Operational Investments Strategy & Implementation. Ehab Azmy Chairman NANSC. //canso

Size: px
Start display at page:

Download "Operational Investments Strategy & Implementation. Ehab Azmy Chairman NANSC. //canso"

Transcription

1

2 Operational Investments Strategy & Implementation Ehab Azmy Chairman NANSC

3 CANSO Middle East Conference Transforming ATM Performance through Innovation and Collaboration 3-5 February 2014 Amman, Jordan Operational Investments NANSC Strategy & Implementation Ehab Mohey Azmy NANSC Chairman Presented by: Cap. Medhat Abd El Azim DG of international cooperation and affairs

4 Operational Investments Strategy & Implementation Contents Introduction The strategy for operational investments in ATM NANSC current and future air navigation plan(asbu alignment)

5 Introduction The corporate strategy formulation begins with a vision what the company wishes to become in the distant future. Then the company s mission is formulated, which includes its purpose, philosophy and goals. Operational Investment, is an investment strategy which aims to generate investment return in the form of increased value by improving operational performance

6 The strategy for operational investments in ATM ASBU Framework Concepts to implement the safety and efficiency strategic objectives Vision ATMOC block upgrades should serve as a Resource Management, planning for Capital Investment, Training As Well As Potential reorganization Strategy Global Plans Tactics Initiatives Global Air Navigation Plan Global Performance Initiatives Global Aviation Safety Plan Global Safety Initiatives Action ASBUs Global and regional work plans as part of the business plan for ICAO led activities

7 The global aviation system block upgrade The global aviation system block upgrade initiative constitutes a worldwide framework for ATM system modernization. Offering a structure based on expected operational benefits, it will facilitate investment and implementation processes, by clarifying the clear relationship between technology and operational improvements.

8 Block 0-10 PBN 1. A review was undertaken on what would be the priority for low hanging fruits for block The following 3 were identified: improved airport accessibility using PBN Improved flexibility and efficiency in descent profiles Continuous descent operations Improved flexibility and efficiency in departure profiles Continuous Climb Operations

9 PBN is a key enabler of single sky; improved airport accessibility using PBN Improved flexibility and efficiency in descent profiles Continuous descent operations Improved flexibility and efficiency in departure profiles Continuous Climb Operations CDO and CCOs reduce fuel burn and noise(continuous Descent Operations Save fuel lbs Up to 40% less noise Reduced radio transmissions Lower pilot workload Reduced hearback / readback errors ) Main enabler to address CFIT and unstabilized approaches Accessibility Main enabler for runway safety more RWYs are accessible (previously not accessible, or by less safe circling, offset or steep angle approaches) RNP Approach RNP Approach allows 3D use

10 SBAS will help to make the skies safer and aircraft routing more efficient, which ultimately saves time, fuel and money Shifting from NPA to PA and introducing IFR like procedures at low cost into the GA community will significantly increase safety B0-65 Optimization of approach procedures including vertical guidance Commercial case to use SBAS, both for pilots, airport operators EGNOS has been certified for aviation in March 2011 where we considered Cairo FIR is the natural extension Euromed GNSS II/MEDUSA project (Global Navigation by Satellite Systems EGNOS / GALILEO) Egypt national workshop, 12 March 2014

11 WHY Euromed region is a natural extension for EGNOS homogeneous extension The extension will Reduces the impact on the Integrity Margin as well as Maximizes the number of monitored GPS

12 expected Operational benefits INCREASED SAFETY Enhanced operational safety due to the vertical guidance provided Reduction of CFIT events Increase situational awareness to the pilot Better precision in low altitude routes (helicopters, obstacles) ENVIRONMENTAL ASPECTS Mitigate impact on noise / environment sensitive areas More flexibility for highly populated areas More efficient routes and time / fuel saving COST SAVINGS Reduced dependence on terrestrial navaids Cost reduction in maintenance of ground infrastructure and conventional navaids Allows for rationalisation of ground navigation infrastructure The availability of off-the-shelf ABAS and SBAS Low cost avionics brings PBN within the economic reach of all aircraft operators.

13 NANSC Surveillance domain Six(6) En-Route Mono Pulse Secondary Radar with detection range of 250 NM, Five (5) of them are validated to operate with selectivity mode (mode S). All the En-Route stations are remote controlled automatically and monitored by more than one level. There are eight (8) approach radars Each station consists of Monopulse secondary radar with detection range 250 NM AND Primary radar with detection range 60 NM. The future strategy are: 1.increasing SSR redundant coverage by connected approach RADARS to the central En-Route RADAR data processor (RDP) with multitasking process. This operation will done after the upgrading of approach radars. 2.Using ADSB system to cover non radar areas at south east (Halayeeb triangle) and south west (Owinat).

14 NANSC Communication domain NANSC is member in NAFISAT network which is communication network carries ATS/DS and AFTN circuits over North Eastern African and Indian Ocean. NANSC hosts one site of NAFISAT network in Cairo which has links with 4 African countries (Eretria Libya Sudan Kenya). NANSC communication is based on two internal VSAT networks,(gsi )as main network and (ALCATEL) as backup network. GSI network contains of 19 VSAT sites and one hub station carries all the services of voice (VHF HL PABX ) and data (RADAR - RCMS AFTN AIS ). Alcatel network contain 6 sites and one hub station carries the traffic of the Enrout Radar and main VHF channel sites during any interference on the main network (GSI) or during the sun outage phenomena NANSC is planning now to replace the old backup network (ALCATEL ) with new network to keep the availability of the communication network The new network will be with different access technique to the satellite and will be on other satellite to avoid the failure of the two network at the same time

15 B0-75 Improved Runway Safety (A-SMGCS) Cairo port surface surveillance NANSC currently implements a modern project Multilateration (MLAT) system which represents upgrade to A-SMGCS system and consists of (32) receiver station, (13) transmitter station, (3) transponders to check the accuracy of the operation and Central target processor(ctp). we use Motorola wireless canopy system to connect most of stations to the (CTP). there is a Remote and control terminal for monitoring and control the system.

16 B0-25(Improve Information Exchange) Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration Supports the coordination of ground-ground data communication between ATSU based on OLDI Successful trials in place between Cairo FIR and Both ATINS and Jeddah FIRs AMHS in place since 2011

17 Aeronautical Information Management B0-30 Service Improvement through Digital Aeronautical Information Management Initial introduction of digital processing and management of information, by the implementation of AIS/AIM making use of AIXM(2013/2014), moving to electronic AIP and better quality and availability of data. NANSC flight procedures office which besides its tasks provide training opportunities for trainees from AFI/MID states.

18

19

20 MIDRAR to MAEP Alan Corner Director, Middle East Helios

21 MIDRAR - a short history MIDRAR was established by CANSO in 2011 to find ways of increasing airspace capacity through regional cooperation. It was a key programme for CANSO Middle East region. The approach: Phase 1: A top down review of the existing situation, the identification of key challenges and the development of a framework and initiatives to meet the challenges ( ) Phase 2: Establish a regional, multi-stakeholder vehicle to implement initiatives by coordinating projects already planned by individual service providers and airspace users and other regional initiatives. A regional programme office. (2012+) Phase 3: Develop a strategic plan to prepare the region for future challenges (2013+)

22 From MIDRAR to MAEP CANSO initially made good progress Phase 1: Report was completed in 2012 Phase 2: Detailed planning started in late 2012; however, despite the involvement from many stakeholders, lack of buy-in meant that it was impossible to tum this support into implementation At the same time. DGCA/2 reviewed several proposed approaches to evolving Middle East airspace and actioned ICAO to establish MAEP to focus efforts In the interests of the region and to ensure ANSPs were represented, CANSO members agreed to provide MIDRAR as a key input and take an active role in the development of MAEP The MAEP SCM is planned for February 2014

23 CANSO s role in MAEP CANSO and its members have extensive global and regional experience and propose to play a key role in the development and implementation of MAEP We will work with ICAO MID and other aviation organisations, service providers and stakeholders to ensure buy-in and a single focus We will offer what we have learnt in MIDRAR and other initiatives as a key input and to avoid reinventing the wheel Like other stakeholders, CANSO in consultation with its members has proposed a potential approach to be discussed and developed further at the MAEP SCM

24 What MAEP might look like MAEP Board: Oversight, strategic advice and direction, reports to the MIDANPIRG Representatives from States, plus IATA, CANSO and ACI etc. MAEP Implementation Team: Developing and coordinating initiatives at a regional level. Exploits and leverages additional benefit from initiatives proposed by stakeholders (e.g. States, ANSPs, airspace users etc.) or that need regional collaboration (e.g. coordination of ASBU roll-out). Representatives from ANSPs, airspace users and other stakeholders Potentially a focal point for industry engagement at a regional level PMO: Comprising secondees from participating stakeholders and by fulltime experts from industry as appropriate.

25 MAEP MAEP has support from the highest level It must deliver tangible benefits to the region It should be a vehicle for the many organisations and other stakeholders to find new ways of working together for the greater good of the region CANSO has a key role to play and is committed to ensuring its success

26

27 Operational Investments Strategy & Implementation Matthew Riley Co-chair, CANSO ASBU Workgroup & General Manager Air Traffic Services Serco Middle East

28

29 Enabling and Leading Transformation Gudrun Held Chair CANSO MEAUSE Workgroup & Head of DFS Office Brussels

30

31 Enabling and Leading Transformation H.E. Mohammad Amin Al Quran Chairman MEC3 CANSO & Chief Commissioner CARC

32 -To comply with ICAO requirements - To enable and empower ANSPs to transform to performance- based organizations

33 NANSC GACA CARC

34 Transforming ATM Business processes into performance based services

35 Political will and Sovereignty; Competition; Regional Unrest ; Legal; Regulatory; and Financial

36 Will politicians support transformation in ATM, Follow Best Practice and learn from others Sovereignty is the same for all countries, the trick is how to manage it!!!

37 By Providing Business Case and Strategy

38 Environment (Org. Structure/Separation, Legalization) Equipment (coping with our National Strategy) People (learning, training, growth, HR systems) Internal Processes and Procedures (Simple, Quality) Economic and Financial (Soundness, competition) Customers

39

40 Started in year 2004 supported by the European Commission. Separate the regulator from the operator. Aim to strengthen the regulator functions. Promote service providers autonomy. Improve Quality of Service.

41 The Civil Aviation Authority Airports Management Regulatory Functions! Air Navigation Services Technical Training

42 The Civil Aviation Regulatory Commission (The Regulator) Air Navigation Services AMA Airport Management King Hussein Airport (Aqaba) QAIA QNTC

43 The Civil Aviation Regulatory Commission (The Regulator) Air Navigation Services Jordan Airports Company King Hussein Airport (Aqaba) QAIA QNTC

44

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD اجلمهوریة اجلزائریة الدمیقراطیة الشعبیة RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE وزارة االشغال العمومیة و النقل MINISTÈRE DES TRAVAUX PUBLICS ET DES TRANSPORTS ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN

More information

ATFM/CDM ICAO s Perspective

ATFM/CDM ICAO s Perspective ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance

More information

MID Region Air Navigation Strategy

MID Region Air Navigation Strategy MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Home LIST OF ACRONYMS

Home LIST OF ACRONYMS LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY 8/9/ International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 7-9 October ) Agenda Item : Performance Framework for MID Region Air Navigation

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July 2018 Saudi Arabia Outline High Level Plan Overall Progress in ASBU Implementation (Priority 1) Success Story(ies)/Initiatives

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

MEAUSE WORKSHOP FORUM

MEAUSE WORKSHOP FORUM MEAUSE WORKSHOP FORUM 3-4 APRIL 2016 CAIRO, EGYPT Organisation Host CANSO MEAUSE Workshop Forum Cairo, Egypt, 3-4 April 2016 Organised by CANSO CANSO the Civil Air Navigation Services Organisation is the

More information

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6 8 December 2016 The United Arab Emirates Presented by Hamad Al Belushi Outline Brief on the UAE National ASBU

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

NAVISAT Middle East & Africa

NAVISAT Middle East & Africa Page 1 NAVISAT Middle East & Africa 12 th March, 2014 Contents Page 2 o Historical Background o NAVISAT services o NAVISAT Navigation Service o SBAS ground segments projects in Africa & Middle East SIRAJ

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

ADS-B via Low Earth Orbiting Satellites Benefits Assessment ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,

More information

Welcome to AVI AFRIQUE 2017

Welcome to AVI AFRIQUE 2017 Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

Technology Transfer and Capability Building in GNSS for Airspace Modernization in Nepal

Technology Transfer and Capability Building in GNSS for Airspace Modernization in Nepal Technology Transfer and Capability Building in GNSS for Airspace Modernization in Nepal United Nations/Nepal Workshop on the Applications of Global Navigation Satellite Systems, 12-16 December 2016, Kathmandu

More information

Enhancing capacity beyond infrastrucutre

Enhancing capacity beyond infrastrucutre Enhancing capacity beyond infrastrucutre Safety The air traffic management (ATM) industry is undergoing major changes, including: New entrants to airspace drones, remote air traffic control towers and

More information

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force Multi Profile Training Areas Col Azmi Al Abaddi Royal Jordanian Air Force Multi Profile Training Area (MPTA) Col. Azmi Royal Jordanian Air Force Introduction RJAF released (4) military training areas for

More information

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

Space Based ADS-B. Transforming the Way you See the Sky February, 2015 Space Based ADS-B Transforming the Way you See the Sky February, 2015 The current ATM reality 2 Significant challenges for airlines High physical infrastructure costs Duplication of signals / contingency

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE NPF/SIP/2010-WP/22 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

Fly at the speed of ingenuity on your Learjet 85

Fly at the speed of ingenuity on your Learjet 85 rockwell collins Pro Line Fusion Avionics Fly at the speed of ingenuity on your Learjet 85 Image courtesy of Bombardier. Experience the most advanced avionics system ever offered on a mid-size jet. Achieve

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR UNTED NATIONS INTERNATIONAL MEETING ON THE APPLICATIONS OF GLOBAL NAVIGATION SATELLITE SYSTEMS Vienna, Austria 12 16 December 2011 GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR Presented by:

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management) SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management) Sub-domain Title of the Start End Aeronautical Communication (COM) (ICAO Facilitator: WACAF/ESAF ROs/CNS Objectives

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/18 IP/9 12/2/2012 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP EIGHTEENTH MEETING (APIRG/18) Kampala, Uganda (27 30 March 2012) Agenda Item 3.4: Communication

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

Block 0 to Block 1 Vaughn Maiolla

Block 0 to Block 1 Vaughn Maiolla Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace

More information

Draft PBN Implementation Plan Papua New Guinea

Draft PBN Implementation Plan Papua New Guinea Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN

More information

(Presented by United States) EXECUTIVE SUMMARY

(Presented by United States) EXECUTIVE SUMMARY NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation

More information

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014

NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014 NANSC VISSION AND MISSION NANSC CNS/ATM Roadmap FUTURE ASBU roadmaps NANSC GNSSbased 3 Future works alignment Services 3/3/4 ICAO Doc975 ICAO Assembly Resolution A37- (), for example, urges all States

More information

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015

... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015 Page 1 Egypt & MEDUSA... 8th Euromed GNSS WG meeting Brussels, 25 November 2015 IBRAHIM EISSA, National Air Navigation Service Company, NANSC GENERAL SATELLITE MANAGER Ibrahim.eissa@nansceg.net NANSC company

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec. 2005 Status of implementation of CNS/ATM Systems in the MID Region Mohamed Smaoui RO/AIS/MAP, ICAO MID Office, Cairo Contents

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information