DSNA NAVIGATION STRATEGY

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "DSNA NAVIGATION STRATEGY"

Transcription

1 DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie

2 PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity, Reduction of Environmental impact ICAO ASBUs European environment SESAR FABEC EASA Airspace users consultation PBN National implementation plan Open PBN forum with airspace users and industry Aim to be a PBN European leader 2

3 PBN OPERATIONS IN FRANCE IN 2015 PBN Type NavSpec RNAV RNP Name NavSpec RNAV5 RNAV1 RNP APCH RNP AR APCH Flight Phase En-route Terminal NPA Approach APV Approach Approach with authorisation Type of trajectory Airways SID STAR INA RNAV (GNSS) (under study) Minima Designation LNAV (NPA) LNAV/VNAV (APV baro) LPV (APV sbas)

4 CHARTING PBN FOR APPROACHES Very flexible ICAO concept, down to Cat I Differently equipped users managed by ATC on the same path/chart Easy to manage for ANSP publication GPS + SBAS minima GPS +BaroVNAV minima GPS + RAIM minima

5 AIM OF PBN FOR APPROACHES PBN target for primary runways: Best quality backup to ILS (outages, maintenance, renewal,etc ) DSNA has launched two important programs on major airports: replacement of 8 ILS publication of GNSS + VOR approaches only kept as backup + RNP AR (under study); NICE will become PBN only during 80% of time PBN target for secondary runways: More direct paths, increased safety (vertical guidance in final), increased airport accessibility vs. conventional navaids PBN target for about 50 small/medium airports: Cut DSNA landing infrastructure costs (ILS Cat I) by transitioning to PBN EGNOS supports CAT I performance alternatively to ILS (LPV 250 ft today, LPV 200 ft by Q4 2015) 5 M economized each year, supports the French Landing Tax (RSTCA) reduction program announced by DGAC in 2014

6 PBN APPROACHES STATUS Approx. 200 runway ends included in France PBN plan PBN LNAV since 2004, LPV since 2011, LNAV/VNAV since 2012 Military airports also equipped now with LNAV & LPV 120% 100% 80% 60% 40% 20% 0% Cible Réalisé ICAO PBN RNP APCH A37 11 target Yearly achieved rate 6

7 PUBLISHED PBN PROCEDURES Status Jan 2015: 141 RWY with PBN 139 LNAV 87 EGNOS LPV 34 LNAV/VNAV

8 ILS CAT I rationalisation plan Red: 2016 Airports with ILS reduced network maintained by DSNA Blue: Airports where the existing ILS Cat I is proposed to be replaced by a PBN approach EGNOS supports ILS Cat I equivalent performance and reduces DSNA infrastructure costs by 5 M /year

9 PBN OPERATIONAL LESSONS LEARNED, SINCE 2004 LNAV and LNAV/VNAV today supports a majority of users, but still suffers from some limitations: Safety issues with ICAO PANS OPS LNAV/VNAV criteria, resolved now with the new published criteria, but has delayed up to now LNAV/VNAV Higher minima due to less performing lateral and vertical guidance Issue of «RAIM holes» when PBN is the sole approach Daily LNAV and LNAV/VNAV un availabilities may exist, depending upon the avionics, Dispatch operational penalties will impact users (typically half of AF A320 fleet) within & programs Air France asks for getting away of RAIM holes issues in the future Lower safety level lack of vertical guidance for LNAV, QNH mis setting events from the ground or airborne side have been reported for LNAV/VNAV. Air France asks for getting away of QNH issues in the future EGNOS LPV are high performance/safety approaches, and highly appreciated by equipped users, even wrt ILS Cat I

10 PBN AVIONICS FORECASTS Major European aircraft & avionics manufacturers participate to DSNA PBN implementation WG: Airbus, Airbus Helicopters ATR Dassault Aviation Thales Avionics, Rockwell Collins Positive feedback and interest expressed from all to continue LPV implementation over product lines. Concerning Airbus: Airbus A350 has sold the SBAS/GBAS option to most customers Airbus A SBAS LPV solution certified through Beluga LPV program Airbus now evaluating an SBAS retrofit solution for A320 Future multiconstellation GNSS avionics will include SBAS as a basic function DSNA understanding from manufacturers feedback is that it is worth continuing investing in SBAS (EGNOS) procedures deployment, while of course continuing supporting other equipped users. 10

11 PRECISION GNSS APPROACHES DSNA preferred solution for GNSS CAT I is PBN (with SBAS) SBAS is free, and has no airport infrastructure costs DSNA supports a GBAS Cat I station at Toulouse Blagnac, but no user request/plans for further GBAS Cat I deployment Very limited GBAS Cat I deployment also observed/planned in other European countries DSNA supports R&D for CAT II/III GBAS SESAR station deployed at Toulouse Blagnac ICAO SARPs planned by this year But still technical isues to solve to achieve CAT II/III Ionospheric monitoring, Monitors Vulnerability to Interf, Field Strength Runway Coverage, And also operational concerns to resolve How to give operational benefits to airports and users? Main aim is to increase airport capability in Low Visibility Procedures conditions This will be explored within a DSNA CDG 2025 program (not yet launched) 11

12 SBAS OR GPS RAIM FOR ADS B? A study conducted by DSNA has shown the benefits of SBAS vs. GPS/RAIM to support future US and EU ADS B mandates: ADS B availability with SBAS is 100% Meeting a performance comparable with radar availability requirements (99,9%) ADS B availability with GPS RAIM is within 88% to 98%, depending on GPS constellation satellite status Unsufficient performance with respect to radar availability requirements (99,9 %) Expected to create ATC management issues of ADS B disruptions Operational restrictions for users (potential fligh delay) 12

13 SYNTHESIS OF NAVIGATION AND SURVEILLANCE BENEFITS VS. GNSS TECHNOLOGY Oceanic and Remote areas Approach and Landing Surveillance (> 99,9 % Availability) Accuracy Containment (95%) (10 7) NACp 5 NIC 4 10 Nm RNAV 10 NACp 5 NIC 4 4 Nm RNP 4 NACp 7/8 NIC 6/7 5 Nm En Route RNAV 5 NACp 7/8 NIC 6/7 1 Nm RNP 1 1 Nm Terminal NACp 7/8 NIC 5/7 RNAV 1 RNP 1 NACp 7/8 NIC 5/7 0,3 Nm LNAV NACp 7/8 NIC 6/7 0,1 0,3 Nm RNP AR NACp 7/8 NIC 5/7 16 m/ 4m LPV 250 NACp 7/8 NIC 5/7 16 m/4 m LPV 200 TBD TBD TBD Cat I/II Autoland Navigation (> 99,0 % Availability) Accuracy Containment (95%) (10 7) 20 Nm 8 Nm 10 Nm 2 Nm 2 Nm 0,6 Nm 0,1 0,3 Nm 40 m/50 m 40 m/35 m TBD Positioning sensor Dual Freq SBAS Single Freq SBAS GPS 13

14 SUMMARY OF DSNA VIEWS DSNA implements PBN according to user needs, and also in view to reduce its costs DSNA is committed to serve at best all airspace users,taking account of the diversity of their avionics SBAS/EGNOS is seen as a free of charge, performing, mature and here to stay technology, supporting navigation and surveillance performance requirements GBAS Cat I ground stations deployment potential seems limited due to ground infrastructure costs GBAS Cat III has potential, but needs resolution of technical and operational challenges, to deliver significant benefits 14

15 Thank you for your attention Any question? Ministère de l'écologie, du Développement durable, et de l Énergie

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

GBAS implementation status: international context and situation in France

GBAS implementation status: international context and situation in France Workshop PBN-GNSS Lima August, 2016 GBAS implementation status: international context and situation in France Prepared by Pierre Ladoux DSNA/DTI/CNS/NAV Direction générale de l Aviation civile Ministère

More information

GBAS implementation status: international context and situation in France

GBAS implementation status: international context and situation in France ICAO ACAC Workshop Rabat, 7 9 November 2017 GBAS implementation status: international context and situation in France Pierre Ladoux DSNA/DTI/CNS/NAV Benoit Roturier DSNA/DP Direction générale de l Aviation

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

SBAS as a solution for safe approaches in New Zealand and Australia

SBAS as a solution for safe approaches in New Zealand and Australia SBAS as a solution for safe approaches in New Zealand and Australia Ian Andrews President AOPA NZ 18 th Feb 2015 Greg Perris Manager Procedure Design GroupEAD GPS GLONASS GALILEO They all mean the same

More information

SBAS-ASECNA Programme Status

SBAS-ASECNA Programme Status EGNOS Annual Workshop, 34 Oct. 2017, Athens, SBAS-ASECNA Programme Status 1/15 SBAS-ASECNA Programme Status EGNOS Annual Workshop SBAS in the world agenda item 3-4 October 2017 Athens, Greece EGNOS Annual

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 Overview > Your presenter > easyjet > Opportunities > Benefits Examples > Training > Operations > Summary Who am I? > Not a pilot! > easyjet

More information

Septentrio EGNOS An overview

Septentrio EGNOS An overview Septentrio EGNOS An overview Dirk Werquin Program Manager Aerospace & Defence, Septentrio Information on EGNOS in this presentation is using elements from documents from ESSP and/or GSA. 1 Septentrio Group

More information

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation V. Korchagin PBN implementation plan for the Russian airspace and its first results PBN TF/8 meeting, Paris

More information

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002 Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety

More information

Avionics requirements for State aircraft

Avionics requirements for State aircraft Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although

More information

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY An Overarching Perspective Edition 24 October 2017 OBJECTIVE This Information Paper presents ATM planners and military

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

Performance-Based Navigation Implementation Roadmap

Performance-Based Navigation Implementation Roadmap CAAC CHINA CIVIL AVIATION Performance-Based Navigation Implementation Roadmap 中国民用航空局 Civil Aviation Administration of China Version 1.0 OCTOBER 2009 CHINA CIVIL AVIATION Performance-Based Navigation

More information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In

More information

Towards the Future ATM

Towards the Future ATM Presented by Paul-Franck BIJOU, CEO of Quo Vadis, the PBN company by Airbus Towards the Future ATM ATC Guild Seminar New Delhi, Oct 20-21, 2010 Every 3 seconds in the world an Airbus aircraft takes off

More information

Patrizio Vanni (Project Coordinator)

Patrizio Vanni (Project Coordinator) H2020 project funded by Patrizio Vanni (Project Coordinator) EGNOS Annual Workshop Athens, 3 October 2017 This project has received funding from the European GNSS Agency under the European Union s Horizon

More information

EGNOS History, Status and Plans

EGNOS History, Status and Plans EGNOS History, Status and Plans Reinhard Blasi Market Development Officer European GNSS Agency, GSA March 2015 Navigation solutions powered by Europe EGNOS Services European Commission commitment to ICAO

More information

Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports

Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports ICAO Final Approach Symposium 1 st February 217 Dr Jean-Philippe Ramu NetJets Europe pilot & SESAR Technical Manager

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH B.1 Introduction The general objective of the SES PBN IR as described in the EC mandate to EUROCONTROL is to

More information

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION. CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /

More information

Flight Safety Division Case Nr. Page 1 of 11

Flight Safety Division Case Nr. Page 1 of 11 FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures National Airspace System Performance Workshop Near Term Potential for System Capacity Gains from RNP and RNAV Procedures By Bill Dunlay Leigh Fisher Associates 1 Purpose and Agenda Briefly describe features

More information

Aviation ISSUE 5. Excerpt from the GNSS MARKET REPORT, ISSUE 5 (2017 ) EDITOR S SPECIAL DRONES

Aviation ISSUE 5. Excerpt from the GNSS MARKET REPORT, ISSUE 5 (2017 ) EDITOR S SPECIAL DRONES Aviation EDITOR S SPECIAL DRONES ISSUE 5 Excerpt from the GNSS MARKET REPORT, ISSUE 5 (217 ) 42 Aviation GNSS applications Regulated applications in Aviation use certified equipment to achieve safe and

More information

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR UNTED NATIONS INTERNATIONAL MEETING ON THE APPLICATIONS OF GLOBAL NAVIGATION SATELLITE SYSTEMS Vienna, Austria 12 16 December 2011 GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR Presented by:

More information

Colombian PBN implementation: El Dorado case study

Colombian PBN implementation: El Dorado case study Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical

More information

ART Workshop Airport Capacity

ART Workshop Airport Capacity ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for

More information

PBN Implementation Plan Italy. Version 1

PBN Implementation Plan Italy. Version 1 PBN Implementation Plan Italy Version 1 1 Document appl'oval The PBN Implementation pian has been prepared by Ente Nazionale per l'aviazione Civile (ENAC) and Ilalian ANSP (ENAV) in accordance with ICAO

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS)

Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS) Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS) Emily Q. Calle S.V. Massimini, DSc H. Leslie Crane Frederick A. Niles 21 May 2003 The contents of this material reflect

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Aviation System Block Upgrades

Aviation System Block Upgrades WORKING DOCUMENT FOR THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION ISSUED: 16 NOVEMBER 2011 SUCCESSOR TO THE WORKING DOCUMENT FOR GLOBAL AIR NAVIGATION INDUSTRY SYMPOSIUM (GANIS)

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 GLS Product Offerings Overview Airborne Architecture Product Offerings By Market Air Transport (AT) Business, Regional (BR)

More information

APV Implementation in the UK Initiative

APV Implementation in the UK Initiative APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore Performance Based Navigation Implementation Plan SINGAPORE December 2016 Published by Civil Aviation Authority of Singapore i TABLE OF CONTENTS Summary of Amendments... iii Executive Summary... 1 Glossary

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation Aircraft Operators for LPV The following document provides a set of generic guidelines for Air Navigation Service Providers (ANSPs), Airport Operators and Aircraft Operators within the European Civil Aviation

More information

Terms of Reference for a rulemaking task. Revision of operational approval criteria for performance-based navigation

Terms of Reference for a rulemaking task. Revision of operational approval criteria for performance-based navigation European Aviation Safety Agency Rulemaking Directorate Terms of Reference for a rulemaking task Revision of operational approval criteria for performance-based navigation RMT.0256 & RMT.0257 (MDM.062(a)&(b))

More information

Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018

Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018 Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018 Alan Khalili, CFO - Aireon Aircraft Builders Conference September 22, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED.

More information

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots Civil Aviation Authority INFORMATION NOTICE Number: IN 2017/034 Issued: 18 August 2017 Implementation of Performance Based Navigation Guidance for Pilots This Information Notice contains information that

More information

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011) ESSP EGNOS Service Provider ICAO APV Workshop ESSP Introduction AENA DFS DGAC ENAV NATS SKYGUIDE NAV European Satellite Services Provider ESSP Creation ESSP EEIG founded in 2001 Mission: Operation of EGNOS

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management

More information

Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project

Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project Page 1 of 34 Executive Summary This document presents a business case for the introduction of an APV SBAS (LPV)

More information

RNAV Approach Benefits Analysis - Final Report

RNAV Approach Benefits Analysis - Final Report RNAV Approach Benefits Analysis - Final Report 29 Hercules Way Aerospace Boulevard AeroPark Farnborough Hampshire GU14 6UU UK T +44 1252 451 651 F +44 1252 451 652 E info@askhelios.com W www.askhelios.com

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Flight Inspection Services

Flight Inspection Services Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of

More information

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by

More information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study. Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

Think the solution, experience the change

Think the solution, experience the change Think the solution, experience the change RNP AR Approach Design Don-Jacques OULD FERHAT, Head of Operations Think the solution, experience the change AGENDA Airbus PBN services subsidiary Implementing

More information

Intentionally left blank

Intentionally left blank Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11

More information

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

PBN Operational Approval The Process. ICAO PBN Operational Approval Course PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

LPV implementation to non instrument runways

LPV implementation to non instrument runways LPV implementation to non instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, November 3 rd 2017 Table of Contents 1.

More information

Modern Navigation. [Approaches]

Modern Navigation. [Approaches] Modern Navigation. [Approaches] Page Intentionally blank 1 Index Preface... 3 Satellite Navigation Systems... 4 GNSS (Global Navigation Satellite System)... 4 Supplementary systems... 5 ABAS (Aircraft-Based

More information

AUTONOMOUS TAKE-OFF AND LANDING FOR UNMANNED AIRCRAFT SYSTEM: RISK AND SAFETY ANALYSIS

AUTONOMOUS TAKE-OFF AND LANDING FOR UNMANNED AIRCRAFT SYSTEM: RISK AND SAFETY ANALYSIS AUTONOMOUS TAKE-OFF AND LANDING FOR UNMANNED AIRCRAFT SYSTEM: RISK AND SAFETY ANALYSIS Sergio Chiesa*, Sara Cresto Aleina*, Giovanni Antonio Di Meo*, Roberta Fusaro*, Nicole Viola* *Politecnico di Torino

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013 GNSS NOTAM Aline Troadec RNAV approach specialist EUROCONTROL AI Operations-9 27-28 November 2013 The European Organisation for the Safety of Air Navigation Table of content 3 topics on which AI expertise

More information

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015 Space Based ADS-B Transforming the Way you See the Sky September 23, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED. 2014 AIREON LLC. ALL RIGHTS RESERVED. 1 For optimal operational ATM Performance

More information

For ordering information and for a complete listing of sales agents and booksellers, please go to the ICAO website at

For ordering information and for a complete listing of sales agents and booksellers, please go to the ICAO website at Published in separate English, Arabic, Chinese, French, Russian and Spanish editions by the INTERNATIONAL CIVIL AVIATION ORGANIZATION 999 University Street, Montréal, Quebec, Canada H3C 5H7 For ordering

More information

For ordering information and for a complete listing of sales agents and booksellers, please go to the ICAO website at

For ordering information and for a complete listing of sales agents and booksellers, please go to the ICAO website at Published in separate English, Arabic, Chinese, French, Russian and Spanish editions by the INTERNATIONAL CIVIL AVIATION ORGANIZATION 999 University Street, Montréal, Quebec, Canada H3C 5H7 For ordering

More information

PERFORMANCE-BASED NAVIGATION MANUAL

PERFORMANCE-BASED NAVIGATION MANUAL Doc 9613 PERFORMANCE-BASED NAVIGATION MANUAL VOLUME I CONCEPT AND IMPLEMENTATION GUIDANCE AND VOLUME II IMPLEMENTING RNAV AND RNP OPERATIONS Notice to Users This document is an unedited advance version

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

Winter operations : a critical systemic process

Winter operations : a critical systemic process Winter operations : a critical systemic process Maurice GEORGES DSNA-FRANCE 11 October 2011 www.developpement-durable.gouv.fr Ministère de l'écologie, du Développement durable, des Transports et du Logement

More information

Aeronautical Communications: Changes Ahead - FCI

Aeronautical Communications: Changes Ahead - FCI Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)

More information

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION

More information

Poland Ground Based Augmentation System (GBAS) Seminar AGENDA. GBAS Overview (Honeywell: Pat Reines)

Poland Ground Based Augmentation System (GBAS) Seminar AGENDA. GBAS Overview (Honeywell: Pat Reines) Poland Ground Based Augmentation System (GBAS) Seminar AGENDA 0900-0915 0915-0930 0930-1030 1030-1045 1045-1115 1115-1145 1145-1245 1245-1345 1345-1445 1445-1515 Welcome (PANSA) Introductions (All) GBAS

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

North America Limited International Procedures Initial Detailed Syllabus

North America Limited International Procedures Initial Detailed Syllabus North America Limited International Procedures Initial Detailed Syllabus North America Sources and Content of International Flight Publications Preparation International Operations Manual FAA Oceanic Operations

More information

SRC POSITION PAPER. Edition March 2011 Released Issue

SRC POSITION PAPER. Edition March 2011 Released Issue E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,

More information

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

Operational Benefits, Affordability and Availability

Operational Benefits, Affordability and Availability Synthetic ti & Enhanced Vision i Operational Benefits, Affordability and Availability Tom Horne Experimental Test Pilot Mike Mena Director, Advanced Cockpit Programs Gulfstream Aerospace Corporation Gulfstream

More information

Air Traffic Management

Air Traffic Management Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of

More information

2008 FUture of Navigational Aids

2008 FUture of Navigational Aids 2008 FUture of Navigational Aids Region 1 Debbie Alke, Montana 406-444-2506 Region 2 David Greene, Wisconsin 608-266-2480 Region 3 Joe Pestka, Missouri 573-526-7912 Region 4 Susan V. Chernenko, West Virginia

More information