1 ODOT Traffic Academy Interchange Studies (IJS/IMS/IOS) September 2017
2 Curse Outline Sectin 1... Plicies and Overview Purpse FHWA Authrity... 8 FHWA Plicies ODOT Plicies Plicy Pint Plicy Pint Best Practices (2009 Plicy Pints) Types f Interchange Studies When an IJS/IMS/IOS is Required When an IJS/IMS/IOS is nt Required Crdinatin with ODOT PDP Review Prcess Apprval Authrity Sectin 2... Reprt Cntent Reprt Outline Executive Summary Backgrund Purpse and Need Study Area Existing Cnditins Analysis Years Alternatives Cnsidered Traffic Vlumes Traffic Analyses Cst Estimate Traffic Academy Interchange Studies
3 Cnclusin and Recmmendatins Sectin 3... Analyses Analyses IJS/IMS Analysis Pints ODOT HCS Standards (Freeways/Ramps) ODOT HCS Standards (Majr Merge) ODOT HCS Standards (Majr Diverge) ODOT HCS Standards (Mainline Weave) ODOT HCS Standards (Signals) Balancing Delays LOS Requirements Cnstrained Traffic Types f Mitigatin Turn Lane Strage IOS Reprt Cntent IMS Addendum Cmmn Review Cmments Traffic Academy Interchange Studies
4 TRAFFIC ACADEMY INTERCHANGE STUDIES ODOT CENTRAL OFFICE, SEPTEMBER 21 ST 2017
5 2 Traffic Academy - Interchange Studies
6 TESTING 3 Traffic Academy - Interchange Studies
7 5 SECTIONS OF THE COURSE Plicies and Overview IJS/IMS Reprt Cntent IJS/IMS Analyses IOS Reprt Cntent Addendum 4 Traffic Academy - Interchange Studies
8 POLICIES & OVERVIEW 5 Traffic Academy - Interchange Studies
9 PURPOSE T dcument the impacts f prpsed wrk in the interchange area fr: New Interchange Lcatins Mdificatins t Existing Interchange Lcatins 6 Traffic Academy - Interchange Studies
10 PURPOSE T dcument evidence that the Level f Service (LOS) f the freeway peratins des nt degrade when cmparing the N Build cnditin t the Build cnditin Blueprint fr the Build Cnditin 7 Traffic Academy - Interchange Studies
11 FHWA AUTHORITY Title 23, United States Cde, Highways Sectin 111 (23 U.S.C. 111), Agreements relating t use f and access t ROW - Interstate System Secretary f USDOT delegated the authrity t administer 23 U.S.C. 111 t the FWHA by 49 CFR 1.48 (b)(1) 8 Traffic Academy - Interchange Studies
12 FHWA POLICIES FHWA Plicy Statement, Access t the Interstate System May 22, 2017 First issued in Octber 1990 Updated n February 4, 1998 Updated n August 27, /fraccess.cfm 9 Traffic Academy - Interchange Studies
13 FHWA POLICIES Interstate System Access An Infrmatinal Guide, August terstate/pubs/access/access.pdf AASHTO, A Plicy n Design Standards Interstate System, January Traffic Academy - Interchange Studies
14 ODOT POLICIES Lcatin & Design (L&D) Manual, Vlume I, Sectin 550 Requests fr New r Revised Access Sectin currently mirrrs the 2009 FHWA plicy. It will be updated t match the 2017 plicy. ODOT uses a similar methdlgy as FHWA t evaluate an IMS n a nninterstate freeway 11 Traffic Academy - Interchange Studies
15 POLICY POINT 1 Evidence is prvided thru analyses that the prpsed build cnditin des nt degrade peratins cnsidering: 20 Year Design N Build LOS vs. Build LOS (N Degradatin!) Established LOS criteria Cnceptual Signing Plan fr Cmplex Prjects identifying type and lcatin f signs 12 Traffic Academy - Interchange Studies
16 STUDY AREA FOR IJS/IMS *Next Significant Intersectin within ½ mile Interchange being studied Study Area *Additinal intersectins may be required if they are clsely spaced r part f a crdinated system. 13 Traffic Academy - Interchange Studies
17 POLICY POINT 2 All traffic mvements are prvided Partial interchanges cnsidered n case-bycase basis Must include analysis f a full interchange ptin Must include mitigatin fr missing mvements Cnnectin is t a public rad Design meets r exceeds current standards 14 Traffic Academy - Interchange Studies
18 POLICY POINT 2 Example f a split diamnd interchange Example f a partial interchange 15 Traffic Academy - Interchange Studies
19 BEST PRACTICES (2009 POLICY POINTS) Existing infrastructure cannt be imprved t satisfy design year demand traffic Need is based upn reginal traffic demands, nt lcal Justificatin cannt include enhanced prperty values r access t private facilities 16 Traffic Academy - Interchange Studies
20 BEST PRACTICES (2009 POLICY POINTS) All reasnable alternatives fr design ptins, lcatin and Transprtatin System Management (ramp metering, transit, HOV, etc.) have been cnsidered and cannt satisfy the demand 17 Traffic Academy - Interchange Studies
21 BEST PRACTICES (2009 POLICY POINTS) Fr new interchanges: Spacing (L&D Manual, Sectin 502.3) Urban area, 2 miles, I mile minimum Suburban area, 4 miles, I mile minimum Rural area, 8 miles, 3 miles minimum 18 Traffic Academy - Interchange Studies
22 BEST PRACTICES (2009 POLICY POINTS) In crridrs where the ptential exists fr future multiple interchange imprvements, ensure IMS analysis cnsiders all funded imprvements in the crridr. 19 Traffic Academy - Interchange Studies
23 BEST PRACTICES (2009 POLICY POINTS) Revised access generated by new r expanded develpment shall prvide evidence f crdinatin between the develpment and transprtatin imprvements 20 Traffic Academy - Interchange Studies
24 BEST PRACTICES (2009 POLICY POINTS) Prpsed alternative has been evaluated in the envirnmental prcess The IMS is nt Step 1 f the PDP 21 Traffic Academy - Interchange Studies
25 BEST PRACTICES (2009 POLICY POINTS) IJS/IMS reprts are cnditinally apprved by FHWA District must then request final apprval f the IMS frm FHWA nce NEPA is finalized 22 Traffic Academy - Interchange Studies
26 TYPES OF INTERCHANGE STUDIES Types f Interchange Studies IJS Interchange Justificatin Study IMS Interchange Mdificatin Study IOS Interchange Operatins Study 23 Traffic Academy - Interchange Studies
27 WHEN AN IJS IS REQUIRED New interchange at a new lcatin 24 Traffic Academy - Interchange Studies
28 WHEN AN IMS IS REQUIRED Recnfigured interchange at an existing lcatin Changing interchange type Adding a ramp Relcating ramp terminal t different rad Significant peratinal changes (adding C-D rads) 25 Traffic Academy - Interchange Studies
29 WHEN AN IOS IS REQUIRED Altering the number and/r type f lanes at crssrad ramp intersectin Rad diets Turn lane additins Thru lane additins Changing lane type withut adding r reducing lanes Revising single lane ramps t dual lanes (exit and/r entrance ramps) Adding an auxiliary lane between tw adjacent interchange ramps (preferably less than 1 mile) where the single auxiliary lane des nt functin as a mainline travel lane 26 Traffic Academy - Interchange Studies
30 WHEN AN INTERCHANGE STUDY IS NOT REQUIRED Installing signals at ramp intersectins Extending turn lane lengths n exit ramp r crssrad Mainline thru lane additins Imprving radway features t meet current gemetric standards (i.e. cnstructing accel/decel lanes r radii t current standards) Adding ramp metering NOTE: Any imprvement needs t meet design standards and peratinal requirements 27 Traffic Academy - Interchange Studies
31 COORDINATION WITH ODOT PDP The IMS will be cmpleted after determinatin f the Preferred Alternative. Depending upn the scpe f the prject, the IMS ccurs after the Feasibility Study r the Alternatives Evaluatin Reprt and befre detailed design 28 Traffic Academy - Interchange Studies
32 REVIEW PROCESS L&D Manual, Vl. I, Sectin Submissins are sent t the District The District will submit t ORE 29 Traffic Academy - Interchange Studies
33 REVIEW PROCESS ORE will frward interstate IJS/IMS prjects t FHWA fr apprval ODOT requires an electrnic cpy f the final apprved dcument Reevaluatin f IMS may be required if cnstructin f any phase has nt started within 3 years f IMS apprval 30 Traffic Academy - Interchange Studies
34 APPROVAL AUTHORITY L&D Manual, Vl. I, Sectin ORE has apprval authrity n nninterstate freeways and Interstate IOS reprts FHWA Ohi has apprval authrity n Interstate IMS/IJS reprts FHWA Ohi will crdinate with FHWA (Washingtn D.C.) as necessary 31 Traffic Academy - Interchange Studies
35 IJS/IMS REPORT CONTENT 32 Traffic Academy - Interchange Studies
36 REPORT FORMAT/OUTLINE Executive Summary Backgrund Purpse and Need Study Area Existing Cnditins Analysis Years Alternatives Cnsidered Traffic Vlumes Traffic Analyses Cst Estimate Cnclusin and Recmmendatins Appendices and Exhibits 33 Traffic Academy - Interchange Studies
37 EXECUTIVE SUMMARY Summarize key pints f study Purpse Analyses Cnclusin and Recmmendatins 34 Traffic Academy - Interchange Studies
38 BACKGROUND Describe Prject New r revised access pint Interchange lcatin MPO invlvement, as applicable Include Cunty-Rute-Sectin and PID (e.g. CUY , PID 97676) 35 Traffic Academy - Interchange Studies
39 PURPOSE AND NEED Already dne as part f envirnmental prcess thrugh prject develpment Include brief summary 36 Traffic Academy - Interchange Studies
40 STUDY AREA Describe interchange lcatin, including: Summarize in bullet pints and graphics rather than lng passages f text Reginal and/r lcal transprtatin functin Adjacent interchanges Crridr descriptin Include maps General Lcatin Map Study Area Map 37 Traffic Academy - Interchange Studies
41 EXISTING CONDITIONS EXISTING CONDITIONS Rad Gemetry & Access Lcatins Functinal classificatins Psted & Design speed limits (existing and prpsed) Existing interchange cnfiguratin Existing lane cnfiguratins Deficient gemetric cmpnents Traffic cntrl/signal spacing Summarize in bullet pints and/r schematics Physical Cnditins Terrain Safety Issues Crash data if relevant and identified causes frm previus studies - reference study in reprt 38 Traffic Academy - Interchange Studies
42 ANALYSIS YEARS Identify the Opening Year (typically based upn funds availability) Identify the Design Year (20 years frm Opening Year) 39 Traffic Academy - Interchange Studies
43 ALTERNATIVES CONSIDERED Briefly Discuss: N Build alternative Alternatives cnsidered and dismissed Transprtatin System Management (TSM) cnsideratins Lcal rad imprvements Build alternative 40 Traffic Academy - Interchange Studies
44 ALTERNATIVES CONSIDERED ALTERNATIVES CONSIDERED Build Alternative Include statement f cmpliance with requirements including mitigative measures Discuss any knwn design exceptins r gemetric issues Include Schematic f Build Cnditin Number and type f lanes Turn lane lengths Limited Access Right-f-Way (L/A ROW) 41 Traffic Academy - Interchange Studies
45 ALTERNATIVES CONSIDERED ALTERNATIVES CONSIDERED L/A ROW Limits Shw L/A ROW Limits n schematics Interchange access cntrl established in L&D Manual, Sectin minimum frm ramp intersectin fr stp cnditin 1000 minimum frm ramp intersectin fr free flw cnditin Intent is t minimize influence f adjacent drives n interchange peratins 42 Traffic Academy - Interchange Studies
46 TRAFFIC VOLUMES TRAFFIC VOLUMES IMS/IJS Must be certified by ODOT s Mdeling and Frecasting Sectin Include certified traffic plates in the appendices 43 Traffic Academy - Interchange Studies
47 TRAFFIC ANALYSES Dcument the impact f the interchange imprvements n the interstate/freeway system based n design year traffic Include graphics fr LOS and Turn Lane Lengths 44 Traffic Academy - Interchange Studies
48 TRAFFIC ANALYSES Summarize HCS results f N Build & Build peratins fr the preferred alternative: Freeway sectin HCS analyses Ramp merge and diverge HCS analyses Weave HCS analyses Ramp intersectin HCS analyses including cnstrained analyses, as applicable Adjacent intersectin HCS analyses 45 Traffic Academy - Interchange Studies
49 TRAFFIC ANALYSES Prvide tables & exhibits t dcument impacts Include LOS table(s) and exhibits fr intersectin & freeway analysis pints Include table(s) f prpsed turn lane lengths fr the Build Cnditin..(if it is nt feasible t meet required lengths, dcument why) 46 Traffic Academy - Interchange Studies
50 TRAFFIC ANALYSES Level f Service Exhibits AM/PM: N-Build AM/PM: Build 47 Traffic Academy - Interchange Studies
51 TRAFFIC ANALYSES Detailed infrmatin shuld be included in the appendix All sftware printut analyses Submit sftware files (HCS, Synchr/SimTraffic, etc.) Turn lane length calculatins (including thru blckage) 48 Traffic Academy - Interchange Studies
52 COST ESTIMATE Estimate csts fr all identified imprvements including ROW impacts Identify funding surces and status in the MPO s TIP r ther plans 49 Traffic Academy - Interchange Studies
53 CONCLUSION & RECOMMENDATIONS Easily understd summatin f infrmatin cntained in previus text State why the recmmended imprvements (Build Cnditin) best serve the identified need Identify required mitigative measures, as applicable 50 Traffic Academy - Interchange Studies
54 IJS/IMS ANALYSES 51 Traffic Academy - Interchange Studies
55 ANALYSES Analysis Pints ODOT HCS Standards Balancing Delays LOS Requirements Cnstrained Traffic Turn Lane Strage 52 Traffic Academy - Interchange Studies
56 IJS/IMS ANALYSIS POINTS Only analyze the near side f adjacent interchange if it is a system interchange *Next Significant intersectin within ½ mile * * Interchange being studied * * * Merge Analysis Diverge Analysis Mainline Analysis Weave Analysis (if applicable) *Additinal intersectins may be required if they are clsely spaced r part f a crdinated system. 53 Traffic Academy - Interchange Studies
57 ODOT HCS STANDARDS (FREEWAYS/RAMPS) HCS Parameters: Peak Hur Factr (PHF) Use HCM default f 0.94 Free Flw Speed (FFS) Freeway sectin use design speed Ramp merge/diverge use: 15 MPH less than mainline (straight ramps) Cnsider less fr lp ramps (design speed f curve) 54 Traffic Academy - Interchange Studies
58 ODOT HCS STANDARDS (FREEWAYS/RAMPS) Freeway Segment Freeway Segment Freeway Segment Multiple vlumes by 2 Analyze as 2-lane segment Similar analyses apply t cnverging radways Freeway Segment Multiple vlumes by 2 Analyze as 2-lane segment 55 Traffic Academy - Interchange Studies
59 ODOT HCS STANDARDS (FREEWAYS/RAMPS) Freeway Segment Diverge (1-lane) Freeway Segment Freeway Segment Merge (1-lane) Freeway Segment 56 Traffic Academy - Interchange Studies
60 ODOT HCS STANDARDS (MAJOR MERGE) Majr Merge (Gemetry) Tw radways, each having multiple lanes, merge t frm a single freeway segment HCM 2010, Exhibit 13-18, Page Traffic Academy - Interchange Studies
61 ODOT HCS STANDARDS (MAJOR MERGE) Majr Merge (Gemetry) Tw gemetric categries (a) # f entering lanes = # f exiting lanes 1 (b) # f entering lanes = # f exiting lanes HCM 2010, Exhibit 13-18, Page Traffic Academy - Interchange Studies
62 ODOT HCS STANDARDS (MAJOR MERGE) Majr Merge (Analysis) N effective mdels f perfrmance Analyze by checking capacity f apprach lanes and dwnstream segment Freeway Segment Freeway Segment HCM 2010, Exhibit 13-18, Page Traffic Academy - Interchange Studies
63 ODOT HCS STANDARDS (MAJOR DIVERGE) Majr Diverge (Analysis) A multilane radway splitting int tw multilane segments HCM 2010, Exhibit 13-19, Page Traffic Academy - Interchange Studies
64 ODOT HCS STANDARDS (MAJOR DIVERGE) Majr Diverge (Analysis) Tw gemetric categries (a) # f entering lanes = # f exiting lanes (b) # f entering lanes = # f exiting lanes + 1 HCM 2010, Exhibit 13-19, Page Traffic Academy - Interchange Studies
65 ODOT HCS STANDARDS (MAJOR DIVERGE) Majr Diverge (Analysis) Analyze by checking capacity f apprach lanes and dwnstream segments Failure ccurs when demand flw rate exceeds capacity f the segment Freeway Segment Freeway Segment HCM 2010, Exhibit 13-19, Page Traffic Academy - Interchange Studies
66 ODOT HCS STANDARDS (MAJOR DIVERGE) Majr Diverge (Analysis) HCM Equatin cmputes the average density acrss all appraching freeway lanes within 1,500 feet f the diverge =. D nt use frmula if any f the entering/exiting segment(s) are vercapacity (LOS F). D MD = Majr diverge density in influence area (pc/mi/ln) v F = Demand flw rate immediately upstream f majr diverge influence area (pc/h) N = Number f lanes appraching the majr diverge 63 Traffic Academy - Interchange Studies
67 HCS 2010 WEAVE HCM 2010, Exhibit 12-3, Page Traffic Academy - Interchange Studies
68 HCS 2010 WEAVE HCM 2010, Exhibit 12-4, Page Traffic Academy - Interchange Studies
69 WEAVE EXAMPLE 1 What is the Level f Service f this existing ne sided weave? Certified traffic data: V FF = 2,290 vph V RF = 560 vph V FR = 310 vph V RR = 180 vph 66 Traffic Academy - Interchange Studies
70 WEAVE EXAMPLE 1 Cnfiguratin characteristics: ID = 0.5 (3 miles upstream and dwnstream) LC RF = 1 (min. lane changes ramp t freeway) LC FR = 1 (min. lane changes freeway t ramp) N WL = 2 (zer r ne lane change) LC RR is nly applicable fr 2 sided weaves 67 Traffic Academy - Interchange Studies
71 WEAVE EXAMPLE 1 HCS 2010 Output Weaving Segment Speed, Density, Level f Service and Capacity Weaving segment flw rate, v 3,554 veh/h Weaving segment capacity, c W 6,006 veh/h Weaving segment v/c rati Weaving segment density, D 21.2 pc/mi/ln Level f service, LOS C Weaving intensity factr, W Weaving segment speed, S 58.9 mi/h Average weaving speed, S W 64.7 mi/h Average nn-weaving speed, S NW 57.1 mi/h Maximum weaving length, L max 5,107 ft 68 Traffic Academy - Interchange Studies
72 FREEWAY WEAVING WORKSHEET 69 Traffic Academy - Interchange Studies
73 WEAVE EXAMPLE 2 Des this prpsed build cnditin functin as a weave? Certified traffic data: V FF = 1590 vph V RF = 1120 vph V FR = 1100 vph V RR = 790 vph 70 Traffic Academy - Interchange Studies
74 WEAVE EXAMPLE 2 Cnfiguratin characteristics: ID = 0.5 (3 miles upstream and dwnstream) LC RF = 0 (min. lane changes ramp t freeway) LC FR = 1 (min. lane changes freeway t ramp) N WL = 3 (zer r ne lane change) LC RR is nly applicable fr 2 sided weaves 71 Traffic Academy - Interchange Studies
75 WEAVE EXAMPLE 2 HCS 2010 Output Weaving segment flw rate, v Weaving segment capacity, c W Weaving segment v/c rati Weaving segment density, D Level f service, LOS Weaving intensity factr, W Weaving segment speed, S Average weaving speed, S W Average nn-weaving speed, S NW Maximum weaving length, L max 6,087 ft Ntes*: a. Weaving segments lnger than the calculated maximum length shuld be treated as islated merge and diverge areas using the prcedures f Chapter 13, Freeway Merge and Diverge Segments. b. Fr vlumes that exceed the weaving segment capacity, the level f service is F. 72 Traffic Academy - Interchange Studies
76 FREEWAY WEAVING WORKSHEET 73 Traffic Academy - Interchange Studies
77 WEAVE EXAMPLE 2 In cases where a weave is suspected, prvide the fllwing The certified weave vlumes The HCS Weave analysis which verifies that the maximum weave length is exceeded 74 Traffic Academy - Interchange Studies
78 WEAVE EXAMPLE 2 In cases where the actual weave length is greater than the maximum weave length, prvide the fllwing HCS Basic Freeway Segment (BFS) analysis f the mainline segment between the ramps, #1 HCS BFS analyses f the n and ff ramps, #2, 3 Micrsimulatin may be needed t accurately analyze this scenari 75 Traffic Academy - Interchange Studies
79 ODOT HCS STANDARDS (SIGNALS) Sectin & Figure a f the L&D Manual Use current versin f HCS and the fllwing standard values fr signalized intersectins Peak Hur Factr (PHF) = Use HCS 7 Defaults Right Turn n Red Percentage (RTOR) = 0 Startup Lst Time = 2 secnds 76 Traffic Academy - Interchange Studies
80 ODOT HCS STANDARDS (SIGNALS) Requirement - Balanced Apprach Delay*: Wrst f the east/west apprach delay shall be balanced within 3 secnds f the wrst nrth/suth apprach delay *Used fr designing the intersectin based upn 20 year design traffic, NOT fr determining field signal peratins 77 Traffic Academy - Interchange Studies
81 ODOT HCS STANDARDS (SIGNALS) N Build Cnditin Any failing mvement (v/c > 1.0) shuld be mitigated by adding/altering lanes and/r revising signal phasing/timing as necessary Build Cnditin (t apprpriately size the intersectin) v/c ratis shall typically be less than 0.93 t be cnsidered acceptable Dente when v/c 0.93 and state why it cannt be < 0.93 Refer t L&D Manual, Sectin Traffic Academy - Interchange Studies
82 HCS BALANCING APPROACH DELAY Examples f Signalized Intersectin Intersectin with 4 appraches Intersectin with 3 appraches 79 Traffic Academy - Interchange Studies
83 HCS BALANCING: EXAMPLE 1 80 Traffic Academy - Interchange Studies
84 HCS BALANCING: EXAMPLE 1 Initial Guess n Green Time fr Signal Operatins: Cycle Length = 90 s ; 2 phase Green fr L/T/R East/West = 60 s Green fr L/T/R Nrth/Suth = 20 s Cmpare apprach delays 81 Traffic Academy - Interchange Studies
85 HCS BALANCING: EXAMPLE 1 T be balanced, the highest East/West apprach delay needs t be within 3 secnds f the highest Nrth/Suth apprach delay. Nt Balanced! 50s - 13s = 37 sec 82 Traffic Academy - Interchange Studies
86 HCS BALANCING: EXAMPLE 1 83 Traffic Academy - Interchange Studies
87 HCS BALANCING: EXAMPLE 1 Attempt #2 Redistribute green time: Give mre time t NB/SB Take away frm EB/WB Cycle Length = 90 sec; 2 phase Green fr all East/West L/T/R = 50s Green fr all Nrth/Suth L/T/R= 30s 84 Traffic Academy - Interchange Studies
88 HCS BALANCING: EXAMPLE 1 Nt Balanced: Highest E/W apprach delay is almst equal t the highest N/S, but EB Left delay is significantly higher than any ther f the mvements delays Lks Balanced, but is nt! 85 Traffic Academy - Interchange Studies
89 HCS BALANCING: EXAMPLE 1 86 Traffic Academy - Interchange Studies
90 HCS BALANCING: EXAMPLE 1 Attempt #3 Redistribute green time: Give mre time t EB Left by adding left turn phase Cycle Length = 90 sec; 3 phase Green fr East/West Lt prtected = 7 s Green fr permitted East/West = 42 s Green fr all Nrth/Suth = 26 s Cmpare apprach delays 87 Traffic Academy - Interchange Studies
91 HCS BALANCING: EXAMPLE 1 v/c < 1.0 Cntrl Delays Apprach Delays Apprach delays are balanced & all v/c ratis fr all individual mvements are less than 1.0 Balanced! 88 Traffic Academy - Interchange Studies
92 HCS BALANCING: EXAMPLE 1 89 Traffic Academy - Interchange Studies
93 HCS BALANCING: EXAMPLE 2 90 Traffic Academy - Interchange Studies
94 HCS BALANCING: EXAMPLE 2 Initial Guess n Green Time fr Signal Operatins: Cycle Length = 90 sec. ; 3 phase Green fr Prt. EB Lt & Thru = 15 s Green fr East/West Permit. = 40 s Green fr NB Exit Ramp = 20 s Cmpare highest EB/WB delay with highest NB apprach delays 91 Traffic Academy - Interchange Studies
95 HCS BALANCING: EXAMPLE 2 T be balanced, the highest East/West apprach delay shuld be within 3 sec. f the highest Nrth apprach delay Nt Balanced! 69.9s s = 48.5 sec 92 Traffic Academy - Interchange Studies
96 HCS BALANCING: EXAMPLE 2 93 Traffic Academy - Interchange Studies
97 HCS BALANCING: EXAMPLE 2 Attempt #2 Redistribute green time, Give mre time t NB phase Cycle Length = 90 sec. ; 3 phase Green fr Prt. EB Lt & Thru = 15 s Green fr East/West Permit. = 32 s Green fr NB Exit Ramp = 28 s Cmpare highest EB/WB delay with highest NB apprach delays 94 Traffic Academy - Interchange Studies
98 HCS BALANCING: EXAMPLE 2 v/c < 1.0 Cntrl Delays Apprach Delays Apprach delays are balanced and all v/c ratis fr individual mvements are less than 1.0 Balanced! 95 Traffic Academy - Interchange Studies
99 HCS BALANCING: EXAMPLE 2 96 Traffic Academy - Interchange Studies
100 LOS REQUIREMENTS LOS requirements fr interstate/freeway system and interchange cmpnents (Build Cnditin) LOS C is desired LOS D acceptable in urban areas with ODOT & MPO apprval 97 Traffic Academy - Interchange Studies
101 LOS REQUIREMENTS If: The Build LOS drps a letter grade (t an unacceptable LOS) frm N-Build r LOS remains an F Then: Unacceptable Degradatin may be ccurring 2% Rule is applied t determine 98 Traffic Academy - Interchange Studies
102 LOS REQUIREMENTS - URBAN/SUBURBAN If N-Build = D & Build = D If N-Build = E & Build = E If N-Build = D & Build = E If N-Build = E & Build = F If N-Build = F & Build = F N Degradatin (Cnstrained Analyses are nt Required) Check fr Degradatin with 2% Rule (Cnstrained Analyses Required) 99 Traffic Academy - Interchange Studies
103 LOS REQUIREMENTS - RURAL If N-Build = C & Build = C If N-Build = D & Build = D If N-Build = E & Build = E N Degradatin (Cnstrained Analyses are nt Required) If-N-Build = C & Build = D If N-Build = D & Build = E If N-Build = E & Build = F If N-Build = F & Build = F Check fr Degradatin with 2% Rule (Cnstrained Analyses Required) 100 Traffic Academy - Interchange Studies
104 CONSTRAINED TRAFFIC Cnstrained Traffic ccurs when all the traffic desiring t enter the freeway (demand vlume) cannt d s, i.e., v/c ratis fr entering mvements are greater than 1.0 Nte: This nly needs t be evaluated if pssible degradatin is ccurring 101 Traffic Academy - Interchange Studies
105 CONSTRAINED TRAFFIC It is necessary t determine the difference between the vlume getting nt the freeway in the N Build cnditin vs. the Build cnditin The 2% Rule See L&D Manual, Sectin A prpsed change is deemed t degrade freeway peratins if it increases traffic n the dwnstream freeway merge and/r freeway segment by 2.00% r mre, OR dwnstream weave segment by 2.00% r mre 102 Traffic Academy - Interchange Studies
106 CONSTRAINED TRAFFIC Examples: < 2% > 2% 103 Traffic Academy - Interchange Studies
107 CONSTRAINED TRAFFIC EXAMPLE 1 LOS F Traffic vlumes are the same fr N- Build and Build 104 Traffic Academy - Interchange Studies
108 CONSTRAINED TRAFFIC - EXAMPLE 1 Prblem: Determine whether an additinal EB & NB left turn lane will degrade the freeway peratins. Balance N-Build & Build ramp intersectins Determine v/c s fr all the mvements cntributing t the ramp vlume. If v/c > 1.0, the mvement is cnstrained. The full demand vlume fr the mvement is divided by the v/c t determine the cnstrained vlume that can make it t the ramp. 105 Traffic Academy - Interchange Studies
109 CONSTRAINED TRAFFIC EXAMPLE 1 Balanced N-Build HCS N-Build Ramp Vlume (Cnstrained) Nte: If v/c 1.0, then v/c=1.0 If v/c>1.0, then v/c=v/c = / +# / +$ / = = Traffic Academy - Interchange Studies
110 CONSTRAINED TRAFFIC - EXAMPLE 1 Balanced Build HCS Build Ramp Vlume (Cnstrained) Nte: If v/c 1.0, then v/c=1.0 If v/c>1.0, then v/c=v/c = / +# / +$ / = = Traffic Academy - Interchange Studies
111 CONSTRAINED TRAFFIC - EXAMPLE 1 Cnstrained N-Build Ramp Vlume a 794 Cnstrained Build Ramp Vlume a 857 δ = (Build N Build) = δ = 63 additinal vehicles entering the freeway in the Build Cnditin = δ :;<=>?@ A=>>B?C D375@> E F G?@: D375@>H = δ 011 = LM 011 I111EJKI IJKI = 1.31% O < 2% N Degradatin! 108 Traffic Academy - Interchange Studies
112 CONSTRAINED TRAFFIC - EXAMPLE Traffic Academy - Interchange Studies
113 CONSTRAINED TRAFFIC - EXAMPLE Traffic Academy - Interchange Studies
114 CONSTRAINED TRAFFIC EXAMPLE 2 LOS F Traffic vlumes are the same fr N- Build and Build 111 Traffic Academy - Interchange Studies
115 CONSTRAINED TRAFFIC - EXAMPLE 2 Prblem: Determine whether an additinal EB left turn lane and WB thru lane will degrade the freeway peratins. Balance N-Build & Build ramp intersectins Determine v/c s fr all the mvements cntributing t the ramp vlume. If v/c > 1.0, the mvement is cnstrained. The full demand vlume fr the mvement is divided by the v/c t determine the cnstrained vlume that can make it t the ramp. 112 Traffic Academy - Interchange Studies
116 CONSTRAINED TRAFFIC - EXAMPLE 2 Balanced N-Build HCS N-Build Ramp Vlume (Cnstrained) Nte: If v/c 1.0, then v/c=1.0 If v/c>1.0, then v/c=v/c = / +# / +$ / = = Traffic Academy - Interchange Studies
117 CONSTRAINED TRAFFIC - EXAMPLE 2 Balanced Build HCS Build Ramp Vlume (Cnstrained) Nte: If v/c 1.0, then v/c=1.0 If v/c>1.0, then v/c=v/c = / +# / +$ / = = 1, Traffic Academy - Interchange Studies
118 CONSTRAINED TRAFFIC EXAMPLE 2 Cnstrained N-Build Ramp Vlume a 951 Cnstrained Build Ramp Vlume a 1055 δ = (Build N Build) = δ = 104 additinal vehicles entering the freeway in the Build Cnditin = δ :;<=>?@ A=>>B?C D375@> E F G?@: D375@>H = δ 011 = 01I 011 MQ11EKQ0 IIQ0 = 2.33% O > 2% Degradatin! 115 Traffic Academy - Interchange Studies
119 CONSTRAINED TRAFFIC EXAMPLE Traffic Academy - Interchange Studies
120 CONSTRAINED TRAFFIC EXAMPLE Traffic Academy - Interchange Studies
121 TYPES OF MITIGATION Gemetric Cnstraints Limiting capacity imprvements Eliminating free flw (unsignalized) mvements 118 Traffic Academy - Interchange Studies
122 TYPES OF MITIGATION Variable Lane Assignment ATDM Ramp Metering Typically preferred t be applied n a crridr wide basis Need t cnsider ramp strage Need t prvide letter f cmmitment frm lcal enfrcement agency FHWA Ramp Management and Cntrl Handbk, January 2006 can be fund at: Traffic Academy - Interchange Studies
123 TURN LANE STORAGE Turn lane strage is determined by ODOT L&D Figures & (example included) Turn lanes n the arterial/crssrad shuld accunt fr strage + deceleratin (when applicable) Check fr thru blckage Turn lanes alng the exit ramps shuld be based n strage, it is assumed that deceleratin has already ccurred upstream f the gre. 120 Traffic Academy - Interchange Studies
124 TURN LANE STORAGE EX. 1 Determine EBL Turn Lane Length: 121 Traffic Academy - Interchange Studies
125 TURN LANE STORAGE EX. 1 Speed Limit = 50mph Design Speed = 55mph Cnditin B: Turn lane length = 285 (decel + 50 taper) 122 Traffic Academy - Interchange Studies
126 TURN LANE STORAGE EX. 1 EBL Turn Lane = Decel + Strage = Strage 123 Traffic Academy - Interchange Studies
127 TURN LANE STORAGE EX. 1 Average Vehicles per Cycle = DHV * Cycle Length 3600 sec/hr (345 veh/hr) (90 sec/cycle) 3600 sec/hr = 8.6 veh/cyc rund t 9.0 veh/cyc Strage = 350 EBL Turn Lane = Decel + Strage = = Traffic Academy - Interchange Studies
128 TURN LANE STORAGE EX. 1 Determine EBL Turn Lane Length: Cnditin B = 285 Cnditin C = > 285, s use 515 Hwever, we need t check fr thru blckage. 125 Traffic Academy - Interchange Studies
129 TURN LANE STORAGE EX. 1 Average Vehicles per Cycle = DHV * Cycle Length 3600 sec/hr EBT = 1130 veh/hr (fr 2 lanes), 565 veh/hr/lane (565 veh/hr) (90 sec/cycle) 3600 sec/hr = 14.1 veh/cyc rund t 15.0 veh/cyc EB Thru Queue = 525 EB Left = (taper) = Traffic Academy - Interchange Studies
130 TURN LANE STORAGE EX. 1 Determine EBL Turn Lane Length: Cnditin B = 285 Cnditin C = 515 Accmmdating Thru Blckage = > 515, s use strage + 50 taper 127 Traffic Academy - Interchange Studies
131 TURN LANE STORAGE EX. 2 Determine NBL Turn Lane Lengths: 128 Traffic Academy - Interchange Studies
132 TURN LANE STORAGE EX. 2 Design Speed = 35mph Cnditin A: Turn lane length = (50 taper + Strage) 129 Traffic Academy - Interchange Studies
133 TURN LANE STORAGE EX. 2 Average Vehicles per Cycle = DHV * Cycle Length 3600 sec/hr NBL + NBT = = 655 veh/hr (fr 2 lanes) r 328 veh/hr/lane (328 veh/hr) (90 sec/cycle) 3600 sec/hr = 8.2 veh/cyc rund t 9.0 veh/cyc NB Left Turn Lanes = 350 Queue + 50 Taper = Traffic Academy - Interchange Studies
134 TURN LANE STORAGE Turn Lane Length Summary 131 Traffic Academy - Interchange Studies
135 IOS REPORT CONTENT 132 Traffic Academy - Interchange Studies
136 IOS REPORT FORMAT/OUTLINE Prject Summary Study Area Prblem Descriptin Traffic Analyses Cnclusin Appendices and Exhibits Certified Traffic HCS Analyses Turn Lane Length Calculatins 133 Traffic Academy - Interchange Studies
137 ANALYSIS POINTS FOR IOS (1 INTERSECTION) Intersectin Analysis Nt Required * Intersectin Analysis Merge Analysis Diverge Analysis Mainline Analysis Next significant intersectin within ½ mile Weave Analysis (if applicable) * * Intersectin being mdified Certified Traffic Limits Obtain all cunts within limits 134 Traffic Academy - Interchange Studies
138 ANALYSIS POINTS FOR IOS (2 INTERSECTIONS) Next significant intersectin within ½ mile Intersectin being mdified * Intersectin Analysis Merge Analysis Diverge Analysis Mainline Analysis * * Next significant intersectin within ½ mile Weave Analysis (if applicable) 135 Traffic Academy - Interchange Studies * * Intersectin being mdified Certified Traffic Limits Obtain all cunts within limits
139 ANALYSIS POINTS FOR IOS (AUXILIARY LANE) * * Merge Analysis Diverge Analysis Mainline Analysis Weave Analysis Certified Traffic Limits Obtain all cunts within limits 136 Traffic Academy - Interchange Studies
140 IMS ADDENDUM 137 Traffic Academy - Interchange Studies
141 IMS ADDENDUM When is ne necessary? When a change is prpsed t the Build Cnditin as identified in an already apprved IMS. When cnstructin has nt cmmenced within 3 years f the apprval date f the IMS. This wuld require updating the traffic data t reflect the new Design Year. 138 Traffic Academy - Interchange Studies
142 IMS ADDENDUM Purpse T dcument the differences and assciated impacts between the Original Build Cnditin and the Revised Build Cnditin Nte: The cmparisn is nt between the N Build and the Revised Build. 139 Traffic Academy - Interchange Studies
143 IMS ADDENDUM Include: Reasn fr the change Cmparisn f the changes between the Original Build and Revised Build, such as, study area, updated traffic data, revised gemetry, revised access cnnectins, etc. 140 Traffic Academy - Interchange Studies
144 IMS ADDENDUM Include: The Levels f Service and HCS analyses based upn the Revised Build Cnditin A schematic f the Revised Build Cnditin and the Original Build Cnditin D Nt Include: The HCS analyses f the Original Build Cnditin 141 Traffic Academy - Interchange Studies
145 COMMON REVIEW COMMENTS 142 Traffic Academy - Interchange Studies
146 COMMON REVIEW COMMENTS Cnstructin plans being develped in advance f the IMS/IOS. The IMS/IOS is t serve as the blueprint fr the cnstructin plans, nt vice versa Nt using the mst updated versin f HCS, prviding unbalanced intersectins, r incrrect parameters (PHF, FFS, etc.,...) 143 Traffic Academy - Interchange Studies
147 COMMON REVIEW COMMENTS The text f the IMS shuld be succinct, but additinal discussin is warranted when smething is deficient r des nt meet requirements. Als, traffic cunts, envirnmental studies, traffic signal warrants shuld nt be included. 144 Traffic Academy - Interchange Studies
148 COMMON REVIEW COMMENTS Using nn-certified traffic in preliminary analyses and jumping t an alternative that ends up wrking with certified traffic in the IMS but a simpler/cheaper alternative may have been verlked Nt prviding a gd schematic f the build cnditin, with prpsed turn lanes clearly dimensined. 145 Traffic Academy - Interchange Studies
149 COMMON REVIEW COMMENTS Nt understanding when cnstrained traffic analyses are warranted and hw far t carry them Nt analyzing majr diverges crrectly r at all Turn lane length calculatins being hidden in spreadsheets, unable t fllw Cycle length used in analyses des nt match the cycle length used t calculate the turn lane length 146 Traffic Academy - Interchange Studies
150 TRAFFIC ACADEMY Office f Radway Engineering Dave Hlstein, P.E. Office Administratr Mary Bapu-Tamaskar, P.E. - Studies Engineer Districts 2, 3, 8 and Gary Harringtn, P.E. - Studies Engineer Districts 5, 6, 7 and Brentn Bgard, P.E. Studies Engineer Districts 1, 4, 10 and Traffic Academy - Interchange Studies
ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations
ALI ZAGHARI Deputy District Directr Caltrans, District 7 Divisin f Traffic Operatins Backgrund Califrnia law permits ILEV (Inherently Lw Emissin Vehicles) and previusly hybrid vehicles t access HOV lanes
More informationAPPENDIX D Safety Performance Review
APPENDIX D Safety Perfrmance Review Safety Perfrmance Review Curtneypark Drive East Class EA & Preliminary Design Prepared fr: City f Mississauga Prepared by: Stantec Cnsulting Ltd. 300-675 Cchrane Dr,
More informationUSE OF DURABLE PAVEMENT MARKINGS
Page 1 f 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION General Pavement markings prvide mtrists with valuable guidance and radway infrmatin. Pavement markings have specific functins; they guide the
More informationDraft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process
fr the Tnt Natinal Frest Wilderness Recmmendatin Prcess Intrductin When revising the Frest Plan, the Tnt Natinal Frest is required t identify and evaluate lands that may r may nt be suitable fr inclusin
More informationCHAPTER 1.0 INTRODUCTION
CHAPTER 1.0 INTRODUCTION 1.1 PROPOSED AIR SERVICE AND FAA RESPONSIBILITY This dcument is the Envirnmental Assessment (EA) prepared by the Twn f Mammth Lakes and United Airlines t analyze, dcument, and
More informationATM Network Performance Report
Netwrk Perfrmance Reprt ATM Netwrk Perfrmance Reprt 2018. Page 1 f 17 Netwrk Perfrmance Reprt 2018 Table f cntents Summary... 3 Netwrk Wide Perfrmance... 7 Airbrne delay... 7 Netwrk Delay Rati: 2018...
More informationRunway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011
Runway Expansin Impact Assessment Oshawa Municipal Airprt Presentatin T Develpment Services Cmmittee City f Oshawa May 30, 2011 2 Agenda Airprt s Ecnmic Imprtance Backgrund Scpe f Wrk Prpsed Runway Expansin
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpse and Scpe The infrmatin presented in this reprt represents the study findings fr the 2015 Grand Frks Internatinal Airprt Master Plan Update prepared fr the Grand Frks Reginal
More informationThis section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.
10. TRAVEL Cntents 10. Travel... 1 10.1 Rles and Respnsibilities... 1 10.2 Internatinal Travel... 1 10.2.A Air Travel Standards... 1 10.2.B Air Travel Arrangements... 2 10.2.C Travel Dcumentatin... 3 10.2.
More informationcommittee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation
cmmittee reprt Netwrk Rail: Rute Utilisatin Strategy: Statins Draft fr Cnsultatin Cmmittee Strategy and Prgrammes Date f Meeting 24 June 2011 Date f reprt 31 May 2011 Reprt by Assistant Chief Executive
More informationReview of the previous CARSAMMA and Scrutiny Group meetings Conclusions and Recommendations
Internatinal Civil Aviatin Organizatin GTE/17-WP/02 Seventeenth Meeting f the GREPECAS 16/10/17 Scrutiny Wrking Grup (GTE/17) Lima, Peru, 30 Octber t 03 Nvember 2017 Agenda Item 1: Review f the previus
More informationASISA STANDARD ON UNCLAIMED ASSETS
ASISA STANDARD ON UNCLAIMED ASSETS 1. Backgrund This Standard prvides guidance fr members n the treatment f unclaimed assets. The LOA Cde n Unclaimed Assets was used as the basis t develp this Standard
More informationDOT 3 Hour Rule GoJet SOC Master Plan
DOT 3 Hur Rule GJet SOC Master Plan Backgrund The Department f Transprtatin s (DOT) rule establishes a hard time limit f three hurs after which airlines must allw passengers t deplane. While the rule applies
More informationDenver International Airport Air Traffic Control Tower. and. Denver Approach D01 LETTER OF AGREEMENT
Denver Internatinal Airprt Air Traffic Cntrl Twer and Denver Apprach D01 LETTER OF AGREEMENT Subject: Standard Operatin and Cntrl Jurisdictin Effective: 12/20/2016 Purpse: This letter f agreement establishes
More informationStART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE
StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE StART FACILITATOR S MEETING SUMMARY AVIATION NOISE WORKING GROUP Mnday, January 14 2019 5:30-7:30PM, Cnference Center, Sea-Tac Airprt Member Jhn Resing Terry
More informationI-95/GIR FACT SHEET. Interstate 95 Section GIR - Girard Avenue Interchange Improvement Project City of Philadelphia
I-95/GIR FACT SHEET Interstate 95 Sectin GIR - Girard Avenue Interchange Imprvement Prject City f Philadelphia WHAT PennDOT has mved fur f six cntracts t cnstructin t rebuild three miles f Interstate 95
More informationFLIGHTS OF FANCY How Wing Shape Affects Flight
FLIGHTS OF FANCY Hw Wing Shape Affects Flight Summary/Purpse: The purpse f this activity is t simulate bird flight using mdel paper planes. Students will be able t differentiate between high and lw aspect
More informationPBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish
ALASKA AIR CARRIERS ASSOCIATION 2301 Merrill Field Drive A-3, Anchrage, Alaska 99501 907-277-0071 www.alaskaaircarriers.rg PBN Rute Structure Alaska Sub-Cmmittee AACA C-Chair Dennis Parrish d.parrish@cp.cm
More informationBayview Avenue Class Environmental Assessment. Steeles Avenue to Elgin Mills Road. Environmental Study Report
Bayview Avenue Class Envirnmental Assessment Steeles Avenue t Elgin Mills Rad Envirnmental Study Reprt August 2017 THE PUBLIC RECORD This Envirnmental Study Reprt is available fr a 45 calendar-day public
More informationSec Future Interstate Study Panel on Passenger Travel. Presentation by: Gregory M. Cohen, P.E. President & CEO American Highway Users Alliance
Sec. 6021 Future Interstate Study Panel n Passenger Travel Presentatin by: Gregry M. Chen, P.E. President & CEO American Highway Users Alliance Backgrund The Highway Users is a nn-prfit calitin funded
More informationBCHA Volunteer Hours Reporting Guide
BCHA Vlunteer Hurs Reprting Guide List each participant in the prject and their individual cntributin t the prject: Wrk hurs. Miles f trail maintained. (Wilderness areas and nn-wilderness) Travel time
More informationVILLAGE OF LINCOLNWOOD PRESIDENT AND BOARD OF TRUSTEES COMMITTEE OF THE WHOLE MEETING VILLAGE HALL COUNCIL CHAMBERS DECEMBER 18, 2018
VILLAGE OF LINCOLNWOOD PRESIDENT AND BOARD OF TRUSTEES COMMITTEE OF THE WHOLE MEETING VILLAGE HALL COUNCIL CHAMBERS DECEMBER 18, 2018 Call t Order President Bass called the Cmmittee f the Whle meeting
More informationNational Search and Rescue Committee (NSARC) Secretariat Issue Paper
Natinal Search and Rescue Cmmittee (NSARC) Secretariat Issue Paper Status: Cntingency Airspace and Air Missin Management during a Disaster Respnse (13 June 2012) Issue The fllwing issue paper prvides infrmatin
More informationCO 675 Group Counseling Theories and Techniques
Asbury Thelgical Seminary eplace: preserving, learning, and creative exchange Syllabi ecmmns 1-1-2004 CO 675 Grup Cunseling Theries and Techniques Janet B. Dean Fllw this and additinal wrks at: http://place.asburyseminary.edu/syllabi
More informationHQ 70/5.5 AFM Update AD07-19
20 Massachusetts Avenue, N.W. Washingtn, D.C. 20529 HQ 70/5.5 AFM Update AD07-19 TO: SERVICE CENTER DIRECTORS NATIONAL BENEFITS CENTER DIRECTOR DIRECTOR OF REFUGEE, ASYLUM AND INTERNATIONAL OPERATIONS
More informationConcur Travel Tips and Tricks
Cncur Travel Tips and Tricks Items cvered in this dcument: (can use the link t mve t the specific sectin) Main Search Page Air Results Page Upcming Trips Keybard / Tabbing Optin Time f day Identifiers
More information8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax
8950 Cal Center Drive Bldg.3, Suite 300 Sacrament, CA 95826 916.564.4500 phne 916.564.4501 fax www.esassc.cm memrandum date t frm subject Part 150 Advisry Cmmittee, OSU Airprt FAR Part 150 Study Rn Seymur,
More informationPORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE
PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE REVIEW ITINERARY UPON RECEIPT Please review yur travel itinerary prvided by Prter upn receipt. Yu shuld cntact Prter within 24 hurs f receipt f yur itinerary
More informationDIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)
13/03/2011 DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, 22-24 March 2011) Agenda Item 4: Air Navigatin Issues AIRSPACE AND PBN ACTIVITIES IN THE UAE
More informationSTUDENT APPLICATION PROCESS: TIER 1 STUDENTS
STUDENT APPLICATION PROCESS: TIER 1 STUDENTS A Tier 1 student must be enrlled in a NJ public schl in his r her Resident schl district fr the entire year (2012-13) immediately preceding enrllment in a Chice
More informationParks and Recreation. Goals
Parks and Recreatin Gals The City will: Ensure that new parks and recreatin facilities are designed and lcated t reinfrce and supprt the gals and plicies f the City s Cmprehensive Plan. Prvide parks that
More informationShuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel.
Custmer Agreement / Cmpany Plicies Shuttles are scheduled ONLY when there is a reservatin. Withut reservatins we DO NOT travel. (Excluding Hlidays) Reservatins must be prepaid with a credit card. Please
More informationNORFOLK INTERNATIONAL AIRPORT
Prject Meeting Lcatin Nrflk Internatinal Airprt (ORF) Prject Kick-Off Meeting: Technical Advisry and Cmmunity Advisry Cmmittees (TAC and CAC) Nrflk Internatinal Airprt Date Wednesday, January 24, 2018
More informationWhite Paper Network Video Management System Ensuring end-to-end protection of video integrity
White Paper Netwrk Vide Management System Ensuring end-t-end prtectin f vide integrity Netwrk Vide Management System Octber 7, 2016 NVMSWP002 Revisin 1.0.0 White Paper Netwrk Vide Management System Ensuring
More informationTerra Nova Development
Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt April 01, 2013 June 30, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...
More informationTerra Nova Development
Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt January 01, 2013 March 31, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...
More informationGuidelines for the Consideration and Design of: Engine Out SID (EOSID) and Engine Out Missed Approach Procedures
DRAFT CAAP 235-4(0) Civil Aviatin Advisry Publicatin March 2006 This publicatin is advisry nly and prvides guidance and advice n cmplying with the Civil Aviatin Regulatins 1988 (CAR 1988). Read this advice
More informationContact Details for Visa Information
Imprtant: This Drp Bx facility at Blue dart Centre in Guwahati is nly fr applicants wh d nt need t appear fr Bimetrics. This can be as fllws: 1. Applicants applying fr Lng Term (D-Visa) wh des NOT need
More informationFacilities Worker. Job Information Pack. Employment Conditions. This information package includes:
Facilities Wrker Jb Infrmatin Pack This infrmatin package includes: Emplyment cnditins Psitin Descriptin Selectin criteria Applicatin and recruitment prcess Emplyment Cnditins Emplyment basis: Casual emplyment
More informationLufthansa (LH) Group OB Fee on Apollo
Prduct Advisry Number: 1335 Versin: 01 Lad T Prductin: 10-Nv-11 23:00 EST 04:00 (11-Nv) GMT On Nvember 2 nd 2011, the Lufthansa Grup airlines (Austrian Airlines, bmi British Midland Airways, Brussels Airlines,
More informationAccess control and (pre-)registration
Access cntrl and (pre-)registratin Nte n ISPS Since July 1, 2004, passenger ships and carg ships (GT 500 and upward) n internatinal vyages and prt facilities serving such ships n internatinal vyages, have
More informationREFUND INFORMATION FOR TRAVEL AGENTS
REFUND INFORMATION FOR TRAVEL AGENTS REFUND INFORMATION FOR TRAVEL AGENTS...1 CONTACT INFORMATION...2 PROCESSING TIMEFRAME...2 REFUND PROCESSING ADMINISTRATION FEE...2 EXCHANGE WITH A REFUND (NEGATIVE
More informationAlien Flight Student Program
Instructins t cmplete the applicatin prcess 1. Visit the TSA website at www.flightschlcandidates.gv 2. In the tp right f the screen click n Create New Student Accunt 3. Fill ut and submit the brief applicatin
More informationPUBLIC HEARINGS. Variance 242 Ravenhurst Street (Transcona Ward) File DAV /2017C [c/r DCU /2017C]
Agenda Bard f Adjustment April 4, 2018 PUBLIC HEARINGS Item N. 7 Variance 242 Ravenhurst Street (Transcna Ward) File DAV 179780/2017C [c/r DCU 179775/2017C] WINNIPEG PUBLIC SERVICE RECOMMENDATION: The
More informationD. Aircraft Conformity Procedures. D.1 Formal Request to Add an Aircraft. D.2 Manual Submission
Revisin: Original Page D-1 D. Aircraft Cnfrmity Prcedures These prcedures prvide guidance t peratins and maintenance fr adding an aircraft t the USAC Airways 694 LLC air carrier certificate. D.1 Frmal
More informationAgenda Joint Meeting of The Park Board & City Council
Agenda Jint Meeting f The Park Bard & City Cuncil Parks & Recreatin Bard Visin A city with utstanding parks and recreatinal pprtunities within a valued natural envirnment. Parks & Recreatin Bard Missin
More informationDENVER INTERNATIONAL STANDARD OPERATING PROCEDURES
Order DEN 7110.65B DENVER INTERNATIONAL STANDARD OPERATING PROCEDURES December 7, 2016 VATSIM DEN 7110.65B Effective Date: Denver ATCT December 7, 2016 Nrthwest Muntain District VATUSA Subject: D01 Air
More informationSki & Snowboard Group Guide. Wilmot Mountain, a Vail Resorts Company Fox River Rd. Wilmot, WI 53192
Ski & Snwbard Grup Guide Wilmt Muntain, a Vail Resrts Cmpany 11931 Fx River Rd. Wilmt, WI 53192 Phne: 262-862-2301 www.wilmtmuntain.cm WilmtMtnGrups@vailresrts.cm www.facebk.cm/wilmtmtn Welcme! We are
More informationCurrent Practices in Evaluating Freeway HOV Facilities
TRANSPORTATION RESEARCH RECORD 1299 63 Current Practices in Evaluating Freeway HOV Facilities KATHERINE F. TURNBULL, ROBERT W. STOKES, AND RUSSELL H. HENK Evaluating the impact f high-ccupancy vehicle
More informationThree new ways to fly Agency how to guide
V1 13 March 2018 Three new ways t fly Agency hw t guide Recgnising that ne size desn t fit all, frm spring 2018 Virgin Atlantic will intrduce three new ways t fly ecnmy Ecnmy Light, Ecnmy Classic r Ecnmy
More informationAldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering
Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 182 Chimney Rock Road Colorado Registered Professional Engineer Highlands
More informationMEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015
MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical
More informationPedestrian delay at Pelican crossings in areas operating under SCOOT
TRANSPORT AND ROAD RESEARCH LABORATORY Department f Transprt RRL Cntractr Reprt 249 Pedestrian delay at Pelican crssings in areas perating under SCOOT by J G Hunt, J D Griffiths and K M Hughes (University
More informationsu mejor Modelling Delay Propagation Trees for Scheduled Flights Isdefe ATM Seminar, 11 th edition BRUNO CAMPANELLI, IFISC (UIB-CSIC)
data-driven mdelling f the netwrk-wide extensin f the Tree f REactinary delays in ECAC area su mejr Mdelling Delay Prpagatin Trees fr Scheduled Flights ATM Seminar, 11 th editin BRUNO CAMPANELLI, IFISC
More informationAviation Business Development Program. Economic Development Committee May 18, 2015
Aviatin Business Develpment Prgram Ecnmic Develpment Cmmittee May 18, 2015 Dallas Airprt System Develpment Aviatin Business Develpment Prgram Cmpanies cnsidering a relcatin r expansin r new aernautical
More informationNational Business Ethics Survey 2013 Summary - US
INSTITUTE OF BUSINESS ETHICS Natinal Business Ethics Survey 2013 Summary - US Institute f Business Ethics 24 Greencat Place Lndn SW1P 1BE www.ibe.rg.uk The Natinal Business Ethics Survey f the US wrkfrce
More informationNEW HAVEN DOWNTOWN CROSSING CONSTRUCTION IMPACTS
NEW HAVEN DOWNTOWN CROSSING CONSTRUCTION IMPACTS Sunday, July 13 thrugh Friday, July 18, 2014 Please drive safely and stay infrmed n traffic impacts "New impacts highlighted in range" Exit 2 is scheduled
More informationATFCM Operations Manual NETWORK MANAGER
NETWORK MANAGER Editin Number : 1.0 Editin Validity Date : 10 March 2015 DOCUMENT CHARACTERISTICS Dcument Title Dcument Subtitle (ptinal) Editin Number Editin Validity Date Netwrk Manager 1.0 10 Mar 2015
More informationFeasibility Study of Shared High Occupancy Vehicle Lanes on Bruce B Downs Boulevard between Interstate 75 and Bearss Avenue
Hillsbrugh Cunty Metrplitan Planning Organizatin Feasibility Study f Shared High Occupancy Vehicle Lanes n Bruce B Dwns Bulevard between Interstate 75 and Bearss Avenue TABLE OF CONTENTS Sectin Page 1.0
More informationConcern Worldwide Haiti
Cncern Wrldwide Haiti Transitinal Shelter Prgramme Tabarre Isse A family in their new shelter prvided by Cncern Wrldwide in Haiti Octber 2010 1 Prject Summary: Objective: T prvide safe, secure shelter
More informationAVSP 7 Summer Section 5: Visitor Profile - Destinations and Activities
AVSP 7 Summer 2016 Sectin 5: Visitr Prfile - Destinatins and Activities Destinatins The fllwing pages shw the regins and cmmunities visited by Alaska visitrs, including verall visitatin (day r vernight),
More informationForest and Prairie Protection Act and Regulations Parts I and II - Legislative Review and Regulatory Reform Discussion Paper
Discussin Paper Alberta Agriculture and Frestry Frest and Prairie Prtectin Act and Regulatins Parts I and II - Legislative Review and Regulatry Refrm Discussin Paper The Alberta gvernment is reviewing
More informationQUT Digital Repository:
QUT Digital Repsitry: http://eprints.qut.edu.au/27550 CRC fr Cnstructin Innvatin (2006) Submissin t Brisbane City Cuncil : Draft Brisbane Ecnmic Develpment Plan. The Participants f the CRC fr Cnstructin
More informationAccessibility Guide. Page 1 of 10 12/9/2017. Figure 1 Giraffe
Accessibility Guide Page 1 f 10 Figure 1 Giraffe Table f Cntents San Dieg Z Glbal, an Access Friendly Organizatin 3 Frequently Asked Questins 4 Blind r Lw Visin Guest Assistance 5 Deaf r Hard f Hearing
More informationNACC/WG/4 WP/31 20/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014
2/3/14 Furth Nrth American, Central American and Caribbean Wrking Grup Meeting (NACC/WG/4) Ottawa, Canada, 24 t 28 March 214 Agenda Item 3: Fllw-up n the NAM/CAR Reginal Perfrmance-Based Air Navigatin
More informationMODELING THE OPERATIONAL IMPACT OF AIR TRAFFIC CONTROL AUTOMATION TOOLS:
MODELING THE OPERATIONAL IMPACT OF AIR TRAFFIC CONTROL AUTOMATION TOOLS: A Case Study f Traffic Management Advisr Megan Smirti, Mark Hansen University f Califrnia at Berkeley NEXTOR Berkeley, CA, USA msmirti@berkeley.edu
More informationGAMA/Build A Plane 2017 Aviation Design Challenge
GAMA/Build A Plane 2017 Aviatin Design Challenge OBJECTIVE Cngratulatins! Nw that yu have cmpleted the curriculum, yu are ready t apply what yu ve learned in the prgram t design, build, and fly a virtual
More informationEpisode 3 D Simulation Report on Airspace Organization and Management EPISODE 3
EPISODE 3 Single Eurpean Sky Implementatin supprt thrugh Validatin Dcument infrmatin Prgramme Sixth framewrk prgramme Pririty 1.4 Aernautics and Space Prject title Episde 3 Prject N 037106 Prject Crdinatr
More informationCarbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018
Carbn Offsetting and Reductin Scheme fr Internatinal Aviatin (CORSIA) Overview Kurt Edwards Directr General, IBAC NBAA BACE Octber 2018 Agenda CORSIA Brief Histry CORSIA in cntext Key dates fr CORSIA Am
More informationWhat You Must Know About Your Immigration Status. Presented by the Office of International Affairs (OIA)
What Yu Must Knw Abut Yur Immigratin Status Presented by the Office f Internatinal Affairs (OIA) What Yu Must Knw Abut Yur Immigratin Status Tpics OIA Overview SSN/ITIN/Taxes Maintaining Status Office
More informationChapter 7. Video Broadcast
Chapter 7 Vide Bradcast The Vide feature f Blackbard Cllabrate Web Cnferencing enables yu t transmit and receive vide bradcasts with thers in a sessin. This is vide yu send live via a vide camera (e.g.,
More informationAGENCY DEBIT MEMO (ADM) POLICY
AGENCY DEBIT MEMO (ADM) POLICY OMAN AIR (WY/910) in cmpliance with IATA Reslutin 850m hereby revises its ADM plicy t its Travel Partners effective 01-Jun-2014. OMAN AIR reserves the right t issue ADM fr
More informationGUIDANCE NOTE 17 TRAVEL POLICY & BOOKING PROCEDURE - ONSHORE
GUIDANCE NOTE 17 TRAVEL POLICY & BOOKING PROCEDURE - ONSHORE Revisin Number: 11 Issue Date: 06-Aug-2015 COPYRIGHT This guidance nte and the infrmatin cntained herein is the prperty f Vantage. It may nt
More informationMeeting 2 Workshop Summary
Hilltp Cmmunities, San Bernardin Cunty Meeting 2 Wrkshp Summary Values and Aspiratins Review During the secnd wrkshp in Hilltp, cmmunity members were shwn values and aspiratins segments that they helped
More informationAll Requests for Stamping, Banners, and Space Reservations must be done through TitanLink. Complete the form at:
All Requests fr Stamping, Banners, and Space Reservatins must be dne thrugh TitanLink. Cmplete the frm at: https://fullertn.campuslabs.cm/engage/submitter/frm/start/165803 Guidelines fr the Psting f Printed
More informationSAFETY ALERT - # TRANSPORTATION REQUIREMENTS & FIRST AID ALBERTA EDITION RELEASE DATE: DECEMBER 12, 2007
Functin: Seismic Lcatin: Onshre Incident Type: N/A Incident Date: N/A Lcatin Detail: Seismic Field Operatins Cuntry and Regin: Canada, Alberta ** This alert is intended fr the seismic and il and gas industries
More informationo o o þ þ o o Short title of the project: VILLAGE DEVELOPMENT IN KAUNISSAARI I. BASIC INFORMATION I.1 Short title of the Pilot Action
Shrt title f the prject: I. BASIC INFORMATION I.1 Shrt title f the Pilt Actin 1.1. Full title f the Pilt Actin/ prject Versatile village develpment prject in Kaunissaari village 1.2. Leader+ theme f the
More informationVirtual Royal Air Force
Virtual Ryal Air Frce 2010 www.vraf.rg Virtual Ryal Air Frce Letter f Agreement between VATSIM Italy (VATITA) and virtual Ryal Air Frce (vraf) t establish perating plicies and prcedures fr Exercise Spring
More informationSection: 8 Occupational Health & Safety Policy No: 8.05 Page: 1 of 4 Employees covered: All Employees Effective: 1 November 2010
FIRST AID POLICY Sectin: 8 Occupatinal Health & Safety Plicy N: 8.05 Page: 1 f 4 Emplyees cvered: All Emplyees Effective: 1 Nvember 2010 Subject: First Aid Plicy Authrized: [Signed by G. MacInnis, VP]
More informationCamp BUCKO 2018 Volunteer Application
Camp BUCKO 2018 Vlunteer Applicatin Thank yu fr yur interest in vlunteering at Camp BUCKO. We hpe yu will be able t jin us as we celebrate ur 23rd year!!! Camp week cmmences Sunday August 12, 2018 and
More informationCamp Caillet Crisis Response Plan
Camp Caillet Crisis Respnse Plan The Camp Caillet Operatinal Cmmittee recgnises Scuts Canada Plicy n having a Crisis Respnse Plan in place. In Charge Scuters that run prgrams n Camp Caillet prperty are
More informationAn advisory circular may also include technical information that is relevant to the rule standards or requirements.
Advisry Circular AC21-1 Prduct Certificatin Type Acceptance Certificates Revisin 6 29 January 2018 General Civil Aviatin Authrity advisry circulars cntain guidance and infrmatin abut standards, practices,
More informationOverview of Slum Electrification (Global vs. African Experience), by Connie Smyser October 26-27, 2009, Nairobi, Kenya Promoting Energy Access for
1 Overview f Slum Electrificatin (Glbal vs. African Experience), by Cnnie Smyser Octber 26-27, 2009, Nairbi, Kenya Prmting Energy Access fr the Urban Pr in Africa Overview f Slum Electrificatin (Glbal
More informationParaglider Inspection Report
Paraglider Inspectin Reprt Custmer Details Name: Sme Custmer Phne : Wing Details Manufacturer: Ozne Mdel: Mj Size: L Serial Number: S- Hurs f flight: Hr Checked by: Paul Zapparli Date f receipt : 9// Return
More informationReport to the Minister for Planning
Reprt t the Minister fr Planning N 8: fr the perid ending 31 March 2018 Lucy Turnbull Chief Cmmissiner Sarah Hill Chief Executive Officer 1 Greater Sydney Cmmissin Reprt 31 March 2018 Intrductin Since
More informationNew York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.
New Yrk Actin Team SWAP 2013 Teterbr User Grup Brief By: Le Prusak, Manager f Tactical Operatins Date: March 21, 2013 New Yrk Actin Team bjectives Imprve the flw f traffic and airprt peratins in the New
More informationMIAMI International Real Estate Congress 2013 EB-5
MIAMI Internatinal Real Estate Cngress 2013 EB-5 The linked image cannt be displayed. The file may have been mved, renamed, r deleted. Verify that the link pints t the crrect file and lcatin. Presented
More informationGetting to Grips with ETOPS Volume I: CERTIFICATION AND APPROVAL. Flight Operations Support & Line Assistance
Getting t Grips with ETOPS Vlume I: CERTIFICATION AND APPROVAL Flight Operatins Supprt & Line Assistance 1 Left Intentinally Blank 2 Table f Cntent Table f Cntent Table f cntents TABLE OF CONTENT... 3
More informationGYMNASTICS & NINJA SUMMER CAMPS 2018
1 f 5 GYMNASTICS & NINJA SUMMER CAMPS 2018 GUIDE FOR PARENTS & CAREGIVERS Welcme t Chelsea Piers Summer Camp! Thank yu fr chsing us. Yur child will have a wnderful experience learning gymnastics and making
More informationAttachment: Example of I-9 with I-94 information Good afternoon,
Frm: bunce-107847429-57309561@list.crnell.edu [mailt:bunce-107847429-57309561@list.crnell.edu] On Behalf Of Nicle C. Waterman Sent: Tuesday, August 20, 2013 4:40 PM T: SES-L Subject: Reviewing the Frm
More informationCAC AmeriCorps Position Description
CAC AmeriCrps Psitin Descriptin GIS and Data Management Technician and Trail Crew AmeriCrps Member Dates f Service: August 5 th, 2019 June 26 th, 2020 Partner: Lcatin f Service: Supervisr: Natinal Park
More information1501 Wall Mounted Drinking Fountain
1501 Wall Munted Drinking Funtain FEATURES & BENEFITS Barrier-Free Barrier-free capabilities cmbined with its ease f use allws fr a number f installatin lcatin pssibilities. Integrated Trap Spacius funtain
More informationAPPENDIX A MODULE NO. B1-90 INITIAL INTEGRATION OF REMOTELY PILOTED AIRCRAFT (RPA) INTO NON-SEGREGATED AIRSPACE
AN-Cnf/12-WP/14 Appendix A APPENDIX A MODULE NO. B1-90 INITIAL INTEGRATION OF REMOTELY PILOTED AIRCRAFT (RPA) INTO NON-SEGREGATED AIRSPACE Summary Main perfrmance impact as per Dc 9854 Operating envirnment/
More informationImportant Information about this Release
Imprtant Infrmatin abut this Release Dear MSC Nastran Custmer, MSC is prud t prvide yu with the MSC Nastran 2013.1 release, part f the virtual prduct develpment (VPD) tls available frm MSC Sftware. T help
More informationSchedule Irregularity/IROPS
Schedule Irregularity/IROPS 300-Mile Radius Additinal Ticketing/Itinerary Infrmatin Alternate Cities MAC and Dmestic C Terminals Dmestic/Internatinal Itineraries Dynamic Rebking Index Endrsement Bx Requirements
More informationBMAA TECHNICAL INFORMATION LEAFLET (TIL) TIL 042 ISSUE 9a CHECK FLYING HANDBOOK
BMAA TECHNICAL INFORMATION LEAFLET (TIL) TIL 042 ISSUE 9a CHECK FLYING HANDBOOK Cntents 1. Intrductin... 2 1.1. Types f Check Flight... 2 1.1.1. Airwrthiness Check Flight... 2 1.1.2. Maintenance Check
More informationDistance Learning Course Information
Distance Learning Curse Infrmatin MAR20313 Certificate II in Maritime Operatins (Cxswain Grade1 Near Castal) Unit Cde MARB002 MARC005 MARC006 MARF001 MARF002 MARF004 MARF005 MARH001 Unit f Cmpetency Perfrm
More informationSMSF Professionals webinar July 2016 update
SMSF Prfessinals webinar July 2016 update But first, a little mre abut yu UNCLASSIFIED SMSF prfessinals webinar - July 2016 update 2 Overview Changes t cllectables Safe harbur guidelines fr LRBAs Supprting
More informationManresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017
Manresa Island Reuse and Ecnmic Impact Analysis Study June 2017 The public invlvement prcess fr the Manresa Island Reuse Study used a variety f methds t engage key stakehlders and the public. The elements
More informationTraffic Analysis Final Report
SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707
More information