Aircraft Systems and 4D Trajectory Management
|
|
- Domenic Farmer
- 5 years ago
- Views:
Transcription
1 Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1
2 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize sequences as defined by ATC 2
3 RTA example 3
4 Avionics Requirements for i4d EUROCAE WG85 / SC227, defining the worldwide standard for aircraft requirements on RNP & 4D Navigation Annex to DO-236B / ED-75B Minimum Aviation System Performance Standards (MASPS) EUROCAE WG78 / RTCA SC214 defining the worldwide standard for Advanced ATS Data Communication OSED Operational Services & Environment Definition INTEROP - Interoperability Requirements Standard SPR - Safety and Performance Requirements OSA - Operational Safety Assessment 4
5 Current requirements for ETA ETA = Estimate Time or Arrival ETA is an optional functionality (but required for RTA) ETA shall be available for each point in the flight plan ETA computation updated periodically and at any flight plan or forecast change Note: no definition of periodically Maximum error of ETA at a fix shall be less than 1% of the time of flight remaining to that fix, for the entered conditions and flight plan. Note: means perfect conditions (no forecast errors) ETA display resolution: 1 minute 5
6 ETA error example ETA error versus time to go 300 ETA error (seconds) Time to go (min.) ETA error DO-236B requirement (no meteo error) ETA error (10kts wind error, average Groundspeed 300kts) 6
7 Current requirements for RTA Optional functionality Accuracy +/- 30 seconds, 95% of the time Note: 95% undefined At least 1 RTA point in the flight plan (single flight plan fix), either on ground or flight Available climb, cruise and descent RTA entry and display resolution: 0.1 minute Time source synchronized with UTC is required (preferred that equipment is synchronised to UTC from external sources, such as GPS) Availability determined solely by the flight time to go to the RTA fix and aircraft performance 7
8 New proposed ETA/RTA requirements After initial ETA calculation, the system shall refresh the ETA calculation at least once every 60 seconds If time constraint is within the corresponding ETA min/max interval at the time of entry, the system shall be able to meet the required time of arrival with a 95% accuracy of : 30 seconds for en-route operations; 10 seconds for arrival operations in the terminal area Standard meteorological uncertainty Wind error < 10kts with 95% probability Temp. error < 2kts with 95% probability The system shall be able to compute an ETA min/max interval for any fix of the flight plan. 8
9 Example of ETA min/max function ETAmin-max (FL ft, initially 250NM, M0.75/282/250kts) Time (min.) Time to Go (min.) ETA max real ETA max reliable ETA ETA min reliable ETA min real 9
10 New proposed ETA/RTA requirements Accuracy requirement is expected to be met when a time constraint is combined with AT OR BELOW speed constraint(s) Display resolution of RTA, ETA at RTA waypoint and ETA min/max: 1 second Display resolution of ETA at all other fixes: 1 minute Control function shall give priority to the guidance to altitude and speed constraints compared to the control of the time constraint. Update of acceptable means of compliance to demonstrate the ETA accuracy and the Time of Arrival Control performance 10
11 Future datalink requirements Safety and Performance Requirements (SPR version I): ADS-C ATN downlink of airborne trajectory via Extended Predicted Profile (EPP) Sequence of (pseudo-) waypoints including: Latitude longitude, Fix, Level, Time, Speed, Level constraint value, RTA, Speed restriction value General data (A/C gross mass, speed schedule) ADS-C contract can be on demand, periodic or event based (EPP event type and EPP change parameters) ADS-C contract to downlink ETA min ETA max ADS-C contract to downlink meteo data New CPDLC messages CROSS [position] AT [RTAtimesec] CLEARED TO [position] VIA [routeclearanceenhanced] 11
12 CASSIS RTA Flight Trials (2009) 12
13 Current RTA capability RTA capability is today available on: Airbus aircraft with 2 nd generation FMS (Honeywell Pegasus or Thales-GE) Boeing B737NG (software U7.1 or later) Boeing B757/767 with Honeywell Pegasus FMS Boeing B777 Boeing with FANS 1A (s/w load 15) MD-90 / MD-11 with Honeywell Pegasus FMS RTA currently not available on any other aircraft types (regional, general aviation) 13
14 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% IATA EUROCONTROL Avionics Survey Available Planned Not Available FANS 1/A HFDL Headup Display (HUD) ATN - VDL Mode 2 Electronic Flight Bag (EFB) FMS WPR ADS-C FANS 1/A SatCom FANS 1/A - ACARS VDL Mode A 14 Other Multi-Function Display (MFD) fitted RNP AR Approach ADS-B OUT Fixed Radius Transition (FRT) APV Baro VNAV (LNAV - VNAV) Required Time of Arrival (RTA) ARINC 623 RNP Approach (LNAV) 8kHz33 VHF radios Fixed Radius Turn (RF) Multi Mode Receiver - MMR RNAV 10 GNSS MODE S ACARS RNAV 1 / P-RNAV RNAV 5 INS - IRS DME - DME position update Autothrust (A-THR) Autopilot - Flight Director VNAV EFIS Autopilot - Flight Director LNAV FMS Enhanced Vision System (EVS) LPV SBAS FANS 1/A - VDL Mode 2 GBAS Degree of Equipage
15 SESAR WP 9.1 Flight Test and Simulations i4d real Flight Trial Feb 2012: RTA + datalink tested MUAC and NORACON coupled (with Airbus cockpit) and non-coupled simulations with mixed traffic MUAC observations (March 2012): Datalink (ADS-C) very useful RTA increased workload of controllers uncertainty related to speed changes in RTA mode Mixed mode difficult to handle 15
16 Questions 16
Next Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationi4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales
i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times
More informationAvionics requirements for State aircraft
Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationTHIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.
CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /
More informationThe Flight Trajectory: AnAirborne Perspective with ATM in mind
The Flight Trajectory: AnAirborne Perspective with ATM in mind Miguel Vilaplana Boeing Research & Technology Europe COURSE 102: RESEARCH IN DECISION SUPPORT SYSTEMS FOR FUTURE AIR TRAFFIC MANAGEMENT La
More informationAir traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming
More informationWhat you should know: Future Air Navigation System (FANS)
WHITE PAPER What you should know: Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS 1/A+ STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ WORLD S MOST EXPERIENCED
More informationPBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING
PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationDIGITS - Demonstration of Air Traffic Management Improvements generated by initial Trajectory Sharing
Tom MAIER Airbus Commercial Aircraft Air Traffic Management Engineering EYIBE -AU Technical Coordinator - Demonstration of Air Traffic Management Improvements generated by initial Trajectory Sharing Demonstration
More informationATC Datalink on Boeing Airplanes
ATC Datalink on Boeing Airplanes NAT PBCS Workshop February 2013 Gordon Sandell COPYRIGHT 2013 BOEING. ALL RIGHTS RESERVED introduced on 747-400 in 1995 Now available as standard or optional on all recent
More informationAMAN RESEARCH IN SESAR
AMAN RESEARCH IN SESAR CCA939 TAP842 AZA1480 BPA1713 Arrival MANager (AMAN) Advisories to ground in complex cross border AMAN: Time To Lose/Time To Gain (TTL/TTG) Speed Use of new avionics capabilities:
More informationElectronic visibility via ADS-B for small aircraft. John Korna, NATS
Electronic visibility via ADS-B for small aircraft John Korna, NATS The SESAR General Aviation challenge SESAR is predominantly aimed at scheduled commercial air traffic and 100M+ airframes How is SESAR
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationV3 INTEROP. Abstract. Document information
V3 INTEROP Document information Project Title Approach Procedure with Vertical Guidance (APV) Project Number 05.06.03 Project Manager NATS Deliverable Name V3 INTEROP Deliverable ID D41 Edition 00.01.01
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationAvionics requirements for State aircraft
Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although
More informationNEW FPL Transition Phase & Implementation Stages
International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationNew generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017
New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches
More informationOrganización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/2.5-13/85 13 December 2013
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationOverview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge
ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN
More informationTrajectory Based Operations (TBO)
Trajectory Based Operations (TBO) David Batchelor Head of International Affairs, SESAR Joint Undertaking Emerging Technologies Workshop ATC Global, Beijing, 12 September 2016 SESAR SINGLE EUROPEAN SKY
More informationNBAA IOC Oceanic Operations
Oceanic Operations By: David Maloy, Operations AEA-220 NEXTGen Branch Date: So This Is Why They Paint A Centerline 2 NAT/HLA 27 o N 17 o N 3 Question 1 Approximately how many times a year does your company
More informationAvionics requirements for civil aircraft Edition January Civil aircraft Communications requirements
Avionics requirements for civil aircraft Edition January 2015 Civil aircraft Communications requirements Domain Programme Area VHF Com 8.33 KHZ Equipment The probability of the loss of voice communication
More informationInternational Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010
ATM/AIS/SAR/SG/20 IP/16 05-09/7/10 International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, 05 09 July 2010 Agenda Item 11: Any
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationAirplane Navigation Capabilities
Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes
More informationFlight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently.
Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. 20 Contribution of Flight Systems to Performance-Based
More informationFuture Air Navigation System (FANS)
CLAY LACY AVIATION AVIONICS Future Air Navigation System (FANS) STC Program for Challenger 601-3A/R FANS STC includes CPDLC, ADS-C and provisioning for ADS-B and Link 2000+ 2015 MANAGEMENT CHARTER SALES
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationOPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication
More informationBoeing Air Traffic Management Overview and Status
Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes
More informationSESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink
SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P15.02.07 Airport Surface Datalink AERONAUTICAL COMMUNICATIONS PANEL (ACP) 6th Meeting of the Working Group S (Surface) Sendai, Japan
More informationBeijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014
Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationFALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft
Falcon Elite II Make the most out of your Primus 2000 flight deck FALCON ELITE II Make the most out of your Primus 2000 flight deck For Falcon 900EX and Falcon 900C aircraft FALCON Elite II Make the most
More informationAeronautical Communications: Changes Ahead - FCI
Aeronautical Communications: Changes Ahead - FCI Aviation Electronics Europe Munich, Germany 25-26 March 2015 Nikos Fistas EUROCONTROL v 1.0 Agenda Current Status Future Communication Infrastructure (FCI)
More informationA CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System
A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation
More informationDRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:
AIP ENR 1.10 Amendment ITEM 10: EQUIPMENT AND CAPABILITIES Radio Communication, Navigation and Approach Aid Equipment and Capabilities INSERT one letter as follows: N if no COM/NAV/approach aid equipment
More informationICAO Air Navigation Panels/Study Groups Work Programme
NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air
More informationTaking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER
Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationPBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationStatus of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)
Status of SESAR Iris Public Event 04/02/2013 Peter Hotham (SESAR JU) Activating Deployment Set up a binding framework at EU level ATM Master plan Guidance Material & Common Projects With which instruments?
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationFlightplan form completion guide.
Help using Flightplan Flightplan form completion guide. General instructions Adhere closely to the prescribed format Report hours in Universal Time Coordinated (UTC). Use the 24-hour clock (e.g. 1800,
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT
Ref. Ares(2013)362601-18/03/2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT Directorate E Aviation and International Transport Affairs E2 Single European Sky Brussels, 8 March 2013
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationAirbus Pegasus FMS for the Airbus A330 and A320 Series. Technical Summary
Airbus Pegasus FMS for the Airbus A330 and A320 Series Technical Summary TABLE OF CONTENTS Overview and System Description Honeywell Pegasus II FM Cardset Computer and LCD MCDU Airbus Pegasus FMS Software
More informationAVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3
AVBUYER March 2015 B U S I N E S S A V I A T I O N I N T E L L I G E N C E THIS MONTH GAMA 2014 Year-End Shipment Analysis Safety Focus: Keeping Pace with Technology Aircraft Comparative Analysis - Bell
More informationOverview of NextGen Institute Project
Overview of NextGen Institute Project Optimizing Aircraft Sequencing and Spacing in the Terminal Area Airspace to Increase Airport Capacity, Reduce Fuel Burn and Emissions, and Reduce Noise on Developed
More informationInitial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg
Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg Feb 5, 2013 Background: Inmarsat Aviation Services With more than 11,000 aircraft relying on global in-flight connectivity from Inmarsat,
More informationThe NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.
Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance
More informationTaking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR
Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Pro Line 21 King Air upgrades Baseline package includes the latest AFD version 10.4 and FMS software
More informationOperator and Airport Enablers. Supplement to NextGen Investment for Operators and Airports, FAA s NextGen Implementation Plan, March 2012
Operator and Airport Enablers Supplement to NextGen Investment for Operators and Airports, FAA s NextGen Implementation Plan, March 2012 NextGen Operator and Airport Enablers These detailed descriptions
More informationPat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)
Pat Reines (pat.reines@honeywell.com)) Avionics Support for GBAS and Performance Based Navigation (PBN) Honeywell.com 26 ILS Approaches = 26 Localizers and Glide Slopes 2 Honeywell.com 26 ILS Approaches
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationATNS. Performance Based Navigation Roadmap SOUTH AFRICA
ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance
More informationRethink Convention. LINEAGE 1000E
Rethink Convention. LINEAGE 1000E 01 WE BRING YOU THE LUXURY OF ROOM TO SPARE. MAKE OF IT WHAT YOU WILL. Our ultra-large Lineage 1000E offers five cabin zones in hundreds of configurations. That s true
More informationERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul
ERASMUS Strategic deconfliction to benefit SESAR Rosa Weber & Fabrice Drogoul Concept presentation ERASMUS: En Route Air Traffic Soft Management Ultimate System TP in Strategic deconfliction Future 4D
More informationDP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011
DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen
More informationPerformance Based Navigation (PBN) Implementation Plan Republic of Mauritius
Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current
More informationOverview of On-Going and Future R&D. 20 January 06 Ray Miraflor, NASA Ames Research Center
Overview of On-Going and Future R&D 20 January 06 Ray Miraflor, NASA Ames Research Center Outline JPDO and NGATS FAA - Aviation Environmental Design Tool NASA Research Airspace Concept Evaluation System
More informationInternational Civil Aviation Organization
International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and
More informationSOUTH AFRICA. Performance Based Navigation (PBN) Roadmap
SOUTH AFRICA Performance Based Navigation (PBN) Roadmap ATS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 21 05 03 2012 ENDORSEMENTS In 2007 at the 36th International Civil Aviation Organization (ICAO)
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More informationNEWLY ENACTED INTENT CHANGES TO ADS-B MASPS: EMPHASIS ON OPERATIONS, COMPATIBILITY, AND INTEGRITY
NEWLY ENACTED INTENT CHANGES TO ADS-B MASPS: EMPHASIS ON OPERATIONS, COMPATIBILITY, AND INTEGRITY Richard Barhydt NASA Langley Research Center Hampton, Virginia Anthony W. Warren Boeing Air Traffic Management
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationLife Cycle Solutions
Life Cycle Solutions Increasing Operational Safety & Efficiency June 17, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes only. These
More informationTrajectory Based Operations
Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation
More informationADS-B - A Boeing Perspective
ADS-B - A Boeing Perspective NAM/CAR/SAM Automatic Dependent Surveillance Broadcast (ADS-B) Implementation Meeting/Workshop (ADS-B/IMP) Lima, Peru 13-16 November 2017 William (Bill) Richards Technical
More informationAERONAUTICAL INFORMATION CIRCULAR 33/17
NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,
DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :
More informationADS-B Seminar. National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi
ADS-B Seminar National Institutes of Aviation Management and Research (NIAMAR) Rangpuri, Maharuli, New Delhi Mike Grove January 28, 2010 Topics ADS-B Aircraft Equipment & Architecture Summary Honeywell
More informationANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION
ANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION F.1 Introduction F.1.1 PBN Mandate covers civil-military coordination The European Commission mandated Eurocontrol to develop a draft
More informationIntentionally left blank
Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11
More informationAir/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December
Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December 2001 - Mike Murphy ATN Systems, Inc. (ATNSI) 703-412 412-2900, 2900, Mike.Murphy@atnsi.com ATNSI, ATN Seminar 1 Presentation
More informationAPPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL
APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'RNP Approach Notes for Completion' before completing the form. Please complete the form in BLOCK
More informationBenefits of CNS/ATM Implementation for the Region
Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries
More informationICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS
ICNS 2014 Workshop Integration of Advanced CNS Capabilities supporting NextGen/SESAR/CARATS Introduction to the Workshop With this year s ICNS, we would like to start a new approach for an even more intense
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationGlobal ATM System ~Interoperability and Harmonization ~
SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationAdvisory Circular. Radius to Fix (RF) Path Terminator
Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationWhat is B-RNAV? 1. 1 Adaptado de [ ]
What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations
More information