Flight Operations Inspector Manual
|
|
- Leslie Hensley
- 5 years ago
- Views:
Transcription
1 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and the operator follow-up action for each relevant paragraph in the document(s). 2. Actions Recommended for the inspector and operator a) At the pre-application meeting, the operator and the inspector review the approval process events and establish the form and content of the approval application. b) The operator records s to material in company documents for each relevant paragraph in the job aid. c) The operator submits the completed job aid with the application to the inspector. d) The inspector records his findings for each relevant paragraph in the job aid indicating compliance or necessary corrective action. e) The inspector informs the operator as soon as possible when a corrective action is required. f) The operator provides the inspector with the revised material when so requested. g) The DGCA provides the operator with the operational specifications (OpSpecs) or a letter of authorization (LOA), as applicable, when the tasks and documents have been completed. Part Topic Page 1 General information 2 Aircraft and operator identification 3 Operator application 4 Contents of operator application 5 Basic pilot procedures 6 Contingency procedures 1
2 3. Reference documents Publisher Reference Title ICAO Annex 2 Rules of the Air Annex 6 Doc 4444 Doc 7030 Doc 9613 Operation of Aircraft PANS-ATM Air Traffic Management Regional Supplementary Procedures Manual on Performance Based Navigation FAA AC () US Terminal and En Route Area Navigation (RNAV) 14 CFR Part 121 Sub-part Manual O ti Requirements G EASA AMC Airworthiness and Operational Criteria for RNP APPROACH (RNP APCH) Operations including APV BARO-VNAV Operations. CASA ICAO (SAM) AC 91U-II-C-5 (draft) AS 91U-II- Attachment (draft) AC AC Navigation Authorizations RNP APCH Navigation Authorizations APV BARO-VNAV Aircraft and Operators Approval for RNP Approach (RNP APCH) Operations Aircraft and Operators Approval for Approach Operations with Vertical Guidance/Barometric 2
3 PART 1. GENERAL INFORMATION BASIC EVENTS OF THE APPROVAL PROCESS Action by Operator Action by 1 Establish the need for the authorization 2 Review AFM, AFM Supplement, TC Data Sheet, other appropriate documents (e.g. STCs, SB, SLs) to determine aircraft eligibility if necessary contact aircraft and/or avionics OEM to confirm eligibility. 3 Schedule pre-application meeting with inspector 4 During pre-application meeting establish: Form and contents of application Documents required to support application Target date of application submission Requirement for flight validation 5 Submit application at least 90 days prior to start- up of planned operations 6 Review submission 7 Ensure amendments to manuals, programmes and other relevant documents are complete; provide training to flight crews, flight dispatchers and If required, participate in validation flight maintenance personnel; if required, conduct validation flight 8 Once requirements have been met, issue operational approval 3
4 PART 2. IDENTIFICATION OF AIRCRAFT AND OPERATORS Name of Operator: Aircraft Manufacturer, Model and Series Registration Number Serial Number Navigation Systems Manufacturer, Model and Number RNP Specification Date of pre-application meeting: Dare when application received by DGCA: Date when operator intend to begin RNP APCH operations: DGCA notification date appropriate? Yes No 4
5 PART 3. OPERATOR APPLICATION Annex Title Inclusion by Operator Comments by A Request for authorization B Aircraft eligibility - Airworthiness AFM, AFM Revision, AFM supplement, TCDS showing aircraft RNAV systems are eligible. C Aircraft eligibility- Modifications (if applicable) Maintenance records documenting installation or modification of aircraft systems to achieve eligibility D Maintenance Navigation database maintenance practices. E Minimum equipment list F Training GA* operators or equivalent: Course completion records. G CAT **operators or equivalent: Training programmes for flight crew, flight dispatchers and maintenance personnel. Operating policies and procedures GA operators or equivalent: Extracts from Operations Manual corresponding to application CAT operators or equivalent: Operations Manual and Checklists. *General Aviation 5
6 **Commercial Air Transport CONTENTS OF THE APPLICATION TO BE SUBMITTED BY THE OPERATOR Compliance documentation of the aircraft/navigation systems Operating procedures and policies Sections of the maintenance manual related to RNP system Note. Documents may be grouped in a single binder or may be submitted as individual document PART 4. CONTENTS OF OPERATOR APPLICATION # Topic Specific ICAO Doc Authorization request Statement of intent to obtain authorization 2 Aircraft/navigation system eligibility Documents that establish the eligibility. 3 Training Details of courses completed (GA Operators) Details of training programmes (CAT Operators) 4 Operating Policies and Procedures Extracts from Operations Manual or other documentation (GA operators) (ICAO Doc 9613, Vol. II Part C, Chap. 5, & & DGCA guidance (OC 11 of 2014) 10.1 b) 1) 10.1 b) 2) b) 6) 7) & b) 4) & 8) 10.6 & 10.7 Operator compliance description (Document / method) disposition/ comments (Accepted/no t accepted) Follow-up by (Optional) (Status and date) 6
7 Operations Manual and checklists (CAT operators) 5 Maintenance Practices Document navigation database maintenance practices & b) 9) 6 MEL update b) 10) 7
8 # Topic 1 Flight planning 1a Verify that the aircraft and crew are approved for RNP APCH operations to LNAV or LNAV/VNAV minima. 1b Verify RAIM availability 1c Verify that the navigation database is current. 1d Verify the FPL: R should appear in field 10 and PBN/S1 in field Prior to commencing procedure 2a Verify correct procedure loaded 2b Cross-check chart with RNAV system display 2c Verify GNSS sensor in use (only multisensor systems) 2d Input Baro altimeter setting (only ABAS requiring Baro input) 2e Perform a RAIM availability check if ETA is more than 15 minutes different from the FPL ETA (only for ABAS). PART 5. OPERATING PROCEDURES Specific ICAO Doc 9613 (ICAO Doc 9613, Vol. II, Part C, Chap. 5) DGCA guidance (OC 11 of 2014) & & a) a) Operator complianc e description (Document / method) disposition/ comments (Accepted/n ot accepted) Followup by (Optional) (Status and date) 8
9 2f 2g Do not modify the flight plan in the RNAV system after ATC heading assignment until a clearance is received to re-join the route or a new clearance is confirmed. Direct to clearances accepted up to IF, provided that the resulting track change at the IF does not exceed 45 degrees. Do NOT modify final approach segment # Topic Specific ICAO Doc During procedure 3a Establish on final approach course before starting descent 3b Verify approach mode activated 2Nm prior to FAF 3c Use appropriate display 3d Discontinue approach if: Nav display flag invalid Loss of integrity alert Loss of integrity alerting function prior to the FAF FTE excessive (ICAO Doc 9613, Vol. II, Part C, Chap. 5) DGCA guidance (OC 11 of 2014) Operator compliance disposition/ description comments (Document / method) (Accepted/n ot accepted) Follow-up by (Optional) (Status and date) 9
10 3e Do not use RNP system in missed approach if: RNP system not operational; or Missed approach not loaded from database 3f Follow route centreline within 0.5/0.15/0.5NM. 3g If Baro VNAV used, follow vertical path ±75ft 3h Execute missed approach if lateral or vertical deviations exceed limits in 3f) and 3g) above. 4 General operating procedures 4a Advise ATC if unable to meet the requirements for an RNP APCH. 4b Comply with manufacturer s instructions/procedur es # 4c Topic If the missed approach is based on conventional means, appropriate navigation equipment must be installed and serviceable. Specific ICAO Doc 9613 (ICAO Doc 9613, Vol. II, Part C, Chap. 5) DGCA guidance (OC 11 of 2014) Operator compliance description (Document / method) disposition/ comments (Accepted/n ot accepted) Follow-up by (Optional) (Status and date) 10
11 4d Use FD or AP if available PART 6. CONTINGENCY PROCEDURES # Topic Specific ICAO Doc Contingencies 1a Advise ATC if unable RNP APCH 1b Air-Ground Comms Failure (ICAO Doc 9613, Vol. II, Part C, Chap. 5) DGCA guidance (OC 11 of 2014) A A (Doc 4444 Chapter ) Operator compliance descriptio n (Document / method) disposition/ comments (Accepted/no t accepted) Follow-up by inspector (Optional) (Status and date) 11
RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS
RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide
More informationOFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'O',
More informationRNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS
RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationPBN Operational Approval The Process. ICAO PBN Operational Approval Course
PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based
More informationFAA RNP 10 JOB AID With FAA Order B References (20 May 2010)
OPERATOR APPLICATION TO CONDUCT RNP 10 OPERATIONS IN DESIGNATED OCEANIC CONTROL AREAS (CTAs) Introduction. This RNP 10 Job Aid was developed by the FAA Hq Flight Technologies & Procedures Division (AFS-400)
More informationAnnex to Decision 2016/015/R
Annex to Decision 2016/015/R AMC and GM to Part-CAT Issue 2, Amendment 6 The Annex to Decision 2014/015/R is hereby amended as follows: The text of the amendment is arranged to show deleted, new or amended
More informationSubject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization
OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
More informationSubject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 11 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations
More informationSubject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 6 OF 2014 Date: 4 TH SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationFlight Safety Division Case Nr. Page 1 of 11
FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL
More informationEASA RNP (AR) Workshop The Landscape Working Together
EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches
More informationAPPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL
APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'RNP Approach Notes for Completion' before completing the form. Please complete the form in BLOCK
More informationPBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationSubject: Aircraft and Operators Approval For Approach Operations With Vertical Guidance/Barometric Vertical Navigation (APV/baro- VNAV)
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 12 OF 2014 Date: 28 th June 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For Approach Operations
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N 8700.26 10/10/03 Cancellation Date: 10/10/04 SUBJ: AUTHORIZATION OF AIRCRAFT AND OPERATORS FOR FLIGHT IN REDUCED VERTICAL SEPARATION
More informationAdvisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.
Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework
More informationTitle: PBN Operations and Licensing Requirements - Declaration for AOC Holders
Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More informationAMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300
Application for PBN operations approval Completion of form: Application: Each relevant box should be completed with a tick ( ) or a (X). Items marked with an asterisk (*) to be completed only for first
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationNATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance
NATA Aircraft Maintenance & System Technology Committee Best Practices Reduced Vertical Separation Minimum (RVSM) Airspace reduces the vertical separation above flight level (FL) 290 from 2000-ft minimum
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationApplication Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:
Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)
CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced
More informationADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS
AC 91-008 SRVSOP ADVISORY CIRCULAR AC : 91-008 DATE : 12/10/09 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS 1. PURPOSE This advisory circular
More informationGuidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)
Guidance material DATE : 01/11/13 REVISION : 1 ISSUED BY : EUR PBN TF SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) 1. PURPOSE This guidance material
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation
DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z
More informationADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV MINIMA
AC 91-008 SRVSOP ADVISORY CIRCULAR AC : 91-008 DATE : 18/05/12 REVISION : 2 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV
More informationNavigation 101 Chapter 3 RNP-10
853d Electronic Systems Group Navigation 101 Chapter 3 RNP-10 853 ELSG/NT Electronic Systems Center Hanscom AFB, MA 20 Mar 07 ESC 07-0399 Briefing Overview RNP-10 Fundamentals Avionics Systems Qualifications
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 8 AIRCRAFT OPERATIONS SERIES 'S', PART III ISSUE
More informationRegulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.
Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy NOTICE N 8000.360 Effective Date: 4/4/2007 Cancellation Date: 4/4/2008 SUBJ: Operations Specification C052 Basic Instrument
More informationOPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication
More informationAPPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL
SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'P-RNAV Notes for Completion' before completing the form. Please
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,
DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in
More informationPerformance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA
Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information
More informationSubject: Aircraft and Operators approval for RNP Authorisation Required Approach (RNP AR APCH) Operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 13 OF 2014 Date: 04 th SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Authorisation
More informationADVISORY CIRCULAR. 2. RELATED SECTIONS OF THE LATIN AMERICAN AERONAUTICAL REGULATIONS (LARs) OR EQUIVALENT
AC 91-010 SRVSOP ADVISORY CIRCULAR AC : 91-010 DATE : 12/10/09 REVIEW : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR APPROACH OPERATIONS WITH VERTICAL GUIDANCE/BAROMETRIC VERTICAL
More informationAircraft and Operators approval for RNP 2 operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 14 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP 2 operations 1. PURPOSE This
More informationPERFORMANCE-BASED NAVIGATION (PBN) OPERATIONAL APPROVAL MANUAL
Doc 9997 AN/498 PERFORMANCE-BASED NAVIGATION (PBN) OPERATIONAL APPROVAL MANUAL NOTICE TO USERS This document is an unedited advance version of an ICAO publication as approved, in principle, by the Secretary
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationGeneral Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08
General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications Version 1.0 8/8/08 Glossary of Terms Advisory Circular (AC) AC 90 series provide operational
More informationAPPLICATION FOR SPECIAL OPERATIONAL APPROVALS
A. DETAILS OF AIRCRAFT: 1. Registration Mark: P4-2. A/C Mfr.: 3. Model: 4. Serial No.: B. DETAILS OF APPLICANT: 1. Operator: 2. Name Coordinator/Administrator (1): 3. Tel.: 4. E-mail: 5. Name Coordinator/Administrator
More informationAdvisory Circular. Radius to Fix (RF) Path Terminator
Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationAdvisory Circular. Required Navigation Performance Approach (RNP APCH)
Advisory Circular Subject: Required Navigation Performance Approach (RNP APCH) Issuing Office: Standards Document No.: AC 700-023 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7550326-V23
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In
More informationSECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS
ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA:AC-OPS052 SECURITY OVERSIGHT AGENCY June 2017 1.0 PURPOSE ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS This Order provides guidance to the
More informationGeneral Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/
Application for steep approach approval Completion of form: Each relevant box should be completed with a tick ( ) or a (X). Form must be completed by referring to a document of applicant's documentation
More informationCHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION
June 2017 Page 1 of 7 CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION 1. Purpose and Scope CAR Section 8 Series S Part IV requires the operator to seek DGCA approval
More informationPBN Operational Approval Overview
PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based
More informationUnderstanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations
Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations White Paper Doc No.: WHTP-2013-16-10 May 2018 Safely guiding pilots and their passengers worldwide for over 35 years
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS
AC 91-006 SRVSOP ADVISORY CIRCULAR CA : 91-006 DATE : 09/09/13 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS 1. PURPOSE This advisory circular (AC) establishes
More informationEffective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationP-RNAV GENERAL INFO NOTICE. 1. Background
GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationStandards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY
216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to
More informationPerformance Based Communication and Surveillance
Performance Based Communication and Surveillance Data Link Operational Authorization Process Presented to:
More informationAMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations
AMC 20 26 Effective: 23/12/2009 Annex II to ED Decision 2009/019/R of 16/12/2009 AMC 20 26 Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations This AMC provides
More informationIntentionally left blank
Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationAERONAUTICAL INFORMATION CIRCULAR 33/17
NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationSUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT
ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International
More informationThe NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.
Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance
More informationCivil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace
Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information
More informationREPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY
REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY TEL: +378 (0549) 882929 FAX: +378 (0549) 882928 EMAIL: dennis.michelotti@caa-mna.sm APPLICATION FOR THE ISSUE OF A CERTIFICATE OF AIRWORTHINESS 1. GENERAL
More informationAdvisory Circular. Automatic Dependent Surveillance - Broadcast
Advisory Circular Subject: Automatic Dependent Surveillance - Broadcast Issuing Office: Standards PAA Sub Activity Area: Aviation Safety Regulatory Framework Document No.: AC 700-009 File Classification
More informationINSTRUCTIONS FOR COMPLETING THE FIELD APPROVAL CHECKLIST. AC A APPENDIX A, dated 08/17/2016
INSTRUCTIONS FOR COMPLETING THE FIELD APPROVAL CHECKLIST AC 43-210A APPENDIX A, dated 08/17/2016 When requesting a field approval, you may use the fillable Field Approval Checklist, to provide the requested
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 2 OPERATIONS
AC 91-005 SRVSOP ADVISORY CIRCULAR CA : 91-005 DATE : 16/09/13 REVISION : Original ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 2 OPERATIONS 1. PURPOSE This advisory circular (AC)
More informationSignature: Signature:
Application for ETOPS approval Applicants Statement The undersigned certifies the following information to be correct and true and that aeroplane system installation, continuing airworthiness of systems,
More informationGENERAL INFO NOTICE 1. BACKGROUND
GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationAn advisory circular may also include technical information that is relevant to the standards or requirements.
Advisory Circular AC91-21 RNAV 1, RNAV 2, RNP 1, RNP 2, RNP APCH and BARO VNAV Operational Approvals Revision 0.3 5 September 2016 General Civil Aviation Authority advisory circulars contain guidance and
More informationAIRWORTHINESS ADVISORY CIRCULAR
AAC No. 1 of 2017 Dated 28 th February 2017 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION AIRWORTHINESS ADVISORY CIRCULAR Subject: Procedure for approval of Modification
More informationNOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.
Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationEDTO SARPS FROM ANNEX 6 PART 1
EDTO SARPS FROM ANNE 6 PART 1 4.7.1 Requirements for operations beyond 60 minutes to an en route alternate aerodrome STATE (SRVSOP) IMPLEMENTATION YES Regulation ref. no. NO LAR 121.2581 4.7.1.1 Operators
More informationAny queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:
Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationTCAA-AC-AWS021B. March 2014 ACCEPTANCE OF FOREIGN AIRWORTHINESS CODE FOR TYPE CERTIFICATE AND DATA SHEET 1.0 PURPOSE
Advisory Circular TCAA-AC-AWS021B March 2014 ACCEPTANCE OF FOREIGN AIRWORTHINESS CODE FOR TYPE CERTIFICATE AND DATA SHEET 1.0 PURPOSE 1.1 This Advisory Circular (AC) provides guidance and procedures for
More informationGENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3
IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO
More informationInsert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows:
Insert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows: 2.2.1.5 The air operator certificate shall contain at least the following information
More informationTechnical Standard Order
Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS
More informationAny queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:
Serial Number: 2018_001 Subject: Implementation of Performance Based Separation Minima Originator: NAT SPG Issued: 06 February 2018 Effective: 29 March 2018 The purpose of this North Atlantic Operations
More information