1 Crosswind dependent separations and update on TBS concept (transitional step) June 2010 WAKENET 3 EUROPE 2 nd workshop Airbus, Toulouse Peter CHOROBA, EUROCONTROL peter.choroba@eurocontrol.int The European Organisation for the Safety of Air Navigation

2 Agenda Crosswind operations (CROPS) High-level generic concept of operations Initial benefit assessment Updated EUROBEN results LHR wind stability LHR & CDG benefits Safety criteria Update on Transitional TBS project LHR LIDAR campaign Next steps 2/22

3 Introduction CROPS = CRosswind OPerationS Implementation project (SESAR IP1) focused on runway use optimisation Conditional reduction of separations for departures and arrivals in crosswind operations Wake transported by wind away from the following aircraft path Atmospheric turbulence is sufficient to enhance the wake decay in a timeframe shorter than ICAO minimum separation 3/22

4 Who is involved EUROCONTROL generic concept validation Local adaptation: BAA - OPS team (ops expertise), R&D (data analysis) NATS OPS team (ops expertise), R&D (data analysis, safety assessment) UK Met Office MET expertise, MET data Consultation: UK CAA SRG Airlines EUROCONTROL Wake Vortex Task Force members 4/22

5 High-level concept of operations Based on CREDOS & ATC-WAKE concepts Procedure change only, with limited system support Authorise on the runway, during initial climb and on a final approach reduction or suspension of wake turbulence separation (time or distance) between WT pairs (as per ICAO Doc 4444) Conditional application only in specific crosswind conditions 5/22

6 Separation reduction Departures: Suspension of WT separation, resulting into spacing of sec (depending on SID layout and selection) Arrivals: Reduction by 0.5 NM - low case Reduction by 1.0 NM - high case 6/22

7 Required wind conditions Surface crosswind component wind is equal to or stronger than X kt Wind forecast confirms favourable wind speed and directions for winds aloft for the entire planning period (duration of this period will be shorter for departures = X min and larger for arrivals = Y min) No significant MET situations are forecasted Unfavourable MET conditions will need to be defined, e.g. thunderstorms, wind shear. 7/22

8 Expected benefits Expected benefits are of tactical nature: Reduced delays (ground and/or airborne) Improved RWY resilience Benefits dependent on: Traffic mix (e.g. H-H, H-M pairs) Wind distribution around the year Density 8/22

9 New results based on EUROBEN study* Update EUROBEN WP4 wind analysis to include winds from 5 to 10kt (use of 2009 LHR RWY anemometer data) Recalculate delay reduction using delay profiles from WP4 using new MET data analysis Note difference between CROPS and ATC- WAKE/CREDOS concepts from EUROBEN: Reduction for H-H pair was 0.5 or 1.0 NM (good match) Reduction for H-M pair was 1.5 to 2.0 NM (overestimation of delay reduction for this pair) Underestimation of benefits due to large applicability windows (all day, 5h-9h,9h-15h,15h-22h) * Ref.: EUROBEN deliverables WP3, WP4 D4.1 & D4.2, /22

10 New results based on EUROBEN study - Annual delay reduction at LHR Crosswind threshold 5 kt 6 kt 7 kt 8 kt 9 kt 10 kt Annual delay reduction in minutes (% reduction of annual delay) Low case (12.2%) (7.2%) (3%) (1.2%) (0.7%) (0.4%) CROPS arrivals High case (13.4%) (7.9%) (3.4%) (1.1%) (0.8%) (0.4%) CROPS departures Low case (6.3%) (3.9%) (1.8%) 7643 (0.7%) (0.5%) (0.2%) High case (10.4%) (6.6%) (3.1%) (1.3%) 9388 (0.9%) (0.4%) 10/22

11 40,0% 35,0% 36,7% Initial high-level X-wind component stability analysis for LHR 34,2% Cumulative occurence of crosswind component as % of total hours of operations (1 year of anemometer data - Q4/08-Q3/09) Departures 32,5% Arrivals 31,1% 30,0% 29,1% 27,4% 27,8% 25,0% 25,1% 23,5% 25,8% 22,1% 20,0% 19,4% 20,5% 19,3% 17,4% 17,8% 15,0% 10,0% 5,0% 13,5% 8,9% 5,7% 11,8% 7,6% 4,7% 16,0% 10,7% 6,7% 4,1% 15,0% 9,9% 6,1% 3,6% 13,6% 8,6% 5,4% 3,0% 12,5% 7,9% 4,8% 2,5% 11,1% 7,0% 4,1% 2,0% 0,0% Minimum duration of crosswind component conditions (in minutes) %_5kt %_6kt %_7kt %_8kt %_9kt %_10kt 11/22

12 Results from analytical modelling for LHR and CDG airports WT reduction by 1.0 NM for H-H and H-M pairs only Arrivals only OPS data correlated with one year of RWY anemometer data for crosswind criteria from 5 to 10 kt Two groups of benefits assessed: Real only taking into account H-H and H-M pairs separated close to ICAO separation (+20 seconds max) Max taking into account all H-H and H-M pairs with full distribution of separations Sum of total separations saved converted to potentially gained slots => tactical benefit only => resulting in reduction of airborne delay if wind conditions are met 12/22

13 Potentially gained arrival slots in 1 year per one RWY 4000 Number of potentially gained slots in 1 year per one arrival runway with CROPS operations CDG max CDG real LHR max LHR real kt 6kt 7kt 8kt 9kt 10kt Crosswind threshold 13/22

14 Annual % of potentially gained arrival slots per one RWY 5,00% Annual % of potentially gained slots per one arrival runway with CROPS operations (no HW) 4,50% 4,00% 3,50% 3,00% 2,50% 2,00% 1,50% 1,00% CDG max CDG real LHR max LHR real 0,50% 0,00% Crosswind threshold 14/22

15 Safety criteria Safety assessment activities are on-going Relative risk assessment criteria is proposed: WT risk per movement for a follower on final approach with reduced separations in crosswind conditions (CROPS procedure) being equal to or less than that of current ICAO approved in-trail WT risk (in calm wind conditions) 15/22

16 Transitional TBS current status Full TBS concept Initial validation of the concept undertaken by EUROCONTROL and NATS UK Further development undertaken in SESAR P6.8.1 Phase 1 TBS Transitional step towards full TBS (IP1 improvement) Draft concept of operations discussed with stakeholders Generic safety case under development 16/22

17 Transitional TBS current status Specific reduction of ICAO DBS in specified headwinds Reduction by 0.5nm Only on final approach Between wake turbulence separated a/c pairs Applied without new controller support tool (on/off procedure) Reliable MET information is essential: Approx. 15kt headwind component required on final approach Wind forecast for winds aloft 17/22

18 + RWY anemometer data & METAR ~1516m 27R 008 Vortex tracks + Crosswind ~635m Headwind (from 2 to 15 deg) ~796m VAD scan since March 2010 Vortex tracks + Crosswind ~1550m 27L /22

19 Phase 1 (300ft) Oct 08 Sept 10 27L + 27R Phase 2 (1000ft) Sept 10 Oct 11 27L + 27R NGE OGE LIDAR 19 / 57 LIDAR LIDAR positions are only schematic 19/22

20 Next steps Finalise Concept of Operations & OSED Refine benefit assessment for CROPS TAAM simulations for generic airport model HERMES simulations for LHR on-going Develop Safety Case CROPS Initial planning Safety Plan on-going Safety assessment - starting Preliminary Safety Case Guidance material for local SC Continue collaboration with local stakeholders addressing adaptation of generic concept to local conditions (LHR) 20/22

21 Thank you for your attention! The European Organisation for the Safety of Air Navigation

WakeNet3-Europe Concepts Workshop

WakeNet3-Europe Concepts Workshop WakeNet3-Europe Concepts Workshop Benefits of Conditional Reduction of Wake Turbulence Separation Minima London, 09.02.2011 Jens Konopka (jens.konopka@dfs.de) DFS Deutsche Flugsicherung GmbH 2 Outline

More information

Overview of active wake vortex concepts in Europe

Overview of active wake vortex concepts in Europe Overview of active wake vortex concepts in Europe August 2009 Prepared by Dr. Debbie Mitchell Contents This presentation gives a summary of the major wake vortex concepts at the pre-implementation stage

More information

To optimize Wake Vortex separations. Fabrice ORLANDI THALES AIR SYSTEMS

To optimize Wake Vortex separations. Fabrice ORLANDI THALES AIR SYSTEMS To optimize Wake Vortex separations Fabrice ORLANDI THALES AIR SYSTEMS To optimize Wake Vortex separations 21/10/2015 http://www.ufo-wind-sensors.eu/ London 3 / 22 UFO OPERATIONAL GOALS UFO is studying

More information

Enhanced Time Based Separation

Enhanced Time Based Separation Enhanced Time Based Separation (etbs) Enhanced Time Based Separation (etbs) Evolving TBS from SESAR research TBS tool for Heathrow developed with Lockheed Martin (now Leidos) TBS tool deployed at Heathrow

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007 Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term

More information

Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon

Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon Gerben van Baren (NLR) vanbaren@nlr.nl Catherine Chalon Morgan (Eurocontrol) Vincent Treve (Eurocontrol)

More information

Airport capacity effects of RECAT or: An airport view on RECAT

Airport capacity effects of RECAT or: An airport view on RECAT Airport capacity effects of RECAT or: An airport view on RECAT 21st June 2011, WakeNet-3 Europe RECAT Workshop at TU Berlin S. Wendeberg (FBA-IL2) Fraport AG Seite 2 The best way to anticipate the future

More information

Enhanced Time Based Separation (ETBS) & RECAT EU. Heathrow Crew Briefing

Enhanced Time Based Separation (ETBS) & RECAT EU. Heathrow Crew Briefing Enhanced Time Based Separation (ETBS) & RECAT EU Heathrow Crew Briefing TBS Time Based Separation has been in use at London Heathrow since March 2015. The next phase of the TBS evolution is to enhance

More information

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake

More information

EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach

EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION XXX Specification CEM Enclosure 1 EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach DOCUMENT IDENTIFIER : EUROCONTROL-SPEC-XXX

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

RECAT-EU. European Wake Turbulence Categorisation and Separation Minima on Approach and Departure

RECAT-EU. European Wake Turbulence Categorisation and Separation Minima on Approach and Departure EUROCONTROL RECAT-EU European Wake Turbulence Categorisation and Separation Minima on Approach and Departure Edition: 1.1 Edition date: 15/07/2015 Status: Released Issue Intended for: Stakeholders DOCUMENT

More information

ATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs

ATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs ATSAW (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs CONTENTS 1 2 3 INTRODUCTION ATSAW COCKPIT INTERFACE ATSAW OPERATION

More information

WAKE VORTEX MEASUREMENTS TO SUPPORT SAFETY ASSESSMENT OF THE SIMULTANEOUS OFFSET INSTRUMENT APPROACH PROCEDURE AT SFO

WAKE VORTEX MEASUREMENTS TO SUPPORT SAFETY ASSESSMENT OF THE SIMULTANEOUS OFFSET INSTRUMENT APPROACH PROCEDURE AT SFO WAKE VORTEX MEASUREMENTS TO SUPPORT SAFETY ASSESSMENT OF THE SIMULTANEOUS OFFSET INSTRUMENT APPROACH PROCEDURE AT SFO James N. Hallock WAKENET2 - EUROPE Frank Y. Wang November 30, 2004 George C. Greene

More information

European ATM Development The Big Idea

European ATM Development The Big Idea European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

DOCUMENT INFORMATION

DOCUMENT INFORMATION DOCUMENT INFORMATION TITLE "RECAT-EU" European Wake Turbulence Categorisation and Separation Minima on Approach and Departure Edition Number: 1.1 Edition Date: 15/07/2015 Abstract This document presents

More information

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics Paul Willis Managing Director, Aviation Solutions Overview Some of the Challenges Future Technology Capacity

More information

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest

More information

Enter here your Presentation Title 1

Enter here your Presentation Title 1 EXERCISE 4/ Simulation Potential Improvement Measures The European Organisation for the Safety of Air Navigation Objective Present a selection of additional improvement measures for enhanced civil-military

More information

Airfield Capacity Prof. Amedeo Odoni

Airfield Capacity Prof. Amedeo Odoni Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:

More information

SRC POSITION PAPER. Edition March 2011 Released Issue

SRC POSITION PAPER. Edition March 2011 Released Issue E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,

More information

Wake Turbulence: Managing Safety and Capacity. Bram Elsenaar co-ordinator of the European Thematic Network WakeNet2-Europe

Wake Turbulence: Managing Safety and Capacity. Bram Elsenaar co-ordinator of the European Thematic Network WakeNet2-Europe Wake Turbulence: Managing Safety and Capacity Bram Elsenaar co-ordinator of the European Thematic Network WakeNet2-Europe Outline What s the problem? Present ruling Possible changes and benefits How to

More information

Lessons Learnt From The EUROCONTROL Wake Impact Severity Assessment Flight Simulator Campaign

Lessons Learnt From The EUROCONTROL Wake Impact Severity Assessment Flight Simulator Campaign Lessons Learnt From The EUROCONTROL Wake Impact Severity Assessment Flight Simulator Campaign Vincent Treve (EUROCONTROL) Cpt. Dirk De Winter (Contrator to EUROCONTROL) Content Objectives Experiment setup

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

USA Near-Term Progress for Closely Spaced Parallel Runways

USA Near-Term Progress for Closely Spaced Parallel Runways 2005 The MITRE Corporation. All rights reserved. USA Near-Term Progress for Closely Spaced Parallel Runways Wakenet 2 Europe November 30, 2005 This is the copyright work of The MITRE Corporation, and was

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

Worst-case analysis of wake vortex induced risk of 700ft vertical separation. Gerben van Baren

Worst-case analysis of wake vortex induced risk of 700ft vertical separation. Gerben van Baren Worst-case analysis of wake vortex induced risk of 700ft vertical separation Gerben van Baren Contents Incentive Objective Approach Results Conclusions NLR Air Transport Safety Institute 15-1-2009 2 Incentive

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

ASSEMBLY 37TH SESSION

ASSEMBLY 37TH SESSION International Civil Aviation Organization WORKING PAPER 27/9/10 ASSEMBLY 37TH SESSION TECHNICAL COMMISSION Agenda Item 46: Other business to be considered by the Technical Commission CURRENT ASPECTS OF

More information

Analyzing Risk at the FAA Flight Systems Laboratory

Analyzing Risk at the FAA Flight Systems Laboratory Analyzing Risk at the FAA Flight Systems Laboratory Presented to: Workshop By: Dr. Richard Greenhaw, FAA AFS-440 Date: 29 November, 2005 Flight Systems Laboratory Who we are How we analyze risk Airbus

More information

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY Owen DAVIES Brussels Representative Department of International Affairs, NATS Content of Presentation Introduction Overview of NATS involvement in SESAR Beyond

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

The SESAR Airport Concept

The SESAR Airport Concept Peter Eriksen The SESAR Airport Concept Peter Eriksen EUROCONTROL 1 The Future Airport Operations Concept 1.1 Airports The aim of the future airport concept is to facilitate the safe and efficient movement

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

Helicopter OPS as follower & WTS (we need clarity)

Helicopter OPS as follower & WTS (we need clarity) Helicopter OPS as follower & WTS (we need clarity) WakeNet3-Europe Specific Workshop on "RE-CATEGORIZATION" Berlin 20th June 2011 I.Alkalay WHY? Objectives of this WS: involve the experts from CAAs, ANSPs

More information

Using PBN for Terminal and Extended Terminal Operations

Using PBN for Terminal and Extended Terminal Operations Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data

More information

Cross-sectional time-series analysis of airspace capacity in Europe

Cross-sectional time-series analysis of airspace capacity in Europe Cross-sectional time-series analysis of airspace capacity in Europe Dr. A. Majumdar Dr. W.Y. Ochieng Gerard McAuley (EUROCONTROL) Jean Michel Lenzi (EUROCONTROL) Catalin Lepadatu (EUROCONTROL) 1 Introduction

More information

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2.

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2. 15/ 2/13 INTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG)) SEVENTH MEETING Bangkok, Thailand, 18 to 22 March 2013 Agenda Item 3: Follow-up of IAVWOPSG/6 conclusions STATUS OF FOLLOW-UP OF

More information

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA Airport-CDM Workshop Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA Jean-Baptiste Djebbari Airline Pilot International Affairs DSNA Content Introduction 1. CANSO and A-CDM 2. A-CDM

More information

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR Validation Results of Airport Total Operations Planner Prototype CLOU FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR FAA/EUROCONTROL ATM Seminar 2007 > Andreas Pick > July 07 1 Contents TOP and TOP

More information

Flight Operations Officer Recurrent Training Syllabus

Flight Operations Officer Recurrent Training Syllabus Page 1 Course Duration: 3 days per module 24 classroom hours Proficiency Requirements - Flight Dispatch Personnel (ICAO) Proficiency requirements for flight dispatch personnel, as well as acceptable methods

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report 2018. Page 1 of 16 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 6 Airborne delay... 6 Notable events... 6 Melbourne... 9 Airborne

More information

Potential Use of Aircraft Derived Meteorological Data for Wake Turbulence Applications

Potential Use of Aircraft Derived Meteorological Data for Wake Turbulence Applications Potential Use of Aircraft Derived Meteorological Data for Wake Turbulence Applications Wake Vortex & Wind Monitoring Sensors Workshop Palaiseau, France March 29 th 2010 Dr. Edward Johnson Wake Turbulence

More information

Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager

Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager Final Project Report Document information Project Title Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number 09.49 Project Manager Deliverable Name Deliverable

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011

Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011 Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011 Recategorization is a Three Phase Effort Phase I is Static 6 Category Separation Phase II is static pair-wise separation

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU ENABLING GREENER FLIGHT TRAJECTORIES David Bowen Chief of ATM SESAR JU 24 November 2016 SESAR vision SESAR life cycle To define, develop and deploy the technology that is needed to increase ATM performance

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

The Use of Simulation Models for Airport Planning and ATM Analysis at the Institute of Flight Guidance. Slide 1

The Use of Simulation Models for Airport Planning and ATM Analysis at the Institute of Flight Guidance. Slide 1 The Use of Simulation Models for Airport Planning and ATM Analysis at the Institute of Flight Guidance Slide 1 Dipl.Ing. Tanja Luckova > 19.05.2009 Overview 1. Key areas and sites of DLR 2. Characteristics

More information

Making the World A better place to live SFO

Making the World A better place to live SFO Making the World A better place to live SFO August 2016 Emissions Reduction Roadmap Industry is strongly committed to achieve the targets Only with several lines of actions it is possible to reach 2020

More information

Application of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow

Application of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow Application of Wake Turbulence Separation at London Heathrow Paul Johnson Development Manager NATS Heathrow Heathrow Vital Statistics Passengers per year 67 Million Aircraft movements per year 470,000

More information

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report 2019 Page 1 of 20 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 7 Airborne delay... 7 Notable events... 7 CTOT (Calculated take

More information

WAKE TURBULENCE RE-CATEGORISATION ON APPROACH AND DEPARTURE FOR SAFE AND MORE EFFICIENT AIR TRAFFIC MANAGEMENT

WAKE TURBULENCE RE-CATEGORISATION ON APPROACH AND DEPARTURE FOR SAFE AND MORE EFFICIENT AIR TRAFFIC MANAGEMENT WAKE TURBULENCE RE-CATEGORISATION ON APPROACH AND DEPARTURE FOR SAFE AND MORE EFFICIENT AIR TRAFFIC MANAGEMENT Frédéric Rooseleer*, Vincent Treve*, Ivan De Visscher**, Robert Graham* *European Organization

More information

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) 1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)

More information

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports SOURDINE II EU- 5FW project on Noise Abatement Procedures Overall view Ruud den Boer / Collin Beers Department: ATM & Airports Study of key elements weighed key elements 4th Framework Programme Definition

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Cooperative traffic management

Cooperative traffic management 3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE AIRCRAFT NOISE INFORMATION PACK: Table of Contents CANNING VALE 1. Aircraft movements affecting Canning Vale... 2 2. Effects of wind on runway selection... 2 3. Seasonal winds... 2 4. Flight path illustrations...

More information

Flight Testing the Wake Encounter Avoidance and Advisory system: First results

Flight Testing the Wake Encounter Avoidance and Advisory system: First results Flight Testing the Wake Encounter Avoidance and Advisory system: First results Dr. Fethi Abdelmoula, Tobias Bauer DLR Institute of Flight Systems Paris, May 15 th & 16 th, 2013 WakeNet-Europe Workshop

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress The VINGA project Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress 2016-10-11 Introduction to the VINGA project Validation and Implementation of Next Generation Airspace A Single

More information

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010 The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Think the solution, experience the change

Think the solution, experience the change Think the solution, experience the change RNP AR Approach Design Don-Jacques OULD FERHAT, Head of Operations Think the solution, experience the change AGENDA Airbus PBN services subsidiary Implementing

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

MET matters in SESAR. Dennis HART

MET matters in SESAR. Dennis HART MET matters in SESAR Dennis HART Implementing the Single European Sky Performance Safety Technology Airports Human factor -Performance scheme -Performance Review Body -EASA -Crisis coord. cell European

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the

More information

Airport Slot Capacity: you only get what you give

Airport Slot Capacity: you only get what you give Airport Slot Capacity: you only get what you give Lara Maughan Head Worldwide Airport Slots 12 December 2018 Good afternoon everyone, I m Lara Maughan head of worldwide airports slots for IATA. Over the

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Changi Airport A-CDM Handbook

Changi Airport A-CDM Handbook Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time

More information

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul ERASMUS Strategic deconfliction to benefit SESAR Rosa Weber & Fabrice Drogoul Concept presentation ERASMUS: En Route Air Traffic Soft Management Ultimate System TP in Strategic deconfliction Future 4D

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE Terms of Reference for a rulemaking task Implementation of Evidence-Based Training within the European regulatory framework ISSUE 1 3.9.2015 Applicability Process map Affected regulations and decisions:

More information

CAUTION: WAKE TURBULENCE

CAUTION: WAKE TURBULENCE CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

Aircraft Systems and 4D Trajectory Management

Aircraft Systems and 4D Trajectory Management Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 22/6/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 31: Other high-level policy issues to be considered by the Executive Committee THE

More information

Non Compliant Approach Balancing the risk with SMI

Non Compliant Approach Balancing the risk with SMI Non Compliant Approach Balancing the risk with SMI Safety forum: Airborne conflict Yann Le Fablec Head of Safety & Performance Dept / DSNA 11th of June 2014 Direction des services de la Navigation aérienne

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

Key Issues for the Critical Path Approach, Landing and Go-Arounds

Key Issues for the Critical Path Approach, Landing and Go-Arounds Key Issues for the Critical Path Approach, Landing and Go-Arounds Moderator John Allen Vice-President, Chief Safety Officer, JetBlue Airways Panelists Atholl Buchan Head, Flight Operations Regulatory Affairs,

More information

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA

UPDATE ON THE 6 IDEAS (1-4) NAV CANADA UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival

More information

Operational Performance and Capacity Assessment for Perth Airport

Operational Performance and Capacity Assessment for Perth Airport Operational Performance and Capacity Assessment for Perth Airport Version - 4.1 25 July 2012 Prepared by: NATS Consultancy Page 1 The recipient of this material relies upon its content at their own risk,

More information

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014

Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014 Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014 CANSO Asia Pacific Collaborative ATM Operations Workshop, Colombo 7 May 201 Evolution of the Regional ATFM Concept Research

More information

Performance through Innovation. Case study: Singapore airspace Enhancing airport performance

Performance through Innovation. Case study: Singapore airspace Enhancing airport performance Performance through Innovation Case study: Singapore airspace Enhancing airport performance Innovative ways to maximise performance We provide services and consultancy for airports of all sizes, from the

More information

International Civil Aviation Organization. Runway and Ground Safety Working Group

International Civil Aviation Organization. Runway and Ground Safety Working Group International Civil Aviation Organization Runway and Ground Safety Working Group Third Meeting (RGS WG/3) (Cairo, Egypt, 19-22 September 2016) Agenda Item 3: Implementation of Aerodrome Safety Priorities

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information