Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)
|
|
- Richard Cummings
- 6 years ago
- Views:
Transcription
1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) Operation Name: Urban Transport in Metropolitan Areas (P095485) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 20-Jul-2013 Country: Argentina Approval FY: 2010 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Original Closing Date Planned Mid Term Review Date 04-Nov-2013 Last Archived ISR Date 16-Oct-2012 Effectiveness Date 26-Nov-2010 Revised Closing Date Actual Mid Term Review Date 16-Dec-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) The overall development objective of the proposed program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The first phase (APL1) will support: (i) institutional strengthening in the Buenos Aires Metropolitan Area (AMBA) transport sector institutions, through the creation of the Metropolitan Transport Agency or Consortium and the strengthening of its planning tools and information databases; (ii) support for the electronic ticketing scheme for the AMBA; (iii) transport infrastructure investments in the AMBA and the medium size Metropolitan Areas that are adequately prepared (an underpass and access to suburban railway improvements in AMBA; and infrastructure investments in Tucumán, Mendoza and Posadas); (iv) preparation studies for the remaining infrastructure investments identified in the AMBA and the Medium size Metropolitan Areas (a multijurisdictional project in AMBA to be identified; and infrastructure investments in Córdoba and Rosario); and (v) identification and support studies for other Metropolitan Areas that wish to join the program framework. At this stage, the Metropolitan Areas that have manifested interest in joining the program are Resistencia, Santa Fe, and Paraná. As will be seen further on, APL1 is structured around four components: (i) Creation of a Metropolitan Transport Agency (MTA) for Buenos Aires; (ii) Urban Transport improvements in Argentina#s medium size Metropolitan Areas; (iii) Public Transport Access and mode integration in Buenos Aires Metropolitan Area (AMBA); and (iv) Sectoral Training: Urban Transport Planning Master. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) No Component Name Component Cost Creation of the MTA Urban Transport Improvements in Medium Size Metropolitan Areas Public Transport Access and Modal Integration in AMBA Sectoral Training 2.50 Project Management 4.60 software problem - placeholder 0.00 placeholder - software problem - need to delete this 0.00 Page 1 of 8
2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Implementation Status Overview High The loan has been effective since November 2010 and is disbursing as per schedule. Overall implementation progress in recent months has been affected by a number of events stemming from organizational and personnel changes following from allegations in the press last year of irregularities in the procurement and execution of some contracts financed by the project. In the last few months, thenew management of the project office has focused on reviewing past and in-progress contracts from a fiduciary perspective and making some changes in organizational structure and personnel with a view to strengthen technical and governance systems for project management. This process of review and change is close to being complete and a key focus for the Bank team in the coming months is expected to be on working jointly with new management of the project office to accelerate project implementation. Locations Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Zárate Argentina Not Entered Partido de Vicente López Argentina Not Entered Partido de Tres de Febrero Argentina Not Entered Partido de Tigre Argentina Not Entered Partido de San Vicente Argentina Not Entered Partido de San Isidro Argentina Not Entered Partido de San Fernando Argentina Not Entered Resistencia Argentina Not Entered Partido de Quilmes Argentina Not Entered Posadas Argentina Not Entered Partido de Pilar Argentina Not Entered Partido de Morón Argentina Not Entered Partido de Moreno Argentina Not Entered Esteban Echeverría Argentina Not Entered Partido de Merlo Page 2 of 8
3 Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Mercedes Argentina Not Entered Partido de Matanza Argentina Not Entered Partido de Marcos Paz Argentina Not Entered Partido de Luján Argentina Not Entered Partido de Lomas de Zamora Argentina Not Entered Partido de Lobos Argentina Not Entered Partido de La Plata Argentina Not Entered Partido de Lanús Argentina Not Entered Partido de José C. Paz Argentina Not Entered Departamento de Ituzaingó Argentina Not Entered Hurlingham Argentina Not Entered Partido de General San Martín Argentina Not Entered Partido de General Rodríguez Argentina Not Entered Partido de General Las Heras Argentina Not Entered Partido de Florencio Varela Argentina Not Entered Ezeiza Argentina Not Entered Partido de Exaltación de la Cruz Argentina Not Entered Partido de Esteban Echeverría Argentina Not Entered Partido de Escobar Argentina Not Entered Partido de Ensenada Argentina Not Entered Partido de Canuelas Argentina Not Entered Partido de Campana Argentina Not Entered Buenos Aires Argentina Not Entered Partido de Brandsen Argentina Not Entered Partido de Berisso Page 3 of 8
4 Argentina Not Entered Partido de Berazategui Argentina Not Entered Partido de Avellaneda Argentina Not Entered Partido de Almirante Brown Argentina Not Entered Guernica Argentina Not Entered Santa Fe de la Vera Cruz Argentina Not Entered San Miguel de Tucumán Argentina Not Entered Rosario Argentina Not Entered Paraná Argentina Not Entered Mendoza Argentina Not Entered Córdoba Argentina Not Entered Partido de Malvinas Argentinas Argentina Not Entered Partido de San Miguel Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Tha AMBA Transport Metropolitan Agency is Yes/No Value No No Yes legally created, staffed and operating As noted in the ISR - while the AMT has not yet been legally ratified, there have been significant positive developments Number of Metropolitan Areas with updates OD Number Value surveys, urban transport Maester Plans and modeling tools Rosario. Significant progress in Mendoza, Cordoba, Tucuman, and many other metropolitan areas Page 4 of 8
5 The AMBA Urban Transport Planning Yes/No Value No No Yes Observatory fully functioning The AMBA Transport Master Plan is completed Yes/No Value No No Yes 28-Dec-2011 Tucuman: Percentage of primary school Percentage Value students absent from scholl in low transitability Date 31-Dec May-2011 days Using the baseline as this value will only be measured after the subproject is completed Tucuman: Number of appointements in Percentage Value Community Health Centers cancelled in low 28-Dec-2011 transitability days Using the baseline as this value will only be measured after the subproject is completed Number of days with no circulation of public Number Value buses Using the baseline as this value will only be measured after the subproject is completed Average speed of public buses in Barrio 11 de Kilometers Value Marzo Using the baseline as this value will only be measured after the subproject is completed Mendoza: Avaibility of public bus services Yes/No Value No No Yes along Papagayo corridor 29-Oct-2010 User perception of quality of physical Yes/No Value No No Yes integration of transport networks in AMBA Date 29-Oct-2010 No measurements made yet Survey results will be complex Approval of the AMBA MTA budget Yes/No Value No No Yes Page 5 of 8
6 Intermediate Results Indicators Date will be requested in the 2012 budget Indicator Name Core Unit of Measure Baseline Current End Target Legal creation of AMBA Transport Metropolitan Yes/No Value No No Yes Agency No legal status - but a MoU in October between 3 key stakeholders plus significant progress at technical level. Percentage of staffing according to Percentage Value organization chart designed Organizational chart not designed, but 30 staff working in National Level office that could be a kernel of ATAM Installation of AMBA MTA in offices with Yes/No Value No Yes Yes adequate equipment The planning team, seed of what will be the MTA is in place. Posadas: Linear km of segregated bus lanes Kilometers Value constructed in Avenida Uruguay But detailed design is ongoing Tucuman: Linear km of roads and sidewalks Kilometers Value paved in Barrio 11 de Marzo 31-Dec-2015 Detailed designs complete. It is expected that the Government will finance this with internal funding Mendoza: Linear km of Colector Papagayo Kilometers Value constructed Date Local government has decided that this is no longer a priority. It is likely that this 31-Dec-2015 Page 6 of 8
7 indicator will be dropped and replaced as part of project restructuring Data on Financial Performance (as of 24-Jan-2013) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 11-Aug Nov-2010 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD Disbursement Graph Key Decisions Regarding Implementation No key issues to raise. Restructuring History There has been no restructuring to date. Page 7 of 8
8 Related Projects There are no related projects. Page 8 of 8
Urban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationImplementation Status & Results Argentina AR Basic Municipal Services Project (P060484)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117
More informationImplementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation
More informationImplementation Status & Results Argentina AR Road Safety (P116989)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure
More informationImplementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure
More informationImplementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota
More informationImplementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential
More informationImplementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and
More informationImplementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and
More informationImplementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure
More informationNorte Grande Road Infrastructure (P120198)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768
More informationImplementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY
More informationImplementation Status & Results Peru Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)
More informationImplementation Status & Results Peru Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)
More informationImplementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationImplementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION
More informationImplementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationComponent SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS
AIACC LA 6: Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS Dra. Claudia E. Natenzon, Lic. Silvia González, Lic. Elvira Gentile, Lic. Diego Ríos y Srta. Cecilia Boudín PIRNA FFyL UBA Social
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationImplementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)
Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized
More informationImplementation Status & Results Bolivia BO Rural Alliances (P083051)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:
More informationImplementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development
More informationImplementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development
More informationLOCALIDAD EMPRESA TELEFONO
LOCALIDAD EMPRESA TELEFONO 25 de Mayo EMERGENCIAS 0800-333-6300 9 de Abril EMERGENCIAS 0800-333-6300 9 de Julio EMERGENCIAS 0800-333-6300 Abasto EMERGENCIAS 0800-333-6300 Acasusso EMERGENCIAS 0800-333-6300
More informationImplementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION
More informationImplementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)
More informationArgentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders
Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records
More informationInfrastructure: Networks to Sustain Development
Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:
More informationBRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014
BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014 AATES, Asociación Argentina de Túneles y Espacios Subterráneos Tacuarí 32, Piso 9 ; CP 1071 Buenos Aires, Argentina E-mail : administracion@aates.org.ar
More informationNATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *
NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West
More information3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor
3.3 COST ESTIMATION OF THE MAIN PROJECTS (1) Main projects 1) Improvement of export corridor The promotion of exports is indispensable for the development of the Paraguayan economy, and improvement of
More informationLanding in Latin America & Peering Landscape in Argentina
Landing in Latin America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet
More informationARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES
ARGENTINA 2016-2019 MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA OVERVIEW 2018 1 2 3 Population: 45 million 8 country on surface 24 provinces 4 55 airports 5 39 millions of passengers
More informationCBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés
CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés Buenos Aires, December 5 th 2014 Bioceanico Aconcagua - Video http://youtu.be/ty2ljemubc4?list=uucj5hpq1jmbzksz7zc35h3q 2 Location CÓRDOBA
More informationLanding in South America & Peering Landscape in Argentina
Landing in South America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More informationOperational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS
International Civil Aviation Organization SAM/IG/12-WP/12 South American Regional Office 26/09/13 Twelfth Workshop/Meeting of the SAM Implementation Group (SAM/IG/12) - Regional Project RLA/06/901 (Lima,
More informationMETRO OPERATIONS COMMITTEE
Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition
More information08-15 FDI/GDP (%, average) Foreign Direct Investment (Avg. USD BB/Year) Average 4.5% % 5.0% 6.0x 3.9% 3.4% 2.
1 ~ ~ 2 74.9 Foreign Direct Investment (Avg. USD BB/Year) 90-00 08-15 8.4% 08-15 FDI/GDP (%, average) 6.0x 12.5 2.9x 9.4 27.4 19.7 1.4x 5.8x 6.6x 12.4 5.4x 9.7 7.1 8.2 3.4 1.9 1.5 5.0% 3.9% 3.4% 2.4% Average
More informationResults of Tourism Activity. July, 2017
Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister
More informationWith the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:
TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement
More informationFrom AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas
Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach
More informationPerformance monitoring report 2017/18
Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March
More informationResults of Tourism Activity
Results of Tourism Activity Mexico, July 2016 Lago de San Miguel Regla, Hidalgo. Jardín en Hacienda San Gabriel, Morelos. Parras, Coahuila. Paseo Santa Lucía, Monterrey. Undersecretariat of Planning and
More informationResults of Tourism Activity Mexico, February 2017
Results of Tourism Activity Mexico, February Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO
More informationCONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES
ANSConf-WP/23 4/2/00 ITEM 6 CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES (Montreal, 19-28 June 2000) Agenda Item 6: Guidance and assistance by ICAO ICAO ACTIVITIES IN THE FIELD OF
More informationInternational economic context and regional impact
Contents I. GDP growth trends in Latin America and the Caribbean in 2012 II. Regional performance in 2012: Inflation, employment and wages External sector Policies: Fiscal and Monetary III. Conclusions
More informationFinancing Infrastructure Development
Financing Infrastructure Development Expert Group Meeting United Nations New York - October 2017 Vienna Programme of Action (VPoA) Decade 2014-2024 Transforming landlocked countries into Land linked Countries
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationThis working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.
International Civil Aviation Organization MIDADD SG*/1-WP/7 18/01/ 12 MID Region AIS Database Study Group First Meeting (MIDADD SG*/1) (Cairo, Egypt, 20 22 February 2012) Agenda Item 8: Legal & Institutional
More informationMODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005
MODAIR: Measure and development of intermodality at AIRport INO WORKSHOP EEC, December 6 h 2005 What is intermodality? The use of different and coordinated modes of transports for one trip High Speed train
More informationGAMA 2020 PUBLIC TRANSPORT VISION
GAMA 2020 PUBLIC TRANSPORT VISION BACKGROUND INFORMATION THE MOBILITY CHALLENGE MANIFESTED BY CONGESTION INADEQUATE INFRASTRUCTURE INDISCIPLINE PRESCRIBED SOLUTION Road Space Usage Bus & Trotro Carry 70%
More informationImplementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)
Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Jun-2017 ISR28350 Implementing Agencies:
More informationPPIAF Assistance in Swaziland
PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland
More informationLARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA
LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA This report describes the situation in Argentina with respect to large-scale land acquisitions (LSLA) uploaded to the Land Matrix. This analysis was based
More informationChile. Tourism in the economy. Tourism governance and funding
Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated
More informationManual vs. Automatic Operation and Operational Restrictions
Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit
More informationAnnual Performance Report. easier, faster, safer
Annual Performance Report 2017 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic Volume (Per Corridor
More informationGlobal Real Estate Investment in Latin America Portfolio Diversification Strategies and Urban Development
Masterthese zur Erlangung des Master of Advanced Studies in Real Estate Global Real Estate Investment in Latin America Portfolio Diversification Strategies and Urban Development Verfasser: Eingereicht
More informationSuccesses and Failures of the Policies of Water Supply and Wastewater Services in Argentina
4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply
More informationTourism Sector Development: JICA s Approach
Tourism Sector Development: JICA s Approach April 26, 2013 Japan International Cooperation Agency (JICA) JICA s Vision and Mission Mission1 Addressing global agenda Vision Inclusive and Dynamic Development
More informationJOIN s Investment for Urban Development Projects in Indonesia
JOIN s Investment for Urban Development Projects in Indonesia September 5, 2017 Indonesia - Japan Urban Development & Housing seminar 2017 JOIN (Japan Overseas Infrastructure Investment Corporation for
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa
More informationJAKARTA TRANSPORTATION
Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre
More informationNovember 7 th Post Workshop Report
Malaga Workshop November 7 th 2017 Post Workshop Report Main Conclusions and Lessons Learnt November 2017 Contents 1. Introduction... 3 2. Day 1... 5 2.1. Technical Visit to the Metropolitan Transport
More informationCampus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015
Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November
More informationAGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands
Leveraging Cultural Heritage for Sustainable Development MIDDLE EAST & NORTH AFRICA Hedi Larbi Sector Manager April 16, 2007 AGENDA MENA Region Economic Context/Challenges Importance of Cultural Heritage
More informationResults of Tourism Activity
Results of Tourism Activity Mexico, June Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationActivity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011
Activity Report 2011 IIRSA Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011 Areas of Work 2011 Integration Priority Project Agenda Project Portfolio Sectoral Integration Processes
More informationResults of Tourism Activity Mexico, March 2017
Results of Tourism Activity Mexico, March Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO
More information2007/08 Full Year Results Investor Briefing
2007/08 Full Year Results Investor Briefing Highlights of Result Profit before tax up 46% to $1,408 million Up 36% on the reported result Margin improvement $3 billion of Sustainable Future Benefits achieved
More informationUnited Nations Environment Programme
United Nations Environment Programme Twelfth Forum of Ministers of the Environment of Latin America and the Caribbean Bridgetown, Barbados 2 nd to 7 th March 2000 A. Preparatory Meeting of Experts 2 nd
More informationAbout Romipack 5 ABOUT ROMIPACK
About Romipack 5 01 ABOUT ROMIPACK Romipack is an Argentine company with over 45 years in the market, leader in the manufacturing and sale of paper bags throughout Latin America. The investment policy
More informationTourism strategies for the renovation of mature coastal tourist destinations in Spain
Tourism strategies for the renovation of mature coastal tourist destinations in Spain Sustainable Tourism 010, New Forest, UK. 5-7 July 010 Fernando Vera Rebollo / Isabel Rodríguez Sánchez JF.Vera@ua.es
More informationENHANCED QUALITY FOR PASSENGERS, IMPROVED PROFITABILITY FOR THE COMPANY. Forward-looking terminal development project at Vienna Airport
ENHANCED QUALITY FOR PASSENGERS, IMPROVED PROFITABILITY FOR THE COMPANY Forward-looking terminal development project at Vienna Airport Vienna Airport presses ahead with quality campaign Terminal 3 in operation
More informationRIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE
RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated
More information