Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Size: px
Start display at page:

Download "Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)"

Transcription

1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) Operation Name: Urban Transport in Metropolitan Areas (P095485) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 20-Jul-2013 Country: Argentina Approval FY: 2010 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Original Closing Date Planned Mid Term Review Date 04-Nov-2013 Last Archived ISR Date 16-Oct-2012 Effectiveness Date 26-Nov-2010 Revised Closing Date Actual Mid Term Review Date 16-Dec-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) The overall development objective of the proposed program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The first phase (APL1) will support: (i) institutional strengthening in the Buenos Aires Metropolitan Area (AMBA) transport sector institutions, through the creation of the Metropolitan Transport Agency or Consortium and the strengthening of its planning tools and information databases; (ii) support for the electronic ticketing scheme for the AMBA; (iii) transport infrastructure investments in the AMBA and the medium size Metropolitan Areas that are adequately prepared (an underpass and access to suburban railway improvements in AMBA; and infrastructure investments in Tucumán, Mendoza and Posadas); (iv) preparation studies for the remaining infrastructure investments identified in the AMBA and the Medium size Metropolitan Areas (a multijurisdictional project in AMBA to be identified; and infrastructure investments in Córdoba and Rosario); and (v) identification and support studies for other Metropolitan Areas that wish to join the program framework. At this stage, the Metropolitan Areas that have manifested interest in joining the program are Resistencia, Santa Fe, and Paraná. As will be seen further on, APL1 is structured around four components: (i) Creation of a Metropolitan Transport Agency (MTA) for Buenos Aires; (ii) Urban Transport improvements in Argentina#s medium size Metropolitan Areas; (iii) Public Transport Access and mode integration in Buenos Aires Metropolitan Area (AMBA); and (iv) Sectoral Training: Urban Transport Planning Master. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) No Component Name Component Cost Creation of the MTA Urban Transport Improvements in Medium Size Metropolitan Areas Public Transport Access and Modal Integration in AMBA Sectoral Training 2.50 Project Management 4.60 software problem - placeholder 0.00 placeholder - software problem - need to delete this 0.00 Page 1 of 8

2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Implementation Status Overview High The loan has been effective since November 2010 and is disbursing as per schedule. Overall implementation progress in recent months has been affected by a number of events stemming from organizational and personnel changes following from allegations in the press last year of irregularities in the procurement and execution of some contracts financed by the project. In the last few months, thenew management of the project office has focused on reviewing past and in-progress contracts from a fiduciary perspective and making some changes in organizational structure and personnel with a view to strengthen technical and governance systems for project management. This process of review and change is close to being complete and a key focus for the Bank team in the coming months is expected to be on working jointly with new management of the project office to accelerate project implementation. Locations Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Zárate Argentina Not Entered Partido de Vicente López Argentina Not Entered Partido de Tres de Febrero Argentina Not Entered Partido de Tigre Argentina Not Entered Partido de San Vicente Argentina Not Entered Partido de San Isidro Argentina Not Entered Partido de San Fernando Argentina Not Entered Resistencia Argentina Not Entered Partido de Quilmes Argentina Not Entered Posadas Argentina Not Entered Partido de Pilar Argentina Not Entered Partido de Morón Argentina Not Entered Partido de Moreno Argentina Not Entered Esteban Echeverría Argentina Not Entered Partido de Merlo Page 2 of 8

3 Country First Administrative Division Location Planned Actual Argentina Not Entered Partido de Mercedes Argentina Not Entered Partido de Matanza Argentina Not Entered Partido de Marcos Paz Argentina Not Entered Partido de Luján Argentina Not Entered Partido de Lomas de Zamora Argentina Not Entered Partido de Lobos Argentina Not Entered Partido de La Plata Argentina Not Entered Partido de Lanús Argentina Not Entered Partido de José C. Paz Argentina Not Entered Departamento de Ituzaingó Argentina Not Entered Hurlingham Argentina Not Entered Partido de General San Martín Argentina Not Entered Partido de General Rodríguez Argentina Not Entered Partido de General Las Heras Argentina Not Entered Partido de Florencio Varela Argentina Not Entered Ezeiza Argentina Not Entered Partido de Exaltación de la Cruz Argentina Not Entered Partido de Esteban Echeverría Argentina Not Entered Partido de Escobar Argentina Not Entered Partido de Ensenada Argentina Not Entered Partido de Canuelas Argentina Not Entered Partido de Campana Argentina Not Entered Buenos Aires Argentina Not Entered Partido de Brandsen Argentina Not Entered Partido de Berisso Page 3 of 8

4 Argentina Not Entered Partido de Berazategui Argentina Not Entered Partido de Avellaneda Argentina Not Entered Partido de Almirante Brown Argentina Not Entered Guernica Argentina Not Entered Santa Fe de la Vera Cruz Argentina Not Entered San Miguel de Tucumán Argentina Not Entered Rosario Argentina Not Entered Paraná Argentina Not Entered Mendoza Argentina Not Entered Córdoba Argentina Not Entered Partido de Malvinas Argentinas Argentina Not Entered Partido de San Miguel Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Tha AMBA Transport Metropolitan Agency is Yes/No Value No No Yes legally created, staffed and operating As noted in the ISR - while the AMT has not yet been legally ratified, there have been significant positive developments Number of Metropolitan Areas with updates OD Number Value surveys, urban transport Maester Plans and modeling tools Rosario. Significant progress in Mendoza, Cordoba, Tucuman, and many other metropolitan areas Page 4 of 8

5 The AMBA Urban Transport Planning Yes/No Value No No Yes Observatory fully functioning The AMBA Transport Master Plan is completed Yes/No Value No No Yes 28-Dec-2011 Tucuman: Percentage of primary school Percentage Value students absent from scholl in low transitability Date 31-Dec May-2011 days Using the baseline as this value will only be measured after the subproject is completed Tucuman: Number of appointements in Percentage Value Community Health Centers cancelled in low 28-Dec-2011 transitability days Using the baseline as this value will only be measured after the subproject is completed Number of days with no circulation of public Number Value buses Using the baseline as this value will only be measured after the subproject is completed Average speed of public buses in Barrio 11 de Kilometers Value Marzo Using the baseline as this value will only be measured after the subproject is completed Mendoza: Avaibility of public bus services Yes/No Value No No Yes along Papagayo corridor 29-Oct-2010 User perception of quality of physical Yes/No Value No No Yes integration of transport networks in AMBA Date 29-Oct-2010 No measurements made yet Survey results will be complex Approval of the AMBA MTA budget Yes/No Value No No Yes Page 5 of 8

6 Intermediate Results Indicators Date will be requested in the 2012 budget Indicator Name Core Unit of Measure Baseline Current End Target Legal creation of AMBA Transport Metropolitan Yes/No Value No No Yes Agency No legal status - but a MoU in October between 3 key stakeholders plus significant progress at technical level. Percentage of staffing according to Percentage Value organization chart designed Organizational chart not designed, but 30 staff working in National Level office that could be a kernel of ATAM Installation of AMBA MTA in offices with Yes/No Value No Yes Yes adequate equipment The planning team, seed of what will be the MTA is in place. Posadas: Linear km of segregated bus lanes Kilometers Value constructed in Avenida Uruguay But detailed design is ongoing Tucuman: Linear km of roads and sidewalks Kilometers Value paved in Barrio 11 de Marzo 31-Dec-2015 Detailed designs complete. It is expected that the Government will finance this with internal funding Mendoza: Linear km of Colector Papagayo Kilometers Value constructed Date Local government has decided that this is no longer a priority. It is likely that this 31-Dec-2015 Page 6 of 8

7 indicator will be dropped and replaced as part of project restructuring Data on Financial Performance (as of 24-Jan-2013) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 11-Aug Nov-2010 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD Disbursement Graph Key Decisions Regarding Implementation No key issues to raise. Restructuring History There has been no restructuring to date. Page 7 of 8

8 Related Projects There are no related projects. Page 8 of 8

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS

Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS AIACC LA 6: Component SOCIAL VULNERABILITY, CLIMATIC CHANGE AND FLOODS Dra. Claudia E. Natenzon, Lic. Silvia González, Lic. Elvira Gentile, Lic. Diego Ríos y Srta. Cecilia Boudín PIRNA FFyL UBA Social

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

LOCALIDAD EMPRESA TELEFONO

LOCALIDAD EMPRESA TELEFONO LOCALIDAD EMPRESA TELEFONO 25 de Mayo EMERGENCIAS 0800-333-6300 9 de Abril EMERGENCIAS 0800-333-6300 9 de Julio EMERGENCIAS 0800-333-6300 Abasto EMERGENCIAS 0800-333-6300 Acasusso EMERGENCIAS 0800-333-6300

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records

More information

Infrastructure: Networks to Sustain Development

Infrastructure: Networks to Sustain Development Infrastructure: Networks to Sustain Development Agribusiness Biotechnology Renewable Energies INFRASTRUCTURE Automotive Agricultural Machinery Technical and Professional Services Software Infrastructure:

More information

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014 BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014 AATES, Asociación Argentina de Túneles y Espacios Subterráneos Tacuarí 32, Piso 9 ; CP 1071 Buenos Aires, Argentina E-mail : administracion@aates.org.ar

More information

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor

3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor 3.3 COST ESTIMATION OF THE MAIN PROJECTS (1) Main projects 1) Improvement of export corridor The promotion of exports is indispensable for the development of the Paraguayan economy, and improvement of

More information

Landing in Latin America & Peering Landscape in Argentina

Landing in Latin America & Peering Landscape in Argentina Landing in Latin America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet

More information

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA 2016-2019 MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES ARGENTINA OVERVIEW 2018 1 2 3 Population: 45 million 8 country on surface 24 provinces 4 55 airports 5 39 millions of passengers

More information

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés Buenos Aires, December 5 th 2014 Bioceanico Aconcagua - Video http://youtu.be/ty2ljemubc4?list=uucj5hpq1jmbzksz7zc35h3q 2 Location CÓRDOBA

More information

Landing in South America & Peering Landscape in Argentina

Landing in South America & Peering Landscape in Argentina Landing in South America & Peering Landscape in Argentina South America Region Regional Facts World Population 7.350 B Region Population 652 M - 9% Regional Facts Average Internet Penetration 66% Internet

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS

Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS International Civil Aviation Organization SAM/IG/12-WP/12 South American Regional Office 26/09/13 Twelfth Workshop/Meeting of the SAM Implementation Group (SAM/IG/12) - Regional Project RLA/06/901 (Lima,

More information

METRO OPERATIONS COMMITTEE

METRO OPERATIONS COMMITTEE Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition

More information

08-15 FDI/GDP (%, average) Foreign Direct Investment (Avg. USD BB/Year) Average 4.5% % 5.0% 6.0x 3.9% 3.4% 2.

08-15 FDI/GDP (%, average) Foreign Direct Investment (Avg. USD BB/Year) Average 4.5% % 5.0% 6.0x 3.9% 3.4% 2. 1 ~ ~ 2 74.9 Foreign Direct Investment (Avg. USD BB/Year) 90-00 08-15 8.4% 08-15 FDI/GDP (%, average) 6.0x 12.5 2.9x 9.4 27.4 19.7 1.4x 5.8x 6.6x 12.4 5.4x 9.7 7.1 8.2 3.4 1.9 1.5 5.0% 3.9% 3.4% 2.4% Average

More information

Results of Tourism Activity. July, 2017

Results of Tourism Activity. July, 2017 Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, July 2016 Lago de San Miguel Regla, Hidalgo. Jardín en Hacienda San Gabriel, Morelos. Parras, Coahuila. Paseo Santa Lucía, Monterrey. Undersecretariat of Planning and

More information

Results of Tourism Activity Mexico, February 2017

Results of Tourism Activity Mexico, February 2017 Results of Tourism Activity Mexico, February Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES ANSConf-WP/23 4/2/00 ITEM 6 CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES (Montreal, 19-28 June 2000) Agenda Item 6: Guidance and assistance by ICAO ICAO ACTIVITIES IN THE FIELD OF

More information

International economic context and regional impact

International economic context and regional impact Contents I. GDP growth trends in Latin America and the Caribbean in 2012 II. Regional performance in 2012: Inflation, employment and wages External sector Policies: Fiscal and Monetary III. Conclusions

More information

Financing Infrastructure Development

Financing Infrastructure Development Financing Infrastructure Development Expert Group Meeting United Nations New York - October 2017 Vienna Programme of Action (VPoA) Decade 2014-2024 Transforming landlocked countries into Land linked Countries

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES. International Civil Aviation Organization MIDADD SG*/1-WP/7 18/01/ 12 MID Region AIS Database Study Group First Meeting (MIDADD SG*/1) (Cairo, Egypt, 20 22 February 2012) Agenda Item 8: Legal & Institutional

More information

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005 MODAIR: Measure and development of intermodality at AIRport INO WORKSHOP EEC, December 6 h 2005 What is intermodality? The use of different and coordinated modes of transports for one trip High Speed train

More information

GAMA 2020 PUBLIC TRANSPORT VISION

GAMA 2020 PUBLIC TRANSPORT VISION GAMA 2020 PUBLIC TRANSPORT VISION BACKGROUND INFORMATION THE MOBILITY CHALLENGE MANIFESTED BY CONGESTION INADEQUATE INFRASTRUCTURE INDISCIPLINE PRESCRIBED SOLUTION Road Space Usage Bus & Trotro Carry 70%

More information

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Jun-2017 ISR28350 Implementing Agencies:

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA

LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA LARGE SCALE LAND ACQUISITIONS PROFILE ARGENTINA This report describes the situation in Argentina with respect to large-scale land acquisitions (LSLA) uploaded to the Land Matrix. This analysis was based

More information

Chile. Tourism in the economy. Tourism governance and funding

Chile. Tourism in the economy. Tourism governance and funding Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated

More information

Manual vs. Automatic Operation and Operational Restrictions

Manual vs. Automatic Operation and Operational Restrictions Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit

More information

Annual Performance Report. easier, faster, safer

Annual Performance Report. easier, faster, safer Annual Performance Report 2017 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic Volume (Per Corridor

More information

Global Real Estate Investment in Latin America Portfolio Diversification Strategies and Urban Development

Global Real Estate Investment in Latin America Portfolio Diversification Strategies and Urban Development Masterthese zur Erlangung des Master of Advanced Studies in Real Estate Global Real Estate Investment in Latin America Portfolio Diversification Strategies and Urban Development Verfasser: Eingereicht

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

Tourism Sector Development: JICA s Approach

Tourism Sector Development: JICA s Approach Tourism Sector Development: JICA s Approach April 26, 2013 Japan International Cooperation Agency (JICA) JICA s Vision and Mission Mission1 Addressing global agenda Vision Inclusive and Dynamic Development

More information

JOIN s Investment for Urban Development Projects in Indonesia

JOIN s Investment for Urban Development Projects in Indonesia JOIN s Investment for Urban Development Projects in Indonesia September 5, 2017 Indonesia - Japan Urban Development & Housing seminar 2017 JOIN (Japan Overseas Infrastructure Investment Corporation for

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC17238 Project Name Santa

More information

JAKARTA TRANSPORTATION

JAKARTA TRANSPORTATION Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre

More information

November 7 th Post Workshop Report

November 7 th Post Workshop Report Malaga Workshop November 7 th 2017 Post Workshop Report Main Conclusions and Lessons Learnt November 2017 Contents 1. Introduction... 3 2. Day 1... 5 2.1. Technical Visit to the Metropolitan Transport

More information

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November

More information

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands Leveraging Cultural Heritage for Sustainable Development MIDDLE EAST & NORTH AFRICA Hedi Larbi Sector Manager April 16, 2007 AGENDA MENA Region Economic Context/Challenges Importance of Cultural Heritage

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, June Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011 Activity Report 2011 IIRSA Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011 Areas of Work 2011 Integration Priority Project Agenda Project Portfolio Sectoral Integration Processes

More information

Results of Tourism Activity Mexico, March 2017

Results of Tourism Activity Mexico, March 2017 Results of Tourism Activity Mexico, March Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

2007/08 Full Year Results Investor Briefing

2007/08 Full Year Results Investor Briefing 2007/08 Full Year Results Investor Briefing Highlights of Result Profit before tax up 46% to $1,408 million Up 36% on the reported result Margin improvement $3 billion of Sustainable Future Benefits achieved

More information

United Nations Environment Programme

United Nations Environment Programme United Nations Environment Programme Twelfth Forum of Ministers of the Environment of Latin America and the Caribbean Bridgetown, Barbados 2 nd to 7 th March 2000 A. Preparatory Meeting of Experts 2 nd

More information

About Romipack 5 ABOUT ROMIPACK

About Romipack 5 ABOUT ROMIPACK About Romipack 5 01 ABOUT ROMIPACK Romipack is an Argentine company with over 45 years in the market, leader in the manufacturing and sale of paper bags throughout Latin America. The investment policy

More information

Tourism strategies for the renovation of mature coastal tourist destinations in Spain

Tourism strategies for the renovation of mature coastal tourist destinations in Spain Tourism strategies for the renovation of mature coastal tourist destinations in Spain Sustainable Tourism 010, New Forest, UK. 5-7 July 010 Fernando Vera Rebollo / Isabel Rodríguez Sánchez JF.Vera@ua.es

More information

ENHANCED QUALITY FOR PASSENGERS, IMPROVED PROFITABILITY FOR THE COMPANY. Forward-looking terminal development project at Vienna Airport

ENHANCED QUALITY FOR PASSENGERS, IMPROVED PROFITABILITY FOR THE COMPANY. Forward-looking terminal development project at Vienna Airport ENHANCED QUALITY FOR PASSENGERS, IMPROVED PROFITABILITY FOR THE COMPANY Forward-looking terminal development project at Vienna Airport Vienna Airport presses ahead with quality campaign Terminal 3 in operation

More information

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated

More information