NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014
|
|
- Linda Wheeler
- 5 years ago
- Views:
Transcription
1 NANSC VISSION AND MISSION NANSC CNS/ATM Roadmap FUTURE ASBU roadmaps NANSC GNSSbased 3 Future works alignment Services 3/3/4
2 ICAO Doc975 ICAO Assembly Resolution A37- (), for example, urges all States to implement air traffic services routes and approach procedures in accordance with the ICAO PBN concept. Therefore the Block Module on Optimization of approach procedures including vertical guidance should be considered for implementation by all ICAO Member in the near-term. ICAO A37- called for implementation of PBN RNP approaches with vertical guidance (APV) with satellite based augmentation system (SBAS) or barometric vertical navigation (Baro- VNAV). Where vertical guidance is not available, lateral guidance, only to most instrument flight rules (IFR) runway ends, was prescribed by 6. implementation of approach procedures with vertical guidance (APV) (Baro-VNAV and/or augmented GNSS), including LNAV-only minima, for all instrument runway ends, either as the primary approach or as a back-up for precision approaches by 6 with intermediate milestones as follows: 3 per cent by, 7 per cent by 4; and implementation of straight-in LNAV-only procedures, as an exception to above, for instrument runways at aerodromes where there is no local altimeter setting available and where there are no aircraft suitably equipped for APV operations with a maximum certificated take-off mass of 5 7 kg or more; 3/3/4
3 NAVIGATION Enablers Block 8 Block 3 8 Block Block 3 ILS/MLS Retain to support precision approach and to mitigate GNSS outage Conventional DME Optimize existing network to support PBN operations VOR/NDB Rationalize based on need and equipage Satellite-based Core GNSS Constellations Single frequency (GPS/GLONASS) Multi-Freq/Multi-Constellation (GPS/GLONASS/Beidou/Galileo) GNSS Augmentations SBAS GBAS Cat I GBAS Cat II/III Multi-Freq GBAS/SBAS Capability PBN (see PBN Roadmap) PBN Operations B-65, B-5, B- B-, B-4 B-5 B3-5, B3- Precision Approach 3 CAT I/II/III Landing ILS/MLS GBAS Cat I GBAS Cat II/III Cat I/II/III SBAS LPV B-65 B-65 3/3/4
4 PBN Block 8 Block 3 8 Block Block 3 En-Route Oceanic and Remote Continental RNAV (RNP ) RNP 4 RNP En-Route Continental RNAV 5 RNAV RNAV RNP Advanced RNP RNP.3 (Helicopter only) Terminal Airspace: Arrival and Departure RNAV Basic RNP Advanced RNP RNP.3 (Helicopter only) Approach RNP APCH (SBAS: LPV, BARO VNAV: LNAV/VNAV, Basic GNSS: LNAV) RNP AR APCH (where beneficial) 4 Migration path based on Region/States requirements 3/3/4
5 MID Region Air Navigation Strategy Near-term Objective (3-8) ASU Block: MID Region has chosen 8 out of 8 Block Module for implementation as they respond to air navigation capacity and efficiency requirements for the Region for the period from 3 to /3/4
6 Monitoring of the Aviation System Block Upgrades (ASBU) Implementation in the MID Region B APTA: Optimization of Approach Procedures including vertical guidance Applicability: Aerodromes/RWYs (TBD) Elements LNAV approaches LNAV/VNAV approaches APV with GBAS 6 Performance Indicators/Supporting Metrics Indicator: % of runway ends with LNAV approach Supporting metric: Number of Instrument Runways ENDs provided with GNSS Approach Procedures (LNAV) Indicator: % of instrument Runways ENDs provided with APV Approach procedures (VNAV) Supporting metric: Number of instrument Runways ENDs provided with APV Approach procedures (VNAV) Indicator: % of runway ends with APV GBAS Supporting metric Number Percentage of runway ends with APV GBAS Targets Action Plan Remarks All instrument runway ends, either as the primary approach or as a back-up All instrument runway ends, either as the primary approach or as a backup for precision approaches (NANSC by 4) All instrument runway ends, either as the primary approach or as a back-up for precision approaches by (NANSC 8) ongoing ongoing Planned 6 3/3/4
7 PBN in Egypt (Block - ) Flight Phase Operational Concept Target Date En-Route RNAV 5 implement ed En-Route /TMA Approach / Landing Current Situation Required Performance Enabling Systems Mandatory +/- 5NM (95%) VOR/DME/ GNSS*/ INS* RNAV 8 Planned +/- NM (95%) GNSS/DME RNP APCH (LNAV) RNP AR APCH 4 Implementation +/-.3NM (95%) GNSS Individual Implementation t implemented Depends on required accuracy <.3NM (95%) GNSS APV Baro 8 ongoing +/-.3NM (95%) GNSS/Baro APV SBAS HAL +/- 4m (-7) VAL +/- 5m (-7) GNSS+ SBAS (EGNOS) GBAS CAT I 6 planned ICAO SARPs GNSS + GBAS/I 7 GBAS CAT II/III 3 Concept TBD GNSS + GBAS / II/III 3/3/4
8 Spacing between Parallel Routes 6.5 NM Route Spacing in a Radar Environment Annex How spacing demonstrated Comparative Analysis Airspace Applicable En route between straight tracks only; same direction Extra distance needed on turns YES Nav Spec RNAV5 Additional conditions ( DOC ref) As per generic safety assessment 8 NM Comparative Analysis En Route between straight tracks only; opposite direction YES RNAV5 As per generic safety assessment NM ATC Intervention Studies MID RMA(CRM) Between KATAB/SML YES RNAV5 As per generic safety assessment 8-NM CRM En route between straight tracks only; same direction YES RNAV As per generic safety assessment 8-NM 8 CRM Terminal between straight tracks only; same direction YES RNAV (RNP for non radar area) As per generic safety assessment 3/3/4
9 8 Primary / Major International Aerodromes A/D PA ILS/ DME NPA VOR / DME LNAV Baro-LNAV-VNAV Site critical remark Current Required 4 Current Required4-8 Back up primary Back up primary Back up primary Back up primary Alexandria NIL end 4 YES HEL Borg El Arab end end I SID CAIRO 6 end 6 end 6 6 Hurghada end end YES Luxor end end YES Marsa Alam NIL end Sharm El Sheikh end end YES Aswan end end YES TOTAL
10 LNAV...Baro VNAV current status Primary/Major International Aerodromes A/D R/WS ends LNAV procedures Target Date 8 4 CURRENT REQUIRED All backup mean 7 A/D 9 Procedures 3 A/D 5 Procedures by4 A/D R/WS ends ILS EQP Baro-VNAV procedures Target Date 8 4 -to develop Baro-VNAV procedures as a backup mean By 8 -to develop Baro-VNAV procedures as primary mean By 8 3/3/4
11 9 Secondary/ International Aerodromes A/D PA ILS/ DME NPA VOR / DME LNAV Baro-LNAV-VNAV Site critical remar k Current Required 4 Current Required4-8 Back up primary Back up primary Back up primary Back up primary Al Alamain NIL end circling ENDS El Arish NIL end Asyut end end 4 ends 3 NDB+ Almaza end end 3 HEL Shark El Oweinat NIL NDB end Port Said NIL end HEL St. Catherine NIL NDB circling YES Suhag NIL end Taba end end YES TOTAL
12 LNAV...Baro VNAV current status Secondary/Major International Aerodromes A/D R/WS ends LNAV procedures Current 9 4 A/D 9 Procedures required 6 A/D 3 Procedures Target Date All backup mean by4 A/D R/WS ends ILS EQP Baro-VNAV procedures Target Date 9 -to develop 3 Baro-VNAV procedures as a backup mean By 8 -to develop 9 Baro-VNAV procedures as primary mean By 8 3/3/4
13 8 National Airports A/P PA ILS/ DME NPA VOR / DME LNAV Baro-LNAV-VNAV Site critical remark Current Required 4 Current Required4-8 Back up primary Back up primary Back up primary Back up primary Abu Simbel end end Dakhla NIL NDB end El GOUNA NIL end El Gora NIL NIL El Kharga NIL end Mersa Matruh NIL 3 end 3 4 October NIL NIL El Tor NIL NIL TOTAL 7 7
14 LNAV...Baro VNAV current status National Aerodromes A/D R/WS ends LNAV procedures current 8 3 A/D 8 procedures Required 5 A/D Procedures Target Date By4 A/D R/WS ends ILS EQP Baro-VNAV procedures Target Date 9 -to develop Baro-VNAV procedures as a backup mean By 8 -to develop 7 Baro-VNAV procedures as primary mean By 8 4 3/3/4
15 MID Region Air Navigation Strategy B CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO) Applicability: Aerodromes Elements International aerodromes /TMAs with CDO PBN STARs 5 Performance Indicators/Supporting Metrics) Indicator: % of International Aerodromes/TMA with CDO implemented Supporting Metric: Number of International Aerodromes/TMAs with CDO implemented Indicator: % of International Aerodromes/TMA with PBN STAR implemented Supporting Metric: Number of International Aerodromes/TMAs with PBN STAR implemented Targets Action Plan Remarks 3 8 Ongoing through Enhanced Route Structures Improved Vertical Profiles Enabled by airspace design, airspace procedures and ATC Need to Upgrade the ground trajectory calculation function Airspace Design Training Define application Requirements Cairo: Good DME/DME coverage, no additional station is needed also Sharm el Seikh and Hurgada RNAV in surveillance environment and with adequate navigation infrastructure. Basic RNP in non surveillance Environment(need dual operational approval).dme stations will have to be maintained as a backup navigation means, as long as, every user is equipped with multi-constellation 3/3/4 and multi-frequency GNSS.
16 MID Region Air Navigation Strategy B CCO: Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) Applicability: Aerodromes Elements International aerodromes/ TMAs with CCO PBN SIDs 6 Performance Indicators/Supporting Metrics) Indicator: % of International Aerodromes/TMA with CCO implemented Supporting Metric: Number of International Aerodromes/TMAs with CCO implemented Indicator: % of International Aerodromes/TMA with PBN SID implemented Supporting Metric: Number of International Aerodromes/TMAs with PBN SID implemented Targets Action Plan Remarks 3 Ongoing through Enhanced Route Structures Improved Vertical Profiles Enabled by airspace design, airspace procedures and ATC Need to: Upgrade the ground trajectory calculation function Training Define application Requirements 8 Cairo: Good DME/DME coverage, no additional station is needed also Sharm el Seikh and Hurgada RNAV in surveillance environment and with adequate navigation infrastructure. Basic RNP in non surveillance Environment(need dual operational approval).dme stations will have to be maintained as a backup navigation means, as long as, every user is equipped with multiconstellation and multi-frequency 3/3/4 GNSS.
17 NANSC NAVAIDS Network Rationalisation 5 ILS---4 VOR---6DVOR DME--- 7NDB.Referred to our NAVAIDS Database a bottom-up approach shall be considered as at the end of each navigation aid s economic life (typically to 5 years)..gradual removal of the rest NDBs at their lifetime end depending both on the availability of GNSS approaches and other conventional NAVAIDs,general aviation needs and equipment status; 3.There is a need to retain some VORs: as a back-up to GNSS or may be used in the missed approach segment of RNP APCH procedures as a backup to RNP APCH operations. to support non-gnss guidance for aircraft operating at or above 5, feet to an airport within nm specially around major airports 4.ILS ILS will continue being the primary means for approach navigation. GBAS Cat I will start to be considered as an alternative at 8-3.ILS will be back up. GBAS will be considered the main precision approach NAVAID, replacing existing ILS, supported by the correspondent cost/benefit analysis /3/4
18 Into our consideration to Determine the Best Model for Mixed Mode of Operation: 8 Operation by users that are not RNAV- and/or RNP equipped; Mixed-equipage (PBN and non-pbn) environment. The diversity of aircraft, including low-performance aircraft flying in the lower airspace and conducting arrival and departure procedures on the same path or close to the paths of high-performance aircraft. We are solely responsible for approving and authorizing an Instrument Approach Design Organization as well as the Instrument Flight Procedures it designs for use within our FIR. PBN as part of the airspace concept, the total system needs to be monitored to ensure that safety of the system is maintained. A system safety assessment shall be conducted during and after implementation and evidence collected to ensure that the safety of the system is assured. Segregating traffic according to navigation capability and granting preferred routes to aircraft with better navigation performance. Establishment of PBN operational approval process. 3/3/4
19 What is further?. Perform feasibility studies considering impacts of new PBN procedures.. Review National safety case in order to update some mitigations. 3. Consider EGNOS/GALELIO evolutions rather than extension to develop more efficient GNSS strategy for NANSC. 4. Update National PBN plan: Achieve a total RNP RNAV environment Support aircraft with lower capabilities Support State aircraft operations Ensure quality of navigation data Rationalise infrastructure Implement 4D RNAV operations 9 3/3/4
20 NANSC GNSS-Based Services Implementation(-) At the global level Egypt has removed its names from footnotes 5.36B and 5.36C during WRC-. This was a significant step forward towards achieving better worldwide protection of GNSS. NANSC implemented a basic GNSS operations without developing a detailed business case (the navigation system infrastructure (GPS) came at no cost). We noted that interoperable ranging sources could allow ABAS to provide worldwide vertically guided approaches with minimal, or potentially no need for external augmentation signals in the long term. NANSC toke the advantage of documentation available from other States and implement basic GNSS operations without the need for a detailed business case analysis. GNSS PNT is the key enabling technology for reduced separation standards as well as for lateral navigation. The real time monitor concept is neither practical nor required for GNSS ABAS operations. We noted that Aircraft operators with access to prediction software specific to their particular ABAS/RAIM avionics will find it advantageous to employ that software rather than use the general notification service.(in the case of SBAS and GBAS, operators will rely on service status notifications). GPS stand-alone approach is designed because the VOR -based procedures were not suited to implement an overlay program due to certain approach legs cannot be adapted to the RNAV data coding system also to avoid the potential for confusion between two approaches to the same runway.
21 NANSC GNSS-Based Services implementation(-) All ABAS-based NPA procedures is a back up procedures due to potential lack of % RAIM availability; as well as the availability of conventional aids. GNSS-based RNAV capabilities were initially used to fly NPA procedures. The design of a n Precision approach is made according to a single set of design criteria in ICAO PANS-OPS and is not dependent on the flying technique. simulation hours done flying Egypt air simulator as ground validation.75 life trials don as flight validation by different operators for airports. Training has been conducting for 9 controllers at regional airports. We noted that Many aircraft operators decided to equip with off-theshelf TSO C9 avionics when they calculated the fuel savings provided by direct routings and the cost savings associated with lower approach minima. We noted that as of, international airlines did not generally believe there was a business case to equip with SBAS avionics for several reasons: these airlines typically serve airports with ILS; by integrating GNSS with IRS they achieve high availability of guidance; and through integration with Baro VNAV they can fly vertically-guided approaches, albeit to higher minima than with SBAS. 3/3/4
22 GNSS Vulnerability: Mitigating the Impact on Operations NANSC Mitigation Strategies. employing procedural (aircrew and/or ATC) methods.. taking advantage of conventional navigation aids and radar; the availability of radar; for enrout and terminals at 7 primary international airports. DME will be part in the near to the long term of mitigation strategy to allow continued RNAV operations to support PBN operations, since it currently provides an input to multi-sensor navigation systems that allow area navigation in both en-route and terminal airspace. VOR/DME currently provides a useful backup capability for en route flight. We will retain all of the existing ILSs at airports. 3/3/4
23 Minimum OCH per Approach Type Up to 4 different minima boxes on chart! 3 NPA - an approach without vertical guidance flown to the LNAV or the LP MDA/H. APV Baro - an approach with barometric vertical guidance flown to the LNAV/VNAV DA/H. APV SBAS - an approach with geometric vertical guidance flown to the LPV 3/3/4 DA/H
24 The main factors for choosing between APV Baro or APV SBAS Approach name APV Baro APV SBAS Best theoretically achievable minima 5 ft ft Intended principally for Airline Operators + - Intended principally for business and general aviation - + The airport(s) are outside of coverage + - The airport(s) elevation is higher than 5 ft AMSL - + height check at FAF independent is independent of the GNSS Geometric height APV Baro - an approach with barometric vertical guidance flown to the LNAV/VNAV DA/H APV SBAS :- an approach with The lateral guidance is equivalent to a ILS localizer and the vertical guidance is provided against a geometrical path in space rather than a barometric altitude. Annex 4 does not provide guidance on runway infrastructure requirements for approach and landing operations with vertical guidance. In order to assess whether the runway is suitable for an approach procedure with vertical guidance, that runway and associated OLS should at least meet the Annex 4 requirements for non-precision approach runway if the OCH is not less than 9 m (3 ft) and for CAT I precision approach runway if the OCH is lower than 9 m (3 ft). LNAV/VNAV procedures can be flown by SBAS aircraft to LNAV/VNAV minima if coded in the database. SBAS avionics are available on the majority of modern business aviation aircraft, or avionics upgrades are available for the FMS.(Universal, Rockwell Collins and Honeywell) SBAS Will support LPV operations(by 5), comparable to ILS CATI minima(in areas where ILS cannot be sited for terrain or obstacle reasons ) -Cost of a procedure = yearly ILS maintenance SBAS and Barometric Approaches are complimentary if APV is implemented using Baro- VNAV and SBAS, NANSC could provide APV protection to the most population of the IFR flights and general aviation will not be left behind. The cost of designing and publishing several or all types of minima at a time will be lower than the sum of costs for the design 4 and publication of the different minima one after the other. 3/3/4
25 SBAS APV Approach are pushed for several reasons(-) SBAS is considered a primary Navigation system. GNSS navigation alone requires checks and is considered a supplementary navigation system. SBAS is designed to enable users to rely on GNSS navigation data for all phases of flight, for all qualified airports within an SBAS coverage area. SBAS also provides for immunity to improper setting of QNH on the aircraft.. Flight safety for helicopters providing up to degree glide path approaches onto helistations. Flying, enabling near CAT I capability without an ILS array covering all RWY thresholds and allowing steeper glide paths, (redundancy, future decommissioning of ILS CAT I arrays) With an APV, the approach becomes precision, with minimums between ft and 5ft similar to ILS CAT I. (SBAS, unlike ILS, does not have sensitive areas that must be protected so reduce delays) Compared to barometric altitude derived vertical guidance (BARO VNAV), the use of LPVs is far superior as it is not affected by the path (altitude) variations associated with ISO-bar temperature.as a result of the reference path variability, BARO VNAV operations show higher minimums. 5
26 SBAS APV Approach are pushed for several reasons(-) SBAS provides for positive guidance (RNP.3) across the SBAS service volume. supports Trajectory Based Operations (TBO) Continuous Descent Approach (CDA) and reduction in track dispersions during SBAS Terminal operations. Best fore site critical airports. improved access to runways where siting constraints prevent the use of conventional aids SBAS position accuracy and integrity meet the performance requirements for ADS-B terminal and surface surveillance, as well as surface movement guidance and control systems. Reduced costs for procedure validation compared with ILS and other conventional aids because SBAS approaches do not require periodic flight inspections by aircraft with complex equipment;, as well as reduction of periodic maintenance. Reduced aircrew training costs when all approaches can be flown using vertical guidance; and(when SBAS fail fly BARO LNAV/VNAV) increased capacity on closely spaced parallel runways by supporting multiple glide path angles and displaced thresholds. SBAS avionics can also provide advisory vertical guidance when flying NDB and VOR approaches and GNSS NPAs in areas where an SBAS supports this level of service, thus providing the benefits of a stabilized descent. SBAS avionics provide a considerable increase in availability for en route through NPA compared with Basic GNSS.This allows removing operational restrictions required when using Basic GNSS receivers. 6 3/3/4
27 SBAS Global Interoperability/ Barriers? The need to establish adequate co-operation/coordination among SBAS providers is commonly recognized so that their implementation becomes more effective and part of a seamless world-wide navigation system. Seamless transition between SBAS Service Areas. Evaluating transitions between SBAS and RAIM along with transitions between two SBAS and between SBAS and GBAS. Common interpretation of Standards amongst SBAS Developers. Established a work plan for development of a definition Document to support a dual-frequency, multi-constellation user. Currently Limited Global Coverage. Availability of worldwide LPV- service expected with addition of a second frequency, extended networks and additional GNSS constellations. Continued support to legacy single frequency users by ensuring backwards compatibility. Insufficient number of equipped aircraft Lack of cost benefit analysis adverse ionosphere Lack of procedures and appropriate training 7 Evaluation of a real operational requirement 3/3/4
28 Euromed region is a natural extension for EGNOS (Existing and planned SBAS systems) Interoperable with other SBAS systems. Enabler for PBN implementation and SBAS Approach with Vertical Guidance (LPV). 8 3/3/4
29 EGNOS is the European SBAS which Improves GPS over Europe,considered Major stepping-stone towards Galileo homogeneous extension The extension will Reduces the impact on the Integrity Margin as well as 9 Maximizes the number of monitored GPS 3/3/4
30 3 3/3/4
31 Failure of the development of downstream service and application(demonstration) due to lack of EGNOS service coverage Approach operations with vertical guidance (APV-I)= - 8x-6/5s.99 to An EGNOS Regional/National Plan requiring: EGNOS technology readiness(sbas Receivers are currently available,limited impact on the Flight Management System) and easy 3 usage/adoption an EGNOS Regional/National coverage. 3/3/4
32 In order to meet the anticipated future operational requirements by 3 in an evolutionary manner, the following guiding principles to the development of surveillance infrastructure will be required for NANSC: We track both non-cooperative targets and co-operative targets.there are eight (8) approach radars Each station consists of Mono- pulse secondary radar with detection range 5 NM and Primary radar with detection range 6 NM. in 7 primary major airports..and S(Six(6) En-Route Mono Pulse Secondary Radar with detection range of 5 NM, Five (5) of them are validated to operate with selectivity mode (mode S). All the En-Route stations are remote controlled automatically and monitored by more than one level. The future strategy is to increasing SSR redundant coverage by connected approach RADARS to the central En-Route RADAR data processor (RDP) with multitasking process. This operation will done after the upgrading of approach radars. Wide Area Multilateration in Cairo airport(nansc currently implements a modern project Multilateration (MLAT) system which represents upgrade to A- SMGCS system and consists of (3) receiver station, (3) transmitter station, (3) transponders to check the accuracy of the operation and Central target processor(ctp).we intend to extend this service to SHARM and HURGHADA. Since aircraft will have the necessary Mode S and ADS-B equipage, the choice of Cooperative surveillance technology (Mode S, ADS-B, Multilateration) remains flexible with NANSC determining the best solution for particular operating environment, based on cost and performance;
33 NANSC ADS-B strategy B-85 Air Traffic Situational Awareness (ATSA) n Radar Area: Safety Enhancement(Basic airborne situational awareness applications). Traffic Management SSR like. Capacity increase by reducing separation to SSR like (e.g. 5NM). Reduction in cost of operation for aircraft (like better flight level). at south east (Halayeeb triangle) and south west (Owinat). Radar Area: Enables decommissioning of redundant SSRs providing same level of service. Expected to be the primary means of surveillance with radar as back-up. For areas where there is lack of multi-radar tracking. Usable in combination with other surveillance sensors like Wide Area Multilateration, SSR, PSR etc. Airport Applications: New tool for surface movement surveillance. Integrated with A-SMGCS expected to fulfill airport requirements. 33 3/3/4
34 34 3/3/4
35 ADS-B Implementation L/T ( ADS-B + MSSR) en route surveillance coverage (FL 45) (8 3) M/T (7 ADS-B + MSSR) en route surveillance coverage 3/3/4 35 (FL ) (4 8)
36 Cairo ACC 36 3/3/4
DSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationSBAS Frequently Asked Questions
SBAS Frequently Asked Questions 1. What is SBAS? 2. Where are SBAS networks in operation or under development? 3. What are the benefits of SBAS? 4. What is SBAS interoperability? 5. Will SBAS provide a
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More informationICAO framework for LPV
ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region
ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationPBN and Procedure Design training
PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationFirst LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile
First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationFinal Approach Operations Symposium
Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationFrench DSNA approach to CNS rationalization & evolution
French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationAPV IMPLEMENTATION PLAN
APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion
More informationNew generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017
New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches
More informationPerformance Based Navigation Operational End-State 2023
Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,
More informationPromoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS
Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationEUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA
EUROMED GNSS II Achievements and expectations Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA Presentation Overview Generalities Current Situation LPV approaches in
More informationMID Region Air Navigation Strategy
MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules
More informationSBAS as a solution for safe approaches in New Zealand and Australia
SBAS as a solution for safe approaches in New Zealand and Australia Ian Andrews President AOPA NZ 18 th Feb 2015 Greg Perris Manager Procedure Design GroupEAD GPS GLONASS GALILEO They all mean the same
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationAppendix E NextGen Appendix
Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationGNSS/EGNOS services and applications in civil aviation
GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation
More informationEvolving and improving landing networks with EGNOS
Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach
More informationGNSS/EGNOS services and applications in civil aviation
GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Jordan national workshop Euromed GNSS II national workshop, Amman, 11 December 2013 1 Index EGNOS SoL operation in
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationRNP AR and Air Traffic Management
RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationNavigation at the. Federal Aviation Administration Crossroads
Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing
More informationE-GNSS systems for GA
E-GNSS systems for GA Workshop voor de general aviation Dufourmont Tim 9 November 2018 LVNL Amsterdam Netherlands GSA in a nutshell What? Gateway to Services Galileo & EGNOS Operations and Service Provision
More informationOverview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002
Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationInternational Civil Aviation Organization
AN-CONF/12 International Civil Aviation Organization TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 VOLUME II AVIATION SYSTEM BLOCK UPGRADES REPORT FOLDER Only material which has been
More informationDraft PBN Implementation Plan Papua New Guinea
Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationBangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)
INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,
DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :
More informationPBN Implementation Plan - Fiji Version 1 19 January 2010
PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationE GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal
E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal Carmen Aguilera, Aviation & H2020 Coordinator 21 st September, Lisbon E GNSS applications in
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationWide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update
Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Presented to: By: Date: CGSIC Leo Eldredge, FAA September 24, 2008 Agenda WAAS Architecture WAAS Services Overview
More informationEUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY
EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY An Overarching Perspective Edition 24 October 2017 OBJECTIVE This Information Paper presents ATM planners and military
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationAPPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION
RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1
ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation
DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationSOUTH AFRICA. Performance Based Navigation (PBN) Roadmap
SOUTH AFRICA Performance Based Navigation (PBN) Roadmap ATS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 21 05 03 2012 ENDORSEMENTS In 2007 at the 36th International Civil Aviation Organization (ICAO)
More informationATNS. Performance Based Navigation Roadmap SOUTH AFRICA
ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance
More informationFAA GBAS Program Update January 29, 2010
US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed
More informationNEW CALEDONIA PBN PLAN
NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationEffective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationPerformance Based Navigation (PBN) Implementation Plan Republic of Mauritius
Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationICAO Air Navigation Panels/Study Groups Work Programme
NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air
More informationOperational Investments Strategy & Implementation. Ehab Azmy Chairman NANSC. //canso
Operational Investments Strategy & Implementation Ehab Azmy Chairman NANSC CANSO Middle East Conference Transforming ATM Performance through Innovation and Collaboration 3-5 February 2014 Amman, Jordan
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More informationATFM/CDM ICAO s Perspective
ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance
More informationPLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013
PLAN 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion Generalities Generalities Through the Office of Civil Aviation and Airports : OACA A contract between the OACA
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationPBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING
PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware
More informationAircraft Systems and 4D Trajectory Management
Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize
More informationPreparation for ASBU B1 (PBN)
Preparation for ASBU B1 (PBN) Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo 12 February 2018 Outline Background MID ASBU Block 0 APTA, CCO and CDO GANP ASBU Coverage Area
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationRequired Navigation Performance (RNP) in the United States
Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In
More informationFlight Operations Inspector Manual
1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and
More informationWorkshop Exercise, EGYPT Air Navigation Plan 10 /12/2010
Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR
More information