WARSZAWA/Modlin RWY 08 OLILA 2C RNAV 1 STANDARD DEPARTURE CHART INSTRUMENT (SID) - ICAO AD 2 EPMO AIP POLSKA AIP POLAND AIRAC effective date
|
|
- Rafe Reynolds
- 6 years ago
- Views:
Transcription
1 AIP POSKA AIP POAND AIAC effective date AD 2 EPMO NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 OIA 2C DESIGNATO OUTE EMAKS OIA 2C Climb on D 076 MO to - - DOMOB - WA663 [F80+] - OIA [F100+]. Climb and maintain 4000 ft unless otherwise cleared by ATC. DOMOB WA663 OIA COODINATES N E N E N E ATITUDE ESTICTIONS F80 F100 TEMINATO FY - OVE TUN TACK CIMB GADIENT CF Turn at : MAX IAS 220 KT bank angle 25. POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196
2 AD 2 EPMO AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 OSI 2C DESIGNATO OUTE EMAKS OSI 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - GIA - WA664 - OSI. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 GIA WA664 OSI COODINATES E N E N E N E N E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF ft F80 F130 F Turn at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY
3 AIP POSKA AIP POAND AIAC effective date AD 2 EPMO NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 SOXE 2C DESIGNATO OUTE EMAKS SOXE 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - GIA - WA666 - SOXE. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 GIA WA666 SOXE COODINATES E N E N E N E N E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF ft F80 F130 F Turn at : MAX IAS POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196
4 AD 2 EPMO AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 EVINA 2C DESIGNATO OUTE EMAKS EVINA 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - NITKI - XIBO - NIPUS [F180+] - EVINA. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 NITKI XIBO NIPUS EVINA COODINATES E N E N E N E N E N E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF ft F80 F130 F160 F Turn at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY
5 AIP POSKA AIP POAND AIAC effective date AD 2 EPMO NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 XIMBA 2C DESIGNATO OUTE EMAKS XIMBA 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - WA656 - XIMBA. Climb and maintain 4000 ft unless otherwise cleared by ATC. WA656 XIMBA COODINATES E N E N E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF ft F80 F Turn at : MAX IAS POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196
6 AD 2 EPMO AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 BAMSO 2C DESIGNATO OUTE EMAKS BAMSO 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - DIMU - WA698 - BAMSO. Climb and maintain 4000 ft unless otherwise cleared by ATC. DIMU WA698 BAMSO COODINATES N E N E N E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF ft F80 F Turns at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY
AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS
AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS 4A LAGAS 2A DF 6A DF 4A LAMUS SIX ALFA After take
More informationAIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D
AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY 34 19 SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D BIGRO 6 A Proceed from BIGRO to UJ. Cross GURIN at 2700 m and cross
More informationRNAV - RNP. July 2010
RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve
More informationPORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX
PORTUGAL PHONE: +351.21.8553506 FAX: +351.21.8553399 E-Mail: desica@nav.pt AFTN: LPPPYOYC DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO 8223 1803-001 LISBOA CODEX
More informationREPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia
REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical
More information3) There have some basic terminology of a flight plan and it is the fuel calculations
QUESTION BANK FLIGHT PLANNING (CHAPTER 1) Introduction to Flight Planning 1) It is a duty of flight operation officer (FOO) to do a flight plan before the aircraft want to fly. a) i. Give the definition
More informationIcao Charting Manual Doc 8697
Icao Charting Manual Doc 8697 If looking for a ebook Icao charting manual doc 8697 in pdf form, in that case you come on to correct website. We present the full release of this book in doc, txt, DjVu,
More informationWP 09 Language proficiency for GA
WP 09 Language proficiency for GA Vladimír Foltín ATM/ANS Standardisa5on Team Leader Flight Standards Directorate GA NAA Group & GA sub- SSCC Mee1ng 14 th April 2015 TE.GEN.00409-001 Aircrew requirements!
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationLOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM
INSTRUMENT APPROACH CHART AERODROME ELEV 25 ft HEIGHTS RELATED TO HIGHTEST ELEV TDZ 17 ft HEON APP 135.4 344.7 HEON TWR 118.675 236.6 305.4 RKPS AD CHART 2-7 HEON/Sacheon (RKPS) LOC/DME RWY 06L ELEV, ALT
More informationPilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR
Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR VATSIM-UK and the Heathrow Regional Training Scheme look forward to welcoming you into Heathrow! We ll have all our controllers briefed
More informationEGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information
EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History
More informationGENERAL OPERATING PROCEDURES FINLAND(GOP)
[Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP) General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of
More informationPi Aero Instrument Rating Syllabus
This syllabus was created in order to maintain a high level of positive training as well as meet the minimum hours required by the Federal Aviation Regulations Part 61. There are four sections to this
More informationHOLDING PATTERN USING VOR
HOLDING PATTERN USING VOR 1. Introduction This documentation will present an example of a holding pattern using a VOR as holding point. 2. First Step Before holding over a VOR, you must study the approach
More informationAIR LAW AND ATC PROCEDURES
1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C
More informationCLASS D CONTROLLED AIRSPACE GUIDE
CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).
More informationSID/STAR phraseology FAQ Canadian implementation April 27, 2017
SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard
More informationAIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016
PHONE : +94-11- 2264203 : +94-11- 2259916 FAX : +94-11- 2259916 AFS E-mail : VCBIYHYX : aishq@airport.lk DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA AERONAUTICAL INFORMATION SERVICES (AIS/HQ) AIRPORT &
More informationREPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures
REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical
More informationEKYT - AALBORG AIR BASE
EKYT AD 2.1-1 EKYT - AALBORG AIR BASE 1. AERODROME LOCATION INDICATOR AND NAME EKYT AIR TRANSPORT WING AALBORG 2. AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 570534.04N
More informationLFPG / Paris-Charles de Gaulle / CDG
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationFollowing supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD
TEL: 91 11 24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91 11 24615508 E_mail: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICES AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationUsing PBN for Terminal and Extended Terminal Operations
Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data
More informationUDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E
AIP Republic of Armenia AD 2.UDSG-1 ~~~eaip-amdt~~~airac-2016-0321 JUL 2016 UDSG Gyumri UDSG AD 2.1 Aerodrome location indicator and name UDSG Gyumri UDSG AD 2.2 Aerodrome geographical and administrative
More information2016 Flight Crew Recency Requirements Self-Paced Study Program Refer to paragraph (2)(d) of the Canadian Aviation Regulations (CARs) standard.
2016 Flight Crew Recency Requirements Self-Paced Study Program Refer to paragraph 421.05(2)(d) of the Canadian Aviation Regulations (CARs) standard. Completion of this questionnaire satisfies the 24-month
More informationEffective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@australia.com Effective: AIP SUPPLEMENT (SUP) AIRAC H 04/19 201902271600
More informationSafety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.
Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and
More informationALTIMETER SETTING PROCEDURES
AIP New Zealand ENR 1.7-1 ENR 1.7 ALTIMETER SETTING PROCEDURES 1 INTRODUCTION 1.1 General 1.1.1 The requirements for altimeter setting are detailed in CAR Part 91. The requirements are summarised in this
More informationSAFETYSENSE LEAFLET 11 -
SAFETYSENSE LEAFLET 11 - INTERCEPTION PROCEDURES 1 INTRODUCTION 2 PROCEDURES 3 INTERCEPTING AIRCRAFT SIGNALS AND YOUR RESPONSES 4 SIGNALS INITIATED BY YOUR AIRCRAFT AND RESPONSES BY INTERCEPTING AIRCRAFT
More informationPILOT BRIEFING GENEVA RFE 2018
PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationENR 1.14 AIR TRAFFIC INCIDENTS
AIP ENR.- Republic of Mauritius 0 AUG 00 ENR. AIR TRAFFIC INCIDENTS. Definition of air traffic incidents. "Air traffic incident" is used to mean a serious occurrence related to the provision of air traffic
More informationCrosswind dependent separations and update on TBS concept (transitional step)
Crosswind dependent separations and update on TBS concept (transitional step) 28-29 June 2010 WAKENET 3 EUROPE 2 nd workshop Airbus, Toulouse Peter CHOROBA, EUROCONTROL peter.choroba@eurocontrol.int The
More informationJeppView for Windows. jep=jeppesen. Airport Information For EPWA Printed on 06 Dec 2017 Page 1. Runway Information. Communication Information
Airport Information For EPWA Printed on 06 ec 207 Page (c) SANERSON, INC., 207, ALL RIGHTS RESERVE jep= JeppView for Windows Warsaw General Approach: Information 250 Warsaw irect (Approach Control Radar):
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Praha Ruzyně VERSION 4.0 CHANGES AND UPDATES Effective Version Change - 3.8 Intentionally left blank. 09 JUN 11 3.9 General text revision. New design issued. 15
More informationDEPARTURE, HOLDING, AND APPROACH PROCEDURES
AIP New Zealand ENR 1.5-1 ENR 1.5 DEPARTURE, HOLDING, AND APPROACH PROCEDURES 1 GENERAL 1.1 Use of PANS-OPS 1.1.1 Instrument holding, approach, and departure procedures in New Zealand are designed using
More informationAREA NAVIGATION RNAV- MANAGEMENT
1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional
More informationADMINISTRATIVE BULLETIN Air Navigation services Perum LPPNPI Kantor Cabang JAKARTA AIR TRAFFIC SERVICE CENTER Gedung 611 Bandar Udara Internasional
ADMINISTRATIVE BULLETIN Air Navigation services Perum LPPNPI Kantor Cabang JAKARTA AIR TRAFFIC SERVICE CENTER Gedung 611 Bandar Udara Internasional Soekarno Hatta. Dinas NOTAM Office & Carthography Tel
More informationOperating Procedures. For the Provision of Air Traffic Control Services. RAF Mount Pleasant EGYP. Falklands Islands. RAF Monte Agradable EGYP
Version 2.0 10.05.2008 Operating Procedures For the Provision of Air Traffic Control Services at RAF Mount Pleasant EGYP Falklands Islands RAF Monte Agradable EGYP Islas Malvinas 1 General All IFR traffic
More informationInternational Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1
Wien ACC (LOVV) IVAO Austria Letter of Agreement between and Effective: 15/05/2017 Edition: 1 Zagreb ACC (LDZO) IVAO Croatia 1 1. Purpose The purpose of this Letter of Agreement is to define the coordination
More informationAIP ENR JORDAN 01 MAY 2014
AIP ENR 1.5-1 JORDAN 01 MAY 2014 ENR 1.5 HOLDING, APPROACH AND DEPARTURE PROCEDURES 1. GENERAL 1.1 The procedures used in Jordan are generally in accordance with ICAO DOC 8168. Holding patterns in Jordan
More informationEVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationAirservices Australia 2016
Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)
More informationSAFETYSENSE LEAFLET 11 INTERCEPTION PROCEDURES
SAFETYSENSE LEAFLET 11 INTERCEPTION PROCEDURES 1 INTRODUCTION 2 PROCEDURES 3 INTERCEPTING AIRCRAFT SIGNALS AND YOUR RESPONSES 4 SIGNALS INITIATED BY YOUR AIRCRAFT AND RESPONSES BY INTERCEPTING AIRCRAFT
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationLIRF ROME FIUMICINO Pilot Briefing
LIRF ROME FIUMICINO Pilot Briefing Aeroporto internazionale Leonardo da Vinci Document intended for the VATSIM community only Version 1.51 CHANGES NOT TO BE USED FOR REAL LIFE NAVIGATION FLIGHT SIMULATION
More informationINTERCEPTION PROCEDURES A I R L AW
INTERCEPTION PROCEDURES 1. 0 1 A I R L AW YOU HAVE BEEN INTERCEPTED INTERCEPTION Aircraft can be intercepted in cases: When flying within prohibited or restricted areas Not confirming ATC instructions
More informationTerminal- Area Opera.ons Prof. Hamsa Balakrishnan
Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Istanbul Technical University Air Transporta,on Management M.Sc. Program Air Transporta,on Systems and Infrastructure Strategic Planning Module 8 : 26
More informationAIXM Coding guidelines for the ICAO data sets
AIXM Coding guidelines for the ICAO data sets Eduard POROSNICU DECMA/STR/SWM July 2018 Context Restructured Annex 15 Digital data sets AIP Obstacles Terrain Airport Mapping Instrument Flight Procedures
More informationChapter 6. Airports Authority of India Manual of Air Traffic Services Part 1
Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential
More informationInternational Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2
Brindisi ACC (LIBB) IVAO Italy Letter of Agreement between and Effective: 15/05/2017 Edition: 2 Zagreb ACC (LDZO) IVAO Croatia 1 1. Purpose The purpose of this Letter of Agreement is to define the coordination
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationLisboa RFE. Respect the ATC and the other pilots at all times and be understanding.
INTRODUCTION On this briefing for the 2018 you will find the information you need to have the better experience possible during our event. We count with everyone s full cooperation, both Pilots and ATC
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationLetter of Agreement (LOA)
Page 1 of 8 Letter of Agreement (LOA) Between Sanya FIR (ZJSA), People s Republic of China Division (VATPRC) and Hong Kong FIR (VHHK), Southeast Asia Division (VATSEA) Revision: New Release Effective Date:
More informationSPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR
Phone: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationNorthern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)
Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3
More informationPOLFRA Polish Free Route Airspace
POLFRA Polish Free Route Airspace Spis treści 1. Definitions... 1 2. Apllicability of FRA... 1 3. Access to/from terminal airspace / free route airspace... 1 4. POLFRA Horizontal Entry (E)/Exit(X) Points...
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationTerminal- Area Opera.ons Prof. Hamsa Balakrishnan
Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Istanbul Technical University Air Transporta,on Management M.Sc. Program Air Transporta,on Systems and Infrastructure Strategic Planning Module 8 : 2 April
More informationENR 1.7 ALTIMETER SETTING PROCEDURES
AIP LEBANON ENR 1.7-1 11 APR 2008 ENR 1.7 ALTIMETER SETTING PROCEDURES 1. Introduction: 1.1 The procedures herein describe the method used in providing adequate vertical separation between aircraft and
More informationNON-RNAV STANDARD INSTRUMENT DEPARTURE PROCEUDRE COCHIN INTERNATIONAL AIRPORT
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationAirworthiness considerations for UAVs
A general overview about the approach to a UAV System under current regulations for operation, airspace and certification Presentation by : STN ATLAS ELEKTRONIK Klaus Wohlers, LMP Airborne Systems Type
More informationAD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport
AIP FYWE AD 2-1 Republic of Namibia 20 JUL 2017 AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME FYWE - Windhoek (Eros) Airport FYWE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationPBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain
PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control
More informationJeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen
Airport Information For EPRZ Printed on 27 Jan 208 Page (c) SANERSON, IN., 208, ALL RIGHTS RESERVE jep= JeppView for Windows General Information Location: POL IAO/IATA: EPRZ / Lat/Long: N50 06.60', E022
More informationPROCEDURES SPECIAL OPERATIONS
Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /
More informationNETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS BY: MATHIEU LAFLAMME
NETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS!1 GENERAL This guide is made for controller in AN division. Use this guide if controlling Sint Maarten (TNCM) and Curaçao (TNCF). This guide is
More informationEVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
18 NOV 2010 AIP LATVIA EVVA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.16, AD-2.23 EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA - VENTSPILS
More informationCAT E Subject to NOTAM: No
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to
More informationMID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG
MID Region AIM SG/2 AIS-AIM Study Group 31 August 2015 Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG AIS-AIM Study Group Active since end 2008 Objectives Global strategy/roadmap for the transition from
More informationThe Aircraft Cost Evaluator for Windows. Challenger 300
The Aircraft Cost Evaluator for Windows Challenger 300 The Challenger 300, formerly known as the Continental, is Bombardier's entry into the super mid-sized battle for supremacy. It is a transcontinental
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationThe Aircraft Cost Evaluator for Windows. Gulfstream V
The Aircraft Cost Evaluator for Windows Gulfstream V Founded in 1958, Gulfstream Aerospace Corporation, a wholly owned subsidiary of General Dynamics Corporation. The company has produced more than 1,300
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationairservices AERODROME CHART - Page 1 MELBOURNE/ESSENDON, VIC (YMEN) AD ELEV 282 S E Airservices Australia 2018 ATIS AWIS SMC PAL (AH)
AD ELEV 282 S37 43 41 E144 54 07 AERODROME CART - Page 1 MELBOURNE/ESSENDON, VIC (YMEN) AWIS SMC TWR ML APP (A) PAL (A) Bearings are Magnetic Elevations in FEET AMSL E144 54 00 S37 43 00 S37 43 00 D T
More informationSan Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)
San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control
More informationAdvisory Circular. File No.: Z U Issue No.: 01
Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5
More informationAD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base
AD 2-OERY-1 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME OERY - RIYADH/ King Salman Air Base OERY AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 244319N 0464329E/
More information1- Wher can you find the difference between ICAO standards and Iran regulation and procedure? a) GEN 2.5 b) ENR 3 c) GEN 1.
1- Wher can you find the difference between ICAO standards and Iran regulation and procedure? a) GEN 2.5 b) ENR 3 c) GEN 1.7 d) ENR l 2- Which part of AIP contain conversion table? a) GEN 1 b) GEN 2 c)
More informationNDS Subject to NOTAM: No
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS
More informationOVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)
OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationAnnecy Airport IFR briefing For indication only
1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation
More informationLos Angeles Noise Mitigation. Captain Dan L. Delane FedEx Express Fleet Check Airman 13 November 2013
Los Angeles Noise Mitigation Captain Dan L. Delane FedEx Express Fleet Check Airman 13 November 2013 FedEx Express -FedEx Is committed to reducing NOISE and carbon footprint for both air and ground operations.
More informationCross the Pond Westbound 2013 London Gatwick (EGKK) Pilot Briefing
Cross the Pond Westbound 2013 London Gatwick (EGKK) Pilot Briefing INTRODUCTION We would like to thank you for choosing Gatwick as your departure airport for this year s Cross the Pond event! In this guide
More informationThe aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.
INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend
More informationPART 71. Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points
PART 71 Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points This new part of Jordanian Civil Aviation Regulations is hereby adopted under the
More informationLATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB. Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes
LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes 1 Interception Procedure by DAY or NIGHT: If the pilot of an intercepted
More informationAD 2 AERODROMES EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVLA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
18 NOV 2010 AIP LATVIA EVLA AD 2-1 18 NOV 2010 AD 2 AERODROMES Note: The following sections in this chapter are intentionally left blank: AD-2.16, AD-2.23 EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME
More informationCOSCAP CAAM COOPERATION
14 th STEERING COMMITTEE MEETING 18-20 JUNE, ULAANBAATAR, MONGOLIA CAA OF MONGOLIA COSCAP CAAM COOPERATION ARIUNGEREL Purev AIS Director Civil Aviation Authority of Mongolia Aeronautical Information Management
More informationAUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA
Phone/ Fax : 62 21 3507603 Telegraphic Address AFS : WRRRYNYX REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIR NAVIGATION SUB DIRECTORATE AERONAUTICAL
More informationLETTER OF AGREEMENT. between. and
LETTER OF AGREEMENT between and Effective: 15 th June 2017 Version: 0.1 1 General 1.1 Purpose The purpose of this Letter of Agreement (LoA) is to define the co-ordination procedures to be applied between
More informationSULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11
KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.
More information