REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia
|
|
- Janis Walker
- 5 years ago
- Views:
Transcription
1 REPUBLIC OF CROATIA NonAIRAC Phone: Fax: AFS: LDZAYOYX aip@crocontrol.hr URL: Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia AIP SUP 007/2018 Effective Date: 13Sep2018 End Date: UFN Publication Date: 02Aug2018 LDDU DUBROVNIK/Cilipi Airport Temporary suspension of IAP RNAV (GNSS) RWY12 and trial PBN instrument flight procedures With this AIP SUP instrument flight procedure RNAV(GNSS) RWY12 (LDDU AD IAC RNAV(GNSS) RWY12, effective date 21 JUN 2018) is temporarily suspended. While this AIP SUP is in force, RNAV (GNSS) RWY12 is temporarily replaced with RNAV (GNSS) Z RWY12, which is attached to this AIP SUP. With this AIP SUP a trial satellite based PBN STAR (LDDU AD STAR RNAV RWY30) and PBN APCH (LDDU AD IAC RNAV (GNSS) Y RWY12) instrument flight procedures are available for testing purposes only at DUBROVNIK/ Cilipi Airport. The instrument flight procedures STAR RNAV RWY30 and RNAV(GNSS) Y RWY12 are available and shall be used for flight validation purposes only, by approved operators only and according to Dubrovnik ATC clearance only. The satellite instrument flight procedures are GNSS based and contain STAR and APCH flight procedures, as follows: Standard arrivals (STAR) from ATS routes to the initial approach fix (IAF) NonPrecision Approach (NPA) down to LNAV minima APV approach procedure with Barometric vertical guidance (APV BaroVNAV) down to LNAV/VNAV minima APV SBAS approach procedures with vertical guidance based on European Geostationary Navigation Overlay Service (EGNOS) system down to LPV minima (SBAS APVI). The instrument flight procedures are based on existing ICAO criteria prescribed by ICAO Doc 8168 OPS/611 Vol II (ICAO PANS OPS Vol II). Integral parts of this AIP SUP are: LDDU STAR RNAV RWY30 ICAO Chart, RNAV coding tables (waypoint list), LDDU RNAV(GNSS) Y RWY12 ICAO Chart, SBAS FAS Data Block, RNAV coding tables (waypoint list), LDDU RNAV(GNSS) Z RWY12 ICAO Chart, SBAS FAS Data Block, RNAV coding tables (waypoint list). Record entry of AIP SUP 007/2018 in GEN 0.3. Ref AIP: LDDU AD 2 Croatia Control Ltd. 1/2
2 AIP SUP 007/2018 THIS PAGE INTENTIONALLY LEFT BLANK 2/2 Croatia Control Ltd.
3
4 Serial Number Route Path Descriptor LDDU RNAV STANDARD ARRIVAL RWY 30 Proposed tabular description for navigation database coding Waypoint Identifier 010 NERRA 1Y IF NERRA Course/Track Magnetic Flyover M ( T) Variation Distance (NM) Turn direction Altitude (ft) Speed (kt) NAV SPEC DU705 DU704 DU702 DU701 OLEGU 202 (204.5 T) (117.6 T) (117.8 T) 025 (027.9 T) (118.0 T) IAF 010 SIPAL 1Y IF SIPAL DU706 DU705 DU704 DU702 DU701 OLEGU 154 (157.2 T) 154 (157.3 T) (117.6 T) (117.8 T) 025 (027.9 T) (118.0 T) IAF 010 MOKUN 1Y IF MOKUN DU708 DU703 DU702 DU701 OLEGU 237 (240.2 T) 237 (240.1 T) 295 (298.1 T) 025 (027.9 T) (118.0 T) IAF RNAV HOLDING tabular description Waypoint Identifier Path Descriptor Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn direction M ( T) (NM) (ft) (ft) Speed limit MAX IAS (kt) Magnetic variation NAV SPEC 1MIN / OLEGU HM R (118.0 T) HLDG above 4000 on ATC authorization only
5 Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude MOKUN N E NERRA N E SIPAL N E OLEGU N E DU N E DU N E DU N E DU N E DU N E DU N E DU N E
6 11 DEC 2014 LDDU AD STAR RNAV RWY 30 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.
7 OCA (H) A B C D LNAV 2.5% * 2380 (1853) LNAV 4.0% * 2130 (1603) Straightin LNAV/VNAV 1930 (1403) approach LPV 2.5% * 1690 (1163) LPV 4.0% * 840 (313) Note: * Minimum missed approach climb gradient Timing not authorized for defining the MAPt GS kt FAF DU397 (6.67NM) min:sec 4:27 3:38 3:05 2:40 2:21 2:06 Rate of descent (5.24%) ft/min
8
9 Serial Number Fix LDDU RNAV (GNSS) Y RWY12 Proposed tabular description for navigation database coding APPROACH TRANSITION Course Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Flyover descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) NAV SPEC 010 IAF IF ERASO IF DU (028.0 T) 010 IAF IF PILAP IF DU (118.0 T) Proposed tabular description for navigation database coding FINAL TRANSITION Course Serial Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Fix Flyover Number descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) RNP APCH RNP APCH NAV SPEC 010 IF IF DU FAF DU396 (118.0 T) MAPt DU397 Y (118.1 T) / DU398 Y (118.1 T) 1.9 MAX IAS 150KT FOR LNAV only RNP APCH 060 MAHF DF DU900 R MAHF HM DU900 (005.7 T) 1MIN L Holding above 4000t on ATC clearance only RNAV HOLDING tabular description Waypoint name Path Terminator Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn Speed limit M ( T) NM direction FT FT MAX IAS Magnetic variation NAV SPEC 098 1MIN / PILAP HM R (101.3 T) 3 E 003 1MIN / DU900 HM L 4000 (005.7 T) E Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude ERASO N E PILAP N E DU N E DU N E DU N E DU N E DU N E
10 11 DEC 2014 LDDU AD IAC RNAV (GNSS) Y RWY 12 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.
11
12
13 Serial Number Fix LDDU RNAV (GNSS) Z RWY12 Proposed tabular description for navigation database coding APPROACH TRANSITION Course Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Flyover descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) NAV SPEC 010 IAF IF ERASO IF IAF IF DU402 PILAP 025 (028.0 T) IF DU402 (118.0 T) Proposed tabular description for navigation database coding FINAL TRANSITION Course Serial Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Fix Flyover Number descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) RNP APCH RNP APCH NAV SPEC 010 IF IF DU FAF DU400 (118.0 T) MAPt RW12 Y (118.1 T) / DU399 Y (118.2 T) 2.1 RNP APCH 060 MAHF DF DU900 R MAHF HM DU900 (005.7 T) 1MIN L Holding above 4000t on ATC clearance only RNAV HOLDING tabular description Waypoint name Path Terminator Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn Speed limit M ( T) NM direction FT FT MAX IAS Magnetic variation NAV SPEC 098 1MIN / PILAP HM R (101.3 T) 3 E 003 1MIN / DU900 HM L 4000 (005.7 T) E Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude ERASO N E PILAP N E RW N E DU N E DU N E DU N E DU N E
14 11 DEC 2014 LDDU AD IAC RNAV (GNSS) Z RWY 12 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.
REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures
REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationAIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016
PHONE : +94-11- 2264203 : +94-11- 2259916 FAX : +94-11- 2259916 AFS E-mail : VCBIYHYX : aishq@airport.lk DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA AERONAUTICAL INFORMATION SERVICES (AIS/HQ) AIRPORT &
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,
DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :
More informationFlight Operations Inspector Manual
1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and
More informationNew generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017
New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationTERPS vs PANS-Ops Procedure Design and Operational Differences
Procedure Design and Operational Differences Monday, March 17, 2014 10:30 a.m. 12:00 p.m. PRESENTED BY: Guy Gribble General Manager, International Flight Resources International Operators Conference Tampa,
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationEASA RNP (AR) Workshop The Landscape Working Together
EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationEUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA
EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in
More informationAIP AD SEYCHELLES 03 APR 14
AIP AD 0.6-1 SEYCHELLES 03 APR 14 AD PART 3 AERODROMES (AD) AD 0.6 TABLE OF CONTENTS TO PART 3 AD 1. AERODROMES/HELCOPTER LANDING AREAS INTRODUCTION Pages AD 1.1 Aerodrome/helicopter landing areas availability
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationEffective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationDevelopment and validation of procedures
Development and validation of procedures 07 10 April 2015 Procedure Design Procedure Design includes ATS Routes (enroute, arrival, departure) and Instrument Approach procedures Design criteria in ICAO
More informationAERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG/5-IP/3 02/11/11 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) FIFTH MEETING Montréal, 7 to 11 November 2011 Agenda Item 9: Other Business Report
More informationValidation & Implementation Considerations Module 14 Activities 11 to 17
Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure
More informationAERODROME CHART ATIS CLNC DEL
EFF 10 NOV 16 AERODROME CHART ATIS 121.0 CLNC DEL 123.95 GND 121.9 275.8 -AD TWR 118.4 236.6 TML 119.2 DECL DISTS 05 23 14 32 TORA 10500 10500 7700 7700 TODA 11189 11189 8684 8684 ASDA 10500 10500 7700
More informationFinal Approach Operations Symposium
Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)
PBNTF ECTL-RAISG/1 - IP/08 29/08/2013 ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG) FIRST MEETING (Paris, France, 11-13 September 2013)
More informationAD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport
AIP FYWE AD 2-1 Republic of Namibia 20 JUL 2017 AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME FYWE - Windhoek (Eros) Airport FYWE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationAREA NAVIGATION RNAV
AREA NAVIGATION RNAV 1. Introduction The ICAO definition of area navigation is: A method of navigation which permits aircraft operation on any desired flight path within the coverage of ground-based or
More informationPractical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE
Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed
More informationPractical Experiences & ATM Workshop. ATM Requirements. Setting the Scene
Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest
More informationGEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia
TEL: FAX: AFTN: E-mail: (+995 32) 274 42 95 (+995 32) 274 42 37 (+995 32) 274 42 23 UGTBYOYX ais@airnav.ge ais@caucasus.net GEORGIA Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION
More informationUDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E
AIP Republic of Armenia AD 2.UDSG-1 ~~~eaip-amdt~~~airac-2016-0321 JUL 2016 UDSG Gyumri UDSG AD 2.1 Aerodrome location indicator and name UDSG Gyumri UDSG AD 2.2 Aerodrome geographical and administrative
More informationAREA NAVIGATION RNAV- MANAGEMENT
1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationLecture Minimum safe flight altitude
Lecture Minimum safe flight altitude Calculate of minimum safe flight altitude, safe flight altitude in approach zone, in circle zone (circle altitude), minimum safe flight altitude in aerodrome area,
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationPHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationLPV implementation to non-instrument runways
LPV implementation to non-instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, June 1 st 2017 Table of Contents 1. The
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation
DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change
More informationCivil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots
Civil Aviation Authority INFORMATION NOTICE Number: IN 2017/034 Issued: 18 August 2017 Implementation of Performance Based Navigation Guidance for Pilots This Information Notice contains information that
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationSKUKUZA OPERATIONAL BRIEFING
SKUKUZA OPERATIONAL BRIEFING To all pilots a) The following notice contains operational procedures when operating into and out of Skukuza airport. b) Please familiarise yourself with the instructions contained
More informationRNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.
RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationGBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit
GBAS ICAO Provisions Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit ICAO EUR GBAS Implementation Workshop Paris 18th March 2010 Applicable ICAO provisions ICAO Global provisions ANNEX 10
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationAdvisory Circular. Required Navigation Performance Approach (RNP APCH)
Advisory Circular Subject: Required Navigation Performance Approach (RNP APCH) Issuing Office: Standards Document No.: AC 700-023 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7550326-V23
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationICAO framework for LPV
ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationEvolving and improving landing networks with EGNOS
Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach
More informationEGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information
EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History
More informationPBN and Procedure Design training
PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training
More informationAIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D
AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY 34 19 SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D BIGRO 6 A Proceed from BIGRO to UJ. Cross GURIN at 2700 m and cross
More informationV3 SPR. Abstract. Document information
V3 SPR Document information Project Title Approach Procedure with Vertical Guidance (APV) Project Number 05.06.03 Project Manager NATS Deliverable Name V3 SPR Deliverable ID D38 Edition 00.01.04 Template
More informationRegulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.
Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03
More informationFLIGHT OPERATIONS PANEL
International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationAirservices Australia 2016
Airservices Australia 2016 Airservices Australia 2016 Airservices Australia 2015 Airservices Australia 2016 Airservices Australia 2016 ATIS (H24) (TWR HR) APP TWR SMC ACD FIA (AH) GOLD COAST, QLD (YBCG)
More informationPBN Implementation inside Italian Airspace Status update Summer 2013
PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions
More informationAircraft Systems and 4D Trajectory Management
Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationFollowing supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD
TEL: 91 11 24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91 11 24615508 E_mail: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICES AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationEffective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@australia.com Effective: AIP SUPPLEMENT (SUP) AIRAC H 04/19 201902271600
More information3. The proposed amendments to Annexes 4, 11, 15 and the PANS-OPS, Volumes I and II are in Attachments B through F, respectively.
I nternationa l C ivil Aviation O rganizatio n Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514)
More informationThink the solution, experience the change
Think the solution, experience the change RNP AR Approach Design Don-Jacques OULD FERHAT, Head of Operations Think the solution, experience the change AGENDA Airbus PBN services subsidiary Implementing
More informationSBAS as a solution for safe approaches in New Zealand and Australia
SBAS as a solution for safe approaches in New Zealand and Australia Ian Andrews President AOPA NZ 18 th Feb 2015 Greg Perris Manager Procedure Design GroupEAD GPS GLONASS GALILEO They all mean the same
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 14 1 INTRODUCTION This guidance material has been prepared for use for the definition of protected surfaces in the vicinity of aerodromes. Survey information for an aerodrome is essential for
More informationAERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
08 JAN 2015 LDSB AD 2-1 08 JAN 2015 AD 2 AERODROMES LDSB AD 2 LDSB AD 2.1 AERODROME LOCATION INDICATOR AND NAME LDSB - AIRFIELD BRAČ / Brač I. LDSB AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
More informationRNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS
RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationPBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation
More informationReport for instrument rating - IR(A) skill test
Report for instrument rating - IR(A) skill test FCL.620 (App. 7 to Part FCL) LF-310 Date 06.07.18 Edition: 4 APPLICANT DETAILS Full name Date of Birth Heimilisfang / Permanent address and postcode Training
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationIntentionally left blank
Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11
More informationFlight Safety Division Case Nr. Page 1 of 11
FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL
More informationE-GNSS systems for GA
E-GNSS systems for GA Workshop voor de general aviation Dufourmont Tim 9 November 2018 LVNL Amsterdam Netherlands GSA in a nutshell What? Gateway to Services Galileo & EGNOS Operations and Service Provision
More informationSPREADING THE USE OF EGNSS
SPREADING THE USE OF EGNSS Jakub Kraus 1 Summary: This article focuses on spreading the use of European satellite navigation systems in aviation. Development of satellite navigation systems and their applications
More informationLPV implementation to non instrument runways
LPV implementation to non instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, November 3 rd 2017 Table of Contents 1.
More informationTitle: PBN Operations and Licensing Requirements - Declaration for AOC Holders
Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationJeppesen NavData and Charts
May 2001 The Harmonization of Information for Pilots on Charts and Avionics By James E. Terpstra Senior Corporate Vice President Flight Information and Technology and Aviation Affairs Jeppesen This paper
More information