ATM Network Performance Report

Size: px
Start display at page:

Download "ATM Network Performance Report"

Transcription

1 Netwrk Perfrmance Reprt ATM Netwrk Perfrmance Reprt Page 1 f 17

2 Netwrk Perfrmance Reprt 2018 Table f cntents Summary... 3 Netwrk Wide Perfrmance... 7 Airbrne delay... 7 Netwrk Delay Rati: Errr! Bkmark nt defined. Sydney... 9 Airbrne delay... 9 Ntable events... 9 Melburne Airbrne delay Ntable events CTOT (Calculated take ff time) variatins Brisbane Airbrne delay Ntable events CTOT Variatin Perth Airbrne delay Ntable events Appendix A Crprate Plan Key Perfrmance Indicatr Prfile: Arrival airbrne delay Page 2 f 17

3 Netwrk Perfrmance Reprt 2018 Summary This reprt fcusses n the perfrmance f the Air Traffic Netwrk in The cmbined 75 th percentile perfrmance during fr airbrne delay acrss the fur majr airprts (Sydney, Melburne, Brisbane and Perth) was 3.4 minutes, and the median was 0.6 minutes. These results represent a slight decrease (0.1 minutes fr bth metrics) cmpared t the same perid last year, and are in line with the KPI targets f 3.4 minutes fr the 75 th percentile and 0.6 minutes fr the median. There were a ttal f 16 ntable events during, 12 fewer than in July. als had the fewest number f delay events fr 2018 s far. Details f the ntable events fr are shwn in Figure 1 and summarised in Table 1. Seven f these ntable events resulted in a prlnged and mderately elevated airbrne delay fr the entire day (i.e. 75 th percentile greater than seven minutes acrss the entire day). Nine events resulted in a shrter and mre intense perid f elevated airbrne delay (i.e. tw r mre cnsecutive hurs where the 75 th percentile was ver 10 minutes). Single runway peratins at Sydney r Melburne were a majr cause f prlnged airbrne delays at these airprts. Bx 1 prvides a further descriptin f the impacts f single runway peratins. saw a reductin in the number f delay events at Brisbane related t the cncentratin f demand frm late nn-cmpliant flights. There was nly ne such event in cmpared t six that were experienced in July. This crrespnded with a 28% decrease in the number f flights departing later than planned and arriving during the Brisbane evening peak (frm 124 in July t 89 in ). Further infrmatin n this imprved perfrmance is detailed in the Brisbane sectin belw. Figure 1: Ntable delay impact events during 2018 Numbers underneath the dates indicate the extent f the 75 th percentile f airbrne delay in minutes acrss the day.. Page 3 f 17

4 Netwrk Perfrmance Reprt 2018 Lcatin Day Lcal Time Delay (minutes 75 th percentile) Event Descriptins (Cntributing causes t increased delays) Decreased capacity due t unplanned change t single runway peratins, taxiway/gate cngestin and staff unavailability Cncentratin f demand due t late arrival f several cmpliant aircraft during a lw capacity perid (single runway peratins) & Decreased capacity due t shrt-ntice staffing unavailability in late mrning. Build-up f delay in early evening fllwing an extended lw capacity perid (single runway peratins). Sydney Cncentratin f demand due t exempt and late nn-cmpliant flights during an extended perid f lw capacity (single runway peratins) Cncentratin f demand due t ff-schedule internatinal arrivals during a peak perid & Cncentratin f demand due t ff-schedule internatinal arrivals and late nn-cmpliant flights during a peak perid. Pr visibility extended lnger than frecast. Tactical arrival rates lwered fr staffing breaks t accmmdate increased wrklad in this perid. Cncentratin f demand due t ff-schedule internatinal arrivals during mrning peak perid. Build-up f delay in early evening fllwing an extended lw capacity perid (single runway peratins) and tw MEDEVAC flights during busy perid. Melburne Cncentratin f demand due t ff-schedule internatinal arrivals, and early and late nn-cmpliant flights & Cncentratin f demand in the mrning and evening peak perids due t exempt and late-cmpliant aircraft cmbined with extended perids f lw capacity (single runway peratins) Cncentratin f demand due t late nn-cmpliant flights during a peak perid.. Page 4 f 17

5 Netwrk Perfrmance Reprt 2018 Melburne & Cncentratin f demand during the mrning peak due t ff-schedule internatinal arrivals and late-nn cmpliant aircraft. Build-up f delay in early evening fllwing an extended lw capacity perid (single runway peratins) Cncentratin f demand due t ff-schedule internatinal arrivals during a peak perid Cncentratin f demand due t ff-schedule internatinal arrivals during a peak perid. Brisbane Cncentratin f demand due t late nn-cmpliant flights during a peak perid Cncentratin f demand at the beginning f the 2000 lcal and 2100 lcal hurs. Occurred during a lw demand perid s the increase in delay nly impacted a small number f flights. Table 1: Ntable event descriptins. Page 5 f 17

6 Netwrk Perfrmance Reprt 2018 Single runway peratins Sydney and Melburne are Australia s busiest airprts and can experience ver 550 and 350 arrivals per day, respectively. These large arrival numbers are accmmdated thrugh the peratin f dual runways at each airprt. Hwever, airprt capacity is significantly reduced n days where cnditins require single runway peratins. During single runway peratins the scheduled arrival demand is mre likely t exceed the airprt s actual arrival capacity. In these circumstances, airbrne delay can build up despite the effrts r pre-tactical ATFM as there is n spare capacity t recver frm cncentratins in tactical demand r unplanned factrs (such as MEDEVAC flights r missed appraches). This increase in airbrne delay is cnsistent with the knwn limitatins f pre-tactical ATFM prgrams in situatins where scheduled demand exceeds capacity fr a prlnged perid f time. The figure belw shws hw airbrne delay (blue line) can increase during the perid f single runway peratins (indicated in yellw). An analysis f Sydney airprt shwed that during extended perids f single runway peratins, airbrne delay was substantially higher than average. The airbrne delay (75 th percentile) n these days was 16 minutes acrss the day and 28 minutes during the peak hur. Airbrne delay was even higher n days where single runway peratins included the evening peak perid. The airbrne delay (75 th percentile) n these days was 23 minutes acrss the day and 40 minutes during the peak hur. Airbrne arrival delay (blue line) at Sydney during an extended perid f single runway peratins (runway 25A/25D marked in yellw). Bx 1: Single runway peratins. Page 6 f 17

7 Netwrk Perfrmance Reprt 2018 Netwrk Wide Perfrmance Airbrne delay The cmbined median and 75 th percentile airbrne delay at the fur majr airprts is indicated in Figure 2. The 24-mnth trend is statistically flat and clse t the target levels. Figure 2: 24-mnth trend fr airbrne delay The 48-mnth trends f the 75 th percentile airbrne delay fr each f the fur majr airprts are depicted in Figure 3. The lng-term trends fr Sydney and Melburne are upwards. Mre detailed analysis fr each airprt is presented later in this reprt. Figure 3: Lng-term airbrne delay (75 th percentile) by airprt. Page 7 f 17

8 Sep-17 Oct-17 Nv-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Ttal arrival delay (min) Netwrk Perfrmance Reprt 2018 The mnthly ttal minutes f airbrne delay fr Sydney, Melburne, Brisbane and Perth cmbined is depicted in Figure 4. Figures are adjusted fr the number f days in the mnth. was the fifth lwest mnth f adjusted ttal delay in the September 2017 t 2018 perid. There is n significant trend. 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Mnth-Year Figure 4: Ttal amunt f airbrne delay by mnth fr Sydney, Melburne, Brisbane and Perth Airprts.. Page 8 f 17

9 Netwrk Perfrmance Reprt 2018 Sydney Airbrne delay The 75 th percentile perfrmance figures fr airbrne delay at Sydney are indicated in Figure 5. perfrmance (0.3 minutes median and 3.3 minutes 75 th percentile) met the targets. Cmpared t the same mnth last year, there was a decrease in the airbrne delay median (frm 0.5 minutes) and 75 th percentile (frm 3.6 minutes) perfrmance. The lng-term trend fr airbrne delay at Sydney is upwards. Hwever, the 24-mnth trend is flat. Figure 5: Sydney airbrne delay 75 th percentile (last 24 mnths) Ntable events The fllwing cmmentary describes the ntable airbrne delay events during in Sydney: 12 ( lcal) Delay 2.2 minutes Decreased capacity due t: Unplanned change t single runway peratins frm lcal. Staff unavailability. Taxiway and gate cngestin which increased cntrller wrklad. Tactical rates were reduced by arrivals per hur (frm 34 planned) between lcal. 18 ( lcal) Delay 9.0 minutes Cncentratin f demand due t the late arrival f several cmpliant aircraft at the beginning f a perid f single runway peratins. The lw capacity during single runway peratins did nt enable these additinal arrivals t be absrbed which resulted in increased airbrne delay.. Page 9 f 17

10 Netwrk Perfrmance Reprt ( and lcal) Delay 12.8 minutes Taxiway cngestin and a shrt-ntice staffing unavailability resulted in a Level 2 GDP Revisin at 1031 lcal t reduce rates frm 23 t 15 per hur until 1300 lcal. Cncentratin f demand in the evening due t late nn-cmpliant flights during an extended perid f single runway peratins. The lw capacity during single runway peratins did nt enable this cncentratin t be absrbed which resulted in increased airbrne delay. 21 ( lcal) Delay 6.8 minutes Cncentratin f demand in the evening due t late nn-cmpliant flights during an extended perid f single runway peratins. The lw capacity during single runway peratins did nt enable this cncentratin t be absrbed which resulted in increased airbrne delay. 24 ( lcal) Delay 3.1 minutes Cncentratin f demand due t ff-schedule internatinal arrivals during a peak perid. 27 ( lcal) Delay 3.1 minutes Cncentratin f demand due t ff-schedule internatinal arrivals and late-nn cmpliant aircraft during the mrning peak perid. Pr visibility in the mrning extended lnger than frecast. Additinal staffing breaks were required t accmmdate increased cntrller wrklad in this perid. As a result the tactical arrival rate was lwered frm 42 t 32 frm lcal.. Page 10 f 17

11 Netwrk Perfrmance Reprt 2018 Melburne Airbrne delay The 75 th percentile perfrmance figures fr airbrne delay at Melburne are indicated in Figure 6. perfrmance (1.0 minute median and 3.8 minutes 75 th percentile) did nt meet the targets. Cmpared t the same mnth last year the median delay was steady and the 75 th percentile decreased (frm 4.3 minutes). The lng-term trend fr airbrne delay at Melburne is upwards. Hwever, the 24-mnth trend is flat. Figure 6: Melburne airbrne delay 75 th percentile (last 24 mnths) Ntable events The fllwing cmmentary describes the mst significant airbrne delay events during in Melburne. 03 ( & lcal) Delay 9.5 minutes Cncentratin f demand due t ff-schedule internatinal arrivals during mrning peak perid. Fllwing an extended perid f lw capacity due t single runway peratins, airbrne delay built up in the early evening. Airbrne delay was als impact by tw MEDEVAC flights in the busy evening perid. 08 ( ) Delay 4.7 minutes Cncentratin f demand due t ff-schedule internatinal arrivals, and early and late nn-cmpliant flights during mrning peak perid. 10 ( & lcal) Delay 9.0 minutes Cncentratin f demand in the mrning and evening peak perids due t late nn-cmpliant flights during an extended perid f single runway peratins. The lw capacity during single runway peratins did nt enable this cncentratin t be absrbed which resulted in increased airbrne delay.. Page 11 f 17

12 Netwrk Perfrmance Reprt ( lcal) Delay 5.3 minutes Cncentratin f demand due t late nn-cmpliant flights during the mrning peak perid. 15 ( lcal) Delay 6.1 minutes Cncentratin f demand due t late nn-cmpliant flights during the mrning peak perid. 30 ( & lcal) Delay 7.7 minutes Cncentratin f demand during the mrning peak due t ff-schedule internatinal arrivals and late nn-cmpliant flights. Fllwing an extended perid f lw capacity due t single runway peratins, airbrne delay built up in the early evening. 31 ( ) Delay 7.0 minutes Cncentratin f demand due t late nn-cmpliant flights during the mrning peak perid.. Page 12 f 17

13 Netwrk Perfrmance Reprt 2018 CTOT (Calculated take ff time) variatins The mrning peak ( lcal) is in general the mst cnstrained perid f the day in Melburne. Variatins frm CTOT during the early mrning hurs are the fcus f this sectin due t regular cncentratin f demand leading t increases in delay. The results depicted in Table 1 prvide the flights within this perid that departed either early r late with respect t their CTOTs (-5 t + 15 minutes) n mre than ne ccasin. This facilitates cllabratin t identify patterns and causes. The CTOT against the ATOT (actual take ff time) measure is used as a prxy until the COBT (calculated ff blcks time) against AOBT (actual ff blcks time) can be rutinely reprted n. Table 3: CTOT variatin fr Melburne arrivals lcal Page 13 f 17

14 Netwrk Perfrmance Reprt 2018 Brisbane Airbrne delay The 75 th percentile perfrmance figures fr airbrne delay at Brisbane are indicated in Figure 7. perfrmance (1.2 minutes median and 4.1 minutes 75 th percentile) did nt meet the targets. Cmpared t the same mnth last year there was an increase in the median (frm 1.1 minutes) the 75 th percentile (frm 3.9 minutes) f airbrne delay. The lng-term trend fr airbrne delay at Brisbane is dwnwards. Hwever, the 24-mnth trend is flat. Figure 7: Brisbane airbrne delay 75 th percentile (last 24 mnths) Ntable events The fllwing cmmentary describes the mst significant airbrne delay events during in Brisbane: 22 ( lcal) Delay 6.0 minutes Cncentratin f demand due t ff-schedule internatinal arrivals during a peak perid. 24 ( lcal) Delay 5.1 minutes Cncentratin f demand due t late nn-cmpliant flights during the evening peak perid. 30 ( lcal) Delay 4.7 minutes Cncentratin f demand at the beginning f the 2000 lcal and 2100 lcal hurs. Occurred during a lw demand perid s the increase in delay nly impacted a small number f flights.. Page 14 f 17

15 Netwrk Perfrmance Reprt 2018 CTOT Variatin Variatins frm CTOT at Brisbane during the afternn hurs ( lcal) are the fcus f this sectin due t regular cncentratin f demand leading t increases in delay. Flights that appear at least twice have been included in the table belw. The results depicted in Table 1 prvides the flights within this perid that departed either early r late with respect t their CTOTs (-5 t + 15 minutes) n mre than ne ccasin. This facilitates cllabratin t identify patterns and causes. The CTOT against the ATOT (actual take ff time) measure is used as a prxy until the COBT (calculated ff blcks time) against AOBT (actual ff blcks time) can be rutinely reprted n. Change frm July 2018 saw a substantial imprvement (decrease) in the number f flights with late CTOT variatins arriving at Brisbane in the peak 1800 and 1900 lcal hurs. There were 89 f these flights in, dwn frm 128 in July. In there were 21 flights that departed late with respect t their CTOT tw r mre times. This was dwn frm 27 in July. Table 4: CTOT variatin fr Brisbane arrivals lcal Page 15 f 17

16 Netwrk Perfrmance Reprt 2018 Perth Airbrne delay The 75 th percentile perfrmance figures fr airbrne delay at Perth are indicated in Figure 8. perfrmance (-0.3 minutes median and 1.6 minutes 75 th percentile) met the targets. Cmpared t the same mnth last year there was a decrease in the median (frm -0.1 minutes) and 75 th percentile (frm 1.8 minutes) f airbrne delay. The lng-term and 24-mnth trend fr airbrne delay at Perth is dwnwards. Figure 8: Perth airbrne delay 75 th percentile (last 24 mnths) Ntable events There were n ntable events at Perth during Page 16 f 17

17 Netwrk Perfrmance Reprt 2018 Appendix A Crprate Plan Key Perfrmance Indicatr Prfile: Arrival airbrne delay Crprate Plan Descriptin: The median (and 75 th percentile) excess time incurred during the arrival airbrne phase f flight in reference t the estimated time f arrival fr high-vlume peratins. (High vlume perating envirnments defined as Brisbane, Melburne, Perth and Sydney). Crprate Plan Targets: Year 17/18 18/19 19/20 20/21 21/22 75% Median What is it: Excess time incurred during the arrival phase f flight. What is measured: It is measured by cmparing the estimated flight time and actual flight time fr the prtin f the flight within 250 NM f the destinatin aerdrme. Why 250NM: The 250NM threshld has been identified as the distance frm the aerdrme at which tactical arrival demand/capacity balancing measures start taking effect. It is a true reflectin f the tactical arrival management f the flight, and is nt skewed by ther nn-related issues such as cngestin at the departure aerdrme. Why measure Median rather than Average/Mean: In sme cases, the actual flight time within 250NM f the destinatin aerdrme will be less than the estimated flight time (e.g.: ATC has prvide track shrtening). In the dataset, this translates int a negative value fr that particular flight. The Median shws the mid-pint f the data set and allws us t demnstrate ur impact n all flights, nt just the nes that were delayed. Additinally, ver shrt timeframes and small datasets (such as a daily reprt), Median measurement is mre resilient t data errrs and small grups f utliers which may skew the average. Why measure the 75 th percentile: This supplements the Median and is valuable t demnstrate hw effectively we have managed the arrival f mst f the fleet. The last 25 th percentile can typically cntain arrival data frm flights that were impacted by nn-rutine events, such as Medical pririty traffic r aircraft in an emergency r diversin. Hw d we measure: Uses the high-fidelity Dalí trajectry-based mdel. Fr Sydney, sme assumptins are built in t calculatins as the actual flight path is unique fr each flight (pen STARs).. Page 17 f 17

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report 2018. Page 1 of 16 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 6 Airborne delay... 6 Notable events... 6 Melbourne... 9 Airborne

More information

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report 2019 Page 1 of 20 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 7 Airborne delay... 7 Notable events... 7 CTOT (Calculated take

More information

Tasmanian Tourism Snapshot

Tasmanian Tourism Snapshot Tasmanian Turism Snapsht Year ending December 2014 Intrductin The Tasmanian Turism Snapsht is published every quarter, using the latest figures frm the Tasmanian Visitr Survey, the Internatinal Visitr

More information

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations ALI ZAGHARI Deputy District Directr Caltrans, District 7 Divisin f Traffic Operatins Backgrund Califrnia law permits ILEV (Inherently Lw Emissin Vehicles) and previusly hybrid vehicles t access HOV lanes

More information

Lower prices drive WA first time buyers on to the housing ladder

Lower prices drive WA first time buyers on to the housing ladder MEDIA RELEASE Embarged t 00.01 EST 05 December 2017 Lwer prices drive WA first time buyers n t the husing ladder Western Australia s first time buyers are injecting life int the state s prperty market,

More information

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations. New Yrk Actin Team SWAP 2013 Teterbr User Grup Brief By: Le Prusak, Manager f Tactical Operatins Date: March 21, 2013 New Yrk Actin Team bjectives Imprve the flw f traffic and airprt peratins in the New

More information

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011 Runway Expansin Impact Assessment Oshawa Municipal Airprt Presentatin T Develpment Services Cmmittee City f Oshawa May 30, 2011 2 Agenda Airprt s Ecnmic Imprtance Backgrund Scpe f Wrk Prpsed Runway Expansin

More information

Concur Travel Tips and Tricks

Concur Travel Tips and Tricks Cncur Travel Tips and Tricks Items cvered in this dcument: (can use the link t mve t the specific sectin) Main Search Page Air Results Page Upcming Trips Keybard / Tabbing Optin Time f day Identifiers

More information

su mejor Modelling Delay Propagation Trees for Scheduled Flights Isdefe ATM Seminar, 11 th edition BRUNO CAMPANELLI, IFISC (UIB-CSIC)

su mejor Modelling Delay Propagation Trees for Scheduled Flights Isdefe ATM Seminar, 11 th edition BRUNO CAMPANELLI, IFISC (UIB-CSIC) data-driven mdelling f the netwrk-wide extensin f the Tree f REactinary delays in ECAC area su mejr Mdelling Delay Prpagatin Trees fr Scheduled Flights ATM Seminar, 11 th editin BRUNO CAMPANELLI, IFISC

More information

PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish

PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish ALASKA AIR CARRIERS ASSOCIATION 2301 Merrill Field Drive A-3, Anchrage, Alaska 99501 907-277-0071 www.alaskaaircarriers.rg PBN Rute Structure Alaska Sub-Cmmittee AACA C-Chair Dennis Parrish d.parrish@cp.cm

More information

IRELAND. AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel Fax

IRELAND. AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel Fax IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel +353 61 703750 Fax +353 61 366245 AIC Nr 18 /14 11 DEC Guidance n VFR flight in Airspace Classes

More information

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE REVIEW ITINERARY UPON RECEIPT Please review yur travel itinerary prvided by Prter upn receipt. Yu shuld cntact Prter within 24 hurs f receipt f yur itinerary

More information

CHAPTER 1.0 INTRODUCTION

CHAPTER 1.0 INTRODUCTION CHAPTER 1.0 INTRODUCTION 1.1 PROPOSED AIR SERVICE AND FAA RESPONSIBILITY This dcument is the Envirnmental Assessment (EA) prepared by the Twn f Mammth Lakes and United Airlines t analyze, dcument, and

More information

FLIGHTS OF FANCY How Wing Shape Affects Flight

FLIGHTS OF FANCY How Wing Shape Affects Flight FLIGHTS OF FANCY Hw Wing Shape Affects Flight Summary/Purpse: The purpse f this activity is t simulate bird flight using mdel paper planes. Students will be able t differentiate between high and lw aspect

More information

Draft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process

Draft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process fr the Tnt Natinal Frest Wilderness Recmmendatin Prcess Intrductin When revising the Frest Plan, the Tnt Natinal Frest is required t identify and evaluate lands that may r may nt be suitable fr inclusin

More information

Annual Report FY 2017/18 Port Hedland Ambient Air Quality Monitoring Program

Annual Report FY 2017/18 Port Hedland Ambient Air Quality Monitoring Program Annual Reprt FY 2017/18 Prt Hedland Ambient Air Quality Mnitring Prgram FINAL Prt Hedland Industries Cuncil Octber 2018 Prepared by Katestne Envirnmental Pty Ltd DOCUMENT CONTORL Deliverable Number: D17093-3

More information

ASISA STANDARD ON UNCLAIMED ASSETS

ASISA STANDARD ON UNCLAIMED ASSETS ASISA STANDARD ON UNCLAIMED ASSETS 1. Backgrund This Standard prvides guidance fr members n the treatment f unclaimed assets. The LOA Cde n Unclaimed Assets was used as the basis t develp this Standard

More information

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia BACKGROUNDER Vancuver Internatinal Airprt - Ecnmic Generatr fr British Clumbia Vancuver Internatinal Airprt (YVR) emplys mre than 23,600 peple and is hme t 400 businesses. In 2010 it cntributed $1.9 billin

More information

AVSP 7 Summer Section 5: Visitor Profile - Destinations and Activities

AVSP 7 Summer Section 5: Visitor Profile - Destinations and Activities AVSP 7 Summer 2016 Sectin 5: Visitr Prfile - Destinatins and Activities Destinatins The fllwing pages shw the regins and cmmunities visited by Alaska visitrs, including verall visitatin (day r vernight),

More information

Runway 35 South and West (Jet) Departure Flight Path Amendment

Runway 35 South and West (Jet) Departure Flight Path Amendment Pst Implementatin Review CANBERRA AIRPORT Runway 35 Suth and West (Jet) Departure Flight Path Amendment Versin 1 Effective February 2016 Airservices Australia 2015 1 f 5 Intrductin In 2014 at the request

More information

Terra Nova Development

Terra Nova Development Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt January 01, 2013 March 31, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...

More information

Denver International Airport Air Traffic Control Tower. and. Denver Approach D01 LETTER OF AGREEMENT

Denver International Airport Air Traffic Control Tower. and. Denver Approach D01 LETTER OF AGREEMENT Denver Internatinal Airprt Air Traffic Cntrl Twer and Denver Apprach D01 LETTER OF AGREEMENT Subject: Standard Operatin and Cntrl Jurisdictin Effective: 12/20/2016 Purpse: This letter f agreement establishes

More information

MODELING THE OPERATIONAL IMPACT OF AIR TRAFFIC CONTROL AUTOMATION TOOLS:

MODELING THE OPERATIONAL IMPACT OF AIR TRAFFIC CONTROL AUTOMATION TOOLS: MODELING THE OPERATIONAL IMPACT OF AIR TRAFFIC CONTROL AUTOMATION TOOLS: A Case Study f Traffic Management Advisr Megan Smirti, Mark Hansen University f Califrnia at Berkeley NEXTOR Berkeley, CA, USA msmirti@berkeley.edu

More information

Strand 3- Transportation: Airlines

Strand 3- Transportation: Airlines Strand 3- Transprtatin: Airlines Hw ppular is air travel? In times f peace, apprximately millin peple take a plane trip each day. Air Transprtatin Histry Wright brther s first plane: Passenger travel n

More information

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation cmmittee reprt Netwrk Rail: Rute Utilisatin Strategy: Statins Draft fr Cnsultatin Cmmittee Strategy and Prgrammes Date f Meeting 24 June 2011 Date f reprt 31 May 2011 Reprt by Assistant Chief Executive

More information

Pedestrian delay at Pelican crossings in areas operating under SCOOT

Pedestrian delay at Pelican crossings in areas operating under SCOOT TRANSPORT AND ROAD RESEARCH LABORATORY Department f Transprt RRL Cntractr Reprt 249 Pedestrian delay at Pelican crssings in areas perating under SCOOT by J G Hunt, J D Griffiths and K M Hughes (University

More information

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel.

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel. Custmer Agreement / Cmpany Plicies Shuttles are scheduled ONLY when there is a reservatin. Withut reservatins we DO NOT travel. (Excluding Hlidays) Reservatins must be prepaid with a credit card. Please

More information

Terra Nova Development

Terra Nova Development Canada-Newfundland and Labradr Industrial Benefits Public Quarterly Reprt April 01, 2013 June 30, 2013 Table f Cntents Sectin 1.0 Intrductin... 3 Sectin 2.0 Prject Activity and Benefits Accmplishments...

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Cmmunity Nise Cnsrtium Meeting (CNC) September 8, 2016 Hillsbrugh Cunty Aviatin Authrity 1 Agenda Open Cmments (15 minutes) Taxiway J Update (5 minutes) Onging Cmmunity Engagement (15 minutes) Survey Respnse

More information

USE OF DURABLE PAVEMENT MARKINGS

USE OF DURABLE PAVEMENT MARKINGS Page 1 f 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION General Pavement markings prvide mtrists with valuable guidance and radway infrmatin. Pavement markings have specific functins; they guide the

More information

APPENDIX D Safety Performance Review

APPENDIX D Safety Performance Review APPENDIX D Safety Perfrmance Review Safety Perfrmance Review Curtneypark Drive East Class EA & Preliminary Design Prepared fr: City f Mississauga Prepared by: Stantec Cnsulting Ltd. 300-675 Cchrane Dr,

More information

Three new ways to fly Agency how to guide

Three new ways to fly Agency how to guide V1 13 March 2018 Three new ways t fly Agency hw t guide Recgnising that ne size desn t fit all, frm spring 2018 Virgin Atlantic will intrduce three new ways t fly ecnmy Ecnmy Light, Ecnmy Classic r Ecnmy

More information

INTERIM RESULTS 2016

INTERIM RESULTS 2016 Trinity Limitedit Stck Cde: 891 9 August Brand Activities Intrductin Cutting Our Clth T Suit Cnditins Highly efficient e stre netwrk Fcus n cre Chinese cnsumers Re-engineering cmpany and supply chain Refcused

More information

QUT Digital Repository:

QUT Digital Repository: QUT Digital Repsitry: http://eprints.qut.edu.au/27550 CRC fr Cnstructin Innvatin (2006) Submissin t Brisbane City Cuncil : Draft Brisbane Ecnmic Develpment Plan. The Participants f the CRC fr Cnstructin

More information

Concern Worldwide Haiti

Concern Worldwide Haiti Cncern Wrldwide Haiti Transitinal Shelter Prgramme Tabarre Isse A family in their new shelter prvided by Cncern Wrldwide in Haiti Octber 2010 1 Prject Summary: Objective: T prvide safe, secure shelter

More information

Chapter 7. Video Broadcast

Chapter 7. Video Broadcast Chapter 7 Vide Bradcast The Vide feature f Blackbard Cllabrate Web Cnferencing enables yu t transmit and receive vide bradcasts with thers in a sessin. This is vide yu send live via a vide camera (e.g.,

More information

DOT 3 Hour Rule GoJet SOC Master Plan

DOT 3 Hour Rule GoJet SOC Master Plan DOT 3 Hur Rule GJet SOC Master Plan Backgrund The Department f Transprtatin s (DOT) rule establishes a hard time limit f three hurs after which airlines must allw passengers t deplane. While the rule applies

More information

THIS IS UNCHARTED ADVENTURE

THIS IS UNCHARTED ADVENTURE K i n g s W h a r f, B er m u d a THIS IS UNCHARTED ADVENTURE Send yur clients n a memr y making explre-a-thn with savings the whle family can dive int. Here s what yu need t knw: BOGO50 50% ff secnd guest.

More information

Bi-Annual Statistics Report: Jan-June 2016

Bi-Annual Statistics Report: Jan-June 2016 Bi-Annual Statistics Reprt: Jan-June 2016 1 Executive Summary The Cayman Islands Department f Turism half year reprt aims t deepen the understanding f turism perfrmance based n the Cayman Islands Immigratin

More information

Ski & Snowboard Group Guide. Wilmot Mountain, a Vail Resorts Company Fox River Rd. Wilmot, WI 53192

Ski & Snowboard Group Guide. Wilmot Mountain, a Vail Resorts Company Fox River Rd. Wilmot, WI 53192 Ski & Snwbard Grup Guide Wilmt Muntain, a Vail Resrts Cmpany 11931 Fx River Rd. Wilmt, WI 53192 Phne: 262-862-2301 www.wilmtmuntain.cm WilmtMtnGrups@vailresrts.cm www.facebk.cm/wilmtmtn Welcme! We are

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpse and Scpe The infrmatin presented in this reprt represents the study findings fr the 2015 Grand Frks Internatinal Airprt Master Plan Update prepared fr the Grand Frks Reginal

More information

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012 25 APRIL 2012 CAPITAL SHOPPING CENTRES GROUP PLC INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012 David Fischel, Chief Executive f Capital Shpping Centres Grup PLC, cmmented:

More information

Cherokee Flight Presolo Written Exam (PA28-181)

Cherokee Flight Presolo Written Exam (PA28-181) Cherkee Flight Presl Written Exam (PA28-181) NOTE: AIRCRAFT SPECIFIC QUESTIONS ARE FROM POH Name: Date: 1. What persnal dcuments are required fr a student pilt t fly sl? A. Student pilt certificate, medical

More information

Schedule Irregularity/IROPS

Schedule Irregularity/IROPS Schedule Irregularity/IROPS 300-Mile Radius Additinal Ticketing/Itinerary Infrmatin Alternate Cities MAC and Dmestic C Terminals Dmestic/Internatinal Itineraries Dynamic Rebking Index Endrsement Bx Requirements

More information

Avalanche accidents in back country terrain ofthe Swiss alps: New investigations of a 30 year database

Avalanche accidents in back country terrain ofthe Swiss alps: New investigations of a 30 year database Avalanche accidents in back cuntry terrain fthe Swiss alps: New investigatins f a 3 year database Stephan Harvey *, Chatrigna Signrell Swiss Federal Institute fr Snw and Avalanche Research (SLF), Davs

More information

Review of the previous CARSAMMA and Scrutiny Group meetings Conclusions and Recommendations

Review of the previous CARSAMMA and Scrutiny Group meetings Conclusions and Recommendations Internatinal Civil Aviatin Organizatin GTE/17-WP/02 Seventeenth Meeting f the GREPECAS 16/10/17 Scrutiny Wrking Grup (GTE/17) Lima, Peru, 30 Octber t 03 Nvember 2017 Agenda Item 1: Review f the previus

More information

Greater Tampa Bay Area Council. Zombie Apocalypse

Greater Tampa Bay Area Council. Zombie Apocalypse Greater Tampa Bay Area Cuncil Cub Adventure Camp Zmbie Apcalypse Nvember 16 th 18th Sandhill Scut Reservatin 11210 Crtez Blvd Brksville, FL 34613 Cub Adventure Camp Directr Prfessinal Advisr Shelly Leckie

More information

Figure 1. The sun warms the soil in the daytime. Heat from the soil keeps crops warm at night. A covering traps heat from the soil around the crops.

Figure 1. The sun warms the soil in the daytime. Heat from the soil keeps crops warm at night. A covering traps heat from the soil around the crops. CMG GardenNtes #722 Frst Prtectin and Extending the Grwing Seasn Outline: Types f frst, page 1 Heat surce at night, page 1 Cverings, page 2 Blankets and sheets, page 2 Flating rw cvers, page 2 Plastic

More information

EMERGENCY MANAGEMENT FOR AERODROME CONTROLLER

EMERGENCY MANAGEMENT FOR AERODROME CONTROLLER 1. ntrductin EMERGENCY MNGEMEN FOR ERODROME CONROLLER is a simple set f acrnyms which may make it easier fr cntrllers t remember the immediate actins, r sequence f actins, t be fllwed n initial ntificatin

More information

8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax

8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax 8950 Cal Center Drive Bldg.3, Suite 300 Sacrament, CA 95826 916.564.4500 phne 916.564.4501 fax www.esassc.cm memrandum date t frm subject Part 150 Advisry Cmmittee, OSU Airprt FAR Part 150 Study Rn Seymur,

More information

GAMA/Build A Plane 2017 Aviation Design Challenge

GAMA/Build A Plane 2017 Aviation Design Challenge GAMA/Build A Plane 2017 Aviatin Design Challenge OBJECTIVE Cngratulatins! Nw that yu have cmpleted the curriculum, yu are ready t apply what yu ve learned in the prgram t design, build, and fly a virtual

More information

Camp Caillet Crisis Response Plan

Camp Caillet Crisis Response Plan Camp Caillet Crisis Respnse Plan The Camp Caillet Operatinal Cmmittee recgnises Scuts Canada Plicy n having a Crisis Respnse Plan in place. In Charge Scuters that run prgrams n Camp Caillet prperty are

More information

BCHA Volunteer Hours Reporting Guide

BCHA Volunteer Hours Reporting Guide BCHA Vlunteer Hurs Reprting Guide List each participant in the prject and their individual cntributin t the prject: Wrk hurs. Miles f trail maintained. (Wilderness areas and nn-wilderness) Travel time

More information

Agenda Joint Meeting of The Park Board & City Council

Agenda Joint Meeting of The Park Board & City Council Agenda Jint Meeting f The Park Bard & City Cuncil Parks & Recreatin Bard Visin A city with utstanding parks and recreatinal pprtunities within a valued natural envirnment. Parks & Recreatin Bard Missin

More information

Paraglider Inspection Report

Paraglider Inspection Report Paraglider Inspectin Reprt Custmer Details Name: Sme Custmer Phne : Wing Details Manufacturer: Ozne Mdel: Mj Size: L Serial Number: S- Hurs f flight: Hr Checked by: Paul Zapparli Date f receipt : 9// Return

More information

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm)

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm) Bilingual Service and Sales Agent - Hme Based (Vancuver) Lking fr a great place t wrk? A place where an award-winning culture means empwerment, teamwrk and a passin fr what yu d? Then think WestJet. It's

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report January 2018 Foreword Welcome to this edition of the monthly ATM Network Performance Report for January 2018. January was a good month for Network Performance - the combined

More information

White Paper Network Video Management System Ensuring end-to-end protection of video integrity

White Paper Network Video Management System Ensuring end-to-end protection of video integrity White Paper Netwrk Vide Management System Ensuring end-t-end prtectin f vide integrity Netwrk Vide Management System Octber 7, 2016 NVMSWP002 Revisin 1.0.0 White Paper Netwrk Vide Management System Ensuring

More information

The Combination of Flight Count and Control Time as a New Metric of Air Traffic Control Activity

The Combination of Flight Count and Control Time as a New Metric of Air Traffic Control Activity DOT/FAA/AM-98/15 Office f Aviatin Medicine Washingtn, D.C. 20591 The Cmbinatin f Flight Cunt and Cntrl Time as a New Metric f Air Traffic Cntrl Activity Sctt H. Mills Civil Aermedical Institute Federal

More information

National Search and Rescue Committee (NSARC) Secretariat Issue Paper

National Search and Rescue Committee (NSARC) Secretariat Issue Paper Natinal Search and Rescue Cmmittee (NSARC) Secretariat Issue Paper Status: Cntingency Airspace and Air Missin Management during a Disaster Respnse (13 June 2012) Issue The fllwing issue paper prvides infrmatin

More information

Ohio State Alumni Band Europe Trip Itinerary For The Ohio State University Marching Band Alumni

Ohio State Alumni Band Europe Trip Itinerary For The Ohio State University Marching Band Alumni Ohi State Alumni Band Eurpe Trip Itinerary Fr The Ohi State University Marching Band Alumni Durham & Manchester July 6-12, 2011 Lndn Extensin Returning July 16, 2011 The Ohi State University Marching Band

More information

Cairo, August 11, 2010 TMG Holding reports for 1H 2010: EGP 3.5 BN consolidated revenue,11% higher than same

Cairo, August 11, 2010 TMG Holding reports for 1H 2010: EGP 3.5 BN consolidated revenue,11% higher than same TMG Hlding First Six Mnths and Secnd Quarter ending June, Earning Release Cair, August 11, TMG Hlding reprts fr 1H : EGP 3.5 BN cnslidated revenue,11% higher than same perid f last year, EGP 662 MN cnslidated

More information

Attachments: Sample letter and addresses of Iowa s congressional delegation Airports United Airport Financing Priorities in 2015

Attachments: Sample letter and addresses of Iowa s congressional delegation Airports United Airport Financing Priorities in 2015 May 5, 2015 «AddressBlck» «GreetingLine» The FAA Reauthrizatin bill is at a critical juncture. It is vitally imprtant that ur Iwa Cngressinal delegatin understands the imprtance f this legislatin t Des

More information

SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR

SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR MEDIA RELEASE 11 January 2017 SUNWAY REIT PROPOSES TO ACQUIRE AN INDUSTRIAL PROPERTY FOR RM91.5 MILLION IN SHAH ALAM, SELANGOR Maiden fray int prime industrial prperty in a strategic lcatin Lng tenure

More information

Access Statement Milarrochy Bay. Your Point of Contact

Access Statement Milarrochy Bay. Your Point of Contact Access Statement Milarrchy Bay Yur Pint f Cntact - Fr bkings please call 02476 475 426 - Fr site queries please cntact 01360 870 236 - Site Page http://www.campingandcaravanningclub.c.uk/milarrchybay Yur

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION, thrugh its Cllege f Engineering and Department f Aviatin, the wner and peratr f Ohi State University Airprt (OSUA r Airprt), is undertaking a Federal Aviatin Regulatin (FAR) Part

More information

REFUND INFORMATION FOR TRAVEL AGENTS

REFUND INFORMATION FOR TRAVEL AGENTS REFUND INFORMATION FOR TRAVEL AGENTS REFUND INFORMATION FOR TRAVEL AGENTS...1 CONTACT INFORMATION...2 PROCESSING TIMEFRAME...2 REFUND PROCESSING ADMINISTRATION FEE...2 EXCHANGE WITH A REFUND (NEGATIVE

More information

San Juan Islands Visitor Study

San Juan Islands Visitor Study San Juan Islands Visitr Study Dug Whittaker, B Shelby, and Dan Shelby Cnfluence Research and Cnsulting fr Terrestrial Managers Grup June 2018 San Juan Islands Visitr Study Prepared by Dug Whittaker, B

More information

Camp Scholarship Application

Camp Scholarship Application Please mail all crrespndence t: Camp Fire Minnesta Attn: Camp Schlarship 429 Minnetnka Blvd. Suite 202 St. Luis Park, MN 55416 Camp Schlarship Applicatin Please review these guidelines and cmplete the

More information

Parks and Recreation. Goals

Parks and Recreation. Goals Parks and Recreatin Gals The City will: Ensure that new parks and recreatin facilities are designed and lcated t reinfrce and supprt the gals and plicies f the City s Cmprehensive Plan. Prvide parks that

More information

Access control and (pre-)registration

Access control and (pre-)registration Access cntrl and (pre-)registratin Nte n ISPS Since July 1, 2004, passenger ships and carg ships (GT 500 and upward) n internatinal vyages and prt facilities serving such ships n internatinal vyages, have

More information

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments. 10. TRAVEL Cntents 10. Travel... 1 10.1 Rles and Respnsibilities... 1 10.2 Internatinal Travel... 1 10.2.A Air Travel Standards... 1 10.2.B Air Travel Arrangements... 2 10.2.C Travel Dcumentatin... 3 10.2.

More information

Aviation Business Development Program. Economic Development Committee May 18, 2015

Aviation Business Development Program. Economic Development Committee May 18, 2015 Aviatin Business Develpment Prgram Ecnmic Develpment Cmmittee May 18, 2015 Dallas Airprt System Develpment Aviatin Business Develpment Prgram Cmpanies cnsidering a relcatin r expansin r new aernautical

More information

CAMP WESTWOOD. SUMMER 2017: July 4th - August 25th CONTACT US: Phone: ext. 10

CAMP WESTWOOD. SUMMER 2017: July 4th - August 25th CONTACT US:   Phone: ext. 10 CAMP WESTWOOD Hckey Prgrams SUMMER 2017: July 4th - August 25th 2017 Quality Prgrams in a Great Recreatinal Facility! CONTACT US: Email: campwestwd@gmail.cm Phne: 902-826-2100 ext. 10 Registratin begins

More information

ERA AIR SAFETY GROUP REPORT FOR 2016

ERA AIR SAFETY GROUP REPORT FOR 2016 ERA AIR SAFETY GROUP REPORT FOR 2016 Objectives f the Air Safety Grup The bjective f the Air Safety Grup (ASG) is t assist members f ERA t maintain and imprve the safety f peratins thrugh the analysis

More information

CONTENTS. Aircraft Operations at Airports With FAA Traffic Control Service TABLES. 4. Total Revenue Aircraft Hours, United States Air Carriers..

CONTENTS. Aircraft Operations at Airports With FAA Traffic Control Service TABLES. 4. Total Revenue Aircraft Hours, United States Air Carriers.. \ CONTENTS Page INTRODUCTION 1 AVIATION INDUSTRY TRENDS Air Carrier Trends Air Carrier Fleet General Aviatin Flying and Aircraft Fleet Dmestic Aviatin Fuel Cnsumptin Civil Aircraft and Engine Prductin

More information

DENVER INTERNATIONAL STANDARD OPERATING PROCEDURES

DENVER INTERNATIONAL STANDARD OPERATING PROCEDURES Order DEN 7110.65B DENVER INTERNATIONAL STANDARD OPERATING PROCEDURES December 7, 2016 VATSIM DEN 7110.65B Effective Date: Denver ATCT December 7, 2016 Nrthwest Muntain District VATUSA Subject: D01 Air

More information

NORTH COAST TOURISM STUDIO CANNON BEACH, ORE.

NORTH COAST TOURISM STUDIO CANNON BEACH, ORE. NORTH COAST TOURISM STUDIO 11.14.18 CANNON BEACH, ORE. ADVENTURE TRAVEL & OUTDOOR RECREATION Wrkshp Ntes FUTURE STATE ACTIVITY: If yur regin were n par with wrld-class adventure travel destinatins, what

More information

Accessibility Guide. Page 1 of 10 12/9/2017. Figure 1 Giraffe

Accessibility Guide. Page 1 of 10 12/9/2017. Figure 1 Giraffe Accessibility Guide Page 1 f 10 Figure 1 Giraffe Table f Cntents San Dieg Z Glbal, an Access Friendly Organizatin 3 Frequently Asked Questins 4 Blind r Lw Visin Guest Assistance 5 Deaf r Hard f Hearing

More information

General Manager, Engineering General Manager, Parks, Recreation & Culture

General Manager, Engineering General Manager, Parks, Recreation & Culture CORPORATE REPORT NO: R069 COUNCIL DATE: MAY 11, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: May 6, 2015 FROM: General Manager, Engineering General Manager, Parks, Recreatin & Culture FILE: 0930-30/093

More information

Detailed Information Lauterbrunnen 2019 Hotel Staubbach

Detailed Information Lauterbrunnen 2019 Hotel Staubbach Detailed Infrmatin Lauterbrunnen 2019 Htel Staubbach We are pleased yu are travelling with us this winter and are cnfident yu will have a great time. Dn t wrry if yu are cming alne as with ur friendly

More information

Episode 3 D Simulation Report on Airspace Organization and Management EPISODE 3

Episode 3 D Simulation Report on Airspace Organization and Management EPISODE 3 EPISODE 3 Single Eurpean Sky Implementatin supprt thrugh Validatin Dcument infrmatin Prgramme Sixth framewrk prgramme Pririty 1.4 Aernautics and Space Prject title Episde 3 Prject N 037106 Prject Crdinatr

More information

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly EDUCATIONAL PROGRAM AviatinCV The Better Way t Fly Abut AviatinCV AviatinCV is a cmpany exclusively wrking in the aviatin industry aiming at helping airlines and aviatin prfessinals t get tgether fr a

More information

NORFOLK INTERNATIONAL AIRPORT

NORFOLK INTERNATIONAL AIRPORT Prject Meeting Lcatin Nrflk Internatinal Airprt (ORF) Prject Kick-Off Meeting: Technical Advisry and Cmmunity Advisry Cmmittees (TAC and CAC) Nrflk Internatinal Airprt Date Wednesday, January 24, 2018

More information

Overview of Slum Electrification (Global vs. African Experience), by Connie Smyser October 26-27, 2009, Nairobi, Kenya Promoting Energy Access for

Overview of Slum Electrification (Global vs. African Experience), by Connie Smyser October 26-27, 2009, Nairobi, Kenya Promoting Energy Access for 1 Overview f Slum Electrificatin (Glbal vs. African Experience), by Cnnie Smyser Octber 26-27, 2009, Nairbi, Kenya Prmting Energy Access fr the Urban Pr in Africa Overview f Slum Electrificatin (Glbal

More information

English Version ATC BRIEFING GUIDE. GR IVAO [COMPANY NAME] [Company address]

English Version ATC BRIEFING GUIDE. GR IVAO [COMPANY NAME] [Company address] English Versin ATC BRIEFING GUIDE GR IVAO [COMPANY NAME] [Cmpany address] Table f Cntents Intrductin...2 General Rules:...2 Departures...3 Arrivals...3 Cntrlling at Niks Kazantzakis...4 Runways...4 Cmmunicatins...5

More information

REVISED 2013 TIMETABLE EFFECTIVE 1 MAY 2013

REVISED 2013 TIMETABLE EFFECTIVE 1 MAY 2013 REVISED 2013 TIMETABLE EFFECTIVE 1 MAY 2013 MORNING JOHANNESBURG DEPARTURE: Jhannesburg Ldge Airprt Standard Times Other infrmatin RATE Departure Arrival Departure Apprx Arrival Day f Available Stps between

More information

MISSION VISION VALUES

MISSION VISION VALUES MISSION VISION VALUES TO BRING PEOPLE TOGETHER SAFELY AND SMARTLY TO BE THE BEST AIRLINE TO FLY WITH, WORK FOR AND INVEST IN SAFETY, INNOVATION, CLIENT, FOCUS, RESULTS-DRIVEN AND SUSTAINABILITY GOL DAY

More information

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011) 13/03/2011 DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, 22-24 March 2011) Agenda Item 4: Air Navigatin Issues AIRSPACE AND PBN ACTIVITIES IN THE UAE

More information

2018 Australian Financial Advice Landscape

2018 Australian Financial Advice Landscape 218 Australian Financial Advice Landscape 218 Australian Financial Advice Landscape Cntents Size Of The Cnsumer Advice Market 1 (The Cnsumer) Servicing The Australian Cnsumer 2 (The Adviser) Suppliers

More information

Lufthansa (LH) Group OB Fee on Apollo

Lufthansa (LH) Group OB Fee on Apollo Prduct Advisry Number: 1335 Versin: 01 Lad T Prductin: 10-Nv-11 23:00 EST 04:00 (11-Nv) GMT On Nvember 2 nd 2011, the Lufthansa Grup airlines (Austrian Airlines, bmi British Midland Airways, Brussels Airlines,

More information

The Haiti Information and Communications Technology (ICT) Working Group is providing Internet services in 16 sites across Haiti.

The Haiti Information and Communications Technology (ICT) Working Group is providing Internet services in 16 sites across Haiti. Haiti Hurricane Matthew ETC Situatin Reprt #2 Reprting perid 13/10/16 t 21/11/16 The Emergency Telecmmunicatins Cluster (ETC) has nt been activated in respnse t Hurricane Matthew. As glbal lead f the ETC,

More information

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE StART FACILITATOR S MEETING SUMMARY AVIATION NOISE WORKING GROUP Mnday, January 14 2019 5:30-7:30PM, Cnference Center, Sea-Tac Airprt Member Jhn Resing Terry

More information

TRAFFIC ANALYSIS AND SYNTHETIC SCENARIO GENERATION FOR ATM OPERATIONAL CONCEPTS EVALUATION

TRAFFIC ANALYSIS AND SYNTHETIC SCENARIO GENERATION FOR ATM OPERATIONAL CONCEPTS EVALUATION TRAFFIC ANALYSIS AND SYNTHETIC SCENARIO GENERATION FOR ATM OPERATIONAL CONCEPTS EVALUATION Juan A. Besada, Javier Prtill, Gnzal de Miguel, Rafael de Andrea, U. Plitécnica de Madrid, Madrid, Spain Jse M.

More information

Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018

Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018 Carbn Offsetting and Reductin Scheme fr Internatinal Aviatin (CORSIA) Overview Kurt Edwards Directr General, IBAC NBAA BACE Octber 2018 Agenda CORSIA Brief Histry CORSIA in cntext Key dates fr CORSIA Am

More information

Airspace: AIM Chapter 3:

Airspace: AIM Chapter 3: 1 Airspace: AIM Chapter 3: What is airspace? On any given day, mre than 87,000 flights are in the skies in the United States. [naa.gv] T handle all f this traffic, the FAA has develped what is called the

More information

National Business Ethics Survey 2013 Summary - US

National Business Ethics Survey 2013 Summary - US INSTITUTE OF BUSINESS ETHICS Natinal Business Ethics Survey 2013 Summary - US Institute f Business Ethics 24 Greencat Place Lndn SW1P 1BE www.ibe.rg.uk The Natinal Business Ethics Survey f the US wrkfrce

More information

All Requests for Stamping, Banners, and Space Reservations must be done through TitanLink. Complete the form at:

All Requests for Stamping, Banners, and Space Reservations must be done through TitanLink. Complete the form at: All Requests fr Stamping, Banners, and Space Reservatins must be dne thrugh TitanLink. Cmplete the frm at: https://fullertn.campuslabs.cm/engage/submitter/frm/start/165803 Guidelines fr the Psting f Printed

More information

High Hopes for Colorado

High Hopes for Colorado High Hpes fr Clrad The HHFC Visin is T psitively inspire, mtivate, and create change thrugh the aviatin experience. High Hpes fr Clrad includes tw prgrams: High Hpes fr Wunded Warrirs and High Hpes fr

More information