1 Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized Key Dates Key Project Dates Board Approval date:11-sep-2007 Planned Mid Term Review Date:31-Oct-2015 Original Closing Date:31-Oct-2012 Project Development Objectives Effectiveness Date:17-Mar-2008 Actual Mid-Term Review Date:-- Revised Closing Date:31-Oct-2015 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The development objective of the project is to increase water service coverage in the cities of Beira, Nampula, Quelimane, and Pemba under the delegated management framework and to establish an institutional and regulatory framework for water supply in smaller cities and towns. Has the Project Development Objective been changed since Board Approval of the Project Objective? Yes Board Approved Revised Project Development Objective (If project is formally restructured) The objectives of the Project are to: (i) increase water service coverage in the cities of Beira, Dondo, Nampula, Quelimane, IlhadeMocambique, Mocimboa da Praia, Pemba, Tete, Chimoio, Gondola, Angoche, Moatize, and Nacala under the delegated managementframework,and (ii) establish an institutional and regulatory framework for water supply in a smaller cities and towns of therecipient's territory. Public Disclosure Authorized Components Name Component A: Investments and continuing support in Beira, Dondo, Nampula, Quelimane, Pemba, Tete, Chimoio, Gondola, Angoche, Moatiz e and Nacala under the responsibility of FIPAG:(Cost $58.00 M) Component B: Capacity Building, Institutional and Operational Support to AMU:(Cost $18.60 M) Component C: Capacity Building, Institutional and Operational Support to CRA:(Cost $3.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Page 1 of 8

2 Overall Risk Rating Low Low Implementation Status and Key Decisions The implementation of the project is progressing satisfactorily. A review of results reported in September, 2015 combined with supervision mission findings from June, 2015 confirm that PDO indicator targets have been reached or exceeded. Fundo de Investimento e Patrimonio do Abastecimento de Agua (FIPAG), Administracao de Infra-estruturas de Agua e Saneamento (AIAS), and Conselho de Regulacao Abastecimento de Agua (CRA) have substantially progressed the implementation of all on-going activities supported by the Additional Financing of the WASIS project and are now preparing for project closure. Component A (Investments and continuing support in 11 cities under the responsibility of FIPAG): Progress in the implementation is highly satisfactory. Through the execution of the planned civil works, FIPAG achieved around 149,725 new connections by September, 2015; more than the results framework end target of 110,000. Also, through the execution of civil works, about 890km of network pipeline has been installed exceeding the intermediate target value of 757km. This component has exceeded the targets established in the original Project design and the updated negotiated targets at restructuring for the second Additional Finance. Component B (Capacity building, institutional, and operational support to AIAS) is progressing satisfactorily. Activities carried out under this component are now substantially complete. The new water supply systems constructed in Ilha da Mozambique and Mocimboa da Praia were commissioned in late 2014 and are now operational. Service contract operators have been appointed under the delegated management framework for small towns - guided by regulatory framework agreements which establish service standards and procedures for tariff reviews. Some 3,577 new connections have been installed and 146 new stand pipes reaching some 62,758 direct beneficiaries. In response to a high demand, AIAS is supporting the operators in the two systems to install a further 900 connections, prior to project closure (31 October, 2015). The institutional aspects of this component are progressing well, and AIAS has established 4 provincial representations and have used the model developed and tested under WASIS to expand delegated operations in small towns through the signing service operating contracts for 18 systems. The Provincial Water and Sanitation Council has also been established in Cabo Delgado and Nampula provinces. Component C (Capacity building, institutional, and operational support to the CRA) of the project is progressing highly satisfactory. This component involves expanding CRA's mandate to cover secondary systems, as established in a Decree (published June 8, 2011) which sets out the scope of CRA's mandate, performance principles, authority for regulation, service standards and enforcement compliance, and penalties for all water and sanitation utilities. The new CRA mandate covers all urban water and sanitation sub-sector. For testing the new system, agreements for Ilha de Mozambique and Mocimboa da Praia were signed allowing CRA to regulate the cities and small towns included in the WASIS program. CRA has established fully functional provincial representation in Nampula (Northern region), Beira (Central region) and Inhambane (Southern region). Local Regulatory Commission' have been established and are operational in Ilha de Mozambique and Mocimboa da Praia. CRA is gradually implementing the Regulatory Framework in the 18 water systems for small towns, contracted out by AIAS with private operators. Page 2 of 8

3 Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Low Low Fiduciary -- Low Low Environment and Social -- Low Low Stakeholders -- Low Low Other Overall -- Low Low Results Project Development Objective Indicators PHINDPDOTBL Number of people in urban areas provided with access to Improved Water Sources under the project (Number, Core) Value Date 03-May Mar Sep Oct-2015 Includes - 149,725 new household connections under Component A, plus 3,577 new household connections and 146 public standpipes installed under Component B. Beneficiaries are estimated at 5.3 persons per household and 300 persons per public standpipe. PHINDPDOTBL Number of Provincial Delegations that have capacity to manage service operator contracts (Number, Custom) Page 3 of 8

4 Value Provincial delegations / representations in four provinces include: Nampula, Cabo Delgado, Zambezia and Inhambane. This exceeds original target of 2 delegations (Nampula and Cabo Delgado) Overall Global Environmental Objective Indicators Overall Intermediate Results Indicators Component A: Kilometers of new water supply network laid and operational (Number, Custom) Value Date 03-May Mar Sep Oct-2015 Component B: AMU (AIAS) has deconcentrated the management of provincial water supply to service operators (Text, Custom) Value AMU did not exist 7 service contracts operational and 10 additional service contracts signed 18 service contracts signed and operational AMU (AIAS) legally established and operational Date 03-May May May Oct-2015 AIAS has deconcentrated the management of provincial water supply to service operators through signing contracts for operations in 18 systems. Including Maputo Province: Namaacha & Moamba, Gaza Province: Mabalane & Praia de Bilene, Sofala Province: Nhamatanda & Caia, Nampula Province: Ilha Moçambique, Nametil, Ribáuè & Malema, Zambezia Province: Mopeia, Alto Molócuè, & Mocuba, Tete Province: Ulónguè & Massinga, Inhambane Province: Massinga, Cabo Delgado Province: Montepuez & Mocímboa da Praia. The new systems for delgated management were successfully tested under the project in two pilot towns, Ilha de Mozambique and Mocimboa da Praia and drawing upon lessons learnt and building upon successful experience, the concepts for decentralized operations and regulation were further scaled up, with support of the project and are being implemented in 18 systems across eight provinces Page 4 of 8

5 extending well beyond the projects end targets. Component B: Number of strategic sanitation plans for small cities and towns completed (Number, Custom) Value Strategic sanitation plans were prepared for Ilha de Mozambique and Mocimboa da Praia Component B: Number of water systems rehabilitated and expanded in target small cities and towns (Number, Custom) Value The water supply systems in Ilha de Mozambique and Mocimboa da Praia were rehabilitated and expanded. The new systems were commissioned and have been in operation, under the delegated management framework, since late Component B: Piped household water connections affected by rehabilitation works undertaken under the project (Number, Custom) Value As reported by AIAS a further 900 connections will be installed by the system opreators in the two small towns, prior to project closure. Page 5 of 8

6 Component B: Improved community water points constructed or rehabilitated under the project (Number, Custom) Value Date 03-May May May To optimise project impacts and expand number of beneficaries, additional public standpipes were installed in peri-urban areas of both Ilhad de Mozambique and Mocimboa da Praia Component A: New Piped household water connections resulting from the project intervention (Number, Custom) Value Date 03-May Mar Sep Oct-2015 This component has exceeded the targets established in the original Project design and the updated negotiated targets at restructuring for the second Additional Finance Component B: Number of water utilities the project is supporting (Number, Custom) Value Includes operators of the systems in Ilha de Mozabique and Mocimboa da Praia - under delegated management framework. Page 6 of 8

7 Component C: Legal decree established for regulation of small cities and towns and CRA's provincial representation operationalized (Number, Custom) Value The project supported the estblishment of Decree 23/2011, of June 8: to strengthen decentralized regulation by allowing three levels of regulations, according to size of the system. This enabled CRA to create regional offices and to develop simplified regulatory arrangements for small private providers. For testing the new system, agreements for Ilha de Mozambique and Mocimboa da Praia were signed allowing CRA to regulate the cities and small towns included in the WASIS program. CRA has also established fully functional provincial representation in Nampula (Northern region), Beira (Central region) and Inhambane (Southern region). Local Regulatory Commission's have been established and are operational in Ilha de Mozambique and Mocimboa da Praia. CRA is gradually implementing the Regulatory Framework in the 18 water systems for small towns, contracted out by AIAS with private operators. Overall Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IDA Effective USD % P IDA Effective USD % P TF Closed USD % P TF Closed USD % Key Dates (by loan) Page 7 of 8

8 Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IDA Effective 11-Sep Sep Mar Oct Oct-2015 P IDA Effective 30-Sep Nov Feb Oct Oct-2015 P TF Closed 21-Sep Sep Mar Oct Oct-2012 P TF Closed 17-Nov Nov Feb Oct Sep-2014 Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) P Additional Financing - Water Services and Institutional Support (WASIS) Project,P Water Services and Institutional Support Project Page 8 of 8

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

MOZAMBIQUE UPDATE ON IMPLEMENTING ARTICLE 5 12th Meeting of States Parties to the Anti-Personnel Mine Ban Convention 1 Results of Activities 2008-2012 The 2007-2008 Baseline reported the existence of 541

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Cost of PEC-Zonal Activities in Mozambique Analysis of contract costs from 2008 up to 2011 Júlia Zita, Arjen Naafs

Cost of PEC-Zonal Activities in Mozambique Analysis of contract costs from 2008 up to 2011 Júlia Zita, Arjen Naafs Briefing Note Moz. D 01 Cost of PEC-Zonal Activities in Mozambique Analysis of contract costs from 2008 up to 2011 Júlia Zita, Arjen Naafs (moz.washcost@gmail.com) WASHCost August, 2011(Translated February

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

EDM RURAL ELECTRIFICATION PLAN

EDM RURAL ELECTRIFICATION PLAN EDM RURAL ELECTRIFICATION PLAN By Marcelino Alberto Executive Board Member mgildo@edm.co.mz EDM, E.P. Mozambique Maputo 16 th November 2011 1 Company Profile: The EDM as a State Company was established

More information

Centro de Promoção de Investimentos (Investment Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies

Centro de Promoção de Investimentos (Investment Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies Centro de Promoção de Investimentos ( Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies January 2015 1. Agriculture/Agri-business/Forestry ( Project) 1.1. Farming and Livestock

More information

Sampling methodology Mozambique

Sampling methodology Mozambique Working Paper Moz-WP1 Sampling methodology Mozambique Using the MICS 1 as base for WASHCost WASHCost team March 2010 Version 1.3 1 Multiple Cluster Indicator Survey 1 WASHCost Mozambique Sampling strategy

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Procurement Plan National PPFD

Procurement Plan National PPFD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan National PPFD I. General 1. Project information: Republic of Mozambique,

More information

Mozambique Political Process Bulletin

Mozambique Political Process Bulletin Cidade de Maputo Maputo Gaza Maputo Matola Manhiça Namaacha Chibuto Mandlakazi David Simango Frelimo Frelimo 661,034 67 Fre 51 8 5 JPC Eduardo Namburete Renamo Renamo UNAMO CEV JPC Arão Nhacale Frelimo

More information

Business and Investment Opportunities in the Industrial Sector

Business and Investment Opportunities in the Industrial Sector REPUBLIC OF MOZAMBIQUE MINISTRY OF INDUSTRY AND TRADE NATIONAL DIRECTORATE OF INDUSTRY Business and Investment Opportunities in the Industrial Sector Mozambique Business Luncheon JHB 28 th June 2012 By:Dr.

More information

Nacala Business Campus

Nacala Business Campus Nacala Business Campus Mozambique August 2013 ZAMBIA CHIPATA MALAWI TANZANIA Niassa Cabo Delgado PEMBA Gas Nacala is rapidly moving towards its watershed moment; either it will expand into one of the largest

More information

South-South Learning Exchange Visit, Mozambique IT/ITES Experiences and Challenges

South-South Learning Exchange Visit, Mozambique IT/ITES Experiences and Challenges South-South Learning Exchange Visit, 9 of February 2009 Mozambique IT/ITES Experiences and Challenges By Carlos Tamele (ctame@micti.co.mz) Constantino Sotomane (sotomane@micti.co.mz) Country Background

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

MOZAMBIQUE UPDATE ON DEMINING COMPLETION

MOZAMBIQUE UPDATE ON DEMINING COMPLETION MOZAMBIQUE UPDATE ON DEMINING COMPLETION Meeting of the MASG By Hans Risser and Justus Okoko New York, 18 Octoberr 2013 1 Background Mozambique landmine problem was once one of the most severe in the world,

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

POLICY QUESTIONS FOR TRAVEL FACILITATION FOR ENHANCING MOBILITY IN THE OIC MEMBER COUNTRIES. February 5th, 2015, Ankara

POLICY QUESTIONS FOR TRAVEL FACILITATION FOR ENHANCING MOBILITY IN THE OIC MEMBER COUNTRIES. February 5th, 2015, Ankara POLICY QUESTIONS FOR TRAVEL FACILITATION FOR ENHANCING MOBILITY IN THE OIC MEMBER COUNTRIES February 5th, 2015, Ankara Policies and instruments about travel facilitation in Mozambique Any foreigner who

More information

Japan International Cooperation Agency

Japan International Cooperation Agency Japan International Cooperation Agency Facts and Figures about JICA 1. What is JICA? Since joining the Colombo plan in 1954, Japan has been providing financial and technical assistance to developing countries

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Jun-2017 ISR28350 Implementing Agencies:

More information

MOZAMBIQUE. Drought Humanitarian Situation Report

MOZAMBIQUE. Drought Humanitarian Situation Report UNICEF Mozambique/March 2016 MOZAMBIQUE Drought Humanitarian Situation Report Failed maize crops: UNICEF Mozambique/March, 2016/Bonde SITUATION IN NUMBERS Highlights The Technical Secretariat for Food

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

REPUBLIC OF MOZAMBIQUE

REPUBLIC OF MOZAMBIQUE SAIHC14-5.4F REPUBLIC OF MOZAMBIQUE INSTITUTO NACIONAL DE HIDROGRAFIA E NAVEGAÇÃO NATIONAL REPORT TO THE 14 th SOUTHERN AFRICA AND ISLANDS HYDROGRAPHIC COMMISSION CONFERENCE Saint-Gilles La Réunion 6 th

More information

C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens.

C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens. ! GENERAL PRESENTATION OF THE ATHENS METROPOLITAN REGION (AMR) C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens. Athens, July 2006 1 ! The capital city of Athens

More information

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

SOUTHERN AFRICA TROPICAL CYCLONE IDAI SOUTHERN AFRICA TROPICAL CYCLONE IDAI FACT SHEET #6, FISCAL YEAR (FY) 2019 APRIL 9, 2019 NUMBERS AT A GLANCE 602 Official Confirmed Deaths in Mozambique GRM April 2019 299 Number of Deaths in Zimbabwe

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Mozambique Food Security Outlook April to September 2009

Mozambique Food Security Outlook April to September 2009 Mozambique Food Security Outlook April to September 2009 InMarch,moderatefoodinsecuritywasfoundin most of southern Tete and parts of Manica, Zambézia,andcoastalNampulaprovinces(Figure 1). Aside from these

More information

Instituto Nacional de Desminagem

Instituto Nacional de Desminagem ++ República de Moçambique Ministério dos Negócios Estrangeiros e Cooperação Instituto Nacional de Desminagem CONVENTION ON THE PROHIBITION OF THE USE, STOCKPILING, PRODUCTION AND TRANSFER OF ANTI-PERSONNEL

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

The financing of city services in Southern Africa. 27 March 2012

The financing of city services in Southern Africa. 27 March 2012 The financing of city services in Southern Africa 27 March 2012 The financing of city services in Southern Africa Background Purpose and objectives Participating cities Approaches & methods Roles Expenditure

More information

Appeal coverage: 116.4%; Click here to go to the attached Contributions list, or refer to Federation s website.

Appeal coverage: 116.4%; Click here to go to the attached Contributions list, or refer to Federation s website. MOZAMBIQUE 8 December 2003 Appeal No. 01.18/2003 Appeal Target: CHF 806,03 5 (USD 552,375 or EUR 547,916) Programme Update No. 2 Period covered: June November 2003 The Federation s mission is to improve

More information

Educational inequality in Mozambique

Educational inequality in Mozambique Educational inequality in Mozambique Servaas van der Berg (Resep, Stellenbosch University) Carlos da Maia (World Bank) Cobus Burger (Resep, Stellenbosch University) WIDER conference on Poverty and Inequality

More information

Child-centred Disaster Risk and Vulnerability Assessment. Mozambique

Child-centred Disaster Risk and Vulnerability Assessment. Mozambique Child-centred Disaster Risk and Vulnerability Assessment Mozambique December 2013 Dr Hanna Schmuck Consultant Table of Contents Acknowledgements... 1 Abbreviations and Acronyms... 2 Foreword... 3 1 Introduction...

More information

(Updated version, November 12, 2010)

(Updated version, November 12, 2010) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan I. General (Updated version, November 12, 2010) 1. Project information:

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

PART IV ECONOMIC FEASIBILITY STUDY

PART IV ECONOMIC FEASIBILITY STUDY PART IV ECONOMIC FEASIBILITY STUDY Part IV Economic Feasibility Study Chapter1 Existing Traffic Flow Patterns 1.1 Introduction This chapter aims to analyze traffic flow patterns on the Study Road based

More information

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana THE COMMONWEALTH SECREATARIAT SEEKS APPLICATIONS FOR THE POST OF REGIONAL TRADE ADVISER (RTA) FOR AN ASSIGNMENT WITH THE CARIBBEAN COMMUNITY (CARICOM) SECRETARIAT DATE REQUIRED: December 2014 REPORTING

More information

LEARNING SESSION THREE: INCREASING MUNICIPAL REVENUE STREAMS: OPPORTUNITIES & INNOVATIONS

LEARNING SESSION THREE: INCREASING MUNICIPAL REVENUE STREAMS: OPPORTUNITIES & INNOVATIONS LEARNING SESSION THREE: INCREASING MUNICIPAL REVENUE STREAMS: OPPORTUNITIES & INNOVATIONS LEARNING SESSION THREE 3.1. Understanding the state of African Cities: Short Inputs from selected cities: East

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

123% .1589$ 100% 7.5% 7.5% 100% 7.5% %12 458=5 100% OGE k FMI MOZAMBIQUE OVERVIEW OGE 458=5 100% = % 100% % 25648

123% .1589$ 100% 7.5% 7.5% 100% 7.5% %12 458=5 100% OGE k FMI MOZAMBIQUE OVERVIEW OGE 458=5 100% = % 100% % 25648 % 789.452 789.452 1523% 123% 123% 1 % 100 10 7.% 7. 5% 123. 50 123.250 123.250 5 7.1589 7.1589$.1589$ 10.545 10.545 10545k 0.545k 10. 45k 00 00.5 0.5425 10.54 45k 0.545k 10.545k FM FM OGE OGE %12 %12 %

More information

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS WANNAKIAT THUBTHIMSANG PHUKET MARINE BIOLOGICAL CENTER, DMCR, THAILAND ASIA- PACIFIC DAY FOR THE OCEAN 20 NOVEMBER 2018, CONFERENCE ROOM 4,

More information

Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania. Channing Arndt University of Copenhagen

Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania. Channing Arndt University of Copenhagen Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania Channing Arndt University of Copenhagen Motivation for GAPP What is happening in Africa? Operational Foci Relative

More information

ACI EUROPE POSITION PAPER. Airport Slot Allocation

ACI EUROPE POSITION PAPER. Airport Slot Allocation ACI EUROPE POSITION PAPER Airport Slot Allocation June 2017 Cover / Photo: Madrid-Barajas Adolfo Suárez Airport (MAD) Introduction The European Union s regulatory framework for the allocation of slots

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Building procurement capability through transformation. Jane Harley, Chief Procurement Officer Qantas Group

Building procurement capability through transformation. Jane Harley, Chief Procurement Officer Qantas Group Building procurement capability through transformation Jane Harley, Chief Procurement Officer Qantas Group SECTION TITLE HERE Heading here Group multi-brand structure Australia & New Zealand Singapore

More information

Development Cooperation Ireland public expenditure review report

Development Cooperation Ireland public expenditure review report Development Cooperation Ireland public expenditure review report Front cover: Queuing for water, Massinga Village, Inhambane Province Alfredo Binda Public Expenditure Review Report on the Inhambane Provincial

More information

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands Leveraging Cultural Heritage for Sustainable Development MIDDLE EAST & NORTH AFRICA Hedi Larbi Sector Manager April 16, 2007 AGENDA MENA Region Economic Context/Challenges Importance of Cultural Heritage

More information

Slum Situation Analysis

Slum Situation Analysis Slum Situation Analysis Components of a slum upgrading programme 1. SLUM SITUATION ANALYSIS 2. REVIEW OF POLICIES AFFECTING SLUM AREAS 3. SLUM UPGRADING AND PREVENTION STRATEGY 4. RESOURCE MOBILISATION

More information

Analysts and Investors conference call. Q results. 15 May 2013

Analysts and Investors conference call. Q results. 15 May 2013 Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

Background Beira Development Corridor Limpopo Development Corridor Walvis Bay Corridor One Stop Border Posts

Background Beira Development Corridor Limpopo Development Corridor Walvis Bay Corridor One Stop Border Posts Background Beira Development Corridor Limpopo Development Corridor Walvis Bay Corridor One Stop Border Posts Zimbabwe is a landlocked country and therefore for it to attain the planned economic growth

More information

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,

More information

Nature Conservation and Developing Sustainable tourism in Myanmar

Nature Conservation and Developing Sustainable tourism in Myanmar Nature Conservation and Developing Sustainable tourism in Myanmar Myanmar Tourism O Tourism in Myanmar has boomed in recent years, with the industry generating nearly $1.8 billion in revenue in 2014 as

More information

Frequently Asked Questions

Frequently Asked Questions CAA Funding Review Why has CAA s funding been reviewed? New Zealand has a well-regarded civil aviation system and a good aviation safety record. However, both the government and a range of reviews (including

More information

Areas in which anti personnel mines are known or suspected to be implaced

Areas in which anti personnel mines are known or suspected to be implaced Algeria: Areas in which Anti personnel mines are known or suspected to be implaced. Mines areas inherited from the colonial period are located on Algeria s eastern with Tunisia and Western border with

More information

Accelerating Indigenous Tourism Growth

Accelerating Indigenous Tourism Growth Accelerating Indigenous Tourism Growth INDIGENOUS TOURISM ASSOCIATION OF CANADA / INDIGENOUSTOURISM.CA Table of Contents A Message from Keith Henry 3 New Accelerated Targets for Growth 4 Development 4

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

Dott.ssa Benedetta Valenti

Dott.ssa Benedetta Valenti June 13th, 2016. New rules and procedures with regard to the introduction of noise-related operating restrictions at Union airports Dott.ssa Benedetta Valenti benedetta.valenti@ssalex.com From June 13

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

CROSS-BORDER TRADE IN SERVICES

CROSS-BORDER TRADE IN SERVICES Disclaimer: In view of the Commission's transparency policy, the Commission is publishing the texts of the Trade Part of the Agreement following the agreement in principle announced on 21 April 2018. The

More information

4 Rights and duties in connection with the conduct of petroleum activities

4 Rights and duties in connection with the conduct of petroleum activities Guidelines for application for Acknowledgment of Compliance (AoC) for mobile facilities intended for use in the petroleum activities on the Norwegian Continental Shelf (Unofficial translation), issued

More information

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid ACI EUROPE POSITION A level playing field for European airports the need for revised guidelines on State Aid 16 June 2010 1. INTRODUCTION Airports play a vital role in the European economy. They ensure

More information

Presentation Title: Aerodromes Licensing Requirements

Presentation Title: Aerodromes Licensing Requirements Presentation Title: Aerodromes Licensing Requirements Presenter s name: Ms Mary-Ann Joubert Manager: Aerodrome Operations Date: 29 March 2017 Content Establishment of ICAO Chicago Convention Members Status

More information

Jill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt

Jill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt Public-Private Private-Partnerships Partnerships The Case for PPP in Kosovo Jill L. Jamieson Senior PPP Advisor, BearingPoint May 25 26, 2008 USAID Workshop on PPP Ain Sokhna, Egypt 1 Kosovo: An unlikely

More information