CONTROLLED AIRSPACE CONTAINMENT POLICY
|
|
- Eugenia Bradley
- 5 years ago
- Views:
Transcription
1 Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon References A- F. However, to assist UK airspace designers in determining the level of protection required for traffic flying within UK Controlled Airspace (CAS) against traffic flying outside CAS, guidance from a number of previous DAP internal documents has now been consolidated and included in this SARG Policy Statement (PS). This PS supplements a number of ICAO, Eurocontrol 1 and CAA publications covering requirements for design and dimensions of CAS for ATS routes, Control Zones (CTRs), Terminal Control Areas (TMAs), Control Areas (CTAs), and requirements for containment of SIDs, STARs and Missed Approaches (MAPs) established within CAS. Policy for Holding Patterns will be published separately. 1.2 This PS is not applicable to Instrument Flight Procedures where they are established for aerodromes outside CAS where such procedures may be established following the normal SARG regulatory approval process and associated Safety Case requirements. 1.3 The volume of controlled airspace shall be the minimum practicable necessary for the effective protection of the ATC operation as defined by an ATS provider and to support a safe service, subject to any identified overriding environmental requirements and the need to avoid over complication of airspace structures. 1.4 This PS assumes that the requirements for obstacle clearance have been met in accordance with PANS OPS design criteria. 2 Scope and Applicability 2.1 Scope. This document outlines guidance for containment policy for traffic using ATS Routes, SIDs and STARs (including RNAV Transitions to Final Approach 2 and Point Merge procedures) within CAS and for CTR, CTA and TMA structures. 2.2 Applicability. This PS is primarily designed to provide guidance for new procedures and airspace designs submitted to the CAA for approval. It is not intended to apply these requirements retrospectively to existing procedures. However, ANSPs are expected to frequently review the design and application of their procedures to ensure that they satisfy changing safety, operational and environmental conditions and requirements. Should changing circumstances warrant changes in procedures, any such amendments to airspace / procedure designs shall be made in accordance with the requirements of CAP 724, CAP 725, CAP 778 and CAP 785 (see reference material). 1 See References A-G for ICAO and Eurocontrol reference material. 2 See explanation of terms at page 4. Civil Aviation Authority CAA House Kingsway London WC2B 6TE Telephone Fax dave.raine@.caa.co.uk
2 3. Control Zones and Control Areas 3.1 Where established, CAS in the vicinity of aerodromes shall be designed to provide sufficient airspace protection for aircraft established on, or joining, the final approach track (procedurally, or under radar direction), and the integration of aircraft in a radar traffic pattern or carrying out departures (including SIDs where established), or a missed approach. Dimensions for a CTR should be appropriate to meet the requirements of IFPs at the relative aerodrome with relevant distances being measured from the Aerodrome Reference Point; however, another point of reference may be used in order to satisfy local design requirements. 3.2 The lateral dimensions of Terminal CTAs associated with CTRs (as opposed to en-route CTAs) are to be sufficient to permit the effective integration of flights to and from any adjoining route structure where appropriate or the containment of published terminal, holding and instrument approach procedures where necessary. Containment of such procedures should in the first instance be predicated upon primary obstacle clearance areas used in the design. Where competing airspace requirements preclude containment by primary area, containment of the nominal track defined by the procedure may be less than that afforded by the primary area but shall normally not be less than 3NMs from the edge of CAS. In exceptional circumstances, proposals for procedures resulting in less than 3NMs may be acceptable, but such proposals must be completely justified and supported by a safety case. 3.3 ICAO Annex 11 (Air Traffic Services) states that the lower limit of a CTA shall not be less than 700 feet agl. However, wherever practicable, the lower limit of a CTA adjoining a CTR should be no lower than 1500 ft agl in order to permit VFR flights under the CTA to comply with Rules of the Air Regulations 2007 Rule 5. The use of an expanded CTR to permit higher CTA base levels is preferable. 4. Terminal Control Areas 4.1 The complexity of the route structure and interface procedures (particularly interaction with en-route services), together with associated ATC operations, will determine the extent of a TMA. Base levels should be set at the highest practicable levels to contain integrated instrument approach and departure profiles yet simultaneously permit the effective availability of airspace below the base of controlled airspace for the use by transit traffic. Notwithstanding this, the base of a TMA should not be less than 2000 ft agl. 5. SIDs Departing from Aerodromes Within Controlled Airspace. 5.1 As outlined in Reference N, current UK Policy 3 is that a SID provides a specified Instrument Flight Rules (IFR) departure procedure that should remain wholly within Controlled Airspace (CAS) and permits connectivity with the en-route Air Traffic Service (ATS) route system, however, see exception at paragraph 5.2 Note 2. The International Civil Aviation Organisation (ICAO) uses the term SID and Standard Departure Route (SDR) to identify IFR departure procedures in general Note 1: Certain UK aerodromes use the terms Standard Departure Route (SDR), Preferred Departure Route (PDR) or Planned Departure Route (also PDR) to define IFR departure procedures that are not obstacle-cleared and either leave or remain outside CAS 3 CAP 778 Policy for the Design and Operation of Departure Procedures in UK Airspace, Foreword paragraph 2. 4 See ICAO Annex 11 Air Traffic Services and ICAO Doc 8168 PANS-OPS Procedures for Air Navigation Services Aircraft Operations. Continued (2 of 5 pages)
3 and have no direct connectivity to the en-route ATS system. However, misinterpretation of these terms, inconsistency in their application and potentially a lack of awareness of their not being obstacle-cleared has led to confusion or misunderstandings as to the purpose and status of such procedures. In order to remove such confusion the CAA intends to remove all references of each term. Instead, the use of Omnidirectional Departures as defined by ICAO is intended to become the norm. CAA Policy for Omnidirectional Departures in the UK dated 5 September 2012, facilitates the use of obstacle-cleared instrument departure procedures at aerodromes outside CAS should such aerodromes require them. Note 2: In light of emerging developments regarding the withdrawal of the VOR/NDB infrastructure, in order to provide defined tracks to enable de-confliction of known traffic at aerodromes outside CAS, or to meet specific environmental requirements, in exceptional circumstances, and subject to an acceptable proposal supported by a safety case, to justify why SIDs without CAS are deemed to be appropriate, the establishment of SIDs outside CAS is now being considered by the CAA on a case by case basis. Details will be included in the CAP 778 with the next amendment. 5.3 Vertical Containment. All SIDs established within CAS must be vertically contained within CAS. 5 Where it is necessary to contain a procedure above stepped CAS bases, levels shall be specified which ensure that the flight profile remains at least 500 ft above the base of CAS. In addition, the upper limit of a SID shall be at least 500 ft below the upper limit of CAS. 5.4 Lateral Containment. Lateral containment of SIDs established within CAS, should in the first instance, be based upon the size and shape of the primary area determined for obstacle clearance and applicable to the procedure design RNAV 1 SIDs. 6 For RNAV SIDs established within CAS, the nominal track should not be less than 3 NMs from the lateral limits of CAS. This is based upon the Required Navigation Performance (RNP) standard of +/- 1NM for 95% of the flight time 7. It also acknowledges that normal radar vectoring limitations require controllers to ensure aircraft remain not less than 2NM from the edge of CAS Conventional SIDs. Where it is not possible to introduce RNAV 1 designs due to operating fleet capabilities or other constraints, the nominal track for SIDs established within CAS should in normal circumstances not be less than 5NMs from the limits of CAS 9. Exceptionally, and when this criterion cannot be met, sponsors of conventional SIDs may present alternative proposals with appropriate mitigation supported by a safety case for CAA approval. In such cases, the nominal track must not be less than 3NM from the lateral limits of CAS. 6 STARs and ATS Routes 6.1 STARs and ATS Routes should be contained within CAS, however, see exception at Note 1. For the purposes of this policy statement, STARs are deemed to incorporate RNAV Transitions to Final Approach (see explanation on page 4) and Point Merge procedures. 5 CAP 778 Chapter 3 paragraphs RNAV 1 has previously been referred to as P-RNAV. 7 Note: This value is based on the principle that RNAV 1 route navigation performance standard is based on a Total System Error (TSE) for navigational tolerances being + or - 1NM either side of the nominal track for 95% of the total flight time. 8 MATS Part 1 Section 1 Chapter 5 paragraph Note: This value is based on the principle that RNAV 5 route navigation performance standard is based on a Total System Error (TSE) for navigational tolerances being + or - 5NM either side of the nominal track for 95% of the total flight time Continued (3 of 5 pages)
4 Note 1: In light of emerging developments regarding the withdrawal of the VOR/NDB infrastructure, in order to provide defined tracks to enable de-confliction of known traffic at aerodromes outside CAS, or to meet specific environmental requirements, in exceptional circumstances, and subject to an acceptable proposal supported by a safety case to justify why STARs without CAS are deemed to be appropriate, the establishment of STARs outside CAS is now being considered by the CAA on a case by case basis. Details will be published in due course. 6.2 RNAV 5 / Conventional STARs and ATS Route Lateral Containment. Specified nominal tracks designed to RNAV 5 and conventional navigational criterion, shall be not less than 5 NM from the limits of CAS(see Footnote 10) except within such notified airways where the boundary is less than 5 NM from the centreline and a safety case supports the safe operation of such a route. 6.3 RNAV 1 STARs and ATS Route Lateral Containment. Specified nominal tracks designed to RNAV 1 (RNP 1) standard should not be less than 3 NM from the limits of controlled/advisory airspace (see paragraph and Footnote 8) unless new RNAV 1 procedures are established within existing airways where, under previous arrangements, the boundary is less than 3 NM from the centreline and a safety case supports the safe operation of such a route. This circumstance should be the exception rather than a rule as all new procedures should be designed to meet new policy requirements. 6.4 STARs and ATS Route Vertical Containment. Where it is necessary to contain a procedure above stepped CAS bases, levels shall be specified which ensure that the flight profile remains at least 500 ft above the base of CAS. In addition, the upper limit of a STAR/ATS route shall be at least 500 ft below the upper limit of CAS. 7 SIDs and STAR Procedures Outside Controlled Airspace 7.1 Notes at paragraphs 5.2 and 6.1 alluded to exceptions where SIDs and STARs may be permitted outside CAS. Issues to be considered prior to the implementation of these procedures outside CAS are outwith this PS. Details will therefore be published in a separate PS pending incorporation into appropriate CAPs. References: A B C D E F ICAO Annex 2 - Rules of the Air. ICAO Annex 11 - Air Traffic Services. ICAO Doc 4444 PANS-ATM. ICAO Doc 8168 PANS-OPS. ICAO Doc 9426 ATS Planning Manual. DAP Policy Statement The Application of ICAO Airspace Classifications in UK Flight Information Regions (22 August 2013). G DAP Policy for Omnidirectional Departures in the UK (5 September 2012). H Rules of the Air Rule 5. I CAP 493 Manual of Air Traffic Services Part 1. J K L M N Guidance to the Civil Aviation Authority on Environmental Objectives Relating to the Exercise of its Air Navigation Functions CAP 724 The Airspace Charter Annexes F-H. DAP MS Process DAP1 Airspace Change Process. CAP 725 Airspace Change Process Guidance Document. CAP 778 Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace O CAP 785 Continued (4 of 5 pages)
5 Explanation of Terms - RNAV Transition to Final Approach This is the UK terminology to describe the RNAV initial approach segment from an RNAV Hold Fix to the Final Approach Fix which includes both lateral and vertical guidance (the actual airspace design terminology is known as an Approach Transition). Continued (5 of 5 pages)
4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationSafety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.
Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationFASI(N) IoM/Antrim Systemisation Airspace Change Decision
Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationCAA AIRSPACE CHANGE DECISION
Safety and Airspace Regulation Group All NATMAC Representatives 14 April 2016 CAA AIRSPACE CHANGE DECISION RECLASSIFICATION OF THE BELFAST TERMINAL CONTROL AREA AIRSPACE Organisation proposing the change:
More informationPolicy and Guidance for the Design and Operation of Departure Procedures in UK Airspace
Directorate of Airspace Policy CAP 778 Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace www.caa.co.uk Directorate of Airspace Policy CAP 778 Policy and Guidance
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationSummary of Public Submissions Received on
Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled
More informationCAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL
Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late
More informationCAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL
Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationEASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments
EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation
More informationSAFETY AND AIRSPACE REGULATION GROUP
SAFETY AND AIRSPACE REGULATION GROUP ACTIVITY No 2015-00-0088 2 January 2015 See Distribution ALL TIMES UTC INTRODUCTION AIRSPACE CO-ORDINATION NOTICE FARNBOROUGH RWY 24 ILS CALIBRATION 1. SARG has agreed
More informationRegulations & Obligations
Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:
More informationProposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures
Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationDoncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B
Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationATC PROCEDURES WORKING GROUP. Transition Level
SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen
Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).
More informationNATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)
Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a
More informationOverview ICAO Standards and Recommended Practices for Aerodrome Safeguarding
Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationNDS Subject to NOTAM: No
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationATM 4 Airspace & Procedure Design
ATM 4 Airspace & Procedure Design 1. Introduction 1.1. The proper planning and design of routes, holding patterns, airspace structure and ATC sectorisation in both terminal and en-route airspace can be
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationApplication for amendment to Tauranga control zone and control areas Consultation
Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...
More informationGENERAL AVIATION ALLIANCE Partnership in Aviation
President: Air Chief Marshal Sir John Allison KCB, CBE, FRAeS RAF(rtd) Vice President: The Lord Rotherwick Chacksfield House, 31 St Andrew's Road, Leicester, LE2 8RE Email: facilitator@gaalliance.org.uk
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationDraft airspace design guidance consultation
Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy
More informationCAT E Subject to NOTAM: No
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationInternational Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN
International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationIt is essential that planning take full account of air safety and efficiency of operations.
Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural
More informationAMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION
AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained
More informationManual of Radiotelephony
Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationREPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES
Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09
More informationSERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.
SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE Correct to 1 May 2015. This document is for guidance only and is subject to change. Implementing Regulation (EU) 923/2012, supporting Acceptable
More informationMINIMUM FLIGHT ALTITUDES
MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationSAFETY AND AIRSPACE REGULATION GROUP
SAFETY AND AIRSPACE REGULATION GROUP ACTIVITY No 2014-00-0105 13 January 2014 See Distribution INTRODUCTION AIRSPACE CO-ORDINATION NOTICE LONDON CITY ILS RWYs 09 AND 27 FLIGHT CHECKS 1. SARG has agreed
More informationPBN and Procedure Design training
PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training
More informationGOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case
More informationIRELAND SAFETY REGULATION DIVISION
NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353
More informationElectronic Terrain and Obstacle Data
International Civil Aviation Organization Electronic Terrain and Obstacle Data David Lewtas Chief, Aeronautical Information Unit (MET/AIM) 24 November 2010 ICAO CAR AIM Seminar Kingston, Jamaica 22-24
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationPart 1, Amendment 49. Definitions and Abbreviations. Docket 14/CAR/3
Docket 14/CAR/3 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 3 Insertion of Amendments... 4 Effective date of rule... 4 Availability
More informationCAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL
Safety & Airspace Regulation Group Airspace, Air Traffic Management and Aerodrome Division Edinburgh Airport Limited Scotland EH12 9DN 29 October 2018 CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationContents. Subpart A General 91.1 Purpose... 7
Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91
More informationQuality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E
Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation
More informationCAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.
CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended
More informationOfficial Journal of the European Union L 186/27
7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationINTERNATIONAL FIRE TRAINING CENTRE
INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationAPV Implementation in the UK Initiative
APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»
More informationA Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association
A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association Contents Part Subject Page Introduction: Title Page and Signatures 2 PART ONE: Definitions of the Airspace
More informationAERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW / EDINBURGH AREA CAT Z
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0216 V1 01 June 2016 Date. AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW /
More informationInternational Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY
BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More informationPart 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace
Part 77 CAA Consolidation 1 April 2014 Objects and Activities Affecting Navigable Airspace Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 77 prescribes rules for persons proposing
More informationTransition Altitude (TA) Consultation Commonly Asked Questions & Answers
Transition Altitude (TA) Consultation Commonly Asked Questions & Answers Why am I being consulted? Why does the current system have to change? Why do you need to raise the TA? A harmonised Transition Altitude
More informationDirectorate of Airspace Policy
Directorate of Airspace Policy All NATMAC Representatives 17 February 2012 CAA DECISION LETTER RECLASSIFICATION OF THE GLASGOW CONTROL AREA (CTA) 1 INTRODUCTION 1.1 The Glasgow CTA was formed on 28 September
More informationGestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationLondon Southend Airport Airspace Change Proposal. Annex E to Part B of the Consultation Document Runway 05 Departures via CLN
London Southend Airport Airspace Change Proposal Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation - 2016 Annex E to Part B of
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationAERODROME LICENCE APPLICATION PROCESS
0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)
INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) Durban, South Africa, 4-5 June 2018 Agenda Item 4: System
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationCIVIL AVIATION REGULATIONS SURINAME PART 18 - AIR TRAFFIC SERVICES VERSION 5.0
CIVIL AVIATION REGULATIONS SURINAME PART 18 - AIR TRAFFIC SERVICES VERSION 5.0 January 2018 Part 18 - Air Traffic Services AMENDMENTS Location Date Amended by Description Part 18 - Air Traffic Services
More informationAdvisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.
Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationUK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB
AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-04-0110 V2.0 05 May 2016 22 April 2016 UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationRMT.0464 ATS Requirements The NPA
RMT.0464 ATS Requirements The NPA Fabio GRASSO EASA ATM/ANS Regulations Officer IFISA - FISO Seminar #7 08.09.2016 TE.GEN.00409-001 ATM/ANS CRs Regulation 2016/1377 Main objectives are to: implement Essential
More informationQueenstown control zone amendments User consultation
Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Proposed changes... 1 NZT252 Ridge Peak... 1 NZG755 Coronet Peak... 2 3. Consultation... 3 4. Submissions... 4 5. Further information...
More information