1 Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies: Ministry of Land, Environment and Rural Development, Ministry of Economy and Finance, Biofund Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:18-Nov-2014 Planned Mid Term Review Date:22-May-2017 Original Closing Date:30-Nov-2018 Project Development Objectives Effectiveness Date:01-May-2015 Actual Mid-Term Review Date:15-May-2017 Revised Closing Date:29-Nov-2019 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) To increase the effective management of the Conservation Areas and enhance the living conditions of communities in and around these Conservation Areas Has the Project Development Objective been changed since Board Approval of the Project Objective? No Global Environmental Objective (from Project Appraisal Document) To increase the effective management of the Conservation Areas and enhance the living conditions of communities in and around these Conservation Areas Public Disclosure Authorized Has the Global Environmental Objective been changed since Board Approval of the Project Objective? No Components Name Institutional Strengthening for CA Management:(Cost $12.10 M) Promotion of Tourism in CA:(Cost $2.20 M) Improving CA Management:(Cost $15.30 M) Page 1 of 10

2 Piloting Sustainable Community Livelihoods around CA:(Cost $10.10 M) Project Management, Monitoring and Evaluation:(Cost $4.70 M) Project Preparation Advance:(Cost $1.90 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions MozBio has made significant progress in 2017, and is on its way to meet (sometimes exceed) its PDO targets. Its implementation pace has also significantly improved in Some of the main achievements by component include: Component 1: Strengthening Institutions for Conservation Area Management. Large number of trainings to ANAC staff, including at international institutions. BIOFUND has successfully channeled the operational costs funds to 8 ACs. Signature of the co-management agreement between ANAC and African Parks for the Bazaruto National Park. ANAC's capacity remain a concern and the mission believes it should be reformed. Component 2: Promotion of Tourism in CAs. The Zenguelemo Tourism Concession in the Bazaruto National Park was awarded to the community, and MozBio funding has been secured for lodge construction. In addition, the tour operator, Wide & Far, for the lodge has already been identified. Regularization of Tourism Concessions. The regularization of two private tourism concessions operators of PNAB was advanced. The ToRs for the preparation of a special land use plan (Plano Especial de Ordenamento Territorial) for the 'Coast of the Elephants' (Matutuine District, Maputo Province) was prepared and approved by government, to be launched next year. Some promotional communication material was prepared. Component 3: Improving Conservation Areas Management. Significant achievements on wildlife counting and restocking, marine environment monitoring, ecological restoration, etc. Infrastructure (management and tourism) successfully finalized in Maputo Special Reserve, Ponta do Ouro, Chimanimani Reserve and Quirimbas National Park. The rest of infrastructure has technical design processes prepared and safeguards clearance well advanced, so they should all be concluded by the end of the project. Limited progress in 'rethinking Quirimbas', Component 4: Piloting Support to Sustainable Livelihoods of Communities within and around Conservation Areas. Number of beneficiaries of community development activities exceeded goals by 30%, with sevral ongoing community projects in the targeted areas. Some service providers continue to perform poorly than expected because they lack the necessary technical capabilities or sufficient knowledge of the project implementation area. Component 5 - Project Management, Monitoring and Evaluation. Project management was improved, including in safeguards management. M&E capacity remains a concern. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Moderate Moderate Page 2 of 10

3 Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Moderate Moderate Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other Overall -- Moderate Moderate Results Project Development Objective Indicators PHINDPDOTBL Areas brought under enhanced biodiversity protection (ha) (Hectare(Ha), Custom) Value ,549, ,900, Date 18-Nov Apr Dec Nov-2019 This indicator monitor the Conservation Areas (CA) brought under enhanced biodiversity conservation. Based on the score of the Management Effectiveness Tracking Tool (METT), a Conservation Area is considered brought under enhanced biodiversity when it moves up one level in the METT score since the beginning of the project. Seven of Eleven monitored CAs have already moved up one level in METT score. In 2018 we believe that Bazaruto Archipelafo National Park will also be triggered as enhanced biodiversity conservation areas due to the signing of co-management agreement, strengthening of conservation and infrastructure construction. PHINDPDOTBL Direct project beneficiaries (Number, Custom) Value , , , Date 18-Nov Apr Dec Nov-2019 Page 3 of 10

4 The launching several sub-projects under the Component 4: Piloting Support to Sustainable Livelihoods of Communities within and around Conservation Areas, increased the already number of people benefiting from the project, from 144 in 2016 to 18,147 in Also, the expansion and consolidation of the 20% of revenues channeling process from CAs to local communities (from 11,483 beneficiaries in 2016 to 12,023 beneficiaries in 2017) and jobs creation in CAs (from 1,122 beneficiaries in 2016 to 1,549 beneficiaries in 2017) contributed to the increase in the result. PHINDPDOTBL Female beneficiaries (Percentage, Custom) Value Date 18-Nov Dec Dec Nov-2019 This indicator is the percentage of the Direct Beneficiaries. The value tend to be high because majority of the sub-projects in Component 4 are to finance commercial, ecological and conservation agriculture activities developed by women. PHINDPDOTBL Number of tourism concessions regularized in the Bazaruto Archipelago National Park (Number, Custom) Value Date 29-Nov Dec Dec Nov-2019 The Zeguelemo Tourism Concession awarded the community and regularized. However, despite that no old concession were regularized there was great advance in the negotiation and getting the concessionaires on the sensitized with this objective. Moreover, the Government and we believe the new Co-Managers of the park as well are willing to support, legal and politically, the process the regularization of the remaining 7 concessions. Overall Page 4 of 10

5 PHINDGEOTBL Global Environmental Objective Indicators N/A (Amount(USD), Custom) Value Date Overall PHGEOCMTS Intermediate Results Indicators Score on the institutional capacity tool for ANAC (Percentage, Custom) Value Date 18-May Apr Dec Nov-2019 This index values a relatively high when compared to the End Target Value because ANAC produced several documents and regulations that contributed to the improvement of their index assessment in the current year. However, the maximum value of that the index reaches is 155, an ANAC is at 1/3. So relatively ANAC has improved greatly from the 38 baseline to suppress the 58 End Target but this does not show that ANAC reached its ideal index mark for to deal with conservation challenges. Annual Biofund disbursement to the Conservation areas (Amount(USD), Custom) Value , , ,000, Date 18-May Jun Dec Nov-2019 Page 5 of 10

6 Biofund has substantially over-reached this year Annual Target, this is because on top of channeling its own Sinking Funds (Projecto ABELHA), Biofund now started to disburse the Operational Costs to CAs foressen under Component 3 before channeled through MOZBIO unit. ANAC s annual revenues collected from targeted CAs (Amount(USD), Custom) Value 32,676, ,314, ,808, ,778, Date 18-May Apr Dec Nov-2019 The collected revenues is associated with the installation of a new System for Visitor Counting and Revenue Collection in Maputo Special Reserve and Bazaruto Archipelafo National Park Submitted and/or signed Co-Management Agreements for Conservation Areas. Submitted and/or signed Co-Management Agreements for Conservation Areas (Amount(USD), Custom) Value Date 30-Nov Dec Dec Nov-2019 This indicator reached its End Target for the project since the Bazaruto Archipelafo National Park and Maputo Special Reserve / Ponta do Ouro Marine Partial Reserve agreements have been prepared and submitted for approval to MITADER. However, the Bazaruto Archipelafo National Park have already been signed and we expected that the Maputo Special Reserve / Ponta do Ouro Marine Partial Reserve will also be signed earlier next year as the negotiation are well advanced. Page 6 of 10

7 Number of jobs created in tourism and conservation in targeted CAs (Number, Custom) Value , , , Date 18-Nov Dec Dec Nov-2019 The increase of number of jobs created in tourism and CAs are mainly resulted from a better assessment that ANAC were able to conduct this year. However, we expect that the infrastructure development, for instance the road construction resulting better accessibility to Maputo Special Reserve and Ponta do Ouro Marine Partial Reserve, will increase the number of jobs in tourism (accommodation, restaurants, and tourism leisure activities). Law Enforcement patrols in targeted CAs (Number, Custom) Value 5, , , , Date 18-Nov Dec Dec Nov-2019 The number of patrols have been increased steadily as the Operation Cost are being channeled more regularly to assist this activity and there is strong governmental orientation to strengthen the law enforcement country wide. Planned priority infrastructure completed (Percentage, Custom) Value Date 18-May Apr Dec Nov-2019 The planned priority infrastructure also increased with the completion of the Tandanhangue Pier and the well advanced Shingwedzi Drift in addition the houses and supporting infrastructure in many MOZBIO target CAs. Page 7 of 10

8 Index on local communities perception of benefits from target CAs (Percentage, Custom) Value Date 18-Nov Dec Dec Nov-2019 This index is only planned to be measure at beginning and the end of the project. However, efforts have already been made to start the preparation of the survey so that result can be ready at the end the project. Number of beneficiaries of subprojects supported by the Project (Number, Custom) Value , , , Date 18-Nov Apr Dec Nov-2019 In the current year, the launching of several new sub-projects increased the number of people benefiting from 144 in 2016 to 18,147 in Income derived from tourism and wildlife utilization in targeted CAs and returned to communities. (Amount(USD), Custom) Value 3,115, , ,201, ,786, Date 18-May Apr Dec Nov-2019 The significant increase is due to the augmentatione of Sustainable Wildlife Use of Marromeu National Reserve due to the augmentation of buffaloes populations resulted in a concomitant increase of 20% of the revenue channeled to the communities. Page 8 of 10

9 Annual CO2 emissions from deforestation in selected Conservation areas (Tones/year, Custom) Value 1,000, , , , Date 18-May Dec Dec Nov-2019 Overall The Actual (Current) value for the Indicator CO2 emissions from deforestation in selected CAs represents only the partial value of emissions estimated for Chimanimani National Reserve since the Gile National Reserve emissions values were not available at the time of submission of this ISR. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IDA-H9960 Effective USD % P TF Effective USD % Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IDA-H9960 Effective 18-Nov Dec May Nov Nov-2019 P TF Effective 05-Dec Dec May Nov Nov-2018 Cumulative Disbursements Page 9 of 10

10 Restructuring History Level 2 Approved on 19-Jan-2017,Level 2 Approved on 24-Oct-2017 Related Project(s) P Mozambique GEF Conservation Areas for Biodiversity and Development Project Page 10 of 10

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Jun-2017 ISR28350 Implementing Agencies:

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

AFRICA. Mozambique. Biodiversity

AFRICA. Mozambique. Biodiversity Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA8099 Project Name

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

THE BUSINESS CASE FOR BIODIVERSITY STEWARDSHIP

THE BUSINESS CASE FOR BIODIVERSITY STEWARDSHIP THE BUSINESS CASE FOR BIODIVERSITY STEWARDSHIP Primary Authors - Tracey Cumming (SANBI / DEA), Amanda Driver (SANBI) Secondary Authors Pravin Pillay (Ezemvelo KZN Wildlife), Greg Martindale (Ezemvelo KZN

More information

South African National Parks a business overview PARK PRICING WORKSHOP VICTORIA FALLS 27 to 30 APRIL 2011

South African National Parks a business overview PARK PRICING WORKSHOP VICTORIA FALLS 27 to 30 APRIL 2011 South African National Parks a business overview PARK PRICING WORKSHOP VICTORIA FALLS 27 to 30 APRIL 2011 Contents Overview of conservation in South Africa National Parks in South Africa Business Performance

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Tourism and Wetlands

Tourism and Wetlands CONVENTION ON WETLANDS (Ramsar, Iran, 1971) 43 rd Meeting of the Standing Committee Gland, Switzerland, 31 October 4 November 2011 DOC. SC43-27 Tourism and Wetlands Action requested. The Standing Committee

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

Getting Rural Youth Ready for Work in Burma. (Myanmar) Project No:

Getting Rural Youth Ready for Work in Burma. (Myanmar) Project No: Final Technical Report Getting Rural Youth Ready for Work in Burma Supported by (Myanmar) Project No: 108265-001 Implemented by Tag International Development Yangon, Myanmar 31 st January 2017 Implemented

More information

Tourism Sector Development: JICA s Approach

Tourism Sector Development: JICA s Approach Tourism Sector Development: JICA s Approach April 26, 2013 Japan International Cooperation Agency (JICA) JICA s Vision and Mission Mission1 Addressing global agenda Vision Inclusive and Dynamic Development

More information

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING MEETING CONCLUSIONS Andean South America Regional Meeting Lima, Peru 5-7 March 2002 1.0 ECOTOURISM PLANNING 1.1 Protected Areas Ecotourism in Protected Areas is part of an integrated vision of tourism

More information

Communities and conservation in West Kilimanjaro, Tanzania: Participation, costs and benefits

Communities and conservation in West Kilimanjaro, Tanzania: Participation, costs and benefits Communities and conservation in West Kilimanjaro, Tanzania: Participation, costs and benefits Lokalsamfunn og naturvern i Vest-Kilimanjaro, Tanzania: Deltakelse, kostnader og nytte Philosophiae Doctor

More information

Benefit Sharing in Protected Area Management: the Case of Tarangire National Park, Tanzania

Benefit Sharing in Protected Area Management: the Case of Tarangire National Park, Tanzania Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Findings reports on ongoing operational, economic and sector work carried out by the

More information

TUI GROUP INVESTOR PRESENTATION

TUI GROUP INVESTOR PRESENTATION TUI GROUP INVESTOR PRESENTATION German Investment Conference UniCredit / Kepler Munich, 26-27 September 2012 Future-related statements This presentation contains a number of statements related to the future

More information

Vietnam Marine Protected Area Management Effectiveness Evaluation

Vietnam Marine Protected Area Management Effectiveness Evaluation Vietnam Marine Protected Area Management Effectiveness Evaluation 5 th EAS Congress (16-21 November, 2015) Bui Thi Thu Hien IUCN Viet Nam Marine Protected Areas: Global Status There are over 161,000 protected

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan 1. Name of the Project Ex-Ante Evaluation (for Japanese ODA Loan) Country: The Republic of Peru Project: Amazonas Rural Development Project Loan Agreement: January 9, 213 Loan Amount:

More information

The results of the National Tourism Development Strategy Assessments

The results of the National Tourism Development Strategy Assessments The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

Activity Concept Note:

Activity Concept Note: Activity Concept Note: Summary Provide a short summary of the proposed Activity including indicative New Zealand funding level and note whether this is a New Zealandled or partner-led process. Why: Rationale

More information

The Value of Investing in Local Economic Development and Sustainable Tourism

The Value of Investing in Local Economic Development and Sustainable Tourism The Value of Investing in Local Economic Development and Sustainable Tourism Ji You Urban Specialist Sustainable Development Department The World Bank August 1, 2013 Dunhuang, China The World Bank Group

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Mar Jerie Meacham / DENR MOO 2012 Photo Competition

Mar Jerie Meacham / DENR MOO 2012 Photo Competition Mar Jerie Meacham / DENR MOO 2012 Photo Competition Within ADB s Southeast Asia Department, CTI is a subprogram of the Brunei-Indonesia-Malaysia-Philippines East ASEAN Growth Area. ADB support to the Coral

More information

Results of Tourism Activity. July, 2017

Results of Tourism Activity. July, 2017 Results of Tourism Activity July, 2017 Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO Minister

More information

Heathrow (SP) Limited

Heathrow (SP) Limited Draft v2.0 10 Feb Heathrow (SP) Limited Results for year ended 31 December 2013 24 February 2014 Strong operational and financial performance in 2013 Passenger satisfaction at record high and over 72 million

More information

Analysts and Investors conference call. Q results. 15 May 2013

Analysts and Investors conference call. Q results. 15 May 2013 Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,

More information

Nature Conservation and Developing Sustainable tourism in Myanmar

Nature Conservation and Developing Sustainable tourism in Myanmar Nature Conservation and Developing Sustainable tourism in Myanmar Myanmar Tourism O Tourism in Myanmar has boomed in recent years, with the industry generating nearly $1.8 billion in revenue in 2014 as

More information

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project Manager:

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE GEF GRANT (TF-96758) Approved by the Board on June 17, 2010 TO THE ITAIPÚ BINACIONAL February

More information

33. Coiba National Park and its Special Zone of Marine Protection (Panama) N 1138 rev)

33. Coiba National Park and its Special Zone of Marine Protection (Panama) N 1138 rev) World Heritage status of the area and the Outstanding Universal Value of the Monarch butterfly migration phenomenon, c) Explore options for the development of non-butterfly related tourism activities;

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

From: OECD Tourism Trends and Policies Access the complete publication at: Mexico

From: OECD Tourism Trends and Policies Access the complete publication at:  Mexico From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Mexico Please cite this chapter as: OECD (2014), Mexico, in OECD Tourism Trends and

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC2258 Project Name Djibouti

More information

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX MAY 2018 CTI reading of 51.7 in May 2018 shows that travel to or within the U.S. grew 3.4% in May 2018 compared to May 2017. LTI predicts moderating travel growth

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Bazaruto Archipelago National Park-Mozambique. Mozambique. Workshop on MPAs- Is MPAs a useful tool In Fisheries management?

Bazaruto Archipelago National Park-Mozambique. Mozambique. Workshop on MPAs- Is MPAs a useful tool In Fisheries management? Bazaruto Archipelago National Park-Mozambique Workshop on MPAs- Is MPAs a useful tool In Fisheries management? Norway ; 24-25 25 October 2006 By Paula Santana Afonso Institute for Fisheries Research Mozambique

More information

Workshop on Coastal and Maritime Tourism Cooperation Introductory statement

Workshop on Coastal and Maritime Tourism Cooperation Introductory statement Workshop on Coastal and Maritime Tourism Cooperation Introductory statement Schwerin, 16. May 2013 Wolf Born, State Chancellery Mecklenburg-Vorpommern Agenda 2 Guiding questions for discussion 1. Profiling

More information

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS WANNAKIAT THUBTHIMSANG PHUKET MARINE BIOLOGICAL CENTER, DMCR, THAILAND ASIA- PACIFIC DAY FOR THE OCEAN 20 NOVEMBER 2018, CONFERENCE ROOM 4,

More information

PCN Annex: GEF Data Sheet

PCN Annex: GEF Data Sheet PCN Annex: GEF Data Sheet PROJECT IDENTIFICATION Project Title: West Balkans Drina River Basin Management Country(ies): Bosnia-Herzegovina, Serbia, GEF Project ID: 7 Montenegro GEF (ies): World Bank GEF

More information

2007/08 Full Year Results Investor Briefing

2007/08 Full Year Results Investor Briefing 2007/08 Full Year Results Investor Briefing Highlights of Result Profit before tax up 46% to $1,408 million Up 36% on the reported result Margin improvement $3 billion of Sustainable Future Benefits achieved

More information

Queensland State Election Priorities 2017

Queensland State Election Priorities 2017 Queensland State Election Priorities 2017 Protecting, conserving and celebrating Queensland s environmental, built and cultural heritage. QUEENSLAND S HERITAGE MAKES A DIFFERENCE Environmental, built and

More information

GABON DESIGNED BY NATURE. First Pan-African Conference on Sustainable Tourism Management in National Parks and Protected Areas:

GABON DESIGNED BY NATURE. First Pan-African Conference on Sustainable Tourism Management in National Parks and Protected Areas: Arusha, 16 th Octobre 2012 GABON DESIGNED BY NATURE First Pan-African Conference on Sustainable Tourism Management in National Parks and Protected Areas: Wildlife watching, Challenges and Opportunities

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA124664

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA124664 PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA124664 Project Name Region Country Financing Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/Updated

More information

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER NET PROFIT USD 101 MILLION IN THIRD QUARTER Total income in Q3 up by 10% between years, to USD 536.0 million Passenger revenue higher than expected EBITDA unchanged year on year, at USD 161.1 million Passenger

More information

Putting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism

Putting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism 1 of 5 ICME papers 2002 Putting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism By Clare Mateke Livingstone Museum, P O Box 60498, Livingstone,

More information

Community Based Development through Tourism in Bangladesh: Possibilities and Limitations

Community Based Development through Tourism in Bangladesh: Possibilities and Limitations Community Based Development through Tourism in Bangladesh: Possibilities and Limitations Mr. Haque Md. Monzorul Joint Secretary Ministry of Civil Aviation & Tourism Introduction Initiatives have been taken

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION INTERNATIONAL CIVIL AVIATION ORGANIZATION Implementation of ICAO Universal Safety Oversight Audit Programme (USOAP) Corrective Action Plan Revised Plan of Action for Malawi JULY 2013 - 2 - REVISED ICAO

More information

TRANSFRONTIER CONSERVATION AREAS (TFCAs)

TRANSFRONTIER CONSERVATION AREAS (TFCAs) TRANSFRONTIER CONSERVATION AREAS (TFCAs) PROGRAMME OF WORK IN PROTECTED AREAS 22/03/ 2016 1 DEFINITIONS Transfrontier Conservation Area (TFCA) An area that straddles the boundaries of two or more countries

More information

Theme A ECOTOURISM DEVELOPMENT IN TANZANIA : THE SUSTAINABILITY CHALLENGE

Theme A ECOTOURISM DEVELOPMENT IN TANZANIA : THE SUSTAINABILITY CHALLENGE Theme A STATEMENT BY MR. PHILEMON L. LUHANJO, PERMANENT SECRETARY, MINISTRY OF NATURAL RESOURCES AND TOURISM-TANZANIA, AT THE SUMMIT OF CELEBRATION OF THE INTERNATIONAL YEAR OF ECOTOURISM, QUEBEC CANADA,

More information

Airport Privatization:

Airport Privatization: Airport Privatization: Focus on Concessions Hemant Mistry Director, Global Airport Infrastructure and Fuel Dorian Reece Director, Government and Infrastructure, Deloitte During our AGM in Sydney last year

More information

IATA FUEL EFFICIENCY CAMPAIGN

IATA FUEL EFFICIENCY CAMPAIGN IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track

More information

BILATERAL AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BOTSWANA AND THE GOVERNMENT OF THE REPUBLIC OF SOUTH AFRICA ON THE RECOGNITION OF THE

BILATERAL AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BOTSWANA AND THE GOVERNMENT OF THE REPUBLIC OF SOUTH AFRICA ON THE RECOGNITION OF THE - 1 - BILATERAL AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BOTSWANA AND THE GOVERNMENT OF THE REPUBLIC OF SOUTH AFRICA ON THE RECOGNITION OF THE KGALAGADI TRANSFRONTIER PARK - 2 - PREAMBLE The

More information

Draft LAW. ON SOME AMENDAMENTS IN THE LAW No.9587, DATED ON THE PROTECTION OF BIODIVERSITY AS AMENDED. Draft 2. Version 1.

Draft LAW. ON SOME AMENDAMENTS IN THE LAW No.9587, DATED ON THE PROTECTION OF BIODIVERSITY AS AMENDED. Draft 2. Version 1. Technical Assistance for Strengthening the Capacity of the Ministry of Environment, Forests and Water Administration in Albania for Law Drafting and Enforcement of National Environmental Legislation A

More information

COUNTRY CASE STUDIES: OVERVIEW

COUNTRY CASE STUDIES: OVERVIEW APPENDIX C: COUNTRY CASE STUDIES: OVERVIEW The countries selected as cases for this evaluation include some of the Bank Group s oldest (Brazil and India) and largest clients in terms of both territory

More information

How South Africa is making progress towards the Aichi 2020 Target 11

How South Africa is making progress towards the Aichi 2020 Target 11 How South Africa is making progress towards the Aichi 2020 Target 11 Montreal, Canada 2 May 2016 Oceans and Coasts Content Protected area considerations and progress 1994-2010 Terrestrial Protected Area

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC849 Project Name Lombok

More information

Sweden. Tourism in the economy. Tourism governance and funding

Sweden. Tourism in the economy. Tourism governance and funding Sweden Tourism in the economy In 2014 Sweden s GDP was SEK 3 907 billion. Tourism s share of GDP is 2.8%, and has been growing steadily for the last ten years and is an important contributor to the economy

More information

From: OECD Tourism Trends and Policies Access the complete publication at: Chile

From: OECD Tourism Trends and Policies Access the complete publication at:   Chile From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Chile Please cite this chapter as: OECD (2014), Chile, in OECD Tourism Trends and

More information

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites.

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites. Introduction: A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites Between The tourism industry and the UNESCO, World

More information