1 PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1

2 Presentation Overview UK PBN implementation policy En-route airspace Terminal Airspace Instrument approaches Infrastructure Future technology initiatives Summary 06 October 06 October PBN TF/3 2

3 EUR PBN Strategy Implementation of any RNAV or RNP application shall be in compliance with ICAO PBN Manual (Doc 9613); Recognising that B-RNAV/P-RNAV can be regarded as equivalent to RNAV5/RNAV1, as defined in the ICAO PBN Manual, their use will be continued for en-route and terminal applications at least until 2015; The target date for the completion of implementation for the Approach procedures with vertical guidance (APV) (APV/Baro-VNAV and/or APV/SBAS) for all instrument runway ends is 2016; Replacement of RNAV 5/RNAV 1 (B-RNAV/P-RNAV) specification by RNP specifications (e.g. Basic RNP-1 and Advanced-RNP) for the use in the en-route and terminal airspace to commence by ICAO PBN Manual compliant terms, e.g. RNAV 1 and RNAV 5, shall be implemented for all new aeronautical information publications and as an update to existing publications until NOTE: Although APV/SBAS is currently not referenced in ICAO Doc 9613, in accordance with the General Assembly Resolution (A36-23) it is included in this Strategy as part of APV. 06 October 06 October PBN TF/3 3

4 UK PBN Implementation Policy UK CAA is fully supportive of the ICAO PBN concept State implementation plan under development UK is already a signatory to European Navigation Strategy which captures PBN concepts and specifications Also worth noting that the General Assembly Resolution A36-23 is not a mandate 06 October 06 October PBN TF/3 4

5 UK PBN Implementation Policy In the UK, provision of ATS is separate from policy and regulatory oversight NATS En-Route Ltd (NERL) has a licence to operate services in the en-route and London terminal control CAA can therefore influence PBN implementation for en-route and London terminal airspace through this mechanism Ownership of aerodromes is privatised from the State Therefore it is impracticable to assure implementation of APV at all aerodromes by 2016 Implementation of APV should be considered, not only on the grounds of safety, but also as part of wider business case i.e., operator equipage, access requirements CAA will continue to be proactive in support of APV 06 October 06 October PBN TF/3 5

6 En-Route Airspace Mandate in place for Basic RNAV (RNAV 5) on all ATS routes above FL95 since 1998 Proposed lowering of B-RNAV level to the base of all ATS routes Correction of an anomaly - inside terminal airspace will require B- RNAV above FL95 Legislation (UK Air Navigation Order) being amended to modify equipment carriage rules and better define what performance requirements apply to different airspace Will recognise carriage of GNSS and permit non-carriage of ADF Consultation with industry completed Publication in late October 06 October PBN TF/3 6

7 Terminal Airspace CAA recommends that future designs of SIDs and STARs and Runway Transitions should accommodate Precision RNAV (RNAV 1) and Continuous Descent Approaches (CDA) in accordance with the Government White Paper CAA policy contained in AICs 92/2003 and 125/2006 with AIP GEN Section to be updated Mix of conventional procedures and B-RNAV on STARs i.e., to facilitate connectivity with the en-route Trials of RNAV and latterly P-RNAV, on runway transitions, and SIDs No permanent procedures to date Holds still conventional 06 October 06 October PBN TF/3 7

8 Terminal Airspace Trials Airport Type Date Introduced Comments Luton SID 1992 and 2002 Revised Newcastle Gatwick Heathrow Gatwick Arrivals and Transition RNAV (GNSS) final approach (LNAV/VNAV) Arrivals and transition to ILS Transitions and RNAV (GNSS) final approach 1998 B737, B757 and A US Airways A P-RNAV compliant 2005 P-RNAV compliant Transitions 06 October 06 October PBN TF/3 8

9 Terminal Airspace Trials Airport Type Date Introduced Comments NEMA Transitions to ILS 2006 Shoreham, Exeter, Gloucester, Blackpool, Durham Tees Valley, Inverness RNAV (GNSS) approach 2006 NPA procedures only, targeted at General Aviation Gatwick SID 2007 P-RNAV compliant 06 October 06 October PBN TF/3 9

10 Terminal Airspace Trials Each trial in its own way has provided valuable data to help understand and resolve issues: Procedure design and charting, flyability Aircraft limitations ATC procedures Flight operations (the need for specific training) But trials can only go so far - an artificial environment Ultimately the ANSP has to launch an airspace change 06 October 06 October PBN TF/3 10

11 Terminal Airspace Original plans for large scale RNAV 1 implementation in London TCNorth for Strategic objectives were: Environmental CDA Capacity increase Numerous issues has led to a review of planning for the whole LTMA TCNorth now envisages RNAV 1 SIDs and transitions for Luton and Stansted plus new RNAV holds 06 October 06 October PBN TF/3 11

12 Lessons Learned When introduced as a specification in 2000, P-RNAV was not mandated for terminal airspace A voluntary adoption (remains the case today) Operators did not seek equipment changes and operational approval because P-RNAV procedures were not there ANSPs did not move forward with plans to implement P- RNAV because operators were not approved in sufficient numbers to justify change, and A mixed environment (conventional and P-RNAV procedures) in a congested airspace, was not considered viable Stalemate, until NATS proposed airspace changes to TCNorth 06 October 06 October PBN TF/3 12

13 Lessons Learned With the benefit of hindsight, TCNorth plans were over ambitious Consultation objections not anticipated Simulation revealed controller concerns Pilot concerns with SIDs terminating at a FL with stop at altitude (Standard Operating Procedure compatibility) Aircraft performance limitations Shear complexity of airspace a major stumbling block TCNorth not viable on the scale envisaged Insufficient airspace to account for vertical interaction of departing and arriving aircraft Location of holds too close-in Runway orientation at Stansted makes matters worse Transition altitude seen as too low 06 October 06 October PBN TF/3 13

14 Where RNAV 1 Works Medium density airspace Low complexity airspace i.e., optimum tracks SIDs (under certain conditions as a workload relief) Arrivals and runway transitions where track miles, capacity, throughput not impacted Remaining issues SIDs terminating in a flight level Step climbs and Mode S selected flight level 06 October 06 October PBN TF/3 14

15 Where RNAV 1 Doesn t Work Arrivals, runway transitions and SIDs where due to airspace complexity the track miles are increased In high throughput periods, where a controller using radar vectors is more efficient In less busy periods, where direct routings can be offered 06 October 06 October PBN TF/3 15

16 Future of RNAV 1 There remains a place for RNAV 1 within future implementation plans RNAV 1 alone will not deliver the solution to all of the UK s existing constraints on the use of airspace It has to be considered as one tool amongst a number of other factors affecting capacity, flight efficiency, safety and the environment Note: Systematic implementation of RNAV 1 environment in airspace as densely utilised or as complex as that in the south-east of England, not to be under-estimated 06 October 06 October PBN TF/3 16

17 ATM Model Capacity, Safety, Flight Efficiency, Environment Infrastructure Flight Crew Procedures ATC Procedures Aircraft Capability Airspace Tools e.g., AMAN Airspace Structure Navigation Specification e.g., RNAV 1 06 October 06 October PBN TF/3 17

18 APV in the UK APV Baro VNAV already implemented at LHR and LGW Text populated in AIP GEN 1.5, Paragraph 4 RNAV(GNSS) Instrument Approach Procedures APV SBAS not available until 2010 (awaiting certification and commissioning of EGNOS across ECAC 06 October 06 October PBN TF/3 18

19 RNAV Instrument Approaches Elsewhere in the UK APV Baro proposals for Manchester and Belfast RNAV (GNSS) NPAs at Shoreham, Lydd, Gloucester Exeter, Blackpool, Durham Tees Valley approvals all pending Possible interest in APV SBAS at Southampton, Shoreham and trial at Alderney (Channel Islands) 06 October 06 October PBN TF/3 19

20 RNAV Instrument Approaches Elsewhere in the UK UK will likely struggle to meet the ICAO General Assembly Resolution for APV at all (public transport) runway ends, by 2016 Criteria is available But no incentive for operators Therefore, no pressure on airport operators Consultation concerns IFP outsourcing and who pays? CAA and NATS launching an APV Implementation Initiative to better make the business case to the aerodrome operators 06 October 06 October PBN TF/3 20

21 RNP Authorisation Required (RNP AR) NATS researching application of AR in a concept of environmentally optimised arrivals and approaches in simultaneous operations on (parallel) runway scenario UK carriers seeking US Ops Spec approval for Public SAAAR in the U.S. 06 October 06 October PBN TF/3 21

22 Infrastructure With previously mentioned ANO changes, NERL plans to rationalise numbers of conventional navigation aids Withdraw en-route NDBs and reduce numbers of VOR Implications of navaid removal Dependent terminal airspace procedures Consultation Impact on low end users 06 October 06 October PBN TF/3 22

23 Future Technology Initiatives Possible use of RNAV 1 in the en-route with benefits through reduced route spacing APV SBAS Will provide access to GA and we could have the situation that smaller airfields are better served than regional aerodromes used by public air transport Could be a bow wave of applications in October 06 October PBN TF/3 23

24 Summary CAA commitment to PBN and development of a State Implementation Plan CAA will facilitate PBN implementation and provide policy and regulatory oversight RNAV 1 implementation likely to be piece-meal and only where absolutely necessary i.e., due to infrastructure changes UK experience so far is that RNAV 1 will not work (easily) in complex terminal airspace structures e.g., LTMA But valuable lessons learned on implementing RNAV in the UK NERL conducting another LTMA review 06 October 06 October PBN TF/3 24

25 Summary APV being promoted in-line with ICAO implementation goals Commitment and active involvement required from all stakeholders APV implementation will come eventually, but not in-line with the ICAO 2016 date Technology will likely be the catalyst for future change UK developments tied to SESAR and European ATM Master Plan Until then, unlikely to make any significant short term gains on capacity, efficiency and environmental benefits Costs and consultation still the issues CAA, NATS, DfT and MoD cooperating on a Future Airspace Strategy (FAS) with a roadmap to take UK towards SESAR 06 October 06 October PBN TF/3 25

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

APV Implementation in the UK Initiative

APV Implementation in the UK Initiative APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Future Airspace Strategy Deployment CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Status: Published Version Owner: Phil Roberts

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study. Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Airports Commission s Senior Delivery Group - Technical Report Number 01

Airports Commission s Senior Delivery Group - Technical Report Number 01 Airports Commission s Senior Delivery Group - Technical Report Number 01 Implementation of Performance-Based Navigation in the UK Summary The UK Future Airspace Strategy (FAS) is a programme designed to

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources,

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 EGNOS based Operations Implementation Status and Plans for 2016 EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 Table of Contents Drivers for APV Implementation LPV Implementations:

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

AIRSPACE. Aviation Consultancy at its best.  Specialist aviation support to help solve problems for airports and airport developers AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

ATC PROCEDURES WORKING GROUP. Transition Level

ATC PROCEDURES WORKING GROUP. Transition Level SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining

More information

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Draft PBN Implementation Plan Papua New Guinea

Draft PBN Implementation Plan Papua New Guinea Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN

More information

SRC POSITION PAPER. Edition March 2011 Released Issue

SRC POSITION PAPER. Edition March 2011 Released Issue E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics Paul Willis Managing Director, Aviation Solutions Overview Some of the Challenges Future Technology Capacity

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest

More information

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation Airspace Structure Changes and ATC Operational Procedure Changes Stuart Lindsey Airspace Regulation July 2015 Notified Airspace Structure Airspace Change Process Airspace Charter (CAP 724) provides

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet NNF Work-shop on Navigation, Safety and Technology Dato: 2. February 2016 Gunn Marit Hernes Luftfartstilsynet Scope Present an overview of the main regulatory activities currently undertaken by EASA in

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

Patrizio Vanni (Project Coordinator)

Patrizio Vanni (Project Coordinator) H2020 project funded by Patrizio Vanni (Project Coordinator) EGNOS Annual Workshop Athens, 3 October 2017 This project has received funding from the European GNSS Agency under the European Union s Horizon

More information

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap SOUTH AFRICA Performance Based Navigation (PBN) Roadmap ATS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 21 05 03 2012 ENDORSEMENTS In 2007 at the 36th International Civil Aviation Organization (ICAO)

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

Policy for the Application of Performance Based Navigation in UK/Irish Airspace Intentionally Blank

Policy for the Application of Performance Based Navigation in UK/Irish Airspace Intentionally Blank Intentionally Blank Page ii Policy for the Application of Performance-based Navigation in UK/Irish Airspace Dated: 11 October 2011 Irish Aviation Authority Civil Aviation Authority The Times Building CAA

More information

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH B.1 Introduction The general objective of the SES PBN IR as described in the EC mandate to EUROCONTROL is to

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information