Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)"

Transcription

1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) Operation Name: Urban Transport in Metropolitan Areas (P095485) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 20-Jul-2013 Country: Argentina Approval FY: 2010 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Original Closing Date Planned Mid Term Review Date 04-Nov-2013 Last Archived ISR Date 16-Oct-2012 Effectiveness Date 26-Nov-2010 Revised Closing Date Actual Mid Term Review Date 16-Dec-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) The overall development objective of the proposed program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The first phase (APL1) will support: (i) institutional strengthening in the Buenos Aires Metropolitan Area (AMBA) transport sector institutions, through the creation of the Metropolitan Transport Agency or Consortium and the strengthening of its planning tools and information databases; (ii) support for the electronic ticketing scheme for the AMBA; (iii) transport infrastructure investments in the AMBA and the medium size Metropolitan Areas that are adequately prepared (an underpass and access to suburban railway improvements in AMBA; and infrastructure investments in Tucumán, Mendoza and Posadas); (iv) preparation studies for the remaining infrastructure investments identified in the AMBA and the Medium size Metropolitan Areas (a multijurisdictional project in AMBA to be identified; and infrastructure investments in Córdoba and Rosario); and (v) identification and support studies for other Metropolitan Areas that wish to join the program framework. At this stage, the Metropolitan Areas that have manifested interest in joining the program are Resistencia, Santa Fe, and Paraná. As will be seen further on, APL1 is structured around four components: (i) Creation of a Metropolitan Transport Agency (MTA) for Buenos Aires; (ii) Urban Transport improvements in Argentina#s medium size Metropolitan Areas; (iii) Public Transport Access and mode integration in Buenos Aires Metropolitan Area (AMBA); and (iv) Sectoral Training: Urban Transport Planning Master. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) No Component Name Component Cost Creation of the MTA Urban Transport Improvements in Medium Size Metropolitan Areas Public Transport Access and Modal Integration in AMBA Sectoral Training 2.50 Project Management 4.60 software problem - placeholder 0.00 placeholder - software problem - need to delete this 0.00 Page 1 of 8

2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Implementation Status Overview High The loan has been effective since November 2010 and is disbursing as per schedule. Overall implementation progress in recent months has been affected by a number of events stemming from organizational and personnel changes following from allegations in the press last year of irregularities in the procurement and execution of some contracts financed by the project. In the last few months, thenew management of the project office has focused on reviewing past and in-progress contracts from a fiduciary perspective and making some changes in organizational structure and personnel with a view to strengthen technical and governance systems for project management. This process of review and change is close to being complete and a key focus for the Bank team in the coming months is expected to be on working jointly with new management of the project office to accelerate project implementation. Locations Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Zárate Argentina Not Entered Partido de Vicente López Argentina Not Entered Partido de Tres de Febrero Argentina Not Entered Partido de Tigre Argentina Not Entered Partido de San Vicente Argentina Not Entered Partido de San Isidro Argentina Not Entered Partido de San Fernando Argentina Not Entered Resistencia Argentina Not Entered Partido de Quilmes Argentina Not Entered Posadas Argentina Not Entered Partido de Pilar Argentina Not Entered Partido de Morón Argentina Not Entered Partido de Moreno Argentina Not Entered Esteban Echeverría Argentina Not Entered Partido de Merlo Page 2 of 8

3 Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Mercedes Argentina Not Entered Partido de Matanza Argentina Not Entered Partido de Marcos Paz Argentina Not Entered Partido de Luján Argentina Not Entered Partido de Lomas de Zamora Argentina Not Entered Partido de Lobos Argentina Not Entered Partido de La Plata Argentina Not Entered Partido de Lanús Argentina Not Entered Partido de José C. Paz Argentina Not Entered Departamento de Ituzaingó Argentina Not Entered Hurlingham Argentina Not Entered Partido de General San Martín Argentina Not Entered Partido de General Rodríguez Argentina Not Entered Partido de General Las Heras Argentina Not Entered Partido de Florencio Varela Argentina Not Entered Ezeiza Argentina Not Entered Partido de Exaltación de la Cruz Argentina Not Entered Partido de Esteban Echeverría Argentina Not Entered Partido de Escobar Argentina Not Entered Partido de Ensenada Argentina Not Entered Partido de Canuelas Argentina Not Entered Partido de Campana Argentina Not Entered Buenos Aires Argentina Not Entered Partido de Brandsen Argentina Not Entered Partido de Berisso Page 3 of 8

4 Argentina Not Entered Partido de Berazategui Argentina Not Entered Partido de Avellaneda Argentina Not Entered Partido de Almirante Brown Argentina Not Entered Guernica Argentina Not Entered Santa Fe de la Vera Cruz Argentina Not Entered San Miguel de Tucumán Argentina Not Entered Rosario Argentina Not Entered Paraná Argentina Not Entered Mendoza Argentina Not Entered Córdoba Argentina Not Entered Partido de Malvinas Argentinas Argentina Not Entered Partido de San Miguel Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Tha AMBA Transport Metropolitan Agency is Yes/No Value No No Yes legally created, staffed and operating As noted in the ISR - while the AMT has not yet been legally ratified, there have been significant positive developments Number of Metropolitan Areas with updates OD Number Value surveys, urban transport Maester Plans and modeling tools Rosario. Significant progress in Mendoza, Cordoba, Tucuman, and many other metropolitan areas Page 4 of 8

5 The AMBA Urban Transport Planning Yes/No Value No No Yes Observatory fully functioning The AMBA Transport Master Plan is completed Yes/No Value No No Yes 28-Dec-2011 Tucuman: Percentage of primary school Percentage Value students absent from scholl in low transitability Date 31-Dec May-2011 days Using the baseline as this value will only be measured after the subproject is completed Tucuman: Number of appointements in Percentage Value Community Health Centers cancelled in low 28-Dec-2011 transitability days Using the baseline as this value will only be measured after the subproject is completed Number of days with no circulation of public Number Value buses Using the baseline as this value will only be measured after the subproject is completed Average speed of public buses in Barrio 11 de Kilometers Value Marzo Using the baseline as this value will only be measured after the subproject is completed Mendoza: Avaibility of public bus services Yes/No Value No No Yes along Papagayo corridor 29-Oct-2010 User perception of quality of physical Yes/No Value No No Yes integration of transport networks in AMBA Date 29-Oct-2010 No measurements made yet Survey results will be complex Approval of the AMBA MTA budget Yes/No Value No No Yes Page 5 of 8

6 Intermediate Results Indicators Date will be requested in the 2012 budget Indicator Name Core Unit of Measure Baseline Current End Target Legal creation of AMBA Transport Metropolitan Yes/No Value No No Yes Agency No legal status - but a MoU in October between 3 key stakeholders plus significant progress at technical level. Percentage of staffing according to Percentage Value organization chart designed Organizational chart not designed, but 30 staff working in National Level office that could be a kernel of ATAM Installation of AMBA MTA in offices with Yes/No Value No Yes Yes adequate equipment The planning team, seed of what will be the MTA is in place. Posadas: Linear km of segregated bus lanes Kilometers Value constructed in Avenida Uruguay But detailed design is ongoing Tucuman: Linear km of roads and sidewalks Kilometers Value paved in Barrio 11 de Marzo 31-Dec-2015 Detailed designs complete. It is expected that the Government will finance this with internal funding Mendoza: Linear km of Colector Papagayo Kilometers Value constructed Date Local government has decided that this is no longer a priority. It is likely that this 31-Dec-2015 Page 6 of 8

7 indicator will be dropped and replaced as part of project restructuring Data on Financial Performance (as of 24-Jan-2013) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 11-Aug Nov-2010 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD Disbursement Graph Key Decisions Regarding Implementation No key issues to raise. Restructuring History There has been no restructuring to date. Page 7 of 8

8 Related Projects There are no related projects. Page 8 of 8

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS

Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS AIACC LA 6: Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS Dra. Claudia E. Natenzon, Lic. Silvia González, Lic. Elvira Gentile, Lic. Diego Ríos y Srta. Cecilia Boudín PIRNA FFyL UBA Social

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

LOCALIDAD EMPRESA TELEFONO

LOCALIDAD EMPRESA TELEFONO LOCALIDAD EMPRESA TELEFONO 25 de Mayo EMERGENCIAS 0800-333-6300 9 de Abril EMERGENCIAS 0800-333-6300 9 de Julio EMERGENCIAS 0800-333-6300 Abasto EMERGENCIAS 0800-333-6300 Acasusso EMERGENCIAS 0800-333-6300

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

Landing in Latin America & Peering Landscape in Argentina

Landing in Latin America & Peering Landscape in Argentina Landing in Latin America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, June Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

International economic context and regional impact

International economic context and regional impact Contents I. GDP growth trends in Latin America and the Caribbean in 2012 II. Regional performance in 2012: Inflation, employment and wages External sector Policies: Fiscal and Monetary III. Conclusions

More information

JAKARTA TRANSPORTATION

JAKARTA TRANSPORTATION Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre

More information

JOIN s Investment for Urban Development Projects in Indonesia

JOIN s Investment for Urban Development Projects in Indonesia JOIN s Investment for Urban Development Projects in Indonesia September 5, 2017 Indonesia - Japan Urban Development & Housing seminar 2017 JOIN (Japan Overseas Infrastructure Investment Corporation for

More information

Financing Infrastructure Development

Financing Infrastructure Development Financing Infrastructure Development Expert Group Meeting United Nations New York - October 2017 Vienna Programme of Action (VPoA) Decade 2014-2024 Transforming landlocked countries into Land linked Countries

More information

Chile. Tourism in the economy. Tourism governance and funding

Chile. Tourism in the economy. Tourism governance and funding Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011 CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011 Introduction Airports are becoming new dynamic centres of economic activity.

More information

Tourism Sector Development: JICA s Approach

Tourism Sector Development: JICA s Approach Tourism Sector Development: JICA s Approach April 26, 2013 Japan International Cooperation Agency (JICA) JICA s Vision and Mission Mission1 Addressing global agenda Vision Inclusive and Dynamic Development

More information

LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA

LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA This report describes the situation in Argentina with respect to large-scale land acquisitions (LSLA) uploaded to the Land Matrix. This analysis was based

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Results of Tourism Activity Mexico, May 2017

Results of Tourism Activity Mexico, May 2017 Results of Tourism Activity Mexico, May Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Sound Transit Operations March 2018 Service Performance Report. Ridership

Sound Transit Operations March 2018 Service Performance Report. Ridership March 218 Service Performance Report Ridership Total Boardings by Mode Mar-17 Mar-18 % YTD-17 YTD-18 % ST Express 1,622,116 1,47,79-4.6% 4,499,798 4,428,14-1.6% Sounder 393,33 39,6.% 1,74,96 1,163,76 8.3%

More information

Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA

Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN INDONESIA Transport and Climate Change Week: SUSTAINABLE URBAN TRANSPORT DEVELOPMENT IN Ikhwan Hakim Director of Transportation Ministry of National Development Planning Indonesia Presented at Transport and Climate

More information

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach URBAN DEVELOPMENT Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach Urban Week,January 31, 2011 Chantal Reliquet, Sr. Urban Specialist 1 World Bank Lending in Historic City Regeneration

More information

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode

Sound Transit Operations March 2017 Service Performance Report. Ridership. Total Boardings by Mode March 217 Service Performance Report Ridership ST Express Sounder Tacoma Link Link Paratransit Mar-16 Mar-17 % 1,83,4 1,621,49 2.4% 37,496 82,631 1,264,47 3,821 Total Boardings by Mode 389,98 87,39 1,89,43,297

More information

Bristol Virginia Transit

Bristol Virginia Transit Bristol Virginia Transit 1 Transit Overview Bristol Virginia Transit (BVT) is a Federally Funded and certified urban area transit system. BVT began operation in its current form in 1982. In Fiscal Year

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

Selection of Potential Sites in Argentina for the Deployment of new Nuclear Power Plants

Selection of Potential Sites in Argentina for the Deployment of new Nuclear Power Plants Selection of Potential Sites in Argentina for the Deployment of new Nuclear Power Plants Common User Consideration (CUC) by Developing Countries for Future Nuclear Energy Systems Region 1 (Americas and

More information

CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005

CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005 CONNECT WORKSHOP MANCHESTER NOVEMBER 9, 2005 STIF - Paris Ile de France Public Transport Authority Ile-de-France is one of the 22 administrative "régions" of France 11 million inhabitants (18% of French

More information

Date: 11/6/15. Total Passengers

Date: 11/6/15. Total Passengers Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service

More information

URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE

URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE FONDO NACIONAL DE INFRAESTRUCTURA URBAN TRANSPORT POLICY CHALLENGES-PRACTITIONER S PERSPECTIVE Francisco Quiñones Manager of PROTRAM Programa de Apoyo Federal al Transporte Masivo February 202 0 0 GROWING

More information

ASHGABAT, TURKMENISTAN

ASHGABAT, TURKMENISTAN Republic of Zambia MINISTRY OF TRANSPORT AND COMMUNICATIONS STATEMENT BY H.E. BRIAN MUSHIMBA MINISTER OF TRANSOPORT AND COMMUNICATION, REPUBLIC OF ZAMBIA AND GLOBAL CHAIR OF THE GROUP OF LLDCS Delivered

More information

hotels our business & passion

hotels our business & passion hotels our business & passion ABOUT US Herbert Mascha ME Martin Schaffer MRP hotels supports owners, investors, developers, banks and hotel operators with a comprehensive range of consulting services for

More information

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala 8.INFRASTRUCTURE #INVESTINGUATEMALA Industry in Guatemala General information of the country Capital City Currency Exchange Rate (2013) Official Language Population Labor Force (2013) GDP (2013) FDI inflows

More information

ANNEX 18 Integration Sectoral Processes

ANNEX 18 Integration Sectoral Processes INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA IIRSA ANNEX 18 Integration Sectoral Processes IX Meeting of the Executive Steering Committee of IIRSA December 4th and 5th, Montevideo,

More information

-Dr Panambi Abadie Executive Secretary, AUGM

-Dr Panambi Abadie Executive Secretary, AUGM Workshop 3: Perceptions of the Erasmus Mundus programme in third-countries. -Dr Panambi Abadie Executive Secretary, AUGM EM-iDEA Conference, Ghent 23/11/2011 1 PERSPECTIVES OF AUGM ON THE EM PROGRAMME

More information

TRANSPORT OPERATIONS IN FRAGILE AND CONFLICT AFFECTED SITUATIONS

TRANSPORT OPERATIONS IN FRAGILE AND CONFLICT AFFECTED SITUATIONS TRANSPORT OPERATIONS IN FRAGILE AND CONFLICT AFFECTED SITUATIONS Transport and ICT Global Practice Smart Connections for All Kulwinder Singh Rao Senior Highway Engineer February 2, 2016 PRESENTATION OVERVIEW

More information

Network Manager Adding value to the Network 29 September 2011

Network Manager Adding value to the Network 29 September 2011 Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety

More information

New Mexico Monthly Traffic Fatality Report, 2017

New Mexico Monthly Traffic Fatality Report, 2017 New Mexico ly Traffic Fatality Report, 2017 Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract No. 5801 by UNM Geospatial and Population

More information

City of Chelan Comprehensive Plan Update. Vision Workshop. Agenda

City of Chelan Comprehensive Plan Update. Vision Workshop. Agenda City of Chelan Comprehensive Plan Update Vision Workshop November 16, 2016 Agenda Welcome What is a comprehensive plan? Schedule Visioning / Open House Activities How to stay informed and involved 2 1

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

Experience from Chile

Experience from Chile MULTIMODAL TRANSPORT AND TRANSIT SOLUTIONS Experience from Chile Ashgabat, Turkmenistan 26 27 november 2016 MULTIMODALITY Multimodal Transport takes us to address the following issues: 1.- Transport costs

More information

Sound Transit Operations January 2018 Service Performance Report. Ridership

Sound Transit Operations January 2018 Service Performance Report. Ridership January 218 Service Performance Report Ridership Total Boardings by Mode Jan-17 Jan-18 % YTD-17 YTD-18 % ST Express 1,3,33 1,7,91.3% 1,3,33 1,7,91.3% Sounder 367,33 416,8 13.3% 367,33 416,8 13.3% Tacoma

More information

DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014

DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014 DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014 Overview Our international experience is that public transport works best when it is delivered in Partnership

More information

Japan India Cooperation on Railway Sector

Japan India Cooperation on Railway Sector Japan India Cooperation on Railway Sector 14 th October, 2015 IREE 2015 Takema Sakamoto Chief Representative India Office Japan International Cooperation Agency (JICA) 1 Contents 1. Overview and Strategy

More information

Australian Journal of Basic and Applied Sciences. Why to Introduce Flat Fare System in Janmarg, Ahmedabad, Gujarat A Case Study

Australian Journal of Basic and Applied Sciences. Why to Introduce Flat Fare System in Janmarg, Ahmedabad, Gujarat A Case Study AENSI Journals Australian Journal of Basic and Applied Sciences ISSN:1991-8178 Journal home page: www.ajbasweb.com Why to Introduce Flat Fare System in Janmarg, Ahmedabad, Gujarat A Case Study 1 Jaynila

More information

IHO Capacity Building in the South West Pacific Region NZ Perspective. Adam Greenland National Hydrographer Land Information New Zealand

IHO Capacity Building in the South West Pacific Region NZ Perspective. Adam Greenland National Hydrographer Land Information New Zealand IHO Capacity Building in the South West Pacific Region NZ Perspective Adam Greenland National Hydrographer Land Information New Zealand Overview Introduction to Capacity Building IHO Strategy, Plan and

More information

METROPOLITAN REGIONS COMPETITIVENESS AND GOVERNANCE

METROPOLITAN REGIONS COMPETITIVENESS AND GOVERNANCE METROPOLITAN REGIONS COMPETITIVENESS AND GOVERNANCE THE CASES OF SÃO PAULO AND BUENOS AIRES SÃO PAULO AND BUENOS AIRES METROPOLITAN REGIONS BRAZIL AMÉRICA DO SUL MRSP MRBA ARGENTINA REGIONAL INSERTION

More information

Buenos Aires VISITOR S GUIDE. Welcome

Buenos Aires VISITOR S GUIDE. Welcome Welcome WELCOME TO BUENOS AIRES The City of was founded in 1580 by the Spanish colonizer Juan de Garay, who named it Ciudad de la Santísima Trinidad. Another foundation is recorded in 1536 by the Iberian

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

SAC-D/Aquarius. DCS - Data Collection System. Gustavo Mercado CONAE. An Observatory for Ocean, Climate and Environment

SAC-D/Aquarius. DCS - Data Collection System. Gustavo Mercado CONAE. An Observatory for Ocean, Climate and Environment An Observatory for Ocean, Climate and Environment SAC-D/Aquarius DCS - Data Collection System Gustavo Mercado CONAE 10th Aquarius SAC-D Science Meeting Buenos Aires 1November 17 19,12015 of 18 DCS Components

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

From: OECD Tourism Trends and Policies Access the complete publication at: Ireland

From: OECD Tourism Trends and Policies Access the complete publication at:  Ireland From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Ireland Please cite this chapter as: OECD (2014), Ireland, in OECD Tourism Trends

More information

Public Transport Volumes in Prague and its Suburbs

Public Transport Volumes in Prague and its Suburbs Public Transport Volumes in Prague and its Suburbs Blanka Brožová ROPID (Prague Transport Authority) brozova.blanka@ropid.cz 7 June, 2017 Workshop Travel Behaviour - Prague Introduction Czech Republic

More information

Key Tourism Indicators January to September 2017

Key Tourism Indicators January to September 2017 Department of Tourism, Culture, Industry and Innovation (TCII) Year-To-Date (YTD) Tourism Highlights September 2017* (*Data presented is subject to change, reporting period may vary by indicator) The number

More information

Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean. Wilfrido M. Paiva Paraguay - CRIA

Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean. Wilfrido M. Paiva Paraguay - CRIA Overview of soybean rust in South America during 2005-06 06 Cláudia V. Godoy José T. Yorinori Brazil - Embrapa Soybean Wilfrido M. Paiva Paraguay - CRIA 2004 2003 2001 2002 2005/06 production area Soybean

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Assessing the Impacts of ENSO on South American Agriculture

Assessing the Impacts of ENSO on South American Agriculture Assessing the Impacts of ENSO on South American Agriculture Mark Brusberg United States Department of Agriculture Office of the Chief Economist / Presented to: The International Symposium on Synergistic

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Austria. Tourism in the economy. Tourism governance and funding

Austria. Tourism in the economy. Tourism governance and funding Austria Tourism in the economy According to the Tourism Satellite Account, the direct value-added effects of tourism in 2014 totalled EUR 18.1 billion, or 5.5% of GDP. About 270 500 full-time job equivalents

More information

CHINA HOTEL MARKET OUTLOOK

CHINA HOTEL MARKET OUTLOOK CHINA HOTEL MARKET OUTLOOK Topics To Cover Key Market Assessment China Hotel Market Sentiment Survey The Big Picture For China In 2010 Key Market Outlook KEY MARKET ASSESSMENT Key Market Occupancy Trends

More information

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 22 August 2017

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 22 August 2017 APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 22 August 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives

More information

There was consensus among the participants that a strong European aviation industry is critical to ensure the right to

There was consensus among the participants that a strong European aviation industry is critical to ensure the right to Bruges Declaration Introduction The European aviation industry stands at a crossroads. It is restructuring to face the economic crisis and the growing global competition. The aviation industry is also

More information

PRESS RELEASE. GREEK MERCHANT FLEET: January 2018 (Provisional data)

PRESS RELEASE. GREEK MERCHANT FLEET: January 2018 (Provisional data) HELLENIC REPUBLIC HELLENIC STATISTICAL AUTHORITY Piraeus, ch 19 218 PRESS RELEASE GREEK MERCHANT FLEET: 218 (Provisional data) The Hellenic Statistical Authority (ELSTAT) announces data on the Greek Merchant

More information

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August

Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August Passenger Traffic Achieves Strong Growth of 4.8% for the Month of August Montréal, 7 October Passenger traffic experienced a slight surge in growth to almost +5% for August compared to previous months

More information

Crown Corporation Business Plans. Trade Centre Limited

Crown Corporation Business Plans. Trade Centre Limited Crown Corporation Business Plans Trade Centre Limited Contents Message from the CEO and the Chair... 5 Mandate... 7 Alignment with Government s Priorities... 7 Core Responsibilities... 9 Budget Context...

More information

North Central Regional Transit District. Quick Facts. Our Mission Statement:

North Central Regional Transit District. Quick Facts. Our Mission Statement: North Central Regional Transit District Our Mission Statement: The mission of the North Central Regional Transit District is to provide safe, secure and effective public transportation within North Central

More information

Public-Private Partnerships. Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011

Public-Private Partnerships. Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011 Public-Private Partnerships Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011 Disclaimer Today s presentation includes certain statements that are not

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Present: Dr Jon Hargreaves - Chair Geoff Aitkenhead - Acting Vice Chair Tanya

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

Agenda Item 6: Aviation Security and Facilitation

Agenda Item 6: Aviation Security and Facilitation 50 th Conference of Directors General of Civil Aviation Asia and Pacific Regions Agenda Item 6: Aviation Security and Facilitation Boubacar Djibo Director, Air Transport Bureau ICAO Page 1 Presentation

More information

Designing & Building for People on Bikes within evolving constraints Auckland Central City

Designing & Building for People on Bikes within evolving constraints Auckland Central City Designing & Building for People on Bikes within evolving constraints Auckland Central City Asia Pacific Cycle Congress 19 October 2017 Graeme Bean MEngSc (Transport), BE (Civil), PGDipBus (Mktg), MEngNZ,

More information

Tourism in South Africa A statistical overview

Tourism in South Africa A statistical overview Tourism in South Africa A statistical overview Purpose of presentation Purpose of the presentation is to present different tourism statistics produced by Stats SA People like to travel we are a country

More information

Total expenditure by international tourists visiting Spain in February increases by 4.7% as compared with the same month of 2017

Total expenditure by international tourists visiting Spain in February increases by 4.7% as compared with the same month of 2017 04 April 2018 Tourist expenditure survey. Provisional data Total expenditure by international tourists visiting Spain in February increases by 4.7% as compared with the same month of 2017 Average daily

More information

Network Size and Growth

Network Size and Growth 16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,

More information

CARICOM FRAMEWORK ON PUBLIC PROCUREMENT

CARICOM FRAMEWORK ON PUBLIC PROCUREMENT CARICOM FRAMEWORK ON PUBLIC PROCUREMENT PRESENTATION AT REGIONAL MEETING ON PUBLIC PROCUREMENT SYSTEMS IN LATIN AMERICA AND THE CARIBBEAN 15-16 July 2015 Quito, Ecuador CONTENT OF PRESENTATION Background

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

Partnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015)

Partnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015) International Conference on Sustainable Development through Quality Infrastructure Japanese perspectives on Quality Infrastructure Investment - MLIT Initiative- Ministry of Land, Infrastructure, Transport

More information

UN-GGIM:Americas. UN-GGIM Expanded Bureau Meeting 7-9 December 2016, UN Headquarters New York. Rolando Ocampo President of UN-GGIM:Americas

UN-GGIM:Americas. UN-GGIM Expanded Bureau Meeting 7-9 December 2016, UN Headquarters New York. Rolando Ocampo President of UN-GGIM:Americas UN-GGIM:Americas UN-GGIM Expanded Bureau Meeting 7-9 December 2016, UN Headquarters New York Rolando Ocampo President of UN-GGIM:Americas Antigua and Barbuda 38 Member States Argentina Bahamas Belize Bolivia

More information

CS3: AVENIDA DE AMERICA INTERCHANGE

CS3: AVENIDA DE AMERICA INTERCHANGE CONTRACT NUMBER: TCP8-GA-2009-234082 CS3: AVENIDA DE AMERICA INTERCHANGE WP5: Status Report Lisbon, 15 Dicember 2011 TRANSyT-UPM 1/ AVENIDA DE AMÉRICA: CASE STUDY DESCRIPTION Main features at the site

More information

Argentina Solar Eclipse Tour 2020

Argentina Solar Eclipse Tour 2020 Argentina Solar Eclipse Tour 2020 Exclusive tour designed for Tropical Sails Corp to Argentina for the December 14, 2020 Total Solar Eclipse. Day 1 07 DEC: USA Departure from USA to Buenos Aires Overnight

More information

O REGON TRAILS SUMMIT. Oregon Trails Summit. Rogue River National Forest

O REGON TRAILS SUMMIT. Oregon Trails Summit. Rogue River National Forest O REGON TRAILS SUMMIT Oregon Trails Summit 2014 Rogue River National Forest OREGON TRAILS 2015: A VISION FOR THE FUTURE The 2015-2024 Oregon Statewide Trails Plan Why do a trails plan? 2005-2014 Oregon

More information

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL Capt Miguel Dau - COO 1 OLD STRUCTURE (CGA)- INFRAERO AIRPORT MANAGEMENT CENTER CENTRO DE GERENCIAMENTO AEROPORTUÁRIA The INFRAERO implemented the

More information

Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298)

Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298) Operation Name: Second Participatory Rural

More information

Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016

Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016 3 November 2017 Tourist expenditure survey. Provisional data Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016 Average daily

More information

AIRBUS H Roadshow Presentation. New York July 31 st, 2017

AIRBUS H Roadshow Presentation. New York July 31 st, 2017 AIRBUS H1 2017 Roadshow Presentation New York July 31 st, 2017 H1 2017 HIGHLIGHTS 2 Healthy commercial aircraft environment; robust backlog of 6,771 a/c supports ramp-up plans H1 financials reflect delivery

More information

Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298)

Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia Second Participatory Rural Investment (P101298) Operation Name: Second Participatory Rural

More information

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 7 September 2017

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 7 September 2017 APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 7 September 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives

More information

Global Airline Trends and Impacts International Aviation Issues Seminar

Global Airline Trends and Impacts International Aviation Issues Seminar Global Airline Trends and Impacts International Aviation Issues Seminar December 2017, Washington D.C. Oliver Lamb Managing Director 1 Around the world in 45 minutes Financial Performance Canada Mexico

More information

Urban Climate Change Research Network and ARC3.2

Urban Climate Change Research Network and ARC3.2 Urban Climate Change Research Network and ARC3.2 1 UCCRN Mission Provide knowledge that enables cities and metropolitan regions to fulfill their climate change leadership potential in both mitigation and

More information

TUI GROUP INVESTOR PRESENTATION

TUI GROUP INVESTOR PRESENTATION TUI GROUP INVESTOR PRESENTATION German Investment Conference UniCredit / Kepler Munich, 26-27 September 2012 Future-related statements This presentation contains a number of statements related to the future

More information

Safety Management 1st edition

Safety Management 1st edition Annex 19 Safety Management 1st edition ISM Integrated Safety Management 10 June 2013 initial version Page 1 Why a new Annex? Page 2 Why a New Annex? The ICAO High-level Safety Conference (HLSC) held in

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

V/Line Asset Management

V/Line Asset Management Shaping the Future of Railway V/Line Asset Management Jim Hunter GM Network Engineering 21 st September 2016 Monash IRT 1 SHAPING THE FUTURE OF RAILWAY MONASH IRT 21 SEPTEMBER 2016 Opportunities at V/Line

More information

SPACE ACTIVITIES IN EARTH OBSERVATION IN ARGENTINA. Félix Clementino Menicocci Secretario General Comisión Nacional de Actividades Espaciales

SPACE ACTIVITIES IN EARTH OBSERVATION IN ARGENTINA. Félix Clementino Menicocci Secretario General Comisión Nacional de Actividades Espaciales 2016 SPACE ACTIVITIES IN EARTH OBSERVATION IN ARGENTINA Félix Clementino Menicocci Secretario General Comisión Nacional de Actividades Espaciales National Commission on Space Activities CONAE is a specialized

More information