1 Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia) (P075207) Project Stage: Implementation Seq.No: 19 Status: ARCHIVED Archive : 26-Sep-2012 Country: Serbia Approval FY: 2004 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Public Enterprise Putevi Srbije Key s Board Approval 25-May-2004 Original Closing 31-Dec-2008 Planned Mid Term Review 15-Nov-2006 Last Archived ISR 29-Jan-2012 Effectiveness 07-Sep-2004 Revised Closing Actual Mid Term Review 10-Dec-2007 Project Development Objectives Project Development Objective (from Project Appraisal Document) To assist the Government of Serbia in reducing cost and improving safety for road users through: (a) improving the condition of selected road sections of the main and regional road network; (b) improving the effectiveness of road maintenance through the introduction of performance-based contracting in two pilot regions; and (c) introducing safe road design principles, road safety audits and targeted improvement measures. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost 1. Performance Based Road Maintenance Road Rehabilitation and Safety Improvements Goods, Consulting Services, Operating Costs and Training 6.70 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview An IDA Credit in the amount of SDR 37.5 million (US$ 55 million equivalent) was approved by the Bank for thetransportrehabilitation Project on May 25, 2004 and become effective shortly after on July 9, The original closing date forthe IDACredit was December 31, On June 20, 2007, the Bank approved Additional Financing for the Project in the amount ofeur36.8million (US$50million equivalent) through an IBRD loan; the closing date for the IBRD loan was June 30, 2011 and the closingdate for the IDA Credit was also extended to June 30, The IDA Credit closed on June 30, The IBRD loan closing date wasextended for the first time in March 2010 to December 31, 2011, and Page 1 of 7

2 subsequently a second time in November 2011 to June 15, 2012anda third time in June 2012 to September 30, The additional financing became effective on December 16, 2008, 18 months afterthe board approval. Main reason for delay in effectiveness was elections in the country that took place after the BoardApproval.During this period, the priorities for rehabilitation on the main and regional road network changed, and the roads proposed earlierwere rehabilitated using the budget of Public Enterprise Roads of Serbia (PERS). The length of road to be rehabilitated in theibrd project has increased from 112.5km to km, which required a change in the amount of the IntermediateOutput for thiscomponent in the Results Framework. Good implementation progress of the Project has continued since the last full implementationsupport mission in July August Work on eight of nine sections undergoing rehabilitation and all agreed accident black spotimprovements have been completed and work on the remaining road section is progressing well. All consulting services under theproject have been completed successfully. All contracts under IDA have been completed successfully.unfortunately, due to theheavy fluctuations of the exchange rates, US$ 1.3 million equivalent of IDA funds has been canceled. As of September 5,2012,disbursements amounted to 90 percent (US$104.0 million) of the total loan and credit funds within the project.ida credit hasclosed on June 30, Of the total IBRD loan funds US$ million out of US$ 50million or 80 percent have been disbursed - upfrom 66percent in May 5, There are no outstanding audits, financial management reports are satisfactory and the project'sdevelopment objectives continue to be achievable within the project closing date period. The Ministry of Transport,the Ministry offinances and Economy, and Public Enterprise Roads of Serbia confirmed their continued interest in the new RoadSafety andrehabilitation Program under preparation by the Bank. Locations Country First Administrative Division Location Planned Actual Serbia Central Serbia Zaječar-grad Serbia Central Serbia Opština Paraćin Serbia Not Entered Osnić Serbia Not Entered Lubnica Serbia Not Entered Krivi Vir Serbia Not Entered Kraljevo Serbia Not Entered Kragujevac Serbia Autonomna Pokrajina Vojvodina Opština Inđija Serbia Not Entered Celije Serbia Central Serbia Opština Boljevac Serbia Central Serbia Belgrade Serbia Not Entered Ravni Gaj Serbia Not Entered Zminjak Page 2 of 7

3 Country First Administrative Division Location Planned Actual Serbia Not Entered Valjevo Serbia Not Entered Sabac Serbia Not Entered Prnjavor Serbia Not Entered Loznica Serbia Central Serbia Opština Nova Varoš Serbia Not Entered Kolubarski Okrug Serbia Not Entered Macvanski Okrug Serbia Not Entered Raski Okrug Serbia Not Entered Sumadijski Okrug Serbia Central Serbia Zaječarski Okrug Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Defined reduction in vehicle operating costs (in Percentage Value %) for road users by car, on priority sections 01-Oct is average value of VOCs on all IDA financed sections is average of VOCs on all IDA financed sections after works have been completed. Satisfactory piloting of output and performance based contracts in the two pilot regions. IBRD sections have been just recently completed and the VOC values are not available yet. Yes/No Value No Yes Yes 01-Oct-2004 No experience with OPMBC approach Pilots projects have been successful. Solid experience with PBC approach based on contracts in two pilot regions. A plan to roll out the PBC to all 25 regions in Serbia.EU IPA grant money should be used Page 3 of 7

4 Number of road traffic accidents reduced by 5 percentage points on project sections Defined reduction in vehicle operating costs (in %) for road users by car, or IBRD financed sections to finance preparation of biding documents and education of the contractors. Percentage Value Nov-2010 PEPS now has the baseline data - average number of accidents on IDA financed sections is Average number after works on IDA financed sections is 10.4, but there are concerns over the quality and reliability of the data received from the traffic police. Data will be investigated and updated once data for newly completed sections are collected. Percentage Value Nov is average value of VOCs on all IDA financed sections TThis reflects the work on the IDA-financed roads only, since the sections under the IBRD project either have been just completed or are still under construction. Data will be updated as soon as data for newly completed sections are collected. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of km of highway rehabilitated within Kilometers Value project 01-Jan-2005 This does not include the roads within the pilot regions Up from 310 km, following restructuring of project. improved as part of those contracts. Cumulative reduction in unit costs for Percentage Value maintenance activities in two pilot regions 31-Dec-2004 Cumulative improvement over the three year period. Page 4 of 7

5 Length of road in lane km covered by road Kilometers Value safety audit 01-Jan-2005 Out of these, km have been audited by independent auditor, km by supervision consultant road safety specialist, and 44km by PERS road audit accredited staff and/or Swedish international Development Agency (SIDA) consultant. Number of accident blackspots address in Number Value project 31-Dec addressed under IDA credit, 9 under IBRD loan. Roads in good and fair condition as a share of Percentage Value total classified roads 01-Jan-2008 As per the latest "Road Network Analysis" prepared by PEPS (2011) Size of the total classified network Kilometers Sub Type Supplemental Value Roads rehabilitated, Non-rural Kilometers Value Jan-2005 This does not include the roads within the pilot regions improved as part of those contracts. Up from 310 km, following restructuring of project. Database for road and bridge condition, traffic and accidents is established and operational Remaining 21 km is under construction and are expected to be completed by the project closing date. Yes/No Value No Yes Yes 01-Jan-2005 Established and operational. It is advisable to improve user interfaces as well as interface to the HDM4. Page 5 of 7

6 Data on Financial Performance (as of 07-Sep-2012) Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IBRD Effective 20-Jun Jul Dec Jun-2011 P IDA Closed 25-May Jun Sep Dec Jun-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD P IDA Closed USD Disbursement Graph Key Decisions Regarding Implementation There are no key decisions in respect of disclosure at this time. Restructuring History Level two Approved on 10-Mar-2010, Level two Approved on 12-Mar-2010, Level two Approved on 10-Jun-2011, Level two Approved on 12-Dec-2011, Level two Approved on 14- Jun-2012 Related Projects Page 6 of 7

7 P TRANSPORT REHABILITATION ADDITIONAL FINANCING Page 7 of 7

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure

More information

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation

More information

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina AR Road Safety (P116989) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Norte Grande Road Infrastructure (P120198)

Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768

More information

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117

More information

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:

More information

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development

More information

Contract ID No WBC/RRC- M4/ WBC/RRC- R101/ WBC/RRC- M5PS/ WBC/RRC- M5SB/ WBC/RRC- M5SB/ WBC/RRC- M5SL/

Contract ID No WBC/RRC- M4/ WBC/RRC- R101/ WBC/RRC- M5PS/ WBC/RRC- M5SB/ WBC/RRC- M5SB/ WBC/RRC- M5SL/ re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Item 2 3. 3.2 3.3 3.4 4 5 6 7 8 9 Pavement rehabilitationupgrading of main road M4, Section: Kamenica

More information

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Implementation Status & Results Bolivia BO Rural Alliances (P083051) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

IATA FUEL EFFICIENCY CAMPAIGN

IATA FUEL EFFICIENCY CAMPAIGN IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track

More information

Monthly SunPass Transponder Sales Inception to June 2012

Monthly SunPass Transponder Sales Inception to June 2012 Monthly SunPass Transponder Sales Inception to June 2012 This graph shows the monthly SunPass transponder sales since inception. The significant increase in transponder sales during March 2004 is attributed

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Faculty and Staff: D. Gillen, M. Hansen, A. Kanafani, J. Tsao Visiting Scholar: G. Nero and Students: S. A. Huang and W. Wei

More information

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER NET PROFIT USD 101 MILLION IN THIRD QUARTER Total income in Q3 up by 10% between years, to USD 536.0 million Passenger revenue higher than expected EBITDA unchanged year on year, at USD 161.1 million Passenger

More information

CWC LA - Cash Balance (January 2012)

CWC LA - Cash Balance (January 2012) CWC LA - Cash Balance 2012-13 (January 2012) 1,200,000 Cash Balance 1,000,000 800,000 ($1,000s) 600,000 400,000 200,000 - CWC LA - Actuals/Projected CWC LA - ed (Nov) 1 1 CWC Hollywood - Financial Dashboard

More information

METRO OPERATIONS COMMITTEE

METRO OPERATIONS COMMITTEE Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition

More information

Total expenditure by international tourists visiting Spain in August increases by 10.3% as compared with the same month of 2016

Total expenditure by international tourists visiting Spain in August increases by 10.3% as compared with the same month of 2016 3 October 2017 Tourist expenditure survey. Provisional data Total expenditure by international tourists visiting Spain in August increases by 10.3% as compared with the same month of 2016 Average daily

More information

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective NEXTOR NEXTOR Moving Moving Metrics: Metrics: A Performance-Oriented View View of of the the Aviation Aviation

More information

Semi - Annual Report. April 2, From September 21, 2003 to March 20, 2004

Semi - Annual Report. April 2, From September 21, 2003 to March 20, 2004 Comparison of the Effectiveness of a Personal Computer Aviation Training Device, a Flight Training Device, and an Airplane in Conducting Instrument Proficiency Checks Semi - Annual Report April 2, 2004

More information

PERFORMANCE REPORT NOVEMBER 2017

PERFORMANCE REPORT NOVEMBER 2017 PERFORMANCE REPORT NOVEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND In June

More information

AUCKLAND DESTINATION OVERVIEW

AUCKLAND DESTINATION OVERVIEW AUCKLAND DESTINATION OVERVIEW AUGUST 218 An in-depth overview of Auckland s visitor economy from the latest arrival, accommodation, spend and cruise data through to past five- commentary. Prepared September

More information

INTERNATIONAL DEVELOPMENT ASSOCIATION

INTERNATIONAL DEVELOPMENT ASSOCIATION This report was prepared for use within the Association. It may not be published nor may it be quoted as representing the Association's views. The Association accepts no responsibility for the accuracy

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2017 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

Nova Scotia Tourism Indicators March 2018

Nova Scotia Tourism Indicators March 2018 Nova Scotia Tourism Indicators March 2018 Data as of May 31st, 2018 2018 Tourism Visitation YTD Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Visitor Entries ('000s) Road Visits by Entry Point* 220 68

More information

Cranfield Safety Management and Investigation Course

Cranfield Safety Management and Investigation Course Cranfield Safety Management and Investigation Course 2005 Asia-Pacific Conference on Risk Management and Safety Hong Kong, 1 December 2005 Hong Kong, 28 November 2005 Safety Management System Safety Management

More information

AUCKLAND DESTINATION OVERVIEW

AUCKLAND DESTINATION OVERVIEW AUCKLAND DESTINATION OVERVIEW September 218 An in-depth overview of Auckland s visitor economy from the latest arrival, accommodation, spend, cruise and event data through to past five- commentary. Prepared

More information

Implementation of SESAR Pilot Common Project. - expected effects

Implementation of SESAR Pilot Common Project. - expected effects Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European

More information

Presentation to the Portfolio Committee on Transport by the Director of Civil Aviation Captain Colin Jordaan. 22 October 2010

Presentation to the Portfolio Committee on Transport by the Director of Civil Aviation Captain Colin Jordaan. 22 October 2010 Presentation to the Portfolio Committee on Transport by the Director of Civil Aviation Captain Colin Jordaan 22 October 2010 SACAA Mandate The South African Civil Aviation Authority (SACAA) is an agency

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2016 Economic Impact of Tourism Headline Figures Oxfordshire - 2016 number of trips (day & staying) 27,592,106

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism North Norfolk District - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Norfolk - 2016 Contents Page Summary Results 2 Contextual analysis 4 Volume of Tourism 7 Staying Visitors - Accommodation

More information

Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016

Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016 3 November 2017 Tourist expenditure survey. Provisional data Total expenditure by international tourists visiting Spain in September increases by 12.3% as compared withthe same month of 2016 Average daily

More information

Road Rehabilitation Project

Road Rehabilitation Project Indonesia Road Rehabilitation Project Report Date: March 2001 Field Survey: September 2000 1. Project Profile and Japan s ODA Loan Location Map of Project Area Improved Road Section in Lampung Province,

More information

Nova Southeastern University Joint-Use Library Agreement: Review of Public Usage

Nova Southeastern University Joint-Use Library Agreement: Review of Public Usage Exhibit 1 Nova Southeastern University Joint-Use Library Agreement: Robert Melton, CPA, CIA, CFE, CIG County Auditor Audit Conducted by: Gerard Boucaud, CISA, Audit Manager Dirk Hansen, CPA, Audit Supervisor

More information

Nova Scotia Tourism Indicators November 2018

Nova Scotia Tourism Indicators November 2018 Nova Scotia Tourism Indicators November 2018 2018 Tourism Visitation YTD Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Visitor Entries ('000s) Road Visits by Entry Point* 1,507 68 69 83 90 122 149 274

More information

КORIDORI SRBIJE. The Danube Region Transport Days 2013 STATUS OVERVIEW. October 3, 2013 Belgrade

КORIDORI SRBIJE. The Danube Region Transport Days 2013 STATUS OVERVIEW. October 3, 2013 Belgrade КORIDORI SRBIJE The Danube Region Transport Days 2013 STATUS OVERVIEW October 3, 2013 Belgrade 1 CONTENT Introduction Company profile Basic information Importance of the project Stakeholders map Finance

More information

Contract (Description)

Contract (Description) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A1 A3 A8 Contract Reference Contract (Description) PART A: Sector Policy, Legal, Regulatory,

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

LOVE FIELD ENVIRONMENTAL ADVISORY COMMITTEE QUARTERLY REPORT. October December 2016

LOVE FIELD ENVIRONMENTAL ADVISORY COMMITTEE QUARTERLY REPORT. October December 2016 LOVE FIELD ENVIRONMENTAL ADVISORY COMMITTEE QUARTERLY REPORT October December 2016 VOLUNTARY NOISE CONTROL PROGRAM COMPLIANCE DURING PREFERENTIAL HOURS 2100 0600 (JAN SEP 2016) 2 PERCENTAGE OF COMPLIANCE

More information

MARKET NEWSLETTER No 57 January 2012

MARKET NEWSLETTER No 57 January 2012 OVERVIEW OF INTRA-EUROPEAN UNION TRADING BETWEEN 2007/08 AND 2010/11 The data on intra-eu trade reported in this month s newsletter have been taken from the EUROSTAT database. However, it is important

More information

Keflavik International Airport Passenger forecast 2018

Keflavik International Airport Passenger forecast 2018 Keflavik International Airport Passenger forecast 2018 2 Keflavik International Airport Passenger forecast Keflavik International Airport 2018 3 Passenger Forecast 2018 Forecast 2018 6,409,312 3,971,969

More information

Exchange Sunshine Coast 2014

Exchange Sunshine Coast 2014 Exchange Sunshine Coast 2014 A refresher on CSQ... What does CSQ do? We: promote careers in the building and construction industry invest in skills and training grow the number of skilled workers build

More information

SSP progress in Latvia. Overview

SSP progress in Latvia. Overview SSP progress in Latvia CAA of Latvia: Ms. Ērika Neimane, Head of the ATM Section, ANS Division LGS: Mr. Jānis Lapiņš, Head of Safety, Quality, Security and Audit Management airbaltic: Mr. Lauris Miķelsons,

More information

AUCKLAND DESTINATION OVERVIEW

AUCKLAND DESTINATION OVERVIEW AUCKLAND DESTINATION OVERVIEW October 218 An in-depth overview of Auckland s visitor economy from the latest arrival, accommodation, spend, cruise and event data through to past five- commentary. Prepared

More information

2015 Business Survey Report Erie to Pittsburgh Trail March 2015

2015 Business Survey Report Erie to Pittsburgh Trail March 2015 2015 Business Survey Report Erie to Pittsburgh Trail March 2015 Table of Contents Executive Summary 2 2013 EPT Trail User Survey and Impact Analysis 3 Overview 3 Results 3 2014 2015 Erie to Pittsburgh

More information

PERFORMANCE REPORT DECEMBER 2017

PERFORMANCE REPORT DECEMBER 2017 PERFORMANCE REPORT DECEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND Keith

More information

Sound Transit Operations August 2015 Service Performance Report. Ridership

Sound Transit Operations August 2015 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Aug-14 Aug-15 % YTD-14 YTD-15 % ST Express 1,534,241 1,553,492 1.3% 11,742,839 12,354,957 5.2% Sounder 275,403 326,015 18.4% 2,139,086 2,463,422 15.2% Tacoma Link

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

Air China Limited Annual Results. March Under IFRS

Air China Limited Annual Results. March Under IFRS Air China Limited 21 Annual Results Under IFRS March 211 Agenda Part 1 Highlights Part 2 Business Overview Part 3 Financial Overview Part 4 Outlook 2 Part 1 Highlights Steady Economic Growth; Asia Pacific

More information

Nova Scotia Tourism Indicators August 2017

Nova Scotia Tourism Indicators August 2017 Nova Scotia Tourism Indicators August 2017 Data as of September 28, 2017 2017 Tourism Visitation YTD Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Visitor Entries ('000s) Road Visits by Entry Point*

More information

Sound Transit Operations January 2014 Service Performance Report. Ridership

Sound Transit Operations January 2014 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Jan-13 Jan-14 % YTD-13 YTD-14 % ST Express 1,343,290 1,426,928 6.2% 1,343,290 1,426,928 6.2% Sounder 245,135 256,775 4.7% 245,135 256,775 4.7% Tacoma Link 86,229

More information

Results of Tourism Activity Mexico, February 2017

Results of Tourism Activity Mexico, February 2017 Results of Tourism Activity Mexico, February Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Information meeting. 1 st September 2011

Information meeting. 1 st September 2011 Information meeting 1 st September 2011 Full Year 2010-11 key data April 2010-March 2011 Revenues in billions Operating result in millions 77% Passenger 18.10 +11.3% -44 +874 13% Cargo 3.16 +29.5% +69

More information

Auckland Transport Quarterly Indicators Report 2018/19

Auckland Transport Quarterly Indicators Report 2018/19 Attachment 1 Auckland Transport ly Indicators Report 218/19 September 218 Table of Contents Page 2. 1. Executive summary 2. External indicators 3. Performance by Key Priority 3.1 Deliver an efficient and

More information

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 MR. DON GETTY PROJECT MANAGER Kentucky Lock Addition Nashville District 19 July 2017 The views, opinions and findings contained

More information

Tourism in South Africa A statistical overview

Tourism in South Africa A statistical overview Tourism in South Africa A statistical overview Purpose of presentation Purpose of the presentation is to present different tourism statistics produced by Stats SA People like to travel we are a country

More information

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015 Statistics of Air, Water, and Land Transport 2014 2013 1 Released Date: August 2015 Table of Contents Introduction... 4 Key Points... 5 1. Air Transport... 6 1.1 Aircraft movements... 6 1.2 Number of passengers...

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement

More information