUISE ARRIVALS 224,212 TOTAL VISITOR NIGHTS AVERAGE HOTEL OCCUPANCY 935,402 71.7% ECONOMIC IMPACT $142.6 million HOW WAS OUR

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

Clean and Inclusive Cities in Argentina. November Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Clean and Inclusive Cities in Argentina. November Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Clean and Inclusive Cities in Argentina November 2016 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Clean and Inclusive Cities in Argentina

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

From: OECD Tourism Trends and Policies Access the complete publication at: Italy

From: OECD Tourism Trends and Policies Access the complete publication at:   Italy From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Italy Please cite this chapter as: OECD (2014), Italy, in OECD Tourism Trends and

More information

Slum Situation Analysis

Slum Situation Analysis Slum Situation Analysis Components of a slum upgrading programme 1. SLUM SITUATION ANALYSIS 2. REVIEW OF POLICIES AFFECTING SLUM AREAS 3. SLUM UPGRADING AND PREVENTION STRATEGY 4. RESOURCE MOBILISATION

More information

Significant increase in accommodation activity but slightly less than in the previous month

Significant increase in accommodation activity but slightly less than in the previous month Tourism activity February 2015 15 April, 2015 Significant increase in accommodation activity but slightly less than in the previous month Hotel establishments recorded approximately 2.2 million overnight

More information

Analysts and Investors conference call. Q results. 15 May 2013

Analysts and Investors conference call. Q results. 15 May 2013 Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,

More information

CARICOM Single ICT Space Digital Transformation is a Journey

CARICOM Single ICT Space Digital Transformation is a Journey CARICOM Single ICT Space Digital Transformation is a Journey CARICOM ICT Cluster of Agencies The Agenda Ecosystem & Characteristics Req of the Single ICT Space Caribbean Competitiveness Progress Major

More information

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano Jefatura de Gabinete de Ministros The development of the Argentine North across the Plan Belgrano Plan Belgrano Strategic Axes The North is a part of our identity, it gave to us history and culture. The

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands Leveraging Cultural Heritage for Sustainable Development MIDDLE EAST & NORTH AFRICA Hedi Larbi Sector Manager April 16, 2007 AGENDA MENA Region Economic Context/Challenges Importance of Cultural Heritage

More information

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode January 217 Service Performance Report Ridership ST Express Sounder Tacoma Link Link Paratransit Jan-16 Jan-17 % 1,433,7 1,3,33 4.9% 331,27 7,121 98,411 3,633 Total Boardings by Mode 363,6 74,823 1,76,914

More information