1 PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1

2 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3

3 3 Case Study - Day 1 Learning Objectives Identify navigation performance requirements after describing an Airspace Operational Concept.

4 Reference: BERET Airport 4 Input to Process 1 BERET AIRPORT

5 Chapeau TMA 5 Input to Process 1

6 CHAPEAU CURRENT 6 Input to Process 1

7 1 st Change: Chapeau TMA 7 Input to Process 1 From 120 to 400 IFR Movements per day

8 2 nd Change: Chapeau TMA 8 Input to Process 1 Growth of Homberg Town Spread of Turn Performance Complaints from Homberg & political pressure re Noise

9 3 rd Change: Chapeau TMA 9 Input to Process 1 NDB withdrawn Strong GA lobby want replacement procedure on 03R

10 Process 1 10 Set up Project Team [Regulator]

11 P1: Strategic Objectives 11 Safety? Capacity? Efficiency? Environment? Access? From 120 to 400 a/c per day Growth of Homberg Town Spread of Turn Performance Complaints from Homberg re Noise NDB withdrawn NDB withdrawn Strong GA lobby want replacement procedure

12 P1: Airspace Requirements 12 Safety? Capacity? Efficiency? Environment? Access? Accommodate increased traffic Minimise noise impact over Homberg Town & City of Chapeau GA requires IFR approach for RWY03R VFRs want continued access to/from BERET

13 P1: Analyse Traffic Distribution Step % 35% 15% 10% 10% 40% 15% 35% 60% 40%

14 P1 Airspace Concept Step % Route A 35% Route B 10% 15% 10% 15% 40% 60% 35% 40%

15 P1 Airspace Concept Step 1 15 TMA W TMA E Initial Analysis by PANS-OPS Specialist: RNAV or RNP SIDs/STARs required to achieve Airspace Concept

16 P1 Assess Fleet Capability Step 2 16 Aircraft Performance Mix : 70% jets (IFR) 28% Twin Turbo Prop (IFR) 2% Single-engine engine trainers (VFR only) NAV Capability of IFR Operations: 85% with RNAV-type system + database 30% (mainly GA) have GNSS + VOR 70% (mainly Commercial Transport) have D/D/I + VOR 15% conventional VOR/DME only (IFR mix). Further Analysis by PANS-OPS Specialist: Take advantage of GPS equipage for APCH RWY03R

17 P1 Assess Nav Infrastructure Step 2 17 Two DMEs HOM (Homberg) BER (Beret) Two VORs HOM (Homberg) BER (Beret) NDB (HAT)

18 P1 Assess COM/SUR Infrast. Step 3 18 Primary SUR Radar 15 r.p.m. 1 MSSR 15 r.p.m. COM = VHF Voice ATM Modular Sectorisation: Max 4 Sectors Flight Data Processor Radar Data Processor

19 Limited Listing P1 Navigation Functionalities Required for SID/STARs Step 4 RNAV System Computation of Desired Flight Path With Data Base Navigation Performance Accuracy 1 NM constrained track keeping in the turn Automatic execution of leg transitions IF; CF; TF Load RNAV ATS route from database 19

20 Limited Listing P1 Navigation Functionalities Required for Final Approach Step 4 RNAV System Computation of Desired Flight Path With Data Base Display of desired flight path Navigation Performance Accuracy 0.3 NM on Final Approach Accuracy 1 NM elsewhere Automatic execution of leg transitions IF; DF; TF; Conventional or RNAV missed approach required 20

21 Summary: Process 1 21 Problem Identified at Beret Airport Traffic growth Environmental issues (noise) Withdrawal of NDB Project Team set up New Airspace Concept described COM, SUR assumptions detailed NAV performance requirements identified Next.DAY 2..Selection of ICAO Navigation Specification

22 22 Case Study - Day 1 Learning Objectives Identify navigation performance requirements after describing an Airspace Concept.

23 23 Questions & Feedback

24 24 Case Study - Day 2 Learning Objectives Selecting an ICAO Navigation Specification for Terminal Airspace to satisfy the Airspace Concept.

25 From P1 Airspace Concept 25

26 Limited Listing P1 Navigation Functionalities Required for SID/STARs RNAV System Computation of Desired Flight Path With Data Base Navigation Performance Accuracy 1 NM constrained track keeping in the turn Automatic execution of leg transitions IF; CF; TF Capability to Load RNAV ATS route from database 26

27 P1 Navigation Functionalities Required for Final Approach 27 Limited Listing RNAV System Computation of Desired Flight Path With Data Base Display of desired flight path Navigation Performance Accuracy 0.3 NM on Final Approach Accuracy 1 NM elsewhere Automatic execution of leg transitions IF; DF; TF; Conventional or RNAV missed approach required

28 P2 Find suitable Nav Spec 28 Step 1 Volume II Part A: Overview and Generalities of Nav Specs Part B: Implementing RNAV Part C: Implementing RNP

29 P2 Find suitable Nav Spec 29 Step 1 RNAV 10 RNAV 5 RNAV 2 RNAV 1 RNP 4 BASIC-RNP 1 RNP APCH Day 3 RNP AR APCH

30 Limited Listing P2 Assess Fleet Capability for RNAV 1 functional requirements Step 1a 2 RNAV System 30 Computation of Desired Flight Path With Data Base 85% of IFR can Navigation Performance satisfy RNAV 1 with DME/DME/ Accuracy 1 NM IRU or GNSS Constrained performance on turn Automatic execution of leg transitions IF; DF; TF; CF; Capability to Load RNAV ATS route from database

31 Limited Listing P2 Assess Fleet Capability For Basic RNP 1 functional requirements Step 1a 2 RNAV System 31 Computation of Desired Flight Path With Data Base 3% of IFR having Navigation GNSS satisfy Performance B-RNP 1 Accuracy 1 NM requirements Constrained performance on turn Automatic execution of leg transitions IF; DF; TF Capability to Load RNAV ATS route from database

32 P2 Nav Infrastructure for RNAV 1? 32 Step 1a 2 Two DMEs HOM (Homberg) BER (Beret) Two VORs HOM (Homberg) BER (Beret) NDB (HAT) Further Analysis by PANS-OPS Specialist Additional DME needed to support RNAV 1 D/D/I

33 P2 Nav Infrastructure for RNAV 1? 33 Is it more cost Effective for Aircraft to Retrofit GPS? Consult AOs Step 1a 2 x No retrofit in this case ADDITIONAL DME REQUIRED AT LOCATION X

34 P2 Nav Infrastructure for RNAV 1? 34 Introduction of CAP DME = coverage for the TMA (no obstacles) With 3 DMEs: provision for limited Redundancy in most areas. Step 1a 2 CAP

35 P2 Nav Infrastructure for RNAV 1? 35 Step 1a 2 All proposed routes lie within the service volume CAP

36 P2 Compare COM/SUR Infrast. To requirements in RNAV 1 spec. Step 1a 2 Primary SUR Radar 1 MSSR COM = VHF Voice ATM System Modular Sectorisation: Max 4 Sectors Flight Data Processor Radar Data Processor Further Analysis by project team Approach Radar is Required for RNAV 1 1 (OK) 36

37 P2 Apply Trade-offs 37 Not all aircraft Can achieve RNAV 1 (15%) Step 3 Consult ATC Mix of 85% - 15% OK Need Some Conventional SID/STARs

38 P3 Safety Plan 38 Step 1 Having Selected RNAV Formulate Safety Plan How will safety be measured? How will safety be assessed? What factors need to be considered?

39 P3 Validate Airspace Concept 39 Step 2

40 P3 Procedure Design & Validation 40 Step HOM SID

41 P3 Prepare for Implementation 41 Step 5 8

42 P3 Training from RNAV 1 Spec 42 Steps 8a & 8b Core & Specific Training as per RNAV 1 Specification Pilot Knowledge & Training as per RNAV 1 Specification

43 P3 Implementation & Review 43 Steps 9 & 10

44 Summary: Process 2 & 3 44 In Process 2 we identified the possibility of designing SIDs & STARs based on RNAV 1 The fleet was assessed (OK); COM/SUR assessed (OK) Navaid Infrastructure was found needing a DME (cheaper than GPS reftrofit). Process 3 focused on realising the implementation of RNAV 1 specification. The Airspace Concept was validated. Procedures were designed ATC and Pilots were Trained and Implementation Achieved Next.DAY 3 IFP for RWY03R

45 45 Case Study - Day 2 Learning Objectives Selecting an ICAO Navigation Specification for Terminal Airspace to satisfy the Airspace Concept.

46 46 Questions & Feedback

47 47 Case Study - Day 3 Learning Objectives Selecting an ICAO Navigation Specification for Approach to satisfy the Airspace Concept.

48 From P1 Airspace Concept 48

49 3 rd Change: Chapeau TMA 49 Input to Process 1 X NDB withdrawn Strong GA lobby want replacement procedure on 03R Suggested that GNSS equipage could enable this

50 Limited Listing P1 Navigation Functionalities Required for Final Approach RNAV System Computation of Desired Flight Path With Data Base Display of desired flight path Navigation Performance Accuracy 0.3 NM on Final Approach Accuracy 1 NM elsewhere Automatic execution of leg transitions IF; DF; TF; Consistent with CA & FM 50

51 P2 Find suitable Nav Spec 51 Step 1 Volume II Part A: Overview and Generalities of Nav Specs Part B: Implementing RNAV Part C: Implementing RNP

52 P2 Find suitable Nav Spec For Final Approach Step 1 52 RNAV 10 RNAV 5 RNAV 2 RNAV 1 RNP 4 BASIC-RNP 1 RNP APCH RNP AR APCH

53 Limited Listing P2 Assess Fleet Capability to RNP APCH functional requirements 53 Step 1a 2 30% of GA RNAV System have GPS Computation of Desired Flight Path With Data Base Display of desired flight path All can meet Navigation Performance RNP APCH Accuracy 0.3 NM on Final Approach Accuracy 1 NM elsewhere Automatic execution of leg transitions IF; DF; TF; Conventional missed approach possible (single system)

54 P2 Compare COM/SUR Infrast. To requirements in RNP APCH spec. Step 1a 2 54 COM = VHF Voice (not required for RNP APCH) NAV = GNSS Required Radar (not required for RNP APCH) ATM - n/a COM/NAV/SUR infrastructure OK

55 RNP APCH Procedure RWY03R 55 DESIGN VALIDATE

56 P3 Prepare for Implementation 56 Step 6 Flight Inspection & Flight Validation Step 7 ATC System Integration Considerations Step 8 Awareness & Training Material Step 8a Train ATC Step 8b Train Flight Crews Step 9 Establish Operational Implementation Date Step 10 Post Implementation Review

57 Summary: Process 2 & 3 57 In Process 2 we identified the possibility of designing a procedure for Final Approach using RNP APCH The fleet and Navaid Infrastructure was assessed (OK). Process 3 focused on realising the implementation of RNP APCH. The Procedure was designed The Procedure was validated & Integrated into ATC System ATC and Pilots were Trained and Implementation Achieved

58 58 Case Study - Day 3 Learning Objectives Selecting an ICAO Navigation Specification for Approach to satisfy the Airspace Concept.

59 59 Questions & Feedback

60 60 -END -

61 Reference: BERET Airport 61

62 Determine a suitable Navigational Specification For Final Approach to Runway 03R 62 Given the desire to create an RNP approach (Phase 1 decision), two navigation specifications are appropriate for the final segment RNP approach RNP AR approach RNP AR is more flexible than RNP alone in that it can Accommodate Radius to Fix (RF) turns in all segments including final approach Allow a narrower Obstacle Evaluation Surface (OES) to be applied However, RNP AR requires More stringent equipment and flight crew training requirements compared to RNP alone Special authorization for each airframe and operator

63 RNP Final and Missed Approach Surfaces 63

64 RNP 0.3 AR Approach 64

65 RNP Versus RNP AR Approach Both types of procedures can serve the needs of the airport Since there are no terrain or obstacle issues, both procedures can be designed with a Decision Altitude (DA) as low as 250 feet above the airport. The additional flexibility of the narrower surfaces and the application of RF legs available with RNP AR are not necessary to achieve the objective of accommodating the GA traffic to Runway 03R Because of the additional equipment and training requirements necessary for RNP AR, significantly fewer operations will be initially capable of flying such a procedure Given these considerations, the best choice for Beret Airport is to develop the RNP approach 65

66 RNP and RNP AR Surfaces Combined Showing Obstacle 66 RNP DA = 280 feet above the airport RNP AR DA = 250 feet above the airport Obstacle A Blue final and magenta missed approach = RNP AR 0.3 Red final and green missed approach = RNP approach

67 Summary 67 In many applications both RNP approaches and RNP AR approaches may be considered Due to additional flexibility in the procedure design, use of curved segments and narrower OES surfaces, RNP AR allows for greater flexibility than RNP alone However, careful consideration should be given to each situation to determine if any gain in lower minima or curved segments is offset by the additional aircraft, aircrew and flight operation requirements demanded by RNP AR Initially, significantly fewer aircraft and operators will be qualified for RNP AR than will be able to fly RNP approaches, overshadowing the benefits of RNP AR in this case

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Validation & Implementation Considerations Module 14 Activities 11 to 17

Validation & Implementation Considerations Module 14 Activities 11 to 17 Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

Challenges in Complex Procedure Design Validation

Challenges in Complex Procedure Design Validation Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

Development and validation of procedures

Development and validation of procedures Development and validation of procedures 07 10 April 2015 Procedure Design Procedure Design includes ATS Routes (enroute, arrival, departure) and Instrument Approach procedures Design criteria in ICAO

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

What is an Airspace Concept? Module 5

What is an Airspace Concept? Module 5 What is an Airspace Concept? Module 5 European Airspace Concept Workshops for PBN Implementation Overview Learning Objectives: At the end of this presentation you should: Understand what the purpose of

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

AREA NAVIGATION RNAV- MANAGEMENT

AREA NAVIGATION RNAV- MANAGEMENT 1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

GENERAL INFO NOTICE 1. BACKGROUND

GENERAL INFO NOTICE 1. BACKGROUND GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

MANUAL ON THE USE OF PERFORMANCE-BASED NAVIGATION (PBN) IN AIRSPACE DESIGN

MANUAL ON THE USE OF PERFORMANCE-BASED NAVIGATION (PBN) IN AIRSPACE DESIGN Doc 9992 AN/494 MANUAL ON THE USE OF PERFORMANCE-BASED NAVIGATION (PBN) IN AIRSPACE DESIGN NOTICE TO USERS This document is an unedited advance version of an ICAO publication as approved, in principle,

More information

Draft PBN Implementation Plan Papua New Guinea

Draft PBN Implementation Plan Papua New Guinea Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

P-RNAV GENERAL INFO NOTICE. 1. Background

P-RNAV GENERAL INFO NOTICE. 1. Background GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers

More information

PROCEDURES SPECIAL OPERATIONS

PROCEDURES SPECIAL OPERATIONS Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course Page 1/12 TABLE OF CONTENT LEGAL CAUTION... 2 (RNAV)... 2 INTRODUCTION... 2 ARINC 424:... 2 (RNAV):... 2 Basic Area Navigation (BRNAV):... 2 Closed Termination:... 2 Course to a Fix:... 2 FLY-BY waypoints:...

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

ABBREVIATIONS. Aircraft-based augmentation system. Automatic dependent surveillance broadcast. Automated dependent surveillance contract

ABBREVIATIONS. Aircraft-based augmentation system. Automatic dependent surveillance broadcast. Automated dependent surveillance contract ABBREVIATIONS ABAS ADS-B ADS-C AFM AIP ANSP APV ATM ATS CDI CDU CFIT CRC CRM DME DTED EASA ECAC EUROCAE EUROCONTROL FAA FTE FMS FRT GBAS GNSS GPS GRAS Aircraft-based augmentation system Automatic dependent

More information

Towards the Future ATM

Towards the Future ATM Presented by Paul-Franck BIJOU, CEO of Quo Vadis, the PBN company by Airbus Towards the Future ATM ATC Guild Seminar New Delhi, Oct 20-21, 2010 Every 3 seconds in the world an Airbus aircraft takes off

More information

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002 Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety

More information