EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

Size: px
Start display at page:

Download "EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA"

Transcription

1 EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

2 Presentation Overview Generalities Current Situation LPV approaches in Monastir Future actions and barriers Conclusion 04/06/2014 Ministry of Transport

3 GENERALITIES 04/06/2014 Ministry of Transport

4 Generalities Tunisia has shown its interest in EGNOS since 2003 by hosting entity of a RIMS station installed in Djerba airport Djerba RIMS is the first operational station out of the European Region Civil Aviation and Airports Office (OACA) is providing facility and assuming local maintenance activities of Djerba RIMS 04/06/2014 Ministry of Transport

5 Generalities Tunisia has also adhered the EuroMed GNSS II project in September Civil Aviation and Airports Office (OACA) commitment was formalized in November 2012, as national ANSP. Tunisia is interested in the use of EGNOS services to implement its Performance-based Navigation Plan. 04/06/2014 Ministry of Transport

6 CURRENT SITUATION 04/06/2014 Ministry of Transport

7 Current situation: Enroute Basic Area Navigation B-RNAV (equivalent to RNAV5) was implemented in the Tunisian airspace since December 2006 (from FL155). 04/06/2014 Ministry of Transport

8 Current situation: APPROACH In Tunis FIR/UIR, the use of GPS constellation reinforced by Aircraft Based Augmentation System (ABAS), is the framework for the use of Non precision RNAV (GNSS) approach procedures. When preparing a flight to a Tunisian aerodrome with RNAV GNSS procedure, the availability of RAIM (or equivalent algorithm) must be checked by the operator (RAIM available 15 min before ETA (Estimated Time of Arrival) and up to 15 minutes after ETA). (RAIM NOTAMs consultation) 04/06/2014 Ministry of Transport

9 Current situation: APPROACH 2 LPV procedures have been developed under the MEDUSA project for runways 07 and 25 at Monastir airport. 04/06/2014 Ministry of Transport

10 Current situation: PBN Plan Tunisia Civil Aviation Authority agreed in 2009 the development of a national PBN plan, A PBN committee is set under CAA supervision and introduced by ministerial order, including representatives from OACA, the Ministry of Defense and Tunisian airliners. The committee was called upon to develop, implement and monitor PBN operations in Tunisia, A PBN master plan has been developed and communicated to ICAO. 04/06/2014 Ministry of Transport

11 Current situation Short term Medium term Long term > 2019 En-route RNAV 5/RNP4 RNAV 5 RNAV 1/RNAV2 4D Trajectory Terminal Conventionnal SID and STAR & RNAV 1 & basic RNP 1 Conventionnal SID and STAR & RNAV 1 & basic RNP 1 RNAV 1 & A-RNP Approach NPA /PA APV BARO VNAV & RNP APCH NPA /PA APV BARO VNAV & RNP APCH RNP AR APCH PA GNSS BARO VNAV & RNP APCH & RNP AR APCH 04/06/2014 Ministry of Transport

12 Current situation En-route: RNAV & RNP Operations in Tunisia Airspace From December 2014: B-RNAV (RNAV5) will become applicable on all Tunisia ATS routes in controlled airspace areas (1,2,3 and 4) as promulgated in the Tunisia AIP, RNP 4: will become applicable on southern part of Tunis FIR/UIR. 04/06/2014 Ministry of Transport

13 Current situation Approach: DTTJ RNAV GNSS RWY27 LNAV only, DTTX RNAV GNSS RWY15 and 33 LNAV and LNAV/VNAV, DTTG RNAV GNSS RWY06 and 24 LNAV only, DTTZ RNAV GNSS RWY27 and 09 LNAV only, DTMB RNAV GNSS RWY07 and 25 LNAV, LNAV/VNAV and LPV, DTTZ RNAV GNSS RWY09 and 27 LNAV, LNAV/VNAV (planned for 2014). 04/06/2014 Ministry of Transport

14 LPV PROCEDURES AT MONASTIR AIRPORT 04/06/2014 Ministry of Transport

15 LPV at Monastir airport In the framework of EuroMed GNSS II/MEDUSA project which deals with the introduction of the European Geostationary Navigation Overlay Service (EGNOS) in the MEDA region, MEDUSA team led by Telespazio as a project manager and composed by ENAV, OACA, INECO, and Helios with ESSP assistance, have validated GNSS based approach procedures for Monastir Airport, Performances obtained during more than 4 months monitoring period has shown that the implementation of EGNOS based operations was feasible, in particular LPV approach procedures. 04/06/2014 Ministry of Transport

16 LPV at Monastir airport The validation flight campaign was carried out by ENAV with the support of Telespazio, OACA and ESSP in order to obtain a qualitative assessment of the procedure design including obstacles, terrain and navigation data and provide an assessment of the flyability of the procedure. 04/06/2014 Ministry of Transport

17 LPV at Monastir airport 10/06/2014 Ministry of Transport

18 LPV at Monastir airport 10/06/2014 Ministry of Transport

19 LPV at Monastir airport EGNOS service availability at Monastir is sufficient to support LPV approaches. Good opportunity to count the benefits of EGNOS based operations and the added LPV approaches value in a concrete case. Monastir presents an encouraging model for the exploitation of RNAV APCH procedures down to LPV minima. Stimulate and motivate the decisions-makers to generalize this model to several northern airports. 04/06/2014 Ministry of Transport

20 FUTURE ACTIONS AND BARRIERS TO IMPLEMETATION 04/06/2014 Ministry of Transport

21 LPV at Monastir airport Steps forward: Prepare the ground for the publication of Monastir LPV procedures Extend the experience of Monastir to the rest of Tunisian Airports (MEDUSA has been provided with our priorities for airports) Define the operational implementation path 04/06/2014 Ministry of Transport

22 LPV at Monastir airport Barriers to implementation GNSS/EGNOS an essential key enabler for PBN implementation, but: Guidance on the necessary steps to put in place monitoring and recording systems A backup plan to implement for any degraded situations (jamming, ) even signals are very reliable AUGUR coverage was limited to ECAC airspace only. 04/06/2014 Ministry of Transport

23 LPV at Monastir airport Needed actions to meet operational requirements: EGNOS SoL geographical coverage provision across the Euromed region, SBAS status and performance information provision 04/06/2014 Ministry of Transport

24 CONCLUSION 04/06/2014 Ministry of Transport

25 CONCLUSION Tunisia reiterates its interest in EGNOS to implement PBN operations. The implementation of PBN operations in Tunisia will be closely related to the various changes taking place at the European level and the decisions that may be made, especially the EGNOS coverage extension. Will continue to cooperate with MEDUSA for the next steps. 04/06/2014 Ministry of Transport

26 THANK YOU FOR YOUR ATTENTION 04/06/2014 Ministry of Transport

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013 PLAN 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion Generalities Generalities Through the Office of Civil Aviation and Airports : OACA A contract between the OACA

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD ÁFRICA DE FRANCISCO VALERA SUMMARY Summary: Ineco company. Flight procedure design team. Flight procedure

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information EGNOS SERVICE PROVISION WORKSHOP 2016 DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information Agenda Facts and Figures for Approach Procedures in Germany Brief History

More information

Patrizio Vanni (Project Coordinator)

Patrizio Vanni (Project Coordinator) H2020 project funded by Patrizio Vanni (Project Coordinator) EGNOS Annual Workshop Athens, 3 October 2017 This project has received funding from the European GNSS Agency under the European Union s Horizon

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Jordan national workshop Euromed GNSS II national workshop, Amman, 11 December 2013 1 Index EGNOS SoL operation in

More information

SDM WORKSHOP ON PBN (19/10/2017)

SDM WORKSHOP ON PBN (19/10/2017) SDM WORKSHOP ON PBN (19/10/2017) Experience from real implementations GNSS Department 25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona

More information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 EGNOS based Operations Implementation Status and Plans for 2016 EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 Table of Contents Drivers for APV Implementation LPV Implementations:

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

LPV implementation to non-instrument runways

LPV implementation to non-instrument runways LPV implementation to non-instrument runways Carmen Aguilera, Aviation & H2020 Coordinator European GNSS Agency Combined GA TeB & GA Sectorial Committee Cologne, June 1 st 2017 Table of Contents 1. The

More information

MEDUSA & NANSC, Egypt

MEDUSA & NANSC, Egypt Page 1 1 MEDUSA & NANSC, Egypt PRESENTER :ENG. IBRAHIM HASSAN MOHAMED EISSA Contents Introduction about NANSC,Egypt Role of NANSC with EGNOS NANSC proposed Ideas. LPV implementation in Egypt. NANSC commitment

More information

ENAV experience on LPV implementation

ENAV experience on LPV implementation ENAV experience on LPV implementation Patrizio Vanni GNSS and SES expert International Strategies Office enav.it Tunisi, 23-10-2013 Main topics Company profile ENAV role in MEDUSA ENAV role in GNSS GNSS

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

E-GNSS systems for GA

E-GNSS systems for GA E-GNSS systems for GA Workshop voor de general aviation Dufourmont Tim 9 November 2018 LVNL Amsterdam Netherlands GSA in a nutshell What? Gateway to Services Galileo & EGNOS Operations and Service Provision

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

SBAS Frequently Asked Questions

SBAS Frequently Asked Questions SBAS Frequently Asked Questions 1. What is SBAS? 2. Where are SBAS networks in operation or under development? 3. What are the benefits of SBAS? 4. What is SBAS interoperability? 5. Will SBAS provide a

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Israel national workshop Euromed GNSS II national workshop, Tel Aviv, 6 May 2013 1 Index EGNOS (European Geostationary

More information

SBAS as a solution for safe approaches in New Zealand and Australia

SBAS as a solution for safe approaches in New Zealand and Australia SBAS as a solution for safe approaches in New Zealand and Australia Ian Andrews President AOPA NZ 18 th Feb 2015 Greg Perris Manager Procedure Design GroupEAD GPS GLONASS GALILEO They all mean the same

More information

Gian-Gherardo Calini Head of Market Development Unit. France Switzerland Guernsey Germany

Gian-Gherardo Calini Head of Market Development Unit. France Switzerland Guernsey Germany A word from the GSA EGNOS safety and economic benefits for airspace users are acknowledged and operational implementation in Europe is progressing and expected to boost in the short term. For the GSA,

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015

... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015 Page 1 Egypt & MEDUSA... 8th Euromed GNSS WG meeting Brussels, 25 November 2015 IBRAHIM EISSA, National Air Navigation Service Company, NANSC GENERAL SATELLITE MANAGER Ibrahim.eissa@nansceg.net NANSC company

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

Development of the Safety Case for LPV at Monastir

Development of the Safety Case for LPV at Monastir Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project

Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project Business case for LPV implementation at Habib Bourguiba International Airport MEDUSA project Page 1 of 34 Executive Summary This document presents a business case for the introduction of an APV SBAS (LPV)

More information

SBAS-ASECNA Programme Status

SBAS-ASECNA Programme Status EGNOS Annual Workshop, 34 Oct. 2017, Athens, SBAS-ASECNA Programme Status 1/15 SBAS-ASECNA Programme Status EGNOS Annual Workshop SBAS in the world agenda item 3-4 October 2017 Athens, Greece EGNOS Annual

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000, DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In

More information

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR UNTED NATIONS INTERNATIONAL MEETING ON THE APPLICATIONS OF GLOBAL NAVIGATION SATELLITE SYSTEMS Vienna, Austria 12 16 December 2011 GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR Presented by:

More information

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal Carmen Aguilera, Aviation & H2020 Coordinator 21 st September, Lisbon E GNSS applications in

More information

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources,

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical

More information

PBN Implementation inside Italian Airspace

PBN Implementation inside Italian Airspace PBN Implementation inside Italian Airspace Leonardo NICOLO Airspace and Procedures Design Department TMA, CTR & Airports Unit Responsible Brussels, March, 12-14 2014 0 CONTENTS PBN Implementation Path

More information

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013 GNSS NOTAM Aline Troadec RNAV approach specialist EUROCONTROL AI Operations-9 27-28 November 2013 The European Organisation for the Safety of Air Navigation Table of content 3 topics on which AI expertise

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

PBN Implementation inside Italian Airspace Status update Summer 2013

PBN Implementation inside Italian Airspace Status update Summer 2013 PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011) ESSP EGNOS Service Provider ICAO APV Workshop ESSP Introduction AENA DFS DGAC ENAV NATS SKYGUIDE NAV European Satellite Services Provider ESSP Creation ESSP EEIG founded in 2001 Mission: Operation of EGNOS

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Presented to: By: Date: CGSIC Leo Eldredge, FAA September 24, 2008 Agenda WAAS Architecture WAAS Services Overview

More information

V3 SPR. Abstract. Document information

V3 SPR. Abstract. Document information V3 SPR Document information Project Title Approach Procedure with Vertical Guidance (APV) Project Number 05.06.03 Project Manager NATS Deliverable Name V3 SPR Deliverable ID D38 Edition 00.01.04 Template

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation

Guidelines for ANSP/Airports and Aircraft Operators for LPV implementation Aircraft Operators for LPV The following document provides a set of generic guidelines for Air Navigation Service Providers (ANSPs), Airport Operators and Aircraft Operators within the European Civil Aviation

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

Advisory Circular. Required Navigation Performance Approach (RNP APCH) Advisory Circular Subject: Required Navigation Performance Approach (RNP APCH) Issuing Office: Standards Document No.: AC 700-023 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7550326-V23

More information

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017 Overview > Your presenter > easyjet > Opportunities > Benefits Examples > Training > Operations > Summary Who am I? > Not a pilot! > easyjet

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information European Aviation Safety Agency TERMS OF REFERENCE Task Nr: RMT.0256 and RMT.0257 Issue: 1 Date: 17 July 2012 Regulatory references: Listed in Appendix 2 Reference documents: Listed in Appendix 3 List

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

Septentrio EGNOS An overview

Septentrio EGNOS An overview Septentrio EGNOS An overview Dirk Werquin Program Manager Aerospace & Defence, Septentrio Information on EGNOS in this presentation is using elements from documents from ESSP and/or GSA. 1 Septentrio Group

More information

SBAS (LPV) and LNAV/APV Baro approach safety assessment

SBAS (LPV) and LNAV/APV Baro approach safety assessment Monastir APV SBAS (LPV) and LNAV/APV Baro approach safety assessment Document: Business case for LPV implementation at Habib Bourguiba International Airport Issue: v0.7 Date: 23/09/2013 Page 1 of 142 Executive

More information

DSNA Navigation Strategy. Benoit Roturier (DSNA)

DSNA Navigation Strategy. Benoit Roturier (DSNA) DSNA Navigation Strategy Benoit Roturier (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions of the ICAO 36th Assembly (2007):

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING PBNTF ECTL-RAISG/2 - WP/01 13/03/2014 JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & RAISG MEETING SECOND MEETING (, Brussels 12 14 March 2014) PROPOSED DETAILED AGENDA V8 Agenda Item Supporting material

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Guidance for the preparation of EGNOS National Market Analysis

Guidance for the preparation of EGNOS National Market Analysis http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 12 Number 2 June 2018 DOI: 10.12716/1001.12.02.16 Guidance for the preparation of EGNOS National

More information

APV Implementation in the UK Initiative

APV Implementation in the UK Initiative APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

Bejaia APV SBAS (LPV) and LNAV/APV Baro approach safety assessment

Bejaia APV SBAS (LPV) and LNAV/APV Baro approach safety assessment Bejaia APV SBAS (LPV) and LNAV/APV Baro approach safety assessment Bejaia Airport - Safety Assessment 1 of 135 Document information Document title Author Produced by Produced for Helios contact Produced

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs IATA EUR Airline PBN implementation requirements - March 2011 PBN covers a variety of aircraft and pilot qualifications. Avionics and crew authorizations no less than RNP 0.3 for approaches and RNP 0.6

More information

PBN Implementation Plan Republic of Macedonia

PBN Implementation Plan Republic of Macedonia PBN Implementation Plan Republic of Macedonia Version: SECOND EDITION Date: 19 th November 2018 Executive summary Republic of Macedonia is a signatory of the Convention on International Civil Aviation;

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

PBN Implementation Plan Italy. Version 1

PBN Implementation Plan Italy. Version 1 PBN Implementation Plan Italy Version 1 1 Document appl'oval The PBN Implementation pian has been prepared by Ente Nazionale per l'aviazione Civile (ENAC) and Ilalian ANSP (ENAV) in accordance with ICAO

More information

EGNOS History, Status and Plans

EGNOS History, Status and Plans EGNOS History, Status and Plans Reinhard Blasi Market Development Officer European GNSS Agency, GSA March 2015 Navigation solutions powered by Europe EGNOS Services European Commission commitment to ICAO

More information