1 UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1

2 Current Implementation of PBN in UK Airspace 2

3 Current Status En-route From 7 April 2011, RNAV 5 (B-RNAV) became applicable on all UK ATS routes at all levels/altitudes in controlled airspace as promulgated in the UK AIP 3

4 Current Status Terminal Airspace Still no RNAV 1 (P-RNAV) SIDs or STARs implemented, although STARs are largely covered by the extension of the RNAV 5 mandate Gatwick RNAV 1 SIDs imminent (transposing trials to permanent procedures) NATS London Airspace Management Programme (LAMP) and Northern Terminal Control Area (NTCA) Projects Newcastle, Luton, Birmingham, Southend, Leeds Bradford, Farnborough RNAV 1 procedures 4

5 Trial of RNP 1 Departures with Radius to Fix (RF) Establishing RNP 1 with Radius to Fix (RF) Departure trials at London Stansted RWY 04 DVR and RWY 22 CLN Trial commencement Q

6 SID/NPR Task Force A number of recommendations related to the implementation of PBN SID Procedures with intent to promulgate guidance to key industry stakeholders Recommendations focused on replication of conventional SIDs Define PBN SID replication as The design of an RNAV or RNP procedure that follows the path over the ground of the nominal centreline for the existing conventional procedure as closely as possible Make the distinction between this and an overlay 6

7 SID/NPR Task Force Also considering the replication of a conventional procedure, using an optimised form of the coding used in overlays and applying customised IFP design criteria (which might not be PANS-OPS compliant but still provides an obstacle-safe departure) is a valid national standard in UK airspace where a PANS-OPS compliant replication causes negative environmental impact (Note: this method is still under development) Where replication can be shown, then environmental consultation satisfied through established consultative committees / forums where they are representative of communities living under the replicated procedure; where this is not the case additional representation should be incorporated 23 January 2013 ICAO-EUR PBN TF/8 7

8 Process for Implementation of PBN SID Procedures 8

9 Noise Preferential Routes (NPRs) NPR work resulted in identification of a number of future options: Do nothing leave NPRs as they are Moveable NPRs Fixed NPRs Pros and Cons for each option Next step Industry group (CAA, NATS, Airports) to engage with Government Department to determine next steps 9

10 RNAV Route Spacing and Holding Policy Terminal Airspace Route Spacing: Key to LAMP and NTCA development Link to European Airspace Concept Handbook and existing Collision Risk studies Apply Route Spacing Analysis Methodology as developed by NATS in TC North with RTS validation (5 NM parallel route spacing as target) RNAV Holding Policy Ensure that the RNAV hold and STAR is at least as safe as the current conventional procedures Hold separation standards Hold to adjacent hold Hold to route or edge of Controlled Airspace 10

11 Current Status RNP APCH implementation High levels of interest to implement RNAV (GNSS) Approaches Profile raised by EC 7 th Framework Funding call for LPV implementation (ACCEPTA Phase II) 12 aerodromes successful in UK All will include LNAV Reversion CAA encouraging inclusion of LNAV/VNAV Minima on charts where beneficial Runway ends LNAV Runway ends LNAV/VNAV Runway ends LPV In Service In Design 2013/ January 2013 ICAO-EUR PBN TF/8 11

12 A37-11 Metric A high number of ILS at runways in the UK ICAO Assembly Resolution calls for APV (LNAV/VNAV or LPV) at all instrument runway ends by 2016 But is this the right metric? The primary objective is one of access for all and safety i.e., providing a stabilised 3D approach path to the runway xls (ILS, MLS or GLS) satisfies this requirement, so why not include it in the metric? It is also consistent with the recent ICAO approach classification changes where we now talk about 3D operations and not APV Note: Resilience is highlighted in the resolution as an issue, but is more of a business continuity consideration 23 January 2013 ICAO-EUR PBN TF/8 12

13 Current Situation (Jan 2013 AIRAC) Total Percent Runway Ends 122 ILS Runways LNAV/VNAV LPV APV ILS or APV January 2013 ICAO-EUR PBN TF/8 13

14 Planned Situation (end 2014) Total Percent Runway Ends 131 (122 Instrument and 9 non-instrument) ILS Runways LNAV/VNAV LPV APV ILS or APV Runways without ILS or Planned APV (19) at more remote locations with little public transport movements or rarely used i.e., cross-runway etc. 23 January 2013 ICAO-EUR PBN TF/8 14

15 LPV Flight Procedure Validation Have seen recently that the cost of LPV flight procedure validation is a potential deterrent to implementation of LPV procedures A development navigation data base costs: $5000 for the build incorporating the flight procedure in the data base $1500 per runway end $500 per host configuration i.e., copies of build for different equipment Cost is difficult to justify to a private aerodrome where the customer base is GA and little chance of cost recovery CAA/NATS trying to coordinate flight validation exercise so that aerodromes share the costs and incorporate as many LPV procedures as possible in a given development navigation data base build 23 January 2013 ICAO-EUR PBN TF/8 15

16 CAA Policy Regarding Instrument Approach Procedures To Aerodromes Without an Instrument Runway and/or Approach Control Development of Policy and Guidance (CAP) Consultation in Spring of 2013 Publication by mid

17 Navaid Rationalisation NATS programme to right-size the UK conventional navigation infrastructure compatible with a PBN environment Consistent with changes to require RNAV 5 on all UK ATS routes since April 2011 and AIC Yellow 107/2011 allowing Routes and Procedures to be flown with an equivalent to ADF Removal of 8 en-route NDBs by 2018 Reduction of en-route VORs from 46 to 19 by 2018 VOR dependencies: Terminal airspace conventional procedures e.g., SIDs Instrument Approach procedures Use for training (civil and military) Means of procedural separation Mitigation against controlled airspace infringements Fragmented ownership of airports/procedures 17

18 Proposed Rationalised VOR Network and Coverage 18

19 Future Implementation of PBN in UK Airspace 19

20 The Implementation Decision Making Process Options for an airspace change: Servicing those equipped and capable Wait for natural equipage rate Airspace Notification at least we know where we are Driven by the ANSP Consulted upon with: Airspace users and airports Consideration for the environmental impact 20

21 Regulatory Enablers UK Air Navigation Order Articles 124/125 Area navigation and required navigation performance capabilities Aircraft registered in the UK (124) Aircraft registered elsewhere than the UK (125) Policy for the Application of PBN in UK/Irish Airspace AIC (Y) 023/ Application of PBN in UK Airspace 21

22 What on-the-ground events are telling us: It was anticipated that the combination of primary legislation, policy and guidance would be sufficient to encourage PBN implementation The case for requiring RNAV 1 for LAMP airspace in 2015 is unlikely to be an issue; high fleet compliance; strong benefits case Impact Assessment still required 22

23 What on-the-ground events are telling us: Natural adoption is not driving PBN implementation across rest of the UK: Mixed equipage levels and uncertainty around fleet investment plans make it difficult to re-design the airspace for maximum benefit Dependency on LAMP and NTCA Need to maintain conventional procedures for a period of time can result in additional cost, complexity, workload and safety risks that are a barriers to change Early adoption is deterred by last mover incentives Airports generally supportive & progressive not all aircraft operators are the same 23

24 What on-the-ground events are telling us: Focus group meetings indicate some operators are reluctant to become PBN compliant unless mandates are in place across Users, Airports and ANSPs Feedback from UK Industry Coordination Group (FASIIG) Mandate needs stronger consideration Regulatory intervention required 24

25 Options for Coordinating PBN Implementation 1. Do Nothing (Natural Adoption) 2. Full UK wide Mandate for PBN in Terminal / Airport Environment 3. Locally Supported Mandate CAA Board Approval (November 2012) 25

26 Why Option 3? Build on local knowledge and requirements and provides support where needed Ensures consistency with the national PBN policy Would still require evidence of equipage levels and navigation performance capabilities through an impact assessment together with benefits derived Standard template to be made available to ANSPs and airports Proposal for a mandate considered on basis of impact assessment Scalable to a TMA or an airport No change to legislation required The most viable Option 26

27 Issues Mandate needs to be on all parties Alignment of investment and upgrade plans Need to have greater national co-ordination Accommodating non-equipped aircraft Capturing the operators will be critical to the success of the mandate and therefore the impact assessment is key Provision of conventional arrival/departure alternatives as a time-limited option, or with non-preferential routes/timings Consider State Aircraft and General Aviation/Business Aviation 27

28 Costs / Benefits and Risks The benefits are there LAMP development estimated at 70M to 90M 5% reduction in fuel burn ( 50M p.a.) Non-delivery of UK Future Airspace Strategy (FAS) is the biggest risk Could stall other FAS deployments A national PBN roadmap is designed to ensure that developments fit within a co-ordinated and sequenced plan and minimises risks Other risks include costs of operator equipage (and certification) and ANSP/airport infrastructure Option 3 helps mitigate costs by requiring a local impact assessment Risk of CAA adopting a mandate process Plan to consult on proposals May only be until European mandate comes into effect (circa 2020?) 28

29 In Summary Despite delivering a set of regulatory enablers in line with the FAS it is highly unlikely that PBN implementation will take place in the absence of some form of mandate Schiphol RNAV 1 Mandate in November 2012, a good example of how to encourage operators to seek approval PBN is a key FAS enabler Stalemate a real risk without regulatory intervention Will require close co-operation and co-ordination and greater interaction on the ground with operators/ansps and airports 29

30 Other Actions Development of an Impact Assessment template to assist ANSPs and Airports better understand and present the arguments for a mandate Outside of the Airspace Change process but key to establishing the cost / benefit case PBN Communication Plan PBN Co-ordination Plan 30

31 Impact Assessment Template Note: Points A and B are merely start /end points for the process and the ongoing review. 31

32 Questions? Point of contact: 32

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

APV Implementation in the UK Initiative

APV Implementation in the UK Initiative APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

Airports Commission s Senior Delivery Group - Technical Report Number 01

Airports Commission s Senior Delivery Group - Technical Report Number 01 Airports Commission s Senior Delivery Group - Technical Report Number 01 Implementation of Performance-Based Navigation in the UK Summary The UK Future Airspace Strategy (FAS) is a programme designed to

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Future Airspace Strategy Deployment CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Status: Published Version Owner: Phil Roberts

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

AIRSPACE. Aviation Consultancy at its best.  Specialist aviation support to help solve problems for airports and airport developers AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

DVOR Rationalisation and NDB Withdrawal. NATS Update SAM, OCK, LON. NATMAC 83 1 st June NATS Project Manager NATS Airspace Change Specialist

DVOR Rationalisation and NDB Withdrawal. NATS Update SAM, OCK, LON. NATMAC 83 1 st June NATS Project Manager NATS Airspace Change Specialist DVOR Rationalisation and NDB Withdrawal NATS Update SAM, OCK, LON NATMAC 83 1 st June 2018 NATS Project Manager NATS Airspace Change Specialist Brief history NATMAC consultation (CAA, August 2009) Reduce

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD ÁFRICA DE FRANCISCO VALERA SUMMARY Summary: Ineco company. Flight procedure design team. Flight procedure

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

PBN Implementation inside Italian Airspace

PBN Implementation inside Italian Airspace PBN Implementation inside Italian Airspace Leonardo NICOLO Airspace and Procedures Design Department TMA, CTR & Airports Unit Responsible Brussels, March, 12-14 2014 0 CONTENTS PBN Implementation Path

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Validation & Implementation Considerations Module 14 Activities 11 to 17

Validation & Implementation Considerations Module 14 Activities 11 to 17 Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in

More information

NATA 2018 AGM & CONFERENCE

NATA 2018 AGM & CONFERENCE NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization

More information

Development of the Safety Case for LPV at Monastir

Development of the Safety Case for LPV at Monastir Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final

More information

PBN Implementation inside Italian Airspace Status update Summer 2013

PBN Implementation inside Italian Airspace Status update Summer 2013 PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

Performance Based Navigation Literature Review

Performance Based Navigation Literature Review Performance Based Navigation Literature Review HCNF March 2018 Glen Smith Overview Introduction and Objective of the study Overview of documents that formed the study Summary of key themes and areas derived

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

Policy for the Application of Performance Based Navigation in UK/Irish Airspace Intentionally Blank

Policy for the Application of Performance Based Navigation in UK/Irish Airspace Intentionally Blank Intentionally Blank Page ii Policy for the Application of Performance-based Navigation in UK/Irish Airspace Dated: 11 October 2011 Irish Aviation Authority Civil Aviation Authority The Times Building CAA

More information

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

PBN Operational Approval The Process. ICAO PBN Operational Approval Course PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based

More information

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources,

More information

Final Approach Operations Symposium

Final Approach Operations Symposium Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH B.1 Introduction The general objective of the SES PBN IR as described in the EC mandate to EUROCONTROL is to

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

Future Airspace Strategy Deployment Plan

Future Airspace Strategy Deployment Plan Iteration Three, Version 1.2 Future Airspace Strategy Deployment Plan Level one Modernising airspace across the UK and UK and Ireland FAB 02 The Aviation Sector is a critical part of the UK's and Ireland

More information

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore Performance Based Navigation Implementation Plan SINGAPORE December 2016 Published by Civil Aviation Authority of Singapore i TABLE OF CONTENTS Summary of Amendments... iii Executive Summary... 1 Glossary

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18

Safety and Airspace Regulation group SARG 1C Doc Type: Annex C Version: 1/2012 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title: Airspace Change Proposal Operational Assessment Page 1 of 18 Title of Airspace Change Proposal Change Sponsor Lands End Airport Introduction of Area Navigation Global Navigation Satellite System