Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

Size: px
Start display at page:

Download "Terminal- Area Opera.ons Prof. Hamsa Balakrishnan"

Transcription

1 Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Istanbul Technical University Air Transporta,on Management M.Sc. Program Air Transporta,on Systems and Infrastructure Strategic Planning Module 8 : 26 May 215

2 Terminal areas Terminal airspace control: Terminal Radar Approach Control (TRACON) Handle arrivals and departures Transition between airspace and airport Interact with en route controllers and local controllers (Air Traffic Control Towers) Future concepts related to terminal-areas Super-density operations Metroplexes 2

3 Terminal area congestion and delays Traffic Management System 62, flights delayed in 26 because of terminal-area congestion 3

4 TRACONs 4

5 Arrival fixes Also called gates Metering points at which aircraft enter the TRACON Denver ARTCC (ZDV) Denver TRACON 5

6 TRACON ~ 4 miles 6

7 Terminology Airport with four well-defined (approximately equidistant) arrival fixes: Corner-post arrangement Arrangement of arrival fixes depends on the airport For example, Denver International Airport (DEN) and Atlanta Hartsfield-Jackson (ATL) have 4 arrival gates Boston Logan International Airport (BOS) has two arrival positions and one final control position Enroute Arrival control (TRACON) Final control (TRACON) Final control positions handle merging and spacing, using the downwind and base legs Timing (for spacing) achieved by altering length of trajectory è Trombone approaches è Approach fans 7

8 Schematic of terminal-area arrivals Sequencing areas Downwind leg Final approach Base leg Base leg Downwind leg Sequencing areas 8

9 Atlanta Hartsfield-Jackson International Airport (ATL): Corner-post example

10 Airport Arrival Demand Chart (AADC) [ 1

11 Example terminal-area trajectories: Antalya Airport (AYT)" Arrivals Departures miles km

12 Path stretching for spacing 12

13 Procedures: STARs Standard Terminal Arrival Routes Describe common arrival procedure Via the Pechy Three Arrival 13

14 354º º ' 174º 174º 174º AIP TURKEY STANDARD ARRIVAL CHART INSTRUMENT (STAR) - ICAO DHMI - ANKARA TRANSITION ALTITUDE 1 FT AIRAC AMDT 1/1 ' 352 º ACC : APP : TWR : AD 2 LTBA STAR OCT 1 ÝSTANBUL / ATATÜRK INTERNATIONAL RWY 17L/R Procedures: IST STARs CHANGE: RWY ID º ' 28º ' 41º ' 4º ' L/UL 66 G/UG 8 G/UG 12 M/UM 63 VOR EKI CH 11 X 4º57'3"N - º25'34"E W/UW 2 N/UN 64 G/UG 8 ULMAR N TEKIRDAG LT - P2 (IAF RWY 17) VURAL 8DME 3º N/UN 6 G/UG 8 282º 6 12º ' N/UN 6 G/UG 8 3º º 8' ' 21º º 174º IST R- 354 HOLDING OVER VURAL 3 FT 354 º 6 ULMAR 1B 33 ' EKI R- 83 CORLU NDB 426 CRL 41º7'54"N - º54'37 E BIG R- 47 BIGA VOR 116. BIG CH 116 X 4º17'3"N - º21'55 E CRL R- 3 CORLU CORLU VOR CRL CH 5 X BIG R- 55 BRG and TRACKS are MAG ELEV, ALT and HGT in FEET MSL DIST in NM VAR 4º ' E ( 24 ) ISTANBUL 41º'8"N - º56' E ' 6 BIG 1C 68 6 EKI 1C 5 ' 6 BIG 1F 55 LT - R 3 ÇORLU CTR 4 FT AMSL SFC CRL R- 7 ' (IAF RWY ) CEKMECE NDB 328 CEK 41º'21"N - 28º31'41 E 47º BANDIRMA LT - D 4 LT - D 5 NDB 36 IS 41º3'26"N - 28º48'23 E ' 6 ULMAR 1B 4 83º 55º HEZARFEN CTR 15 FT AMSL SFC º 5' º IST R- 235 ÝMREN FL 165 ISTANBUL TMA 15 FT AMSL LT - P7 1 EKÝ R- 6 HEZARFEN 5' BIG 1F LT - R 4 ÝSTANBUL VOR IST CH 72 X 4º57'45"N - 28º48'35 E UNSAV 2º ' 41º28 42 N- 28º47 23 E IST R- 354/ 31 FATIH 6 YASEN-GAYEM 1F YAA 1R 16 YEÞÝLKÖY CTR ATATÜRK 15 FT AMSL SFC 28º ' 2º ' 7º 3º º 5' - 5' EKI-BIG 1C 15 55º 5' BIG 1F 16 5' UNSAV 1 G IST R- 354 ' R- 287 NOTE: AVAILABILITY OF BIG- 1F SUBJECT TO PRIOR COORDINATION BTN IST ATC AND BANDIRMA MILITARY ATC IF MILITARY ACTIVITES NOT PERMIT FOR BIG 1 F BURSA IST ATC TO USE BIG- 1C ONLY SPEED CONTROL 23 YALOVA VOR YAA CH 124 X 4º28'3"N - 2º12' E 1) GENERAL RULE: MAX IAS 25 KT AT OR BELOW 1' WITHIN TMA 2) ARRIVING AIRCRAFT: - MAX IAS 25 KT AT 4 NM FROM IST VORTAC - MAX IAS 21 KT AT 15 NM FROM IST VORTAC - MAX IAS 16 KT UNTIL 5 NM FROM TRESHOLD - SPEED ACCURACY SHALL BE WITHIN 1 KT 54º YAA 1T-YAA1R 3 352º 4' 234º BKZ R-1726 (IAF RWY 17) BEYKOZ VOR BKZ CH 12 X YASEN 41º11'56"N- 2º3'58 E BKZ R-7 1/ D R-71 BKZ R-8 YAA R- 352 YENISEHIR VOR BRY NDB 352 BRY CH 1 X 4º15'48"N - 2º35'4 E 41º7'37"N - 2º8'34 E ' 7 YASEN 1F 17 7 GAYEM 1F 23 SABIHA GOKCEN ' 251º SABIHA GOKCEN CTR 25 FT AMSL SFC YENISEHIR CTR 8 FT AMSL SFC NOT TO SCALE 352º 6' 172º 8º L/UL 61 W/UW 72 GAYEM 41º2'45"N- 2º37'48 E BKZ R- 8/ D23 SABIHA GOKCEN VOR 18.8 SBH NDB 347 SAB CH 25 X 4º53'58"N - 2º1'13 E YALOVA YENISEHIR LT - D 1 36º º 3' 35' º º 3' 5' MSA 25 NM IST VORTAC LT - P5 L/UL 61 L/UL 62 A/UA 16 L/UL 615 A/UA 4 41º ' L/UL 614 G/UG 8 4º ' 14

15 Standard Instrument Departures (SIDs) 15

16 AIP TURKEY STANDARD DEPARTURE CHART INSTRUMENT (SID) - ICAO DHMI - ANKARA TRANSITION ALTITUDE 1 FT TWR : APP : ACC : AD 2 LTBA SID OCT 1 ÝSTANBUL / ATATÜRK INTERNATIONAL RWY 17L/R AIRAC AMDT 1/1 IST SIDs CHANGE: RWY ID º ' 28º ' BRG and TRACKS are MAG ELEV, ALT and HGT in FEET MSL DIST in NM VAR 4º ' E ( 24 ) CORLU 41º ' L/UL 66 G/UG 8 N G/UG 12 M/UM 63 TEKIRDAG VOR EKI CH 11 X 4º57'3"N - º25'34"E LT - P2 CORLU NDB 426 CRL CORLU CTR 4 FT AMSL 41º7'54"N - º54'37 E SFC N/UN 6 G/UG 8 VOR CRL CH 5 X 41º'8"N - º56' E CORLU BIG 2S L/UL 61 A/UA 16 FENER 41º17'11"N- 28º21'28"E IST R-3/ D28 CRL R- 11 EKI 2S CRL 2 S BIG 2S CEKMECE NDB 328 CEK FENER 2S IST R- 267 IST R º'21"N - 28º31'41 E FL 165 ISTANBUL TMA 15 FT AMSL LT - D 5 HEZARFEN CTR 15 AMSL SFC HEZARFEN 333º LT - P7 LT - R 4 2º ' ERTAS 41º'41"N - 2º8'48 E BKZ R-356/ D2 ÝSTANBUL VOR IST CH 72 X 42º 4º57'45"N - 28º48'35 E YEÞÝLKÖY CTR 15 FT AMSL SFC ATATÜRK IST R- 177 ERTAS 1S 5 DME YAA 2S BKZ R- 27 ERTAS 1T BKZ R- 172 BKZ R- 356 YAA R- 32 YAA R- 352 BEYKOZ VOR BKZ CH 12 X 41º7'37"N - 2º8'34 E YASEN 41º11'56"N- 2º3'58 E BKZ R-7 1/ D BKZ R- 71 YASEN 1S BKZ R- 8 GAYEM 1S YALOVA L/UL 61 W/UW 72 GAYEM 41º2'45"N- 2º37'48"E BKZ R- 8/ D23 SABIHA GOKCEN VOR 18.8 SBH NDB 347 SAB CH 25 X 4º53'58"N - 2º1'13 E LT - D 1 36º º 3' 35' º º 3' 5' MSA 25 NM IST VORTAC LT - P5 L/UL 615 A/UA 4 41º ' L/UL 614 G/UG 8 4º ' W/UW 2 N/UN 64 G/UG 8 N/UN 6 G/UG 8 BIG R- 38 BIGA VOR 116. BIG CH 116 X 4º17'3"N - º21'55 E BANDIRMA LT - R 3 LT - D 4 YALOVA VOR YAA NDB CH35 124YAA X CH 124 X 4º33'54"N 4º28'3"N - 2º22'17 E 2º12' E 28º ' 2º ' BURSA YENISEHIR CTR 8 FT AMSL SFC YENISEHIR VOR BRY NDB 352 BRY CH 1 X 4º15'48"N - 2º35'4 E NOT TO SCALE YENISEHIR L/UL 61 L/UL 62 A/UA 16 4º ' 16

17 Example: Go-around 17

18 Boston Instrument Landing System (ILS) approaches 15R ILS to visual 4L

19 Holding patterns Fix end Holding side Outbound Outbound end Fix Inbound Non-holding side Holding course Holding instructions need to include: direction of holding from fix; name of holding fix; radial, course, bearing, azimuth, route on which aircraft is to hold; direction of turns if not standard (standard = right-hand); Length if nonstandard (1 min inbound leg length); expected further clearance time 1

20 Airport and surrounding terminal area [Idris et al. 2, Carr 24] 2

21 Terminal-area separation: Wake vortex separation Aircraft are trailed by their wake vortices Each wing produces a vortex (that is, there are two counter-rotating vortices behind each aircraft) Strength of the vortex is a function of aircraft weight, speed and shape of the wing of the leading aircraft Maximum vortex generation occurs when aircraft is heavy and slow Therefore takeoffs and landings are particularly susceptible Small aircraft encountering the wake of a heavy aircraft may become uncontrollable Wake vortex separation is a fundamental bottleneck to airport and terminal-area capacity 21

22 Wake-vortex separation" [ 22

23 Airport runway configuration" Selection of runways used for landings and takeoffs! N" LGA" SFO" arrival runways" R1, R2 R3, R4" departure runways" 23

24 Runway configuration example" arrival on runway 22" N" departure on runway 22" 22 22" 24

25 Factors influencing runway configuration selection" Factors that potentially influence configuration selection Wind speed Wind direction Visibility Airport arrival demand Coordination with nearby airports Noise mitigation Difficulty of switching around airport Desire to stay in same configuration LGA" 25

26 Runway configuration switch" 26

27 Multi-airport terminal-areas or Metroplexes [Bonnefoy & Hansman]

28 New York metroplex trajectories [Figure courtesy of Leo Prusak, Manager NorthEast Tactical Operations, FAA] 28

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Istanbul Technical University Air Transporta,on Management M.Sc. Program Air Transporta,on Systems and Infrastructure Strategic Planning Module 8 : 2 April

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

LOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM

LOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM INSTRUMENT APPROACH CHART AERODROME ELEV 25 ft HEIGHTS RELATED TO HIGHTEST ELEV TDZ 17 ft HEON APP 135.4 344.7 HEON TWR 118.675 236.6 305.4 RKPS AD CHART 2-7 HEON/Sacheon (RKPS) LOC/DME RWY 06L ELEV, ALT

More information

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual. INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend

More information

AIP ENR JORDAN 01 MAY 2014

AIP ENR JORDAN 01 MAY 2014 AIP ENR 1.5-1 JORDAN 01 MAY 2014 ENR 1.5 HOLDING, APPROACH AND DEPARTURE PROCEDURES 1. GENERAL 1.1 The procedures used in Jordan are generally in accordance with ICAO DOC 8168. Holding patterns in Jordan

More information

HOLDING PATTERN USING VOR

HOLDING PATTERN USING VOR HOLDING PATTERN USING VOR 1. Introduction This documentation will present an example of a holding pattern using a VOR as holding point. 2. First Step Before holding over a VOR, you must study the approach

More information

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN PILOT BRIEFING ROVANIEMI X-MAS FLY-IN GENERAL ICAO: EFRO IATA: RVN Runways: 03/21 AIP SUPPLEMENT An AIP Supplement will be in effect on the day of the event. This supplement details vital procedures for

More information

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons. The two parallel runways are about 3000 metres long while the intersecting runway (12-30) is about

More information

AD 2 AERODROMES EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVLA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2 AERODROMES EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVLA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 18 NOV 2010 AIP LATVIA EVLA AD 2-1 18 NOV 2010 AD 2 AERODROMES Note: The following sections in this chapter are intentionally left blank: AD-2.16, AD-2.23 EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME

More information

Gleim Instrument Pilot FAA Knowledge Test 2012 Edition, 1st Printing Updates January 27, 2012

Gleim Instrument Pilot FAA Knowledge Test 2012 Edition, 1st Printing Updates January 27, 2012 Page 1 of 5 Gleim Instrument Pilot FAA Knowledge Test 2012 Edition, 1st Printing Updates January 27, 2012 NOTE: Text that should be deleted from the question is displayed with a line through the text.

More information

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions

More information

LZMC/MLC MALACKY 01 JAN IEff 01 FebI. MALACKY, SLOVAKIA Additional Airport Informations. 1. Services ATC and Meteo services available H24.

LZMC/MLC MALACKY 01 JAN IEff 01 FebI. MALACKY, SLOVAKIA Additional Airport Informations. 1. Services ATC and Meteo services available H24. MALACKY 01 JAN 08 10 1 I Additional Airport Informations 1. Services ATC and Meteo services available H24. Telephone numbers: TWR: 00421 960 390 230 00421 960 390 231 METEO Office: 00421 960 390 240 00421

More information

EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 18 NOV 2010 AIP LATVIA EVVA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.16, AD-2.23 EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA - VENTSPILS

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX PORTUGAL PHONE: +351.21.8553506 FAX: +351.21.8553399 E-Mail: desica@nav.pt AFTN: LPPPYOYC DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO 8223 1803-001 LISBOA CODEX

More information

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport AIP FYWE AD 2-1 Republic of Namibia 20 JUL 2017 AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME FYWE - Windhoek (Eros) Airport FYWE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

Application of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow

Application of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow Application of Wake Turbulence Separation at London Heathrow Paul Johnson Development Manager NATS Heathrow Heathrow Vital Statistics Passengers per year 67 Million Aircraft movements per year 470,000

More information

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc S2 Tower Controller Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc Introduction: The next stage in your controlling at Lahore as a tower controller is S2 rating. To be an S2 Controller

More information

OMURA AERODROME A-3 ABN A-2 APRON. MEHT 13.6m(44.6ft) PAPI Angle 3.0. MEHT 13.6m(44.6ft) PAPI Angle 3.0. is not visible from NAGASAKI Tower.

OMURA AERODROME A-3 ABN A-2 APRON. MEHT 13.6m(44.6ft) PAPI Angle 3.0. MEHT 13.6m(44.6ft) PAPI Angle 3.0. is not visible from NAGASAKI Tower. AIP Japan RJDU-AD2-24.1 RJDU / AD CHART AERODROME ABN TRUE NORTH 18 2 2 1 3 A-2 2 2 A-1 APRON 1 3 WDI PAPI Angle 3.0 MEHT 13.6m(44.6ft) PAPI Angle 3.0 MEHT 13.6m(44.6ft) 0 100 200 300m A-3 TO TWR 3 1 36

More information

Number April 2016

Number April 2016 Luxembourg Air Safety Bulletin Number 16-001 - April 2016 This Air Safety Bulletin examines a number of hazards related to flying in and out, and in the vicinity of, Luxembourg Airport. As the Direction

More information

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC. AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX

More information

Airfield Capacity Prof. Amedeo Odoni

Airfield Capacity Prof. Amedeo Odoni Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:

More information

AREA NAVIGATION RNAV- MANAGEMENT

AREA NAVIGATION RNAV- MANAGEMENT 1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional

More information

Airservices Australia 2016

Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)

More information

Providence ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY 34 19 SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D BIGRO 6 A Proceed from BIGRO to UJ. Cross GURIN at 2700 m and cross

More information

EKYT - AALBORG AIR BASE

EKYT - AALBORG AIR BASE EKYT AD 2.1-1 EKYT - AALBORG AIR BASE 1. AERODROME LOCATION INDICATOR AND NAME EKYT AIR TRANSPORT WING AALBORG 2. AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 570534.04N

More information

JeppView for Windows. General Information. jep=jeppesen. Runway: 17R. Length x Width: 9843 ft x 148 ft. Location: ISTANBUL TUR. Surface Type: concrete

JeppView for Windows. General Information. jep=jeppesen. Runway: 17R. Length x Width: 9843 ft x 148 ft. Location: ISTANBUL TUR. Surface Type: concrete Airport Information For LTBA Printed on 11 ec 2017 Page 1 (c) JEPPESEN SANERSON, INC., 2017, ALL RIGHTS RESERVE jep=jeppesen JeppView for Windows General Information Runway: 17R Length x Width: 9843 ft

More information

SkyHoppers Aerial Adventures Instrument Ground School Mid-Term Exam A. R. Dilworth, CFII Flight Instruments

SkyHoppers Aerial Adventures Instrument Ground School Mid-Term Exam A. R. Dilworth, CFII Flight Instruments SkyHoppers Aerial Adventures Instrument Ground School Mid-Term Exam A. R. Dilworth, CFII Flight Instruments 365.H808 Altimeter setting is the value to which the scale of the pressure altimeter is set so

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Praha Ruzyně VERSION 4.0 CHANGES AND UPDATES Effective Version Change - 3.8 Intentionally left blank. 09 JUN 11 3.9 General text revision. New design issued. 15

More information

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

Standard Operating Procedures (SOPs) for UAE Centre (OMAE) Standard Operation Procedures for UAE Centre (OMAE) Pag.1 of 10 Standard Operating Procedures (SOPs) for UAE Centre (OMAE) Standard Operation Procedures for UAE Centre (OMAE) Pag.2 of 10 Index 1. Foreword...

More information

Jordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR

Jordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR Jordan Airspace Manual Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR 1 Contents 1.0 Introduction:... 3 1.1 Airport Information:... 3 1.2 Adjoining FIRs:... 3 1.3 ATC Units:... 4 2.0 Procedures:...

More information

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14 AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@australia.com Effective: AIP SUPPLEMENT (SUP) AIRAC H 04/19 201902271600

More information

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS

AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS 4A LAGAS 2A DF 6A DF 4A LAMUS SIX ALFA After take

More information

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction

More information

AD 2-LGPL-1 GREECE 04 JAN 2018 LGPL AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGPL ASTYPALAIA

AD 2-LGPL-1 GREECE 04 JAN 2018 LGPL AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGPL ASTYPALAIA AIP AD 2-LGPL-1 GREECE 04 JAN 2018 LGPL AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGPL ASTYPALAIA LGPL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 363448N

More information

Cape Area Airports Standard Operating Procedures

Cape Area Airports Standard Operating Procedures Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

CAUTION: WAKE TURBULENCE

CAUTION: WAKE TURBULENCE CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low

More information

HOLDING STACK MANAGEMENT

HOLDING STACK MANAGEMENT 1. Introduction HOLDING STACK MANAGEMENT When an air traffic controller has such an amount of traffic in his approach area that he cannot handle more traffic for a determined or non-determined period of

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Implications of a Pilot Survey and Laboratory Simulations Dr. Anand M. Mundra

More information

UDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E

UDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E AIP Republic of Armenia AD 2.UDSG-1 ~~~eaip-amdt~~~airac-2016-0321 JUL 2016 UDSG Gyumri UDSG AD 2.1 Aerodrome location indicator and name UDSG Gyumri UDSG AD 2.2 Aerodrome geographical and administrative

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures LGAV LTAI Real Flights Event Partnership EUROPE PILOT's BRIEFING March 7 th 2009 Event time: 1200z 2200z 1 Athens FIR Guide 2 LGAV Procedures Written by: Georgios Tzoumbas (GR-TC) & Babis Delagrammatikas

More information

Learning. Goals. Patterns HOW WHEN. Holding. at the. that case. Page 1 of 19. Document : V1.1

Learning. Goals. Patterns HOW WHEN. Holding. at the. that case. Page 1 of 19. Document : V1.1 Learning Goals Holding Patterns HOW TO STOP WHEN YOU ARE AIRBOURNE. Holding Patterns are very important. In this lesson we will learn why they are so important and how to execute them. Imagine you are

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

Gleim Instrument Pilot FAA Knowledge Test 2015 Edition, 1st Printing Updates April 2015

Gleim Instrument Pilot FAA Knowledge Test 2015 Edition, 1st Printing Updates April 2015 Page 1 of 5 Gleim Instrument Pilot FAA Knowledge Test 2015 Edition, 1st Printing Updates April 2015 NOTE: Text that should be deleted is displayed with a line through it. New text is shown with a blue

More information

AD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base

AD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base AD 2-OERY-1 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME OERY - RIYADH/ King Salman Air Base OERY AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 244319N 0464329E/

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Greenville Spartanburg International

Greenville Spartanburg International ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign

More information

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES APPENDIX B INSRUMEN APPROACH CHARS & DEPARURE PROCEDURES DURANGO, COLORADO LOC I- Rwy Idg APP CRS DZE 09. Apt Elev 920 668 6685 AL-480 (FAA) ILS or LOC/DME RWY DURANGO-LA PLAA COUNY() DME from VOR/DME.

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

Annecy Airport IFR briefing For indication only

Annecy Airport IFR briefing For indication only 1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation

More information

AIP AD SEYCHELLES 03 APR 14

AIP AD SEYCHELLES 03 APR 14 AIP AD 0.6-1 SEYCHELLES 03 APR 14 AD PART 3 AERODROMES (AD) AD 0.6 TABLE OF CONTENTS TO PART 3 AD 1. AERODROMES/HELCOPTER LANDING AREAS INTRODUCTION Pages AD 1.1 Aerodrome/helicopter landing areas availability

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

Annecy Airport IFR briefing For indication only

Annecy Airport IFR briefing For indication only 1 DISCLAIMER The pieces of information provided are published only for indication, and are not exhaustive. We make our best effort to keep them updated. They are a valuable complement for flight preparation

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service

More information

Albany ATCT Standard Operating Procedures

Albany ATCT Standard Operating Procedures Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

GEN 0.2 Record of AIP Amendments

GEN 0.2 Record of AIP Amendments AIP Georgia GEN 0.- ~~~eaip-amdt~~~airac0000/0/00 GEN 0. Record of AIP Amendments 0/007 0/007 0/007 0/007 0/008 0/008 0/008 0/008 0/009 0/009 0/009 0/009 0/00 0/00 NR/Year AIRAC AIP AMENDMENT Publication

More information

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC

More information

AD 2-LGAD-1 GREECE 08 JAN 2015 AD 2. AERODROMES LGAD AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGAD - ANDRAVIDA

AD 2-LGAD-1 GREECE 08 JAN 2015 AD 2. AERODROMES LGAD AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGAD - ANDRAVIDA AD 2-LGAD-1 GREECE 08 JAN 2015 AD 2. AERODROMES LGAD AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGAD - ANDRAVIDA LGAD AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

Atlanta NextGen PBN Activities

Atlanta NextGen PBN Activities Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven

More information

SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION N IVAO HONG KONG

SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION N IVAO HONG KONG 53 52 51 50 H1 E1 60 MAINTENANCE APRON E 59 E1 61 F 58 EAST APRON 49 48 H1 G 57 55 56 H1 54 H 47 46 45 44 43 41 CARGO APRON SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION. 22 19 02 N AERODROME

More information

GEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia

GEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia TEL: FAX: AFTN: E-mail: (+995 32) 274 42 95 (+995 32) 274 42 37 (+995 32) 274 42 23 UGTBYOYX ais@airnav.ge ais@caucasus.net GEORGIA Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

DIRECCION DE PERSONAL AERONAUTICO DPTO. DE INSTRUCCION PREGUNTAS Y OPCIONES POR TEMA

DIRECCION DE PERSONAL AERONAUTICO DPTO. DE INSTRUCCION PREGUNTAS Y OPCIONES POR TEMA T E M : 0322 INSTRUTOR_DVNED_07_PROEDURES & IRPT OPS OD_PREG: P R E G U N T : RPT: 6436 n airport without a control tower lies within the controlled airspace of an airport with an operating tower. ccording

More information

VCCC - RATMALANA/Colombo

VCCC - RATMALANA/Colombo AIP VCCC AD 2-1 SRI LANKA RATMALANA/COLOMBO 12 OCT 17 VCCC - RATMALANA/Colombo VCCC AD 2.1 AERODROME LOCATION INDICATOR AND NAME Location Name Ratmalana 2. Name of Aerodrome Colombo 3. ICAO Location Indicator

More information

Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory

Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory MIT Lincoln Laboratory Partnership for AiR Transportation Noise and Emissions Reduction Hamsa Balakrishnan, R. John Hansman, Ian A. Waitz and Tom G. Reynolds! hamsa@mit.edu, rjhans@mit.edu, iaw@mit.edu,

More information

04 Installed on TWY T Installed on TWY T2 THRU T4 22 Installed on TWY T5

04 Installed on TWY T Installed on TWY T2 THRU T4 22 Installed on TWY T5 Civil Aviation Bureau,Japan (EFF:6 MAR 2014) 6/3/14 RWY04 MAG BRG 40.07 04 04 04-22 04-22 04-22 04-22 04-22 04-22 22 22 RWY 04 126ft 0m T1 CEILO METER 453m AP PAPI 3.0 WIND SPEED METER ELEV 102ft MEHT

More information

AD 2-LGSO-1 GREECE 04 JAN 2018 GSO AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGSO SYROS / DIMITRIOS VIKELAS

AD 2-LGSO-1 GREECE 04 JAN 2018 GSO AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGSO SYROS / DIMITRIOS VIKELAS AD 2-LGSO-1 GREECE 04 JAN 2018 GSO AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGSO SYROS / DIMITRIOS VIKELAS LGSO AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD

More information

PLAN Anoka County - Blaine Airport

PLAN Anoka County - Blaine Airport Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION Clearance Delivery [CALLSIGN], YOU ARE CLEARED TO [DESTINATION] VIA [INSTRUCTION-1], THEN [ANOTHER INSTRUCTION

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Course Rules NAS Whiting Field Ops. Created: 27 Aug 11 Last Updated: 24 Nov 15

Course Rules NAS Whiting Field Ops. Created: 27 Aug 11 Last Updated: 24 Nov 15 Course Rules NAS Whiting Field Ops Created: 27 Aug 11 Last Updated: 24 Nov 15 Overview Airfield / General Information Ground Operations Takeoff / Departures Home Field Entry Landing / Parking References

More information

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual ATMM Version 2.2 Issued at 2013-07-01 Effective from 2013-07-05 page 1/15 NOT FOR REAL NAVIGATION 2013-07-01 / PH Content 0. Updates 4 0.1. New items 4 0.2. Updated items 4 0.3. Deleted items 4 1. LOWW_GND

More information

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control

More information

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2 Approach (TMA) Air Traffic Control Table of Contents An Introduction to Approach/Departure Control................. 1 Airspace and Operating Positions........................... 2 Procedural Reference....................................

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007 Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term

More information

IFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.1 of 12 Standard Operating Procedures (SOPs) for Arabian Control (OGCC) Standard Operation Procedures for Arabian Control (OGCC) Pag.2 of 12

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD TEL: 91 11 24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91 11 24615508 E_mail: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICES AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

ENR 1.2 VISUAL FLIGHT RULES

ENR 1.2 VISUAL FLIGHT RULES AIP NETHERLANDS ENR 1.2-1 12 MAR 09 ENR 1.2 VISUAL FLIGHT RULES 1 VFR CRITERIA (ANNEX 2, 4.1 TABLE) A VFR flight may only be carried out when flight visibility and distance of aircraft from clouds are

More information

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation.

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation. IFR FLIGHT BRIEFING 1. Introduction This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation. As IVAO, in a simulated area, is different

More information